Contractor dossier
49 projects on file, including joint ventures this contractor is part of.
Total projects
49
Total budget
₱9.7B
Average progress
94.8%
Completion rate
79.6%
Average risk score
55.8
Medium risk on average, out of 100
Flagged as unusual
7
14.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 28 | ₱2B | 46.1 | 0 | 100.0% |
| Central Office | 13 | ₱6.9B | 74.4 | 5 | 97.0% |
| National Capital Region | 4 | ₱549.9M | 63.8 | 2 | 46.5% |
| Region IV-A | 2 | ₱142.3M | 55.0 | 0 | 99.2% |
| Region IV-B | 2 | ₱136.3M | 54.4 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 27 | ₱6.6B | 59.2 | 3 | 99.1% |
| Roads | 10 | ₱844.7M | 46.0 | 0 | 95.1% |
| Bridges | 5 | ₱542M | 47.7 | 1 | 96.9% |
| Buildings and Facilities | 3 | ₱396.2M | 57.0 | 1 | 66.1% |
| OTHER | 2 | ₱959.3M | 71.0 | 2 | 67.8% |
| Bridges, Roads | 2 | ₱342.2M | 61.8 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19Z00008CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYAN | Central Office | Flood Control Management Cluster | On-Going | ₱945.5M | 100% | High risk78 | Flagged0.023 |
| 17Z00019PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 6 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 17+450 TO STA. 18+130, LEFT AND RIGHT BANKS, MARIKINA CITY | Central Office | Flood Control Management Cluster | Completed | ₱689.3M | 100% | High risk77 | —-0.001 |
| 19Z00034PILOT CHANNELING AT LAGUNA LAKE FROM NAPINDAN RIVER TO MANGGAHAN FLOODWAY CHANNEL - PHASE I | Central Office | Flood Control Management Cluster | Completed | ₱271M | 100% | High risk77 | —-0.039 |
| 18A00116CONSTRUCTION/REHABILITATION OF BOLO RIVER DAM, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTE | Central Office | Flood Control Management Cluster | On-Going | ₱366.6M | 100% | High risk76 | Flagged0.024 |
| 19Z00036CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTE | Central Office | Flood Control Management Cluster | On-Going | ₱533.8M | 94% | High risk76 | Flagged0.027 |
| 18Z00030METRO MANILA FLOOD MANAGEMENT PROJECT, PHASE I, REHABILITATION WORKS FOR BALUT PUMPING STATION | Central Office | Flood Control Management Cluster | Completed | ₱390.9M | 100% | High risk76 | —-0.026 |
| 17Z00005REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Central Office | Flood Control Management Cluster | Completed | ₱862M | 100% | High risk76 | —-0.004 |
| 17C00054CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF PAMPANGA RIVER BASIN, BARANGAY STA. CRUZ, SAN SIMON, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱144.6M | 100% | High risk76 | —-0.057 |
| 18C00051CONSTRUCTION OF FLOOD CONTROL WORKS ALONG SAPANG BAYU AND SAPANG MARAGUL, LUBAO AND STA. RITA, PAMPANGA | Central Office | Flood Control Management Cluster | Completed | ₱94M | 100% | High risk75 | —-0.052 |
| 17Z00004REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Central Office | Flood Control Management Cluster | Completed | ₱862.9M | 100% | High risk73 | Flagged0.017 |
| 19Z00040CONTRACT PACKAGE 2A, BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM I, DESIGN AND BUILD BRIDGES IN LUZON (REGION III - NUEVA ECIJA, AURORA, PAMPANGA, ZAMBALES AND BATAAN) | Central Office | Bridges Management Cluster | On-Going | ₱222.8M | 85% | High risk73 | Flagged0.025 |
| 17CH0090CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM - CONSTRUCTION/IMPROVEMENT | Region III | Pampanga 2nd DEO | Completed | ₱46.8M | 100% | High risk69 | —-0.061 |
| 24O00160CONSTRUCTION OF MULTI-PURPOSE BUILDING,EAST AVENUE MEDICAL CENTER, EAST AVENUE, DILIMAN, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱96.5M | 36% | High risk69 | Flagged0.015 |
| 23Z00026CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) ANDDRAINAGE SYSTEMS ALONG THE FOLLOWING RIVERS;A.) CADCADIR RIVER, BRGY. BACSAY CATARAOAN SUR, CLAVERIA, CAGAYANB.) CADCADIR RIVER, BRGYS. UNION AND CADCADIR, CLAVERIA, CAGAYANC.) CABICUNGAN RI | Central Office | Flood Control Management Cluster | On-Going | ₱1.4B | 100% | High risk68 | —-0.025 |
| 17CH0035CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE | Region III | Pampanga 2nd DEO | Completed | ₱28M | 100% | High risk68 | —-0.061 |
| 17CH0019CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/IMPROVEM | Region III | Pampanga 2nd DEO | Completed | ₱41.9M | 100% | High risk67 | —-0.061 |
| 17CH0005CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SLOPE | Region III | Pampanga 2nd DEO | Completed | ₱39.7M | 100% | High risk67 | —-0.061 |
| 17CH0001CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION OF SLOPE | Region III | Pampanga 2nd DEO | Completed | ₱44.5M | 100% | High risk67 | —-0.060 |
| 17CH0033CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD | Region III | Pampanga 2nd DEO | Completed | ₱27.3M | 100% | High risk67 | —-0.061 |
| 17E00008CONCRETING OF ARMY ROAD (BAGUBAG-SORVILLE-GOZAR-BINAKAS) LEADING TO PAF GOZAR RADAR STATION IN MT. AMBULONG, BRGY. SORVILLE, STA. 2+745.80-STA.5+587.20; STA.6+242-STA.6+364, LUBANGISLAND, OCCIDENTAL MINDORO | Region IV-B | Mindoro Occidental DEO | Completed | ₱91.9M | 100% | High risk67 | —-0.030 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19Z00036CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTE | Central Office | Flood Control Management Cluster | On-Going | ₱533.8M | 94% | High risk76 | Flagged0.027 |
| 19Z00040CONTRACT PACKAGE 2A, BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM I, DESIGN AND BUILD BRIDGES IN LUZON (REGION III - NUEVA ECIJA, AURORA, PAMPANGA, ZAMBALES AND BATAAN) | Central Office | Bridges Management Cluster | On-Going | ₱222.8M | 85% | High risk73 | Flagged0.025 |
| 18A00116CONSTRUCTION/REHABILITATION OF BOLO RIVER DAM, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTE | Central Office | Flood Control Management Cluster | On-Going | ₱366.6M | 100% | High risk76 | Flagged0.024 |
| 19Z00008CONSTRUCTION OF BANK PROTECTION WORKS ALONG CAGAYAN RIVER AT IGUIG, CAGAYAN AND AGGUNETAN, LASAM, CAGAYAN | Central Office | Flood Control Management Cluster | On-Going | ₱945.5M | 100% | High risk78 | Flagged0.023 |
| 17Z00004REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Central Office | Flood Control Management Cluster | Completed | ₱862.9M | 100% | High risk73 | Flagged0.017 |
| 24O00160CONSTRUCTION OF MULTI-PURPOSE BUILDING,EAST AVENUE MEDICAL CENTER, EAST AVENUE, DILIMAN, QUEZON CITY | National Capital Region | National Capital Region | On-Going | ₱96.5M | 36% | High risk69 | Flagged0.015 |
| 20O00076DESIGN AND BUILD PROJECT FOR THE REPAIR/RENOVATION OF LANDBANK 1 BUILDING AT BUENDIA, GIL PUYAT, MAKATI CITY | National Capital Region | National Capital Region | Completed | ₱289.4M | 100% | High risk64 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 18C00035CONSTRUCTION AND MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, ALMACEN RIVER IMPROVEMENT PROJECT, HERMOSA AND ORANI, BATAAN, PROVINCE OF BATAAN | Region III | Region III | Completed | ₱136.3M | 100% | Medium risk59 | —-0.037 |
| 27 | 21C00060NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION), PACKAGE 6, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱211.7M | 100% | Medium risk58 | —-0.052 |
| 28 | 20C00024NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION), PACKAGE 4, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱144.7M | 100% | Medium risk54 | —-0.041 |
| 29 | 19C00014NETWORK DEVELOPMENT PROGRAMS-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION) PAMPANGA 2ND LEGISLATIVE DISTRICT, PAMPANGA | Region III | Region III | Completed | ₱192.7M | 100% | Medium risk54 | —-0.058 |
| 30 | 18C00031BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES, BAMBAN-CENTENNIAL BRIDGE (BO0102LZ) ALONG MANILA NORTH ROAD (PHASE III), MABALACAT, PAMPANGA | Region III | Region III | Completed | ₱111M | 100% | Medium risk52 | —-0.037 |
| 31 | 18C00086LOCAL PROGRAMS-LOCAL ROADS AND BRIDGES-LOCAL ROADS, CONSTRUCTION/IMRPOVEMENT/UPGRADING OF LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD, (PHASE 6), PAMPANGA | Region III | Region III | Completed | ₱133.6M | 100% | Medium risk52 | —-0.081 |
| 32 | 23C00082NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION), PACKAGE 9, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱101.6M | 100% | Medium risk51 | —-0.088 |
| 33 | 19CH0016ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY-JOSE ABAD SANTOS AVENUE (JASA) K0082+800-K0083+350, K0083+991-K0084+395, K0085+022-K0085+193, K0086+732-K0086+932, K0087+197-K0087+353, K0088-580-K0088+626, K0089+78 | Region III | Pampanga 2nd DEO | Completed | ₱96.4M | 100% | Medium risk51 | —-0.090 |
| 34 | 18CH0023FLOOD CONTROL & DRAINAGE-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS OF SLOPE PROTECTION ALONG GUMAIN RIVER, PANDAGUIDIG, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱92.3M | 100% | Medium risk50 | —-0.079 |
| 35 | 24D00264CONSTRUCTION OF NEW SUPER HEALTH CENTERS / RHU CUENCA, SUPER HEALTH CENTER, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱11.8M | 98% | Medium risk44 | —-0.022 |
| 36 | 19ED0148REPAIR/REHABILITATION OF ABATON FLOOD CONTROL STA. 0+000 - 0+107.48 (UPSTREAM) AND STA. 0+010 - 0+240 (DOWNSTREAM), CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱44.4M | 100% | Medium risk42 | —-0.024 |
| 37 | 22C00081NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS-LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (LUBAO-GUAGUA SECTION) PACKAGE 6, PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱86.8M | 100% | Medium risk40 | —-0.085 |
| 38 | 22CH0083CONSTRUCTION OF SLOPE PROTECTION AND CANAL STRUCTURE OF PORAC-GUMAIN RIS, GUAGUA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱77.2M | 100% | Medium risk35 | —-0.085 |
| 39 | 20CI0064NETWORK DEVELOPMENT-ROAD WIDENING-PRIMARY ROADS,MANILA NORTH ROAD, KO087+701-KO088+340, KO088+860-KO089+200, KO089+854-KO090+104, KO090+118-KO090+470, MABALACAT CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱33.7M | 100% | Medium risk33 | —-0.103 |
| 40 | 22CH0040CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/REHABILILTATION OF SLOPE PROTECTION ALONG PORAC RIVER, POBLACION SECTION, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱48.8M | 100% | Medium risk33 | —-0.090 |
| 41 | 20CI0006CONVERGENCE SPECIAL SUPPORT PROGRAM;CONST/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES,CAMACHILES-SAPANG BIABAS-BICAL ROAD,MABALACAT CITY,PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱34.3M | 100% | Medium risk32 | —-0.102 |
| 42 | 19CH0010CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF GUMI FLOOD CONTROL, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱48.9M | 100% | Medium risk32 | —-0.090 |
| 43 | 18CI0009FLOOD MANAGEMENT PROGRAM:CONST/MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM; CONST OF REINFORCED CONCRETE SLOPE PROTECTION W/ STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, BRGY SAPALIBUTAD, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱48.3M | 100% | Medium risk32 | —-0.091 |
| 44 | 21C00032BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES, BAMBAN-CENTENNIAL BRIDGE (BOO102LZ) ALONG MANILA NORTH ROAD (PHASE IV), PROVINCE OF PAMPANGA | Region III | Region III | Completed | ₱40.2M | 100% | Medium risk30 | —-0.061 |
| 45 | 23CH0087CONSTRUCTION OF SLOPE PROTECTION ALONG PALCARANGAN CREEK, STA. CRUZ, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱19.6M | 100% | Low risk30 | —-0.091 |
| 46 | 18CH0054CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - REHABILITATION/IMPROVEMENT OF DIKE WITH SLOPE PROTECTION ALONG PORAC RIVER, STA. RITA, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱44M | 100% | Low risk30 | —-0.090 |
| 47 | 18CI0087CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRA INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL BRIDGES; CONST OF BRIDGE WITH SLOPE PROTECTION AT BRGY STA MARIA, MABALACAT, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱23.3M | 100% | Low risk29 | —-0.066 |
| 48 | 23CI0035FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENENCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; CONST OF REINFORCED CONCRETE SLOPE PROTECTION WITH STEEL SHEET PILES FOUNDATION ALONG ABACAN RIVER, BRGY CAPAYA, ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱38.1M | 100% | Low risk29 | —-0.091 |
| 49 | 18CH0139CONCRETING OF PUROK 2, CALZADANG BAYU FMR, BRGY. CALZADANG BAYU, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱4.7M | 100% | Low risk21 | —-0.042 |