Contractor dossier
86 projects on file, including joint ventures this contractor is part of.
Total projects
86
Total budget
₱4.4B
Average progress
99.2%
Completion rate
90.7%
Average risk score
53.8
Medium risk on average, out of 100
Flagged as unusual
2
2.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 86 | ₱4.4B | 53.8 | 2 | 99.2% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 55 | ₱2.4B | 51.9 | 0 | 99.9% |
| Flood Control and Drainage | 19 | ₱1.4B | 55.5 | 0 | 97.1% |
| OTHER | 4 | ₱326.4M | 80.2 | 2 | 100.0% |
| Buildings and Facilities | 4 | ₱187.9M | 46.4 | 0 | 100.0% |
| Bridges | 3 | ₱128.9M | 51.2 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱19M | 56.2 | 0 | 87.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PB0002002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF KARAGAWAN RIVER FLOOD CONTROL, STA. 81+404 - STA. 82+456 (L/S), KARAGAWAN, K | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.6M | 100% | High risk84 | Flagged0.016 |
| 24PB0011ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF APAYAO RIVER FLOOD CONTROL | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.6M | 100% | High risk83 | Flagged0.016 |
| 21PC0060CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES SAN SEBASTIAN - SAN JOSE - SAN FRANCISCO ROAD IN SUPPORT OF HANDICRAFT, FURNITURE, PROCESSED HIGH VALUE CROPS, VEGETABLE RICE AND CORN INDUSTRIES, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱47.7M | 100% | High risk79 | —-0.015 |
| 19PF0028CONSTRUCTION OF MISSING LINKS/NEW ROADS, BAGUIO-LA TRINIDAD-ITOGON-SABLAN-TUBA-TUBLAY (BLISTT), LABEY-LACAMEN PROVINCIAL ROAD | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱91.5M | 100% | High risk75 | —-0.016 |
| 24PC0006OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAGUTONG SEC,STA. 30+315-STA.30+831 (R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱134.4M | 100% | High risk67 | —-0.008 |
| 24PC0005OO2:PROTECT LIVES AND PROP AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROG-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE, BAGUTONG SEC,STA.29+205-STA.29+760(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱142.9M | 100% | High risk67 | —-0.037 |
| 24PC0013OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG- CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCT, SAN MARIANO SECTION, STA.23+808-STA.24+384(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱143.9M | 98% | High risk66 | —-0.002 |
| 24PC0015OO2:PROTECT LIVES & PROP AGAINST MAJOR FLOODS-FLOOD MNGT PROG-CONS/ REHAB OF FLOOD MITIGATION FACI W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CTRL STRUCTURE,BAROCBOC-SAN MARIANO SEC,STA.22+002-STA.22+578(R/S) | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱143.9M | 100% | High risk65 | —-0.037 |
| 24P00037CONSTRUCTION OF DALIMUNO, BANTAY FLOOD CONTROL ALONG CHICO RIVER (STA. 100+023 - STA. 100+430), BANTAY, TABUK CITY, KALINGA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱96.5M | 47% | High risk63 | —-0.012 |
| 23PC0029OO 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG-CONS./REHAB./ OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS. OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC,CAPANNIKIAN SEC,STA 34+440-STA 34+995 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.051 |
| 23PC0032OO 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROG.-CONS/REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONS OF APAYAO-ABULUG RIVER BASIN FLOOD CONTROL STRUC,SAN SEBASTIAN SEC,STA 28+085-STA 28+635 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.051 |
| 21P00023LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/ FACILITIES - CONSTRUCTION/ REHABILITATION OF MULTI-PURPOSE BUILDING (BENGUET SPORTS COMPLEX AND FACILITIES) AT BARANGAY WANGAL, LA TRINIDAD, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱163.4M | 100% | High risk61 | —-0.051 |
| 24PC0019ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - AYAGA-STA. MARCELA-FLORA-LASAM RD - K0679 + 000 - K0680 + 500 | Cordillera Administrative Region | Apayao 2nd DEO | On-Going | ₱94.5M | 96% | High risk60 | —-0.034 |
| 23PC0038CSSP-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL SRUCTURE ALONG APAYAO RIVER BASIN, TANGLAGAN SECTION, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.050 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24PB0002002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF KARAGAWAN RIVER FLOOD CONTROL, STA. 81+404 - STA. 82+456 (L/S), KARAGAWAN, K | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.6M | 100% | High risk84 | Flagged0.016 |
| 24PB0011ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF APAYAO RIVER FLOOD CONTROL | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱93.6M | 100% | High risk83 | Flagged0.016 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 19PC0054NETWORK DEVELOPMENT: PAVING OF UNPAVED ROADS-TERTIARY ROADS CLAVERIA-CALANASAN-KABUGAO ROAD STA. K0716+277-K0718+027, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱77.8M | 100% | Medium risk56 | —-0.070 |
| 27 | 21PB0002NETWORK DEVELOPMENT- PAVING OF UNPAVED ROADS-TERTIARY ROADS, APAYAO-ILOCOS NORTE RD (S00622LZ), K0634+(-308) - K0635+406 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱66.2M | 100% | Medium risk56 | —-0.075 |
| 28 | 21PC0051LOCAL ROADS AND BRIDGES-LOCAL ROADS-LOCAL INFRASTRUCTURE PROGRAM-CONCRETING OF ROAD, SISIRITAN MATAGUISI, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.9M | 100% | Medium risk56 | —-0.077 |
| 29 | 22PB0002ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, APAYAO-ILOCOS NORTE ROAD K0621+290-K0621+390 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱74.9M | 100% | Medium risk55 | —-0.073 |
| 30 | 23PC0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS - APAYAO - ILOCOS NORTE ROAD - K0636+000 - K0636+730 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱34.7M | 100% | Medium risk55 | —-0.073 |
| 31 | 20PB0021NETWORK DEVELOPMENT -PAVING OF UNPAVED ROADS, TERTIARY ROADS, APAYAO-ILOCOS NORTE RD, K0643+176- K0643+676 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱21.9M | 100% | Medium risk55 | —-0.080 |
| 32 | 23PB0013NETWORK DEVELOPMENT PROGRAM - PAVING OF UNPAVED ROADS - TERTIARY ROADS, APAYAO-CAGAYAN ROAD (ILI-GUINAMGAMMAN-RIZAL ROAD) - (S00694LZ) CHAINAGE 0 - CHAINAGE 3027 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱72.4M | 100% | Medium risk55 | —-0.075 |
| 33 | 21PC0026NETWORK DEVELOPMENT PROGRAM-PAVING OF UNPAVED ROADS-TERTIARY ROADS-AYAGA-STA. MARCELA-FLORA-LASAM ROAD-K0697+057-K0697+457, FLORA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.8M | 100% | Medium risk55 | —-0.077 |
| 34 | 21PC0030CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS LYDIA-LALANGGAN ROAD LEADING TO PUDTOL TOURISM SITES, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.8M | 100% | Medium risk55 | —-0.077 |
| 35 | 21PC0059ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPES COLLAPSE, AND LANDSLIDES-TERTIARY ROADS CLAVERIA-CALANASAN-KABUGAO ROAD K0668+200-K0668+415 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱93.6M | 100% | Medium risk55 | —-0.067 |
| 36 | 22PC0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES-TERTIARY ROADS CLAVERIA-CALANASAN-KABUGAO ROAD-K0672+193-K0672+300 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱94.8M | 100% | Medium risk55 | —-0.067 |
| 37 | 21PC0044BUILDINGS AND OTHER STRUCTURES-MULTI-PURPOSE/FACILITIES-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION OF MULTI-PURPOSE BUILDING (ASSOCIATION OF BARANGAY CAPTAINS) CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱5M | 100% | Medium risk54 | —-0.074 |
| 38 | 22PC0022NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS ADAMS (ILOCOS NORTE)-CALANASAN (APAYAO) ROAD, BUCAROT BRIDGE, APAYAO-CONSTRUCTION OF STEEL BRIDGE | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱56.4M | 100% | Medium risk54 | —-0.035 |
| 39 | 21PC0031CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, DAGUPAN-SALVACION ROAD IN SUPPORT OF HANDICRAFTS, FURNITURE, PINEAPPLE, BANANA,VEGETABLES, RICE AND CORN INDUSTRIES, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.4M | 100% | Medium risk54 | —-0.076 |
| 40 | 23PC0030ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - TERTIARY ROADS-CLAVERIA-CALANASAN-KABUGAO ROAD- K0700+712 - K0700+765 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱43.5M | 100% | Medium risk54 | —-0.077 |
| 41 | 21PC0015CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES PANAY-BATO, SABEL ROAD IN SUPPORT OF CASSAVA, CORN, RICE, MANDARIN, TOURISM, HANDICRAFT, FURNITURE, FRUIT WINES AND COCONUT, STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.4M | 100% | Medium risk53 | —-0.076 |
| 42 | 23PC0008CSSP-CONS./IMP. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY & TRAD INFRA. PROG.-ROLL-IT)- DOÑA LORETA-LYDIA RD. IN SUPPORT OF FURNITURE, HANDICRAFT, LOOMWEAVING, BLACKSMITHING, PINEAPPLE, BANANA | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.9M | 100% | Medium risk53 | —-0.078 |
| 43 | 21PC0036LOCAL ROADS AND BRIDGES-LOCAL ROADS-LOCAL INFRASTRUCTURE PROGRAM-CONSTRUCTION/IMPROVEMENT OF BUTAO-PULOT ROAD, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.8M | 100% | Medium risk53 | —-0.077 |
| 44 | 23PC0024ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES - TERTIARY ROADS -CLAVERIA-CALANASAN-KABUGAO ROAD- K0662+905 - K0663+000 | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱93.3M | 100% | Medium risk53 | —-0.069 |
| 45 | 21PC0024CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS SAN CARLOS-NUEVA-MARCELA ROAD LEADING TO BACUT LAKE, STA. MARCELA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.4M | 100% | Medium risk53 | —-0.076 |
| 46 | 21PC0040CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-TUROD BAYUGAO ROAD LEADING TO BAYUGAO WATERFALLS, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.4M | 100% | Medium risk53 | —-0.075 |
| 47 | 21PC0048NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-PENRO APAYAO (BUROT)-SAN ISIDRO-QUIRINO ROAD, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱9.8M | 100% | Medium risk53 | —-0.075 |
| 48 | 23PC0058CSSP-CONSTRUCTION/IMPR. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) SAN SEBASTIAN-SAN JOSE-SAN FRANCISCO ROAD IN SUPPORT OF HANDICRAFT, FURNITURE, PROCESSED HIGH VALUE CROPS, VEGETABLE RICE AND CORN INDUSTRIES, LUNA, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.9M | 100% | Medium risk53 | —-0.075 |
| 49 | 20PC0020CONSTRUCTION OF SABANGAN FLOOD CONTROL STRUCTURE ALONG APAYAO RIVER, POBLACION, CALANASAN, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱29M | 100% | Medium risk53 | —-0.061 |
| 50 | 23PC0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURIMS ROAD INFRASTRUCTURE PROGRAM - TRIP) - LYDIA-LALANGGAN ROAD LEADING TO PUDTOL TOURISM SITES, PUDTOL, APAYAO | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱4.8M | 100% | Medium risk52 | —-0.076 |