Cross-referencing the ledgers…
Cross-referencing the ledgers…
Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
8,793
Total budget
₱315.2B
Average progress
96.0%
Completion rate
88.6%
Average risk score
38.3
Medium risk on average, out of 100
Flagged as unusual
507
5.8% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 3,392 | ₱159.3B | 41.4 | 77 | 96.0% |
| Buildings and Facilities | 2,892 | ₱25B | 26.6 | 52 | 98.1% |
| Flood Control and Drainage | 1,201 | ₱94.9B | 48.0 | 122 | 94.5% |
| Bridges | 625 | ₱16.3B | 38.4 | 17 | 97.3% |
| Water Provision and Storage | 328 | ₱1.7B | 24.8 | 7 | 99.2% |
| GAA 2025 SSP | 140 | ₱4.8B | 92.5 | 120 | 72.0% |
| OTHER | 87 | ₱5.1B | 73.2 | 56 | 88.7% |
| GAA 2025 OO-1 | 74 | ₱3.7B | 89.1 | 45 | 74.0% |
| Bridges, Roads | 29 | ₱2.9B | 54.3 | 5 | 85.1% |
| GAA 2025 OO-2 | 25 | ₱1.5B | 89.4 | 6 | 74.9% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Mindoro Oriental DEO | 1,268 | ₱21.7B | 33.3 | 34 | 97.7% |
| Romblon DEO | 1,117 | ₱39.6B | 41.0 | 56 | 97.9% |
| Region IV-B | 1,045 | ₱159.6B | 59.0 | 241 | 82.4% |
| Southern Mindoro DEO | 970 | ₱14.2B | 34.6 | 31 | 98.1% |
| Palawan 1st DEO | 960 | ₱13.5B | 33.1 | 38 | 98.0% |
| Palawan 2nd DEO | 958 | ₱14.4B | 33.0 | 46 | 97.9% |
| Mindoro Occidental DEO | 955 | ₱22.3B | 39.1 | 22 | 95.9% |
| Marinduque DEO | 917 | ₱21.2B | 37.5 | 22 | 98.8% |
| Palawan 3rd DEO | 603 | ₱8.7B | 30.6 | 17 | 98.7% |
Exhibit C
Joint-venture projects count toward each partner.
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EH0163CONSTRUCTION OF ROAD, SITIO EAST MAAMBONG, BARANGAY MAGSAYSAY TO SITIO CAPDANG BARANGAY AGMANIC, STA. FE, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱140.2M | 69% | High risk96 | Flagged0.031 |
| 25EH0161CONSTRUCTION OF ROAD, SITIO MAGSUPOT TO SITIO ILAYA, BARANGAY CALAGONSAO, ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱140.2M | 73% | High risk96 | Flagged0.029 |
| 25EH0080CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CANTINGAS, SAN FERNANDO, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱145.5M | 93% | High risk96 | Flagged0.024 |
| 25EH0087CONSTRUCTION OF ROAD, ODIONGAN ROAD LEADING TO TUGDAN AIRPORT, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱142.6M | 63% | High risk96 | Flagged0.035 |
| 25EH0088CONSTRUCTION OF ROAD, ALCANTARA TO ODIONGAN, ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱142.7M | 63% | High risk96 | Flagged0.034 |
| 25EH0079CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO CABANGAHAN BARANGAY CARMEN, SAN AGUSTIN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱145.5M | 100% | High risk96 | Flagged0.023 |
| 25EH0111CONSTRUCTION OF REVETMENT STRUCTURE ALONG PATO-O RIVER (PHASE 2), ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱139.8M | 22% | High risk96 | Flagged0.043 |
| 25EH0110CONSTRUCTION OF REVETMENT STRUCTURE ALONG PATO-O RIVER, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱139.7M | 27% | High risk96 | Flagged0.042 |
| 25ED0041CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CAMANSIHAN, CALAPAN CITY, ORIENTAL MINDORO | Mindoro Oriental DEO | SILVERWOLVES CONSTRUCTION CORPORATION | On-Going | ₱96.2M | 87% | High risk95 | Flagged0.018 |
| 25ED0109INSTALLATION OF STREET LIGHTS ALONG CALAPAN SOUTH ROAD K0007+400 -K0021+000, CALAPAN - NAUJAN, ORIENTAL MINDORO | Mindoro Oriental DEO | MG SAMIDAN CONSTRUCTION | Completed | ₱95.1M | 100% | High risk95 | —-0.008 |
| 25ED0015CONSTRUCTION OF ROAD DIKE, BARANGAY BAGONG BUHAY, NAUJAN, ORIENTAL MINDORO | Mindoro Oriental DEO | SILVERWOLVES CONSTRUCTION CORPORATION | On-Going | ₱95M | 71% | High risk95 | Flagged0.023 |
| 25ED0043CONSTRUCTION OF ROAD DIKE ALONG BAGTU RIVER, BARANGAY ARANGIN, NAUJAN, ORIENTAL MINDORO | Mindoro Oriental DEO | SILVERWOLVES CONSTRUCTION CORPORATION | On-Going | ₱109.2M | 54% | High risk95 | Flagged0.032 |
| 25EH0042CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, SITIO RIVERSIDE, BARANGAY TABOBO-AN, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱137.9M | 69% | High risk95 | Flagged0.031 |
| 25ED0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO CAGUISIKAN, BARANGAY GUTAD, CALAPAN CITY, ORIENTAL MINDORO | Mindoro Oriental DEO | SILVERWOLVES CONSTRUCTION CORPORATIONLUX DRAGON CONSTRUCTION CORPORATION | On-Going | ₱96.6M | 40% | High risk95 | Flagged0.031 |
| 25EE0075CONSTRUCTION OF TARADUNGAN BRIDGE ALONG TAMARBONG-TARADUNGAN-ILAN-CAPAYAS ROAD ROXAS, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱98.8M | 21% | High risk95 | Flagged0.053 |
| 25ED0147REHABILITATION OF ROAD, BARANGAY STA. ISABEL - BARANGAY TAWAGAN, CALAPAN CITY, ORIENTAL MINDORO | Mindoro Oriental DEO | UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP. | On-Going | ₱96.5M | 84% | High risk95 | Flagged0.019 |
| 25ED0108INSTALLATION OF STREET LIGHTS ALONG CALAPAN SOUTH ROAD K0047+200 - K0060+800, SOCORRO, ORIENTAL MINDORO | Mindoro Oriental DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱96.5M | 81% | High risk95 | Flagged0.021 |
| 25ED0114REHABILITATION OF SUGUI - PALHI ROAD, TIBAG - PACHOCA - WAWA ROAD, CALAPAN CITY, ORIENTAL MINDORO (PHASE 2) | Mindoro Oriental DEO | STX ENTERPRISES | On-Going | ₱96M | 57% | High risk95 | Flagged0.029 |
| 25EH0153CONSTRUCTION OF ROAD, SITIO PALATE TO BARANGAY PANIQUE, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱93.5M | 65% | High risk95 | Flagged0.026 |
| 25EH0154CONSTRUCTION OF ROAD, BARANGAY LAWAN TO BARANGAY SAN ISIDRO (PHASE 2), ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱93.5M | 81% | High risk95 | Flagged0.021 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23EE0137CONSTRUCTION OF BUSUANG TO CARAMAY FMR, CARAMAY, ROXAS, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱14.9M | 0% | Medium risk59 | Flagged0.074 |
| 23EE0138CONSTRUCTION OF SITIO NALBOT TO ARADO FMR, POBLACION, TAYTAY, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱14.9M | 0% | High risk60 | Flagged0.071 |
| 24EE0151CONSTRUCTION OF SCHOOL BUILDING, PAG-ASA ELEMENTARY SCHOOL BUILDING PAG-ASA, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱49.7M | 81% | High risk86 | Flagged0.069 |
| 24EF0084CONST. OF SCHOOL BLDG., PUNANG ES BLDG. IN SOFRONIO ESPANOLA, PAL., SOFRONIO ESPANOLA, PAL. | Palawan 2nd DEO | KIR KONSTRUCTICON BUILDERS AND SUPPLY INC. (FORMERLY: KONSTRUCTION BUILDERS AND SUPPLY) | On-Going | ₱19.9M | 96% | High risk84 | Flagged0.068 |
| 24E00262CONCRETING OF SITIO LAMOT BABOY, BRGY. PINAGLABANAN FMR, QUEZON, PALAWAN | Region IV-B | IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) | On-Going | ₱35M | 82% | High risk84 | Flagged0.067 |
| 23EE0139CONSTRUCTION OF SAN NICOLAS TO SITIO CANIOGAN FMR, CORON, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱14.9M | 0% | Medium risk58 | Flagged0.064 |
| 24EH0170CONSTRUCTION OF STORM SURGE PROTECTION/CAUSEWAY ALONG POBLACION SEAPORT, ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱144.8M | 87% | High risk90 | Flagged0.062 |
| 23EF0116CONSTRUCTION OF RIVERBANK PROTECTION RIVER CONTROL DIKE ALONG COLBY RIVER (RIGHT SIDE), RIZAL, PALAWAN | Palawan 2nd DEO | IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) | On-Going | ₱96.5M | 95% | High risk64 | Flagged0.061 |
| 24EH0171CONSTRUCTION OF SHORE PROTECTION/CAUSEWAY POBLACION, ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱141.9M | 86% | High risk90 | Flagged0.061 |
| 24E00226ROMBLON STATE UNIVERSITY- CONSTRUCTION OF THE HEALTH AND WELLNESS BUILDING, PHASE I, ODIONGAN, ROMBLON | Region IV-B | PERFORMANCE BUILDERS & DEVELOPERS CORPORATION | On-Going | ₱14.1M | 37% | High risk86 | Flagged0.057 |
| 23E00311ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG QUEZON-PUNTA BAJA ROAD, K0147+414-K0150+465, PALAWAN | Region IV-B | NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC | On-Going | ₱202.6M | 66% | High risk66 | Flagged0.057 |
| 23E00306SUSTANABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF POBLACION-TAGUMPAY DIVERSION ROAD LEADING TO CORON CRUISE PORT, PACKAGE 1 | Region IV-B | MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION) | On-Going | ₱280.2M | 20% | High risk64 | Flagged0.057 |
| 24EH0179CONSTRUCTION OF LUMBANG WESTE FLOOD CONTROL STRUCTURE ALONG LUMBANG RIVER PHASE 2, CAJIDIOCAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱130.4M | 100% | High risk90 | Flagged0.057 |
| 25EF0087CONST. OF PEDESTRIAN OVERPASS-PUERTO PRINCESA SOUTH ROAD K090+1075, NARRA, PALAWAN | Palawan 2nd DEO | L.D. DEMAALA CORPORATION | On-Going | ₱22.1M | 12% | High risk94 | Flagged0.056 |
| 24EE0144PACKAGE 2-CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDINGS IN:1. SAN FERNANDO NATIONAL HIGH SCHOOL, BARANGAY SAN FERNANDO2. DIAPILA NATIONAL HIGH SCHOOL, BARANGAY TENEGUIBAN, EL NIDO, PALAWAN | Palawan 1st DEO | E.V. VILLAOS TRADING & CONSTRUCTION | On-Going | ₱9.9M | 88% | High risk85 | Flagged0.055 |
| 25EB0117CONCRETING OF BRGY. SALVACION FMR, BRGY. SALVACION, RIZAL, OCCIDENTAL MINDORO | Mindoro Occidental DEO | MIGHTY DRAGON BUILDERS INC. | On-Going | ₱14.9M | 55% | High risk86 | Flagged0.055 |
| 25EG0014CONSTRUCTION OF ROAD, APORAWAN TO SITIO DAAN, 00+000.00 - 02+098.00, ABORLAN, PALAWAN | Palawan 3rd DEO | IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) | On-Going | ₱103.4M | 29% | High risk95 | Flagged0.055 |
| 23E00310ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- PREVENTIVE MAINTENANCE (ASDPHALT OVERLAY) ALONG PPSR JCT. (ABO-ABO)-QUEZON ROAD, K0139+568-K0142+730, PALAWAN | Region IV-B | NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC | On-Going | ₱173.7M | 71% | High risk64 | Flagged0.055 |
| 25ED0210CONSTRUCTION OF SCHOOL BUILDING, ORIENTAL MINDORO NATIONAL HIGH SCHOOL, SAN VICENTE EAST, CALAPAN CITY, ORIENTAL MINDORO | Mindoro Oriental DEO | MIDR CONSTRUCTION AND SUPPLIES | On-Going | ₱19.3M | 60% | High risk87 | Flagged0.054 |
| 25EE0075CONSTRUCTION OF TARADUNGAN BRIDGE ALONG TAMARBONG-TARADUNGAN-ILAN-CAPAYAS ROAD ROXAS, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱98.8M | 21% | High risk95 | Flagged0.053 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 801 | 24EH0084CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DAVID BRIDGE UPSTREAM (L/S), ODIONGAN ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | Completed | ₱125.5M | 100% | High risk63 | —-0.058 |
| 802 | 25E00142COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD AND CAUSEWAY, BRGY. ALIBAGON, SIBUYAN ISLAND, ROMBLON | Region IV-B | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | On-Going | ₱230.2M | 69% | High risk63 | —-0.029 |
| 803 | 25E00149BASIC INFRASTRUCTURE PROGRAM (BIP)- COASTAL ROADS AUGMENT RESILIENCY OF COMMUNITIES- CONST. OF COASTAL ROAD, BRGY. POBLACION, STA. FE, ROMBLON | Region IV-B | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | On-Going | ₱230.9M | 42% | High risk63 | —-0.024 |
| 804 | 24E00157SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF BACAWAN-BUHAY NA TUBIG-CALIMA ROAD, POLA, OR. MINDORO | Region IV-B | DUMDUMA CONSTRUCTION AND TRADING CORPORATIONRHODIUM 688 BUILDERS, INC. (FORMERLY: STUDIO26 CONSTRUCTION INC.) | On-Going | ₱279.4M | 24% | High risk63 | —-0.003 |
| 805 | 18E00006CONSTRUCTION OF MISSING LINK ON VICTORIA-SABLAYAN (MINDORO CROSS ISLAND ROAD), STA. 0+000.00 - STA. 1+908.00, OCC. MINDORO | Region IV-B | MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. | Completed | ₱140.3M | 100% | High risk63 | —-0.066 |
| 806 | 25ED0135REHABILITATION OF BRGY. MALUANLUAN - BRGY. MALIBAGO ROAD, POLA, ORIENTALMINDORO | Mindoro Oriental DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱144.1M | 98% | High risk63 | —-0.048 |
| 807 | 22E00008REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - CALAPAN NORTH ROAD, KO042+740-KO042+1008, KO043+060-KO043+170, ORIENTAL MINDORO | Region IV-B | ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196) | Completed | ₱154.9M | 100% | High risk63 | —-0.067 |
| 808 | 25E00112ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS, PUERTO PRINCESA SOUTH ROAD, K0100+441- K0102+625, NARRA, PALAWAN | Region IV-B | NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC | On-Going | ₱235.6M | 51% | High risk63 | —-0.001 |
| 809 | 24E00030ASSET PRESERVATIION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0051+870-K0051+959, MARINDUQUE | Region IV-B | ALRIE CONSTRUCTION SERVICES | On-Going | ₱193M | 93% | High risk63 | —-0.029 |
| 810 | 24E00111ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0051+691-K0051+781, MARINDUQUE | Region IV-B | EIGHT J'S CONSTRUCTION SERVICES | Completed | ₱193M | 100% | High risk63 | —-0.057 |
| 811 | 24E00029ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD- K0051+781-K0051+870, MARINDUQUE | Region IV-B | EIGHT J'S CONSTRUCTION SERVICES | Completed | ₱193M | 100% | High risk63 | —-0.057 |
| 812 | 24E00075ASSET PRESERVATION PROGRAM- REHAB./RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE- SECONDARY ROADS- MARINDUQUE CIRCUMFFERENTIAL ROAD, K0052+448-K0052+581, MARINDUQUE | Region IV-B | JIIK CONSTRUCTION SERVICES | On-Going | ₱289.5M | 80% | High risk63 | —-0.019 |
| 813 | 23E00110SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC- CONST. OF TABLAS ISLAND SOUTHERN ROAD NETWORK, STA. 000+000-STA. 000+980, STA. FE, ROMBLON | Region IV-B | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | Completed | ₱241.2M | 100% | High risk63 | —-0.052 |
| 814 | 24E00026SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239- INSTALLATION OF ROADWAY LIGHTING STRUCTURE ALONG MINDORO WEST COASTAL ROAD, K0324+300-K0340+000 (INTERMITTENT SECTIONS), OCC. MINDORO | Region IV-B | JIIK CONSTRUCTION SERVICES | Completed | ₱241.2M | 100% | High risk63 | —-0.053 |
| 815 | 22E00054WIDENING OF PERMANENT BRIDGES - SIIJERON BR. (B00031TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, TABLAS ISLAND, ROMBLON | Region IV-B | PLERM CONSTRUCTION AND DEVELOPMENT CORPORATION | Completed | ₱241.2M | 100% | High risk63 | —-0.012 |
| 816 | 22E00075CLUSTER 15: REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, TAGBAC-LUBANG-LOOC ROAD, 15.1: KO034+110-KO034+204.25; 15.2: KO035+380-KO035+478; KO035+507-KO035+523.55; 15.3: KO035+170-KO035+197.51, LUBANG, | Region IV-B | ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762) | On-Going | ₱180M | 84% | High risk63 | —-0.015 |
| 817 | 25E00259SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF CABIGAAN-APUIRAWAN CROSS COUNTRY ROAD PACKAGE D, ABORLAN, PALAWAN | Region IV-B | AR LUSTRE CONSTRUCTION CORPORATION (FORMERLY:A.R. LUSTRE JR. CONSTRUCTION) | On-Going | ₱232.6M | 0% | High risk63 | Flagged0.015 |
| 818 | 17EB0070ASSET PRESERVATION OF NATIONAL ROADS - CONSTRUCTION/UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, BULALACAO-SN JOSE-JCT MAPAYA RD - K0220 + 488, K0220 + 689, K0223 + 450, K0224 + 684 - K0227 + 607, S00141MRMAGSAYSAY AND SAN JOSE, OCCIDENTA | Mindoro Occidental DEO | CAVACON CORPORATION (FORMERLY CAGAYAN VALLEY CONST | Completed | ₱48.8M | 100% | High risk62 | —-0.035 |
| 819 | 25E00182ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- TERTIARY ROADS- JCT. MWCR (LABANGAN)-MURTHA-JCT. IRIRON ROAD, K0256+699-K0260+900, CALINTAAN, OCC. MINDORO | Region IV-B | SILVERWOLVES CONSTRUCTION CORPORATIONEGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | On-Going | ₱183.1M | 11% | High risk62 | —-0.018 |
| 820 | 23E00090WIDENING OF PERMANENT BRIDGES- BABUYAN BRIDGE (B00095PW) ALONG PUERTO PRINCESA NORTH ROAD, PALAWAN | Region IV-B | YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. | Completed | ₱159.2M | 100% | High risk62 | —-0.012 |
| 821 | 25EH0121CONSTRUCTION OF VICTORIA RIVER FLOOD CONTROL STRUCTURE, SAN ANDRES, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱119.4M | 72% | High risk62 | —-0.022 |
| 822 | 25E00143COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD, PHASE 3, BRGY. TUGDAN, TABLAS, ROMBLON | Region IV-B | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | On-Going | ₱230.2M | 83% | High risk62 | —-0.033 |
| 823 | 24E00001NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING- SECONDARY ROADS- MARINDUQUE CIRCUMFERENTIAL ROAD, K0057+460-K0064+994 (INTERMITTENT SECTIONS), MARINDUQUE | Region IV-B | HGG BUILDERS & SUPPLY | On-Going | ₱148.2M | 40% | High risk62 | —-0.029 |
| 824 | 22E00161PREVENTIVE MAINTENANCE-SECONDARY ROADS-CALAPAN SOUTH ROAD, KO071+867-KO075+036, KO075+850-KO078+475 | Region IV-B | STX ENTERPRISES | Completed | ₱298.2M | 100% | High risk62 | —-0.045 |
| 825 | 24E00100ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS, BONGABONG-SAGANA-ROXAS-SAN AQUILINO ROAD- K0106+470-K0107+796; K0110+000-K0110+171; SOUTHERN MINDORO | Region IV-B | EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | On-Going | ₱162.4M | 7% | High risk62 | —-0.016 |