Contractor dossier
347 projects on file, including joint ventures this contractor is part of.
Total projects
347
Total budget
₱10.4B
Average progress
91.9%
Completion rate
85.6%
Average risk score
46.3
Medium risk on average, out of 100
Flagged as unusual
6
1.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 343 | ₱10.1B | 46.2 | 6 | 91.9% |
| Region VIII | 2 | ₱162.2M | 62.5 | 0 | 100.0% |
| Region XIII | 1 | ₱149.6M | 53.2 | 0 | 100.0% |
| Region III | 1 | ₱9.6M | 31.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 186 | ₱6.6B | 46.0 | 4 | 91.8% |
| Buildings and Facilities | 58 | ₱665.7M | 43.3 | 0 | 93.2% |
| Flood Control and Drainage | 51 | ₱2.3B | 49.5 | 0 | 91.4% |
| Bridges | 32 | ₱492.3M | 42.1 | 0 | 100.0% |
| Water Provision and Storage | 14 | ₱103.2M | 48.1 | 0 | 75.7% |
| OTHER | 6 | ₱229.5M | 75.3 | 2 | 83.3% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DE0247CLUSTER - CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BAGONG TUBIG, SAN LUIS, BATANGAS (PHA | Region IV-A | Batangas 2nd DEO | On-Going | ₱5.8M | 0% | High risk85 | Flagged0.059 |
| 23DE0179CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MUZON, SAN L | Region IV-A | Batangas 2nd DEO | On-Going | ₱7.1M | 100% | High risk85 | Flagged0.041 |
| 17I00001IMPRVT./WIDENING OF NAT'L. ROADS, ALLEN-CATARMAN ROAD (S00005SM), KO729+000-KO731+300; KO731+350-KO732+949; KO722+751-KO723+480, NORTHERN SAMAR, 1ST LD | Region VIII | Region VIII | Completed | ₱141.7M | 100% | High risk80 | —-0.015 |
| 20DB0007ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - TERNATE-NASUGBU RD - K0085+288 - K0085+433 | Region IV-A | Batangas 1st DEO | Completed | ₱96.5M | 100% | High risk72 | —-0.062 |
| 20DB0027FLOOD MANAGEMENT PROGRAM-CONSTRUCTION /MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG SINISIAN RIVER AT BRGY. SINISIAN WEST, LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱19.6M | 100% | High risk68 | —-0.055 |
| 25DE0183CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), BRGY. GASANG, MABINI, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱19.2M | 14% | High risk68 | —-0.010 |
| 16DE0184MFO-1 NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT IMPROVEMENT/WIDENING OF NATIONAL ROADS, SECONDARY ROAD AT PALICO - BALAYAN- BATANGAS ROAD, K0148+709 - K0149+813, K0149+855 - K0149+1147 | Region IV-A | Batangas 2nd DEO | Completed | ₱48M | 100% | High risk67 | —-0.067 |
| 16DE0181MFO-1 NATIONAL ROAD NETWORK SERVICES, CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGE 1 TO MORE THAN 2 LANES BALAGTAS BR. (B02918LZ) ALONG MANILA-BATANGAS ROAD. | Region IV-A | Batangas 2nd DEO | Completed | ₱10.8M | 100% | High risk67 | —-0.041 |
| 24DE0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF TESDA REGIONAL TRAINING CENTER (CALABARZON) BUILDING, P. HERRERA ST., BARANGAY 6, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱59.4M | 100% | High risk67 | —-0.039 |
| 20DB0123CONCRETING & RIPRAPPING OF LOCAL ROAD OF BRGY. TUBUAN, LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱4.8M | 100% | High risk67 | —-0.042 |
| 17DB0050ASSET PRESERVATION OF NATIONAL ROADS - REHAB./RECONST. OF NATIONAL ROADS WITH SLIPS, COLLAPSE, AND LANDSLIDE - SECONDARY, P00103564LZ, TERNATE-NASUGBU RD, S01859LZ, K0075+(-176)-K0075+(-076) NASUGBU, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱12.3M | 100% | High risk66 | —-0.071 |
| 17DB0004ASSET PRESERVATION OF NATIONAL ROADS - PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) - SECONDARY, P00100529LZ, TAGAYTAY-NASUGBU RD., S05790LZ, K0102+224-K0102+499 | Region IV-A | Batangas 1st DEO | Completed | ₱5.1M | 100% | High risk66 | —-0.064 |
| 17DB0023NETWORK DEVELOPMENT-IMPROVEMENT/WIDENING OF NATIONAL ROADS-TERTIARY, P00109152LZ, TALISAY-LAUREL-AGONCILLO RD., S00515LZ, K0122+(-974)-K0122+(-334), LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱22M | 100% | High risk66 | —-0.075 |
| 24DE0241CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
| 24DE0242CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
| 24DE0228ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, BAUAN-MABINI RD - K0166+412 - K0166+474, K0167+272 - K0 | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 8% | High risk65 | Flagged0.026 |
| 25DE0068ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL STRUCTURE ALONG MABINI-BAUAN-SAN LUIS-TAAL-LEMERY | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 31% | High risk65 | —-0.025 |
| 25DE0031ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES AL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 20% | High risk65 | —-0.021 |
| 25DE0030ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRU | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 21% | High risk65 | —-0.021 |
| 24DE0227ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, TINGLOY CIRCUMFERENTIAL ROAD, PACKAGE O, SECTION 1-A, TINGLOY, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱98.3M | 0% | High risk65 | Flagged0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DE0247CLUSTER - CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BAGONG TUBIG, SAN LUIS, BATANGAS (PHA | Region IV-A | Batangas 2nd DEO | On-Going | ₱5.8M | 0% | High risk85 | Flagged0.059 |
| 23DE0179CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY MUZON, SAN L | Region IV-A | Batangas 2nd DEO | On-Going | ₱7.1M | 100% | High risk85 | Flagged0.041 |
| 24DE0227ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, TINGLOY CIRCUMFERENTIAL ROAD, PACKAGE O, SECTION 1-A, TINGLOY, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱98.3M | 0% | High risk65 | Flagged0.028 |
| 24DE0228ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, BAUAN-MABINI RD - K0166+412 - K0166+474, K0167+272 - K0 | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.6M | 8% | High risk65 | Flagged0.026 |
| 24DE0241CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
| 24DE0242CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF CIRCUMFERENTIAL ROAD, TINGL | Region IV-A | Batangas 2nd DEO | On-Going | ₱93.7M | 0% | High risk65 | Flagged0.026 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 19DB0014BRIDGE-WIDENING OF PERMANENT BRIDGES-BINAMBANG BR. (B03048LZ) ALONG BALAYAN-BALIBAGO RD. - K0107+008.40 | Region IV-A | Batangas 1st DEO | Completed | ₱59.8M | 100% | Medium risk54 | —-0.059 |
| 77 | 19DE0033ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, TERTIARY ROADS, BAUAN-MABINI RD, K0160+443 - K0160+503, K0163+951 - K016 | Region IV-A | Batangas 2nd DEO | Completed | ₱72.2M | 100% | Medium risk54 | —-0.101 |
| 78 | 19DB0011NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, DIOKNO HIGHWAY - K0077+500 TO K0079+200 | Region IV-A | Batangas 1st DEO | Completed | ₱67.6M | 100% | Medium risk54 | —-0.100 |
| 79 | 19DB0007NETWORK DEVELOPMENT-ROAD WIDENING-SECONDARY ROADS, NASUGBU-LIAN-CALATAGAN RD. - K0113+605 TO K0115+840.80 | Region IV-A | Batangas 1st DEO | Completed | ₱86.9M | 100% | Medium risk54 | —-0.093 |
| 80 | 22DB0006ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS, TERNATE-NASUGBU RD K0077+000-K0077+128 | Region IV-A | Batangas 1st DEO | Completed | ₱72.4M | 100% | Medium risk54 | —-0.098 |
| 81 | 17N00145CONSTRUCTION OF UNION - BOTONG - CONSUELO - GENERAL LUNA ROAD, SIARGAO, SURIGAO DEL NORTE | Region XIII | Region XIII | Completed | ₱149.6M | 100% | Medium risk53 | —-0.023 |
| 82 | 24DE0032ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALON | Region IV-A | Batangas 2nd DEO | Completed | ₱86.9M | 100% | Medium risk53 | —-0.076 |
| 83 | 24DE0031ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALON | Region IV-A | Batangas 2nd DEO | Completed | ₱86.9M | 100% | Medium risk53 | —-0.079 |
| 84 | 23DD0070ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF REVETMENT ALONG LAWAYE RIVE | Region IV-A | Batangas 4th DEO | Completed | ₱76.2M | 100% | Medium risk53 | —-0.083 |
| 85 | 23DE0058OO2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (SEAWALL), BRGY. BALITE, SAN LUIS, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱67.6M | 100% | Medium risk52 | —-0.084 |
| 86 | 19DE0089ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE AT BRGY. PULONG BA | Region IV-A | Batangas 2nd DEO | Completed | ₱57.9M | 100% | Medium risk52 | —-0.084 |
| 87 | 23DB0017FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER, STA. 0 + 000 - STA. 0 + 536 (UPSTREAM R/S) AT BALAYAN, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱77.2M | 100% | Medium risk52 | —-0.082 |
| 88 | 23DB0018ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVERBANK PROTECTION ALONG BINAMBANG RIVER, STA. 0 + | Region IV-A | Batangas 1st DEO | Completed | ₱77.2M | 100% | Medium risk52 | —-0.082 |
| 89 | 19DE0051ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING, SECONDARY ROADS, BATANGAS-TABANGAO-LOBO RD, K0123+610 - K0124+598 | Region IV-A | Batangas 2nd DEO | Completed | ₱52.5M | 100% | Medium risk52 | —-0.103 |
| 90 | 18DE0108ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION, REHABILITATION / RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROADS, BATANGAS-TABANGAO-LOBO RD K0128+252 - K0128+384, K0137+400 - | Region IV-A | Batangas 2nd DEO | Completed | ₱52.1M | 100% | Medium risk52 | —-0.104 |
| 91 | 18DB0005ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS ALONG TAGAYTAY - NASUGBU RD. K0080+000 - K0081+730, K0082+000 - K0082+500, K0093+227 - K0093+387, K0094+000 - K0095+000 | Region IV-A | Batangas 1st DEO | Completed | ₱51.9M | 100% | Medium risk51 | —-0.102 |
| 92 | 22DD0039CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF ROAD INCLUDING DRAINAG | Region IV-A | Batangas 4th DEO | Completed | ₱47.6M | 100% | Medium risk51 | —-0.105 |
| 93 | 21DD0294LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF ROAD AT MABAYABAS-POBLACION, POBLACION - DAGATAN, STO. NIÑO -PINAGBAYANAN, TAYSAN, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱48M | 100% | Medium risk51 | —-0.105 |
| 94 | 23DE0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, REHABILITATION OF ROAD ALONG TALUMPOK WEST, BATANGAS CITY | Region IV-A | Batangas 2nd DEO | Completed | ₱49.5M | 100% | Medium risk51 | —-0.105 |
| 95 | 22DE0125CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MAHACOT KANLURAN, BATANGAS CITY, BATAN | Region IV-A | Batangas 2nd DEO | Completed | ₱49.5M | 100% | Medium risk51 | —-0.105 |
| 96 | 25DE0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, BARANGAY SAN PEDRO-MAHACOT, PACKAGE A, BATANGAS | Region IV-A | Batangas 2nd DEO | On-Going | ₱49M | 0% | Medium risk51 | —-0.043 |
| 97 | 21DE0089ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING SECONDARY ROADS - BATANGAS-QUEZON RD K0135+401 - K0136+461 | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.103 |
| 98 | 23DE0087OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS, BATANGAS-TABANGAO-LOBO RD - K0113+852 - K0114+020 | Region IV-A | Batangas 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.105 |
| 99 | 25DB0084CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) IN BARANGAY MAYASANG, LEMERY, BATANGAS | Region IV-A | Batangas 1st DEO | On-Going | ₱4.8M | 74% | Medium risk51 | —-0.056 |
| 100 | 24DB0007ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS -TERNATE-NASUGBU RD - K0075 + 000 - K0075 + 460 | Region IV-A | Batangas 1st DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.102 |