Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
8,793
Total budget
₱315.2B
Average progress
96.0%
Completion rate
88.6%
Average risk score
38.3
Medium risk on average, out of 100
Flagged as unusual
507
5.8% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 3,392 | ₱159.3B | 41.4 | 77 | 96.0% |
| Buildings and Facilities | 2,892 | ₱25B | 26.6 | 52 | 98.1% |
| Flood Control and Drainage | 1,201 | ₱94.9B | 48.0 | 122 | 94.5% |
| Bridges | 625 | ₱16.3B | 38.4 | 17 | 97.3% |
| Water Provision and Storage | 328 | ₱1.7B | 24.8 | 7 | 99.2% |
| GAA 2025 SSP | 140 | ₱4.8B | 92.5 | 120 | 72.0% |
| OTHER | 87 | ₱5.1B | 73.2 | 56 | 88.7% |
| GAA 2025 OO-1 | 74 | ₱3.7B | 89.1 | 45 | 74.0% |
| Bridges, Roads | 29 | ₱2.9B | 54.3 | 5 | 85.1% |
| GAA 2025 OO-2 | 25 | ₱1.5B | 89.4 | 6 | 74.9% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Mindoro Oriental DEO | 1,268 | ₱21.7B | 33.3 | 34 | 97.7% |
| Romblon DEO | 1,117 | ₱39.6B | 41.0 | 56 | 97.9% |
| Region IV-B | 1,045 | ₱159.6B | 59.0 | 241 | 82.4% |
| Southern Mindoro DEO | 970 | ₱14.2B | 34.6 | 31 | 98.1% |
| Palawan 1st DEO | 960 | ₱13.5B | 33.1 | 38 | 98.0% |
| Palawan 2nd DEO | 958 | ₱14.4B | 33.0 | 46 | 97.9% |
| Mindoro Occidental DEO | 955 | ₱22.3B | 39.1 | 22 | 95.9% |
| Marinduque DEO | 917 | ₱21.2B | 37.5 | 22 | 98.8% |
| Palawan 3rd DEO | 603 | ₱8.7B | 30.6 | 17 | 98.7% |
Exhibit C
Joint-venture projects count toward each partner.
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EH0163CONSTRUCTION OF ROAD, SITIO EAST MAAMBONG, BARANGAY MAGSAYSAY TO SITIO CAPDANG BARANGAY AGMANIC, STA. FE, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱140.2M | 69% | High risk96 | Flagged0.031 |
| 25EH0161CONSTRUCTION OF ROAD, SITIO MAGSUPOT TO SITIO ILAYA, BARANGAY CALAGONSAO, ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱140.2M | 73% | High risk96 | Flagged0.029 |
| 25EH0080CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CANTINGAS, SAN FERNANDO, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱145.5M | 93% | High risk96 | Flagged0.024 |
| 25EH0087CONSTRUCTION OF ROAD, ODIONGAN ROAD LEADING TO TUGDAN AIRPORT, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱142.6M | 63% | High risk96 | Flagged0.035 |
| 25EH0088CONSTRUCTION OF ROAD, ALCANTARA TO ODIONGAN, ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱142.7M | 63% | High risk96 | Flagged0.034 |
| 25EH0079CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO CABANGAHAN BARANGAY CARMEN, SAN AGUSTIN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱145.5M | 100% | High risk96 | Flagged0.023 |
| 25EH0111CONSTRUCTION OF REVETMENT STRUCTURE ALONG PATO-O RIVER (PHASE 2), ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱139.8M | 22% | High risk96 | Flagged0.043 |
| 25EH0110CONSTRUCTION OF REVETMENT STRUCTURE ALONG PATO-O RIVER, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱139.7M | 27% | High risk96 | Flagged0.042 |
| 25ED0041CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CAMANSIHAN, CALAPAN CITY, ORIENTAL MINDORO | Mindoro Oriental DEO | SILVERWOLVES CONSTRUCTION CORPORATION | On-Going | ₱96.2M | 87% | High risk95 | Flagged0.018 |
| 25ED0109INSTALLATION OF STREET LIGHTS ALONG CALAPAN SOUTH ROAD K0007+400 -K0021+000, CALAPAN - NAUJAN, ORIENTAL MINDORO | Mindoro Oriental DEO | MG SAMIDAN CONSTRUCTION | Completed | ₱95.1M | 100% | High risk95 | —-0.008 |
| 25ED0015CONSTRUCTION OF ROAD DIKE, BARANGAY BAGONG BUHAY, NAUJAN, ORIENTAL MINDORO | Mindoro Oriental DEO | SILVERWOLVES CONSTRUCTION CORPORATION | On-Going | ₱95M | 71% | High risk95 | Flagged0.023 |
| 25ED0043CONSTRUCTION OF ROAD DIKE ALONG BAGTU RIVER, BARANGAY ARANGIN, NAUJAN, ORIENTAL MINDORO | Mindoro Oriental DEO | SILVERWOLVES CONSTRUCTION CORPORATION | On-Going | ₱109.2M | 54% | High risk95 | Flagged0.032 |
| 25EH0042CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, SITIO RIVERSIDE, BARANGAY TABOBO-AN, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱137.9M | 69% | High risk95 | Flagged0.031 |
| 25ED0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO CAGUISIKAN, BARANGAY GUTAD, CALAPAN CITY, ORIENTAL MINDORO | Mindoro Oriental DEO | SILVERWOLVES CONSTRUCTION CORPORATIONLUX DRAGON CONSTRUCTION CORPORATION | On-Going | ₱96.6M | 40% | High risk95 | Flagged0.031 |
| 25EE0075CONSTRUCTION OF TARADUNGAN BRIDGE ALONG TAMARBONG-TARADUNGAN-ILAN-CAPAYAS ROAD ROXAS, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱98.8M | 21% | High risk95 | Flagged0.053 |
| 25ED0147REHABILITATION OF ROAD, BARANGAY STA. ISABEL - BARANGAY TAWAGAN, CALAPAN CITY, ORIENTAL MINDORO | Mindoro Oriental DEO | UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP. | On-Going | ₱96.5M | 84% | High risk95 | Flagged0.019 |
| 25ED0108INSTALLATION OF STREET LIGHTS ALONG CALAPAN SOUTH ROAD K0047+200 - K0060+800, SOCORRO, ORIENTAL MINDORO | Mindoro Oriental DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱96.5M | 81% | High risk95 | Flagged0.021 |
| 25ED0114REHABILITATION OF SUGUI - PALHI ROAD, TIBAG - PACHOCA - WAWA ROAD, CALAPAN CITY, ORIENTAL MINDORO (PHASE 2) | Mindoro Oriental DEO | STX ENTERPRISES | On-Going | ₱96M | 57% | High risk95 | Flagged0.029 |
| 25EH0153CONSTRUCTION OF ROAD, SITIO PALATE TO BARANGAY PANIQUE, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱93.5M | 65% | High risk95 | Flagged0.026 |
| 25EH0154CONSTRUCTION OF ROAD, BARANGAY LAWAN TO BARANGAY SAN ISIDRO (PHASE 2), ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱93.5M | 81% | High risk95 | Flagged0.021 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23EE0137CONSTRUCTION OF BUSUANG TO CARAMAY FMR, CARAMAY, ROXAS, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱14.9M | 0% | Medium risk59 | Flagged0.074 |
| 23EE0138CONSTRUCTION OF SITIO NALBOT TO ARADO FMR, POBLACION, TAYTAY, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱14.9M | 0% | High risk60 | Flagged0.071 |
| 24EE0151CONSTRUCTION OF SCHOOL BUILDING, PAG-ASA ELEMENTARY SCHOOL BUILDING PAG-ASA, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱49.7M | 81% | High risk86 | Flagged0.069 |
| 24EF0084CONST. OF SCHOOL BLDG., PUNANG ES BLDG. IN SOFRONIO ESPANOLA, PAL., SOFRONIO ESPANOLA, PAL. | Palawan 2nd DEO | KIR KONSTRUCTICON BUILDERS AND SUPPLY INC. (FORMERLY: KONSTRUCTION BUILDERS AND SUPPLY) | On-Going | ₱19.9M | 96% | High risk84 | Flagged0.068 |
| 24E00262CONCRETING OF SITIO LAMOT BABOY, BRGY. PINAGLABANAN FMR, QUEZON, PALAWAN | Region IV-B | IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) | On-Going | ₱35M | 82% | High risk84 | Flagged0.067 |
| 23EE0139CONSTRUCTION OF SAN NICOLAS TO SITIO CANIOGAN FMR, CORON, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱14.9M | 0% | Medium risk58 | Flagged0.064 |
| 24EH0170CONSTRUCTION OF STORM SURGE PROTECTION/CAUSEWAY ALONG POBLACION SEAPORT, ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱144.8M | 87% | High risk90 | Flagged0.062 |
| 23EF0116CONSTRUCTION OF RIVERBANK PROTECTION RIVER CONTROL DIKE ALONG COLBY RIVER (RIGHT SIDE), RIZAL, PALAWAN | Palawan 2nd DEO | IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) | On-Going | ₱96.5M | 95% | High risk64 | Flagged0.061 |
| 24EH0171CONSTRUCTION OF SHORE PROTECTION/CAUSEWAY POBLACION, ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱141.9M | 86% | High risk90 | Flagged0.061 |
| 24E00226ROMBLON STATE UNIVERSITY- CONSTRUCTION OF THE HEALTH AND WELLNESS BUILDING, PHASE I, ODIONGAN, ROMBLON | Region IV-B | PERFORMANCE BUILDERS & DEVELOPERS CORPORATION | On-Going | ₱14.1M | 37% | High risk86 | Flagged0.057 |
| 23E00311ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG QUEZON-PUNTA BAJA ROAD, K0147+414-K0150+465, PALAWAN | Region IV-B | NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC | On-Going | ₱202.6M | 66% | High risk66 | Flagged0.057 |
| 23E00306SUSTANABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF POBLACION-TAGUMPAY DIVERSION ROAD LEADING TO CORON CRUISE PORT, PACKAGE 1 | Region IV-B | MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION) | On-Going | ₱280.2M | 20% | High risk64 | Flagged0.057 |
| 24EH0179CONSTRUCTION OF LUMBANG WESTE FLOOD CONTROL STRUCTURE ALONG LUMBANG RIVER PHASE 2, CAJIDIOCAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱130.4M | 100% | High risk90 | Flagged0.057 |
| 25EF0087CONST. OF PEDESTRIAN OVERPASS-PUERTO PRINCESA SOUTH ROAD K090+1075, NARRA, PALAWAN | Palawan 2nd DEO | L.D. DEMAALA CORPORATION | On-Going | ₱22.1M | 12% | High risk94 | Flagged0.056 |
| 24EE0144PACKAGE 2-CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDINGS IN:1. SAN FERNANDO NATIONAL HIGH SCHOOL, BARANGAY SAN FERNANDO2. DIAPILA NATIONAL HIGH SCHOOL, BARANGAY TENEGUIBAN, EL NIDO, PALAWAN | Palawan 1st DEO | E.V. VILLAOS TRADING & CONSTRUCTION | On-Going | ₱9.9M | 88% | High risk85 | Flagged0.055 |
| 25EB0117CONCRETING OF BRGY. SALVACION FMR, BRGY. SALVACION, RIZAL, OCCIDENTAL MINDORO | Mindoro Occidental DEO | MIGHTY DRAGON BUILDERS INC. | On-Going | ₱14.9M | 55% | High risk86 | Flagged0.055 |
| 25EG0014CONSTRUCTION OF ROAD, APORAWAN TO SITIO DAAN, 00+000.00 - 02+098.00, ABORLAN, PALAWAN | Palawan 3rd DEO | IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) | On-Going | ₱103.4M | 29% | High risk95 | Flagged0.055 |
| 23E00310ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- PREVENTIVE MAINTENANCE (ASDPHALT OVERLAY) ALONG PPSR JCT. (ABO-ABO)-QUEZON ROAD, K0139+568-K0142+730, PALAWAN | Region IV-B | NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC | On-Going | ₱173.7M | 71% | High risk64 | Flagged0.055 |
| 25ED0210CONSTRUCTION OF SCHOOL BUILDING, ORIENTAL MINDORO NATIONAL HIGH SCHOOL, SAN VICENTE EAST, CALAPAN CITY, ORIENTAL MINDORO | Mindoro Oriental DEO | MIDR CONSTRUCTION AND SUPPLIES | On-Going | ₱19.3M | 60% | High risk87 | Flagged0.054 |
| 25EE0075CONSTRUCTION OF TARADUNGAN BRIDGE ALONG TAMARBONG-TARADUNGAN-ILAN-CAPAYAS ROAD ROXAS, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱98.8M | 21% | High risk95 | Flagged0.053 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 676 | 20E00023CONST. OF MISSING LINKS/NEW ROADS, PALAWAN CIRCUMFERENTIAL ROAD (LATUD-CANIPAAN SECTION), PACKAGE D, STA. 304+565.00-STA. 313+166.00, PALAWAN | Region IV-B | YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. | Completed | ₱144.7M | 100% | High risk65 | Flagged0.028 |
| 677 | 20EI0050CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF TAWAS RIVER CONTROL, BONGABONG, ORIENTAL MINDORO | Southern Mindoro DEO | LUMEL GLENN CONSTRUCTION | Completed | ₱19.6M | 100% | High risk65 | —-0.045 |
| 678 | 17EH0031CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG TABLAS CIRCUMFERENTIAL ROAD,K0084 + 000 - K0090 + 210, K0120 + 920 - K00124 + 010.00, K0128 + 000 - K0129 + 020 (AS PER RBIA), TABLAS ISLAND, ROMBLON | Romblon DEO | MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. | Completed | ₱84.1M | 100% | High risk65 | —-0.048 |
| 679 | 17E00061REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIP, SLOPE COLLAPSE AND LANDSLIDE, SIBUYAN CIRCUMFERENTIAL ROAD K0003+615.71 - K0004+000, SIBUYAN, ROMBLON | Region IV-B | ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762) | Completed | ₱112.8M | 100% | High risk65 | —-0.041 |
| 680 | 19E00042CONSTRUCTION OF CONCRETE PARALLEL BRIDGE - PAGBAHAN BRIDGE ALONG MINDORO WEST COASTAL ROAD, MINDORO OCCIDENTAL | Region IV-B | PLERM CONSTRUCTION AND DEVELOPMENT CORPORATION | Completed | ₱154.3M | 100% | High risk65 | —-0.030 |
| 681 | 20EF0014CONSTRUCTION OF BATANG-BATANG RIVER FLOOD CONTROL STRUCTURE, NARRA, PALAWAN | Palawan 2nd DEO | C.T. LEONCIO CONSTRUCTION & TRADING | Completed | ₱26.5M | 100% | High risk65 | —-0.024 |
| 682 | 24EH0088CONSTRUCTION OF SHORE PROTECTION/ CAUSEWAY/ BREAKWATER ALONG BACHAWAN FEEDER PORT, SAN AGUSTIN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | Completed | ₱139.9M | 100% | High risk65 | —-0.054 |
| 683 | 24EH0065CONSTRUCTION OF GABAWAN RIVER CONTROL ALONG BULWANG UPSTREAM(B/S) PHASE 3, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | Completed | ₱139.9M | 100% | High risk65 | —-0.056 |
| 684 | 24EH0064CONSTRUCTION OF GABAWAN RIVER CONTROL ALONG BULWANG UPSTREAM(B/S) PHASE 2, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | Completed | ₱139.9M | 100% | High risk65 | —-0.056 |
| 685 | 24EH0081CONSTRUCTION OF MAINIT (DS-RS) FLOOD CONTROL STRUCTURE, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | Completed | ₱139.9M | 100% | High risk65 | —-0.056 |
| 686 | 23E00077SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF TURBONG COASTAL ROAD, BRGY. MARANGAS, BATARAZA, PALAWAN | Region IV-B | MARCBILT CONSTRUCTION, INC. | Completed | ₱192.6M | 100% | High risk65 | —-0.015 |
| 687 | 22E00072CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS)- CONST. OF PNP BUILDING, MAMBURAO, OCCIDENTAL MINDORO | Region IV-B | ANORE CONSTRUCTIONST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908) | On-Going | ₱37.5M | 56% | High risk65 | Flagged0.005 |
| 688 | 18EG0024CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE SYSTEM, PUERTO PRINCESA NORTH ROAD (JCT. PPNR-HONDA BAY ROAD TO INABUYAN BRIDGE), K0012+(-117.70)-K0012+455.70, PUERTO PRINCESA CITY, PALAWAN | Palawan 3rd DEO | F.F. GALANG CONSTRUCTION | Completed | ₱9.4M | 100% | High risk64 | —-0.030 |
| 689 | 17EB0083NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SABLAYAN PENAL COLONY RD - K0331 + 736 - K0333 + 512, S00101MR | Mindoro Occidental DEO | F.A. TORRES CONSTRUCTIONORIENT STAR CONSTRUCTION, INC. (FORMERLY: ORIENT S | Completed | ₱49M | 100% | High risk64 | —-0.052 |
| 690 | 24E00092BRIDGE PROGRAM- WIDENING OF BRIDGE, SIJERON BRIDGE (B00031TL) ALONG TABLAS CIRCUMFERENTIAL ROAD, PHASE II, TABLAS ISLAND, ROMBLON | Region IV-B | PLERM CONSTRUCTION AND DEVELOPMENT CORPORATION | On-Going | ₱292M | 85% | High risk64 | Flagged0.015 |
| 691 | 25E00192SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONSTRUCTION OF BRIDGE, BRGY. TABUK, STA. 000+080.00-STA. 000+140.00, SABLAYAN, OCC. MINDORO | Region IV-B | MAG KONSTRUCTION & SUPPLY INC.MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. | On-Going | ₱112.3M | 42% | High risk64 | —-0.024 |
| 692 | 20EI0049CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF PANLUAN RIVER CONTROL, BONGABONG, ORIENTAL MINDORO | Southern Mindoro DEO | E E CONSTRUCTION | Completed | ₱19.6M | 100% | High risk64 | —-0.045 |
| 693 | 25E00154BRIDGE PROGRAM- WIDENING OF PERMANENT BRIDGES- SIJERON BR. (B00031TL), PHASE III ALONG TABLAS CIRCUMFERENTIAL OAD, STA. 62+372.204-STA. 62+675.055, TABLAS ISLAND, ROMBLON | Region IV-B | PLERM CONSTRUCTION AND DEVELOPMENT CORPORATION | On-Going | ₱280.7M | 6% | High risk64 | Flagged0.030 |
| 694 | 17EI0088CONSTRUCTION OF FLOOD MITIGATION STRUCTURES, CONSTRUCTION OF FLOOD CONTROL BALETE RIVER, GLORIA, ORIENTAL MINDORO | Southern Mindoro DEO | ALBERTO UY CONSTRUCTION & DEVELOPMENT | Completed | ₱11.2M | 100% | High risk64 | —-0.045 |
| 695 | 17ED0031CONSTRUCTION OF MAG-ASAWANG TUBIG RIVER CONTROL, PINAGSABANGAN SECTION, NAUJAN, ORIENTAL MINDORO 1ST LD, NAUJAN, ORIENTAL MINDORO | Mindoro Oriental DEO | KING'S BUILDERS & DEVELOPMENT CORPORATION | Completed | ₱18.7M | 100% | High risk64 | —-0.045 |
| 696 | 23E00080SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF RIVER BANK PROTECTION WORKS ALONG BULALACAO RIVER, BATARAZA, PALAWAN | Region IV-B | KATHA BUILDERS & SUPPLIES INC.RDF TRADING AND CONSTRUCTION | Completed | ₱193M | 100% | High risk64 | —-0.013 |
| 697 | 25E00088CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF ROAD DIKE ALONG BUCAYAO GRANDE RIVER, BRGY. MALVAR (UPSTREAM-LEFTSIDE), NAUJAN, OR. MINDORO | Region IV-B | HGG BUILDERS & SUPPLY | On-Going | ₱115.2M | 35% | High risk64 | —-0.015 |
| 698 | 24E00174SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF TUBONG COASTAL ROAD (PHASE 1), BRGY. BONO-BONO SECTION, BATARAZA, PALAWAN | Region IV-B | MRRM TRADING & CONSTRUCTIONSALMEGA BUILDERS | Completed | ₱144.7M | 100% | High risk64 | —-0.028 |
| 699 | 24E00205SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- CONST. OF TUBONG COASTAL ROAD (PHASE 2), BRGY. MARANGAS-BRGY. BONO-BONO SECTION, STA. 000+000-STA. 001+029.70, BATARAZA, PALAWAN | Region IV-B | MRRM TRADING & CONSTRUCTIONSALMEGA BUILDERS | Completed | ₱144.7M | 100% | High risk64 | —-0.028 |
| 700 | 24E00105BRIDGE PROGRAM- WIDENING OF BRIDGE- ORCONUMA BR. (B00217MR) ALONG BONGABONG-SAGANA-ROXAS-SAN AQUILINO ROAD, BONGABONG, OR. MINDORO | Region IV-B | ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196) | On-Going | ₱156.9M | 84% | High risk64 | —-0.006 |