Contractor dossier
50 projects on file, including joint ventures this contractor is part of.
Total projects
50
Total budget
₱3.5B
Average progress
94.8%
Completion rate
76.0%
Average risk score
58.8
Medium risk on average, out of 100
Flagged as unusual
2
4.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VI | 27 | ₱1.3B | 51.2 | 0 | 99.4% |
| Region IX | 20 | ₱1.9B | 69.1 | 2 | 87.9% |
| Region VIII | 3 | ₱311.8M | 59.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 24 | ₱1.9B | 61.4 | 1 | 95.4% |
| Roads | 17 | ₱1.3B | 57.3 | 1 | 93.0% |
| Bridges | 3 | ₱84.5M | 53.8 | 0 | 100.0% |
| Buildings and Facilities | 3 | ₱57.4M | 45.7 | 0 | 100.0% |
| Bridges, Roads | 2 | ₱132.6M | 60.2 | 0 | 84.8% |
| OTHER | 1 | ₱71.1M | 74.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17J00039CONSTRUCTION OF LABASON RIVER CONTROL, POBLACION LABASON ZAMBOANGA DEL NORTE 3RD LD, RIGHT SIDE: BEG. OF PROJECT 0 + 000.00 END OF PROJECT 0 + 884.40 (572.88), EXCEPTION: 0 + 441.32 - 0 + 752.84, LEFT SIDE: BEG. OF PROJECT 0 + 540.00 END OF PROJECT 0 + 87 | Region IX | Region IX | Completed | ₱94.3M | 100% | High risk75 | —-0.038 |
| 18GA0104CONST. OF TANGALAN BYPASS ROAD, INCL. ROW AND BRIDGE, TANGALAN, AKLAN | Region VI | Aklan DEO | Completed | ₱71.1M | 100% | High risk75 | —-0.022 |
| 24JA0167CONSTRUCTION OF GUIWAN-TUGBUNGAN-DIVISORIA BY-PASS ROAD PACKAGE 1, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱96.4M | 0% | High risk75 | Flagged0.038 |
| 24JA0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TUMAGA SECTION), ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱130.9M | 90% | High risk75 | —-0.011 |
| 24J00037CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER, SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 4 | Region IX | Region IX | On-Going | ₱138.7M | 90% | High risk75 | —-0.012 |
| 20J00157CONSTRUCTION OF BY- PASS AND DIVERSION ROADS - ZAMBOANGA CITY BY-PASS ROAD,(WEST COAST SECTION), ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱141.8M | 100% | High risk75 | —-0.052 |
| 21J00028CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/ EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱121.5M | 90% | High risk74 | Flagged0.004 |
| 25J00012CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KIPIT RIVER AT KIPIT BR. 2 SECTION (B01183MN) ALONG LILOY-SIOCON RD (S01146MN) (UPSTREAM - LEFT SIDE | Region IX | Region IX | On-Going | ₱145M | 42% | High risk74 | —-0.006 |
| 22J00015CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱94.9M | 85% | High risk74 | —-0.003 |
| 23J00028CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/ EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱105.1M | 100% | High risk74 | —-0.018 |
| 20J00030CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - EXTENSION OF FLOOD CONTROL STRUCTURE, ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE | Region IX | Region IX | Completed | ₱99.2M | 100% | High risk74 | —-0.058 |
| 18J00044CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE | Region IX | Region IX | Completed | ₱101.2M | 100% | High risk74 | —-0.061 |
| 21J00026CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF LABASON FLOOD CONTROL AT ANTONINO, LABASON, ZAMBOANGA DEL NORTE (UPSTREAM) PACKAGE 1 | Region IX | Region IX | On-Going | ₱99M | 94% | High risk73 | —-0.002 |
| 20J00029CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF LABASON FLOOD CONTROL AT ANTONINO, LABASON, ZAMBOANGA DEL NORTE | Region IX | Region IX | Completed | ₱114.6M | 100% | High risk73 | —-0.059 |
| 22J00074NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS & DIVERSION ROADS - ZAMBOANGA CITY BY-PASS ROAD, WIDENING OF TULUNGATUNG BRIDGE INCLUDING APPROACHES, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱98.8M | 70% | High risk72 | —-0.002 |
| 17J00008ROAD UPGRADING (GRAVEL TO PAVED) OF ZAMBOANGA WEST COASTAL ROAD (LIMPAPA-SIBUCO SECTION), ZAMBOANGA DEL NORTE, 2ND DEO, K 1996 + 500.00 - K 1998 + 270.00, L = 1,770.00 LN.M. K 2002 + 855.00 - K 2003 + 415.00, L = 560.00 LN.M. CHAINAGE 0 - CHAINAGE 940.00 | Region IX | Region IX | Completed | ₱129.3M | 100% | High risk67 | —-0.036 |
| 23JJ0044CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG SIOCON-SIRAWAI RD (S01147MN), K2088+875 - K2089+043, K2093+095 - K2093+155 | Region IX | Zamboanga del Norte 4th DEO | Completed | ₱61.8M | 100% | High risk64 | —-0.019 |
| 19J00020CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CHANNELIZATION OF PUTIK RIVER WITH MAJOR TRAINING WORKS, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱58M | 100% | High risk62 | —-0.066 |
| 17I00035ASSET PRESERVATION OF NAT'L. ROADS - REHAB./ RECONST./UPGRADING OF PAVED NAT'L. ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MGT. SYSTEM/HIGHWAY DEV'T. & MGT.-4 (HDM-4) - PRIMARY ROADS, DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BR.),..., N. SAMAR, 1ST LD | Region VIII | Region VIII | Completed | ₱156.1M | 100% | High risk61 | —-0.038 |
| 20G00055CONSTRUCTION OF CONCRETE ROAD-KALIBO CIRCUMFERENTIAL ROAD, PACKAGE 2, AKLAN | Region VI | Region VI | Completed | ₱94.9M | 100% | High risk60 | —-0.075 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24JA0167CONSTRUCTION OF GUIWAN-TUGBUNGAN-DIVISORIA BY-PASS ROAD PACKAGE 1, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱96.4M | 0% | High risk75 | Flagged0.038 |
| 21J00028CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/ EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱121.5M | 90% | High risk74 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 17J00039CONSTRUCTION OF LABASON RIVER CONTROL, POBLACION LABASON ZAMBOANGA DEL NORTE 3RD LD, RIGHT SIDE: BEG. OF PROJECT 0 + 000.00 END OF PROJECT 0 + 884.40 (572.88), EXCEPTION: 0 + 441.32 - 0 + 752.84, LEFT SIDE: BEG. OF PROJECT 0 + 540.00 END OF PROJECT 0 + 87 | Region IX | Region IX | Completed | ₱94.3M | 100% | High risk75 | —-0.038 |
| 2 | 18GA0104CONST. OF TANGALAN BYPASS ROAD, INCL. ROW AND BRIDGE, TANGALAN, AKLAN | Region VI | Aklan DEO | Completed | ₱71.1M | 100% | High risk75 | —-0.022 |
| 3 | 24JA0167CONSTRUCTION OF GUIWAN-TUGBUNGAN-DIVISORIA BY-PASS ROAD PACKAGE 1, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱96.4M | 0% | High risk75 | Flagged0.038 |
| 4 | 24JA0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TUMAGA SECTION), ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱130.9M | 90% | High risk75 | —-0.011 |
| 5 | 24J00037CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER, SIOCON, ZAMBOANGA DEL NORTE, PACKAGE 4 | Region IX | Region IX | On-Going | ₱138.7M | 90% | High risk75 | —-0.012 |
| 6 | 20J00157CONSTRUCTION OF BY- PASS AND DIVERSION ROADS - ZAMBOANGA CITY BY-PASS ROAD,(WEST COAST SECTION), ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱141.8M | 100% | High risk75 | —-0.052 |
| 7 | 21J00028CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/ EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱121.5M | 90% | High risk74 | Flagged0.004 |
| 8 | 25J00012CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KIPIT RIVER AT KIPIT BR. 2 SECTION (B01183MN) ALONG LILOY-SIOCON RD (S01146MN) (UPSTREAM - LEFT SIDE | Region IX | Region IX | On-Going | ₱145M | 42% | High risk74 | —-0.006 |
| 9 | 22J00015CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱94.9M | 85% | High risk74 | —-0.003 |
| 10 | 23J00028CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/ EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE | Region IX | Region IX | On-Going | ₱105.1M | 100% | High risk74 | —-0.018 |
| 11 | 20J00030CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - EXTENSION OF FLOOD CONTROL STRUCTURE, ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE | Region IX | Region IX | Completed | ₱99.2M | 100% | High risk74 | —-0.058 |
| 12 | 18J00044CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - EXTENSION OF FLOOD CONTROL STRUCTURE ALONG SIOCON RIVER (UPSTREAM), SIOCON, ZAMBOANGA DEL NORTE | Region IX | Region IX | Completed | ₱101.2M | 100% | High risk74 | —-0.061 |
| 13 | 21J00026CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF LABASON FLOOD CONTROL AT ANTONINO, LABASON, ZAMBOANGA DEL NORTE (UPSTREAM) PACKAGE 1 | Region IX | Region IX | On-Going | ₱99M | 94% | High risk73 | —-0.002 |
| 14 | 20J00029CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF LABASON FLOOD CONTROL AT ANTONINO, LABASON, ZAMBOANGA DEL NORTE | Region IX | Region IX | Completed | ₱114.6M | 100% | High risk73 | —-0.059 |
| 15 | 22J00074NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS & DIVERSION ROADS - ZAMBOANGA CITY BY-PASS ROAD, WIDENING OF TULUNGATUNG BRIDGE INCLUDING APPROACHES, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱98.8M | 70% | High risk72 | —-0.002 |
| 16 | 17J00008ROAD UPGRADING (GRAVEL TO PAVED) OF ZAMBOANGA WEST COASTAL ROAD (LIMPAPA-SIBUCO SECTION), ZAMBOANGA DEL NORTE, 2ND DEO, K 1996 + 500.00 - K 1998 + 270.00, L = 1,770.00 LN.M. K 2002 + 855.00 - K 2003 + 415.00, L = 560.00 LN.M. CHAINAGE 0 - CHAINAGE 940.00 | Region IX | Region IX | Completed | ₱129.3M | 100% | High risk67 | —-0.036 |
| 17 | 23JJ0044CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG SIOCON-SIRAWAI RD (S01147MN), K2088+875 - K2089+043, K2093+095 - K2093+155 | Region IX | Zamboanga del Norte 4th DEO | Completed | ₱61.8M | 100% | High risk64 | —-0.019 |
| 18 | 19J00020CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CHANNELIZATION OF PUTIK RIVER WITH MAJOR TRAINING WORKS, ZAMBOANGA CITY | Region IX | Region IX | Completed | ₱58M | 100% | High risk62 | —-0.066 |
| 19 | 17I00035ASSET PRESERVATION OF NAT'L. ROADS - REHAB./ RECONST./UPGRADING OF PAVED NAT'L. ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MGT. SYSTEM/HIGHWAY DEV'T. & MGT.-4 (HDM-4) - PRIMARY ROADS, DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO BR.),..., N. SAMAR, 1ST LD | Region VIII | Region VIII | Completed | ₱156.1M | 100% | High risk61 | —-0.038 |
| 20 | 20G00055CONSTRUCTION OF CONCRETE ROAD-KALIBO CIRCUMFERENTIAL ROAD, PACKAGE 2, AKLAN | Region VI | Region VI | Completed | ₱94.9M | 100% | High risk60 | —-0.075 |
| 21 | 18I00010ASSET PRESERVATION OF NAT'L. ROADS-PREVENTIVE MAINT. BASED ON PAVEMENT MGT. SYSTEM/HIGHWAY DEV'T. & MGT.-4 (HDM-4)-TERTIARY ROADS,RAWIS-CATUBIG ROAD,KO787+(-767)-KO787+248,KO788+141-KO791+284,KO793+497-KO795+019,KO795+033-KO797+115..,NORTHERN SAMAR 2ND LD | Region VIII | Region VIII | Completed | ₱96.5M | 100% | Medium risk59 | —-0.082 |
| 22 | 19G00001CONSTRUCTION OF GRAVEL ROAD - KALIBO CIRCUMFERENTIAL ROAD, AKLAN | Region VI | Region VI | Completed | ₱92.5M | 100% | Medium risk58 | —-0.076 |
| 23 | 18GA0101WIDENING OF BRIDGE-VENTURANZA BRIDGE (B00282PN) ALONG AKLAN EAST RD. INCL. ROW, BANGA, AKLAN | Region VI | Aklan DEO | Completed | ₱31.6M | 100% | Medium risk58 | —-0.009 |
| 24 | 25JJ0011REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, SIOCON-SIRAWAI-SIBUCO-LIMPAPA RD - K2135 + 871 - K2135 + 907, K2136 + 316 - K2136 + 358 | Region IX | Zamboanga del Norte 4th DEO | On-Going | ₱34.7M | 99% | Medium risk58 | —-0.051 |
| 25 | 18I00029PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY, ARTECHE - JIPAPAD - LAS NAVAS - RAWIS ROAD, KO805+(-237) - KO806+748, KO806+778 - KO810+293, NORTHERN SAMAR 2ND LD | Region VIII | Region VIII | Completed | ₱59.2M | 100% | Medium risk57 | —-0.058 |