Contractor dossier
73 projects on file, including joint ventures this contractor is part of.
Total projects
73
Total budget
₱3.8B
Average progress
97.1%
Completion rate
90.4%
Average risk score
55.4
Medium risk on average, out of 100
Flagged as unusual
7
9.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 52 | ₱3B | 56.2 | 5 | 99.7% |
| Region I | 15 | ₱362.5M | 52.7 | 1 | 93.7% |
| Region IV-A | 2 | ₱193M | 60.1 | 0 | 100.0% |
| Region III | 2 | ₱96.7M | 36.7 | 0 | 100.0% |
| Region VI | 1 | ₱96.2M | 94.2 | 1 | 0.2% |
| Region II | 1 | ₱48M | 46.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 32 | ₱2B | 53.5 | 2 | 100.0% |
| Flood Control and Drainage | 17 | ₱1B | 52.9 | 2 | 99.9% |
| Bridges | 14 | ₱369.2M | 50.5 | 1 | 93.2% |
| GAA 2025 OO-1 | 4 | ₱126M | 88.8 | 0 | 98.3% |
| OTHER | 3 | ₱195.2M | 74.9 | 1 | 97.8% |
| Buildings and Facilities | 2 | ₱17.1M | 28.0 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱96.2M | 94.2 | 1 | 0.2% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GP0011CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY SAN ROQUE, DUMALAG, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱96.2M | 0% | High risk94 | Flagged0.020 |
| 25PJ001025PJ0010: ASSET PRESERVATION PROGRAM- REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS-ALFONSO LISTA-AURORA BDRY RD - K0445 + 765 - K0446 + 735, K0446 + 775 - K0447 + 282 | Cordillera Administrative Region | Ifugao 2nd DEO | On-Going | ₱78.5M | 96% | High risk93 | —-0.001 |
| 25PJ001225PJ0012: ASSET PRESERVATION PROGRAM-CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS -SECONDARY ROADS-BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD - K0398 + 033 - K0398 + 130, K0398 + 481 - K0398 + 593, K0399 + 032 - K0399 + 503, K0400 | Cordillera Administrative Region | Ifugao 2nd DEO | On-Going | ₱32.2M | 98% | High risk92 | —-0.004 |
| 25PJ002225PJ0022: BRIDGE PROGRAM-RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES-GUIHOB BR. (B04284LZ) ALONG BANAUE-MAYOYAO-A LISTA-ISABELA BDRY RD | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱7.2M | 100% | High risk90 | —-0.032 |
| 25PJ002025PJ0020: BRIDGE PROGRAM-RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES-COSILE BR. (B02215LZ) ALONG JCT POTIA-MT PROVINCE BDRY RD | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱8.2M | 100% | High risk80 | —-0.030 |
| 21P00050LOCAL PROGRAM - CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES / FACILITIES - CONSTRUCTION OF NAGUEY FLOOD CONTROL, ATOK, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱96.5M | 100% | High risk78 | —-0.016 |
| 23PE0028CONSTRUCTION OF ROAD, BAGUIO GOLD - MANGGA, BARANGAYS LOACAN AND TUDING, ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱69.3M | 93% | High risk75 | Flagged0.016 |
| 16AD0158REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCUDING DRAINAGE BASED ON PAVEMENT MANGEMENT SYSTEM HIGHWAY DEVELOPMENT AND MANGEMENT -4 (HDM-4) , BURGOS, LIDLIDDA ROAD, K0363+655-K0364+000, K0364+000-K0364+655 | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | High risk72 | —-0.024 |
| 17AE0040REHABILITATION AND IMPROVEMENT OF AMBURAYAN RIVER CONTROL AT BRGY. OLD. CENTRAL, SUDIPEN, LA UNION | Region I | La Union 1st DEO | Completed | ₱19.6M | 100% | High risk65 | —-0.043 |
| 16AD0149REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGED BASED ON PAVEMENT MANAGEMENT-4(HDM-4), JCT. STA. LUCIA-SALCEDO ROAD, K0340+000-K0341+000 AND K0341+918-K0342+000 | Region I | Ilocos Sur 2nd DEO | Completed | ₱31.3M | 100% | High risk64 | —-0.049 |
| 16AD0133PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) TAGUDIN-CERVANTES ROAD, K0330+144-K0330+000, K0331+000-K0331+645 | Region I | Ilocos Sur 2nd DEO | Completed | ₱8.8M | 100% | High risk64 | —-0.056 |
| 16AD0157CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION OF SAN ANTONIO- SAN PEDRO RIVER CONTROL, NARVACAN, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | High risk63 | —-0.039 |
| 24PJ001724PJ0017: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF MAPACOPACO FLOOD CONTROL, STA. 38+850 - STA. 39+900 (R/S), POSNAAN, AGUINALDO, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱98M | 100% | High risk62 | —-0.057 |
| 17PA0031NETWORK DEVELOPMENT- IMPROVEMENT/WIDENING OF NATIONAL ROADS, ABRA-KALINGA ROAD, KO421+600 - KO425+000 | Cordillera Administrative Region | Abra DEO | Completed | ₱69.5M | 100% | High risk62 | —-0.043 |
| 22PI0050CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYUDAN RIVER, KABULAWAN - BUSILAC BILA - OTUCAN SUR, STA. 55+800 - STA. 56+480 (B.S.), BAUKO, MOUNTAIN PROVINCE | Cordillera Administrative Region | Mountain Province 1st DEO | Completed | ₱96.5M | 100% | High risk61 | —-0.057 |
| 16PA007716PA0077 - ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION/UPGRADING OF ABRA-ILOCOS SUR ROAD; KO398+000 - KO398+475; KO398+513 - KO399+000 | Cordillera Administrative Region | Abra DEO | Completed | ₱27.4M | 100% | High risk60 | —-0.046 |
| 22DH0049REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANSLIDE, SECONDARY ROADS, CALAMBA-STA. CRUZ-FAMY JCT. ROAD, K0096+487 TO K0096 + 598 CALAMBA-STA. CRUZ-FAMY JCT ROADS | Region IV-A | Laguna 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.097 |
| 22DH0048REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, SECONDARY ROAD, CALAMBA-STA. CRUZ-FAMY JCT ROAD K0096 + 376 TO K0096 + 487, CALAMBA-STA. CRUZ-FAMY JCT ROAD | Region IV-A | Laguna 1st DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.097 |
| 17PA0029CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS-BANI HOTSPRING ACCESS ROAD, PHASE III, BOLINEY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱19.3M | 100% | High risk60 | —-0.051 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GP0011CONSTRUCTION OF RIVER CONTROL ALONG PANAY RIVER BASIN, BARANGAY SAN ROQUE, DUMALAG, CAPIZ | Region VI | Capiz 2nd DEO | On-Going | ₱96.2M | 0% | High risk94 | Flagged0.020 |
| 17PL0204PACKAGE 2: A) BALONG FLOOD CONTROL ALONG BALIGATAN CREEK, BRGY. BALONG, TABUK CITY, B) CANAL LINING (MEGA CANAL), PUROK 5, BULANAO CENTRO, TABUK CITY, C) BULANAO CEMETERY FLOOD CONTROL, BULANAO, TABUK CITY, D) APPAS FLOOD CONTROL (AGLAWA, BAG-AY & AGNAYA) | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱76.8M | 100% | Medium risk58 | Flagged0.016 |
| 23PE0028CONSTRUCTION OF ROAD, BAGUIO GOLD - MANGGA, BARANGAYS LOACAN AND TUDING, ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | On-Going | ₱69.3M | 93% | High risk75 | Flagged0.016 |
| 17PL0235PACKAGE 9: A) ALUBBAGAN FLOOD CONTROL ALONG BIGA RIVER, BRGY. DUPLIGAN, TANUDAN B) BANNENG FLOOD CONTROL, TABUK | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱28.8M | 100% | Medium risk53 | Flagged0.011 |
| 25A00313REPLACEMENT OF PERMANENT WEAK BRIDGES - MARAGAYAP EAST BR. (B02654LZ) ALONG MANILA NORTH RD | Region I | Region I | On-Going | ₱28.1M | 14% | Medium risk46 | Flagged0.004 |
| 17PA0085REPAIR/REHABILITATION/IMPROVEMENT OF ABABENG-CAUPASAN ROAD, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱26.1M | 100% | Medium risk51 | Flagged0.003 |
| 17PA0059CONSTRUCTION/REHABILITATION OF JUNCTION-TAYAWA ROAD, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱17.6M | 100% | Medium risk52 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23P00012CONSTRUCTION OF ROAD, BOLIWONG - ABINUAN - NATTUM - ALIMIT, MAYOYAO, IFUGAO | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱241.2M | 100% | Medium risk59 | —-0.049 |
| 27 | 22P00042CONSTRUCTION OF SINACBAT - ALILEM ROADBAKUN, BENGUET | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱197.9M | 100% | Medium risk58 | —-0.042 |
| 28 | 17PL0204PACKAGE 2: A) BALONG FLOOD CONTROL ALONG BALIGATAN CREEK, BRGY. BALONG, TABUK CITY, B) CANAL LINING (MEGA CANAL), PUROK 5, BULANAO CENTRO, TABUK CITY, C) BULANAO CEMETERY FLOOD CONTROL, BULANAO, TABUK CITY, D) APPAS FLOOD CONTROL (AGLAWA, BAG-AY & AGNAYA) | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱76.8M | 100% | Medium risk58 | Flagged0.016 |
| 29 | 22PC0023NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS PIDDIG-CARASI-CALANASAN ROAD (CALANASAN SIDE), MALUNGOG BRIDGE, APAYAO-CONSTRUCTION OF STEEL BRIDGE | Cordillera Administrative Region | Apayao 2nd DEO | Completed | ₱57.9M | 100% | Medium risk56 | —-0.033 |
| 30 | 17AE0025REPLACEMENT OF PERMANENT WEAK BRIDGE,SAN JUAN BRIDGE (B00871LZ) ALONG SAN JUAN-SAN GABRIEL ROAD, BRGY. ILI NORTE, SAN JUAN, LA UNION | Region I | La Union 1st DEO | Completed | ₱18.6M | 100% | Medium risk55 | —-0.018 |
| 31 | 17AE0024CONSTRUCTION OF NEW PERMANENT IPET BRIDGE ALONG ALILEM-SUGPON-SUDIPEN ROAD BRGY. IPET, SUDIPEN, LA UNION | Region I | La Union 1st DEO | Completed | ₱14.3M | 100% | Medium risk54 | —-0.026 |
| 32 | 17PE0025REPLACEMENT OF BRIDGES (FROM TEMPORARY TO PERMANENT), BATUAN BRIDGE (B04275LZ) ALONG ASIN (KM-8)-NANGALISAN-SAN PASCUAL, TUBA, BENGUET-LU BDRY ROAD, K0267+007, TUBA, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱28.7M | 100% | Medium risk53 | —-0.020 |
| 33 | 17PL0235PACKAGE 9: A) ALUBBAGAN FLOOD CONTROL ALONG BIGA RIVER, BRGY. DUPLIGAN, TANUDAN B) BANNENG FLOOD CONTROL, TABUK | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱28.8M | 100% | Medium risk53 | Flagged0.011 |
| 34 | 24AF0044CONST. OF BRIDGE, BRGY. HALOG WEST, (PHASE 1), TUBAO, LA UNION | Region I | La Union 2nd DEO | Completed | ₱48.6M | 100% | Medium risk53 | —-0.050 |
| 35 | 21PM0002ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM; CONSTRUCTION OF MARAT FLOOD CONTROL, STA. 119+470 - STA. 119+520 (R.S.), ST | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱84.3M | 100% | Medium risk52 | —-0.059 |
| 36 | 22PM0017ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF LOWER SAKAKANG FLOOD CONTROL STRUCTURE, STA. 117+620 - STA. 118+070 (R.S.), STA. | Cordillera Administrative Region | Mountain Province 2nd DEO | Completed | ₱81.1M | 100% | Medium risk52 | —-0.059 |
| 37 | 24PJ002124PJ0021: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS -CONSTRUCTION OF HALAG FLOOD CONTROL, STA. 54+942 - STA. 55+442 (R/S), STA. 55+712 - STA. 56+162 (R/S), HALAG, A | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱67.6M | 100% | Medium risk52 | —-0.067 |
| 38 | 23PJ001923PJ0019: CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF MAPACOPACO FLOOD CONTROL, STA. 41+902-STA. 42+170 (RS), STA. 42+667-STA. 43+527 (RS), POSNAAN AGUINALDO, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | Completed | ₱57.9M | 100% | Medium risk52 | —-0.068 |
| 39 | 17PA0059CONSTRUCTION/REHABILITATION OF JUNCTION-TAYAWA ROAD, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱17.6M | 100% | Medium risk52 | Flagged0.002 |
| 40 | 17PA0085REPAIR/REHABILITATION/IMPROVEMENT OF ABABENG-CAUPASAN ROAD, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱26.1M | 100% | Medium risk51 | Flagged0.003 |
| 41 | 22PE0054CONSTRUCTION OF ROAD, BUA-GUMATDANG-PACALSO ROAD, ITOGON, BENGUET | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱77.2M | 100% | Medium risk51 | —-0.076 |
| 42 | 22PF0054REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, GOV. BADO DANGWA NATIONAL ROAD: K0328+236-K0328+246, K0328+352-K0328+371, K0332+188-K0332+198, K0339+305-K0339+334, K0340+800-KO341+000, K0341+900-K0342+000, | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱64.7M | 100% | Medium risk51 | —-0.081 |
| 43 | 21PE0049CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - CONG. ANDRES ACOP COSALAN RD. - K0318+428 - K0318+463, K0318+930 - K0318+948, K0323+112 - K0323+134, K0323+840 - K0323+866, K0331+1260 - K0331+1292, K0331+1381 - K0331+1398, K0331+1617 - K0331+1668, K0333+ | Cordillera Administrative Region | Benguet 1st DEO | Completed | ₱68.2M | 100% | Medium risk51 | —-0.081 |
| 44 | 23PF0010CONSTRUCTION OF LEGWEY - TABA-AO ROAD, BARANGAY TABA-AO, KAPANGAN, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱69.3M | 100% | Medium risk51 | —-0.079 |
| 45 | 25PJ003025PJ0030: FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, STA. 40 +075- STA. 40+640, SAN JUAN, ALFONSO LISTA, IFUGAO | Cordillera Administrative Region | Ifugao 2nd DEO | On-Going | ₱55.7M | 99% | Medium risk51 | —-0.034 |
| 46 | 23PF0013CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG AGNO RIVER, CALAMAGAN SECTION, STA. 11 + 008 - STA. 11 + 700 (R.S), STA. 11 + 008 - STA. 11 + 713 (L.S) BUGUIAS, BENGUET | Cordillera Administrative Region | Benguet 2nd DEO | Completed | ₱72.4M | 100% | Medium risk51 | —-0.067 |
| 47 | 18PL0082LOCAL ROADS - IMPROVEMENT OF 503RD BRIGADE ROAD TO MT. PROVINCE - CALANAN NATIONAL ROAD | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱19M | 100% | Medium risk51 | —-0.082 |
| 48 | 22PB0009CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), MANAG-TALIFUGO-PADDAOAN ROAD IN SUPPOR | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱46.6M | 100% | Medium risk50 | —-0.076 |
| 49 | 18PK0036REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - MT. PROVINCE BOUNDARY-CALANAN-PINUKPUK-ABBUT ROAD | Cordillera Administrative Region | Upper Kalinga DEO | Completed | ₱51.8M | 100% | Medium risk50 | —-0.080 |
| 50 | 23PB0017FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF MADDUANG RIVER FLOOD CONTROL ALONG APAYAO-ABULUG RIVER BASIN, STA.88+535 - STA.88+680 (L/S), STA.89+133 - STA.89+633 (R/S), MADDUANG, | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.063 |