Contractor dossier
81 projects on file, including joint ventures this contractor is part of.
Total projects
81
Total budget
₱2.2B
Average progress
82.5%
Completion rate
67.9%
Below 70%
Average risk score
44.9
Medium risk on average, out of 100
Flagged as unusual
6
7.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 79 | ₱2.2B | 45.1 | 6 | 84.6% |
| Region III | 2 | ₱45.1M | 36.2 | 0 | 2.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 48 | ₱1.4B | 46.9 | 2 | 86.4% |
| Buildings and Facilities | 20 | ₱499.7M | 39.0 | 3 | 74.0% |
| Flood Control and Drainage | 7 | ₱206.4M | 42.7 | 0 | 86.4% |
| Water Provision and Storage | 3 | ₱13.6M | 39.7 | 1 | 66.7% |
| Bridges | 2 | ₱62.8M | 48.0 | 0 | 87.8% |
| GAA 2025 OO-2 | 1 | ₱47.5M | 91.1 | 0 | 77.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DQ0030CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CARMONA RIVER (UPSTREAM) AT BARANGAY LANTIC, CARMONA, CAVITE | Region IV-A | Cavite 3rd DEO | On-Going | ₱47.5M | 77% | High risk91 | —-0.027 |
| 25DF0014ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE & RELIABLE NAT'L RD SYSTEM ASSET PRESERVATION PROG REHAB/ RECONST/ UPGRADING OF DAMAGED PAVED RDS - SECONDARY RDS CAVITE-BATANGAS RD - K0025 + 000 - K0025 + 195, K0025 + 220 - K0025 + 715, K0025 + 780 - K0026 + 162 | Region IV-A | Cavite 1st DEO | On-Going | ₱50.4M | 29% | High risk70 | —-0.027 |
| 24DE0255CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL ROA | Region IV-A | Batangas 2nd DEO | On-Going | ₱95.5M | 0% | High risk65 | Flagged0.025 |
| 24DE0254CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL RO | Region IV-A | Batangas 2nd DEO | On-Going | ₱95.5M | 0% | High risk65 | Flagged0.024 |
| 23D00153CONSTRUCTION OF MULTI - PURPOSE BUILDING (CITY HALL), LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱198M | 26% | High risk65 | Flagged0.002 |
| 24DE0109ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL AT BRGY. SIMLONG, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 25DE0158CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, MALIMATOC I - MALIMAT | Region IV-A | Batangas 2nd DEO | On-Going | ₱112.3M | 3% | High risk60 | —-0.032 |
| 23DE0109CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD SLOPE PROTECTION STRUC | Region IV-A | Batangas 2nd DEO | Completed | ₱111M | 100% | High risk60 | —-0.093 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DE0255CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL ROA | Region IV-A | Batangas 2nd DEO | On-Going | ₱95.5M | 0% | High risk65 | Flagged0.025 |
| 24DE0254CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL RO | Region IV-A | Batangas 2nd DEO | On-Going | ₱95.5M | 0% | High risk65 | Flagged0.024 |
| 24DE0192CY 2024 BASIC EDUCATIONAL FACILITIES FUND, CONSTRUCTION OF 4STY20CL, BAUAN TECHNICAL INTEGRATED HIGH SCHOOL, BAUAN, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱57.8M | 38% | Medium risk54 | Flagged0.015 |
| 24DE0248CLUSTER - CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY ALALUM, SAN PASCUAL, BATANGAS (PHASE | Region IV-A | Batangas 2nd DEO | On-Going | ₱3.8M | 0% | Low risk22 | Flagged0.013 |
| 23D00153CONSTRUCTION OF MULTI - PURPOSE BUILDING (CITY HALL), LIPA CITY, BATANGAS | Region IV-A | Region IV-A | On-Going | ₱198M | 26% | High risk65 | Flagged0.002 |
| 24DE0115CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS, WATER SUPPLY SYSTEM, CONSTRUCTION OF WATER SUPPLY SYSTEM, SAN TEODORO, MABINI, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱6.9M | 0% | Medium risk48 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24DD0144CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD AT BARANGAY ANILAO, | Region IV-A | Batangas 4th DEO | On-Going | ₱38M | 100% | Medium risk47 | —-0.069 |
| 27 | 24DE0055ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, PALICO-BALAYAN-BATANGAS RD - K0149+855 - K0149+1147 | Region IV-A | Batangas 2nd DEO | On-Going | ₱32.4M | 61% | Medium risk47 | —-0.051 |
| 28 | 25DE0141ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE-TERTIARY ROAD, BATANGAS CADRE RD K0106+(-374) - K0106+233 | Region IV-A | Batangas 2nd DEO | On-Going | ₱28.5M | 42% | Medium risk47 | —-0.060 |
| 29 | 23DE0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD LEADING TO EVACUATION CENTER WITH DRAINAGE CANAL | Region IV-A | Batangas 2nd DEO | Completed | ₱29.7M | 100% | Medium risk47 | —-0.100 |
| 30 | 24DE0203ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROADS, BATANGAS PORT DIVERSION RD - K0102+355 - K0102+770 | Region IV-A | Batangas 2nd DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.105 |
| 31 | 22DE0089CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF BALAGTAS-NATUNUAN-CUENCA | Region IV-A | Batangas 2nd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.107 |
| 32 | 22DE0030ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, BATANGAS PORT DIVERSION RD - K0103+046 - K0103+731 | Region IV-A | Batangas 2nd DEO | Completed | ₱34.8M | 100% | Medium risk47 | —-0.107 |
| 33 | 24DE0085CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONCRETING OF BARANGAY ROAD, TALUMPOK SILAN | Region IV-A | Batangas 2nd DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.107 |
| 34 | 22DE0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF BANABA SOUTH-BANABA WEST | Region IV-A | Batangas 2nd DEO | Completed | ₱29.4M | 100% | Medium risk47 | —-0.108 |
| 35 | 23DE0096CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD AT SITIO CUEVA, BRGY. TALUMPOK KANLURAN, BATANGA | Region IV-A | Batangas 2nd DEO | Completed | ₱29.7M | 100% | Medium risk47 | —-0.108 |
| 36 | 25DE0038ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE-TERTIARY ROAD, BAUAN-MABINI RD - K0150+777 - K0151+159 | Region IV-A | Batangas 2nd DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.104 |
| 37 | 23DE0007OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF FLOOD CONTROL STRUCTURE AT BARANGAY BOLBOK, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱41.8M | 100% | Medium risk47 | —-0.087 |
| 38 | 24DE0073ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAN ROQUE TO SAN ANDRES, BAUAN, | Region IV-A | Batangas 2nd DEO | Completed | ₱19.3M | 100% | Medium risk47 | —-0.089 |
| 39 | 25DD0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF SAN JOSE - IBAAN SECTION, SAN JOSE, IBAAN, BATANGA | Region IV-A | Batangas 4th DEO | On-Going | ₱24M | 74% | Medium risk47 | —-0.070 |
| 40 | 25DD0135CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF SAN JOSE - IBAAN ROAD, (PHAS | Region IV-A | Batangas 4th DEO | On-Going | ₱23.8M | 78% | Medium risk47 | —-0.071 |
| 41 | 23DE0005OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, BOLBOC ACCESS ROAD - (S01938LZ) CHAINAGE 000 - CHAINAGE 630 | Region IV-A | Batangas 2nd DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.108 |
| 42 | 23DE0027OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS, BOLBOC ACCESS ROAD - (S01939LZ) CHAINAGE 000 - CHAINAGE 630 | Region IV-A | Batangas 2nd DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.108 |
| 43 | 20DE0096LOCAL INFRASTRUCTURE PROGRAM REHABILITATION/IMPROVEMENT OF CONDE LABAC- STO. DOMINGO RD., BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱19.8M | 100% | Medium risk47 | —-0.109 |
| 44 | 21DE0081LOCAL INFRASTRUCTURE PROGRAM CONCRETING OF ROAD, BARANGAY TALUMPOK SILANGAN, BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱14.9M | 100% | Medium risk47 | —-0.109 |
| 45 | 25DE0165ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF DRAINAGE STRUCTURE (OUTFALL), BARANGAY PULONG BALIBAGUH | Region IV-A | Batangas 2nd DEO | On-Going | ₱28.5M | 5% | Medium risk46 | —-0.023 |
| 46 | 22DD0138CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY ANILAO LABAC, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.106 |
| 47 | 24DE0098CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF ROAD AT BARANGAY BANABA WEST, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.103 |
| 48 | 24DE0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF ROAD AT BARANGAY BANABA SOUTH, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.106 |
| 49 | 20DE0095LOCAL INFRASTRUCTURE PROGRAM CONSTRUCTION/REHABILITATION OF ROAD, BRGY. TALUMPOK SILANGAN, BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.109 |
| 50 | 21DE0034LOCAL INFRASTRUCTURE PROGRAM CONCRETING OF ROAD, BARANGAY TALUMPOK KANLURAN, BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.109 |