Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
10,287
Total budget
₱224.6B
Average progress
94.4%
Completion rate
83.6%
Average risk score
41.9
Medium risk on average, out of 100
Flagged as unusual
686
6.7% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 4,377 | ₱33.1B | 33.3 | 186 | 95.8% |
| Roads | 3,762 | ₱106.3B | 44.8 | 88 | 95.5% |
| Flood Control and Drainage | 908 | ₱43.3B | 50.1 | 53 | 93.2% |
| Bridges | 478 | ₱13.9B | 45.7 | 36 | 94.6% |
| Water Provision and Storage | 279 | ₱1.5B | 33.0 | 1 | 99.1% |
| OTHER | 229 | ₱12.3B | 79.6 | 160 | 76.0% |
| GAA 2025 SSP | 104 | ₱2.8B | 92.2 | 89 | 70.0% |
| GAA 2025 OO-1 | 58 | ₱2.2B | 92.9 | 40 | 58.5% |
| Bridges, Roads | 53 | ₱5.7B | 58.8 | 8 | 91.0% |
| GAA 2025 OO-2 | 39 | ₱3.6B | 92.3 | 25 | 56.8% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Iloilo 2nd DEO | 1,442 | ₱24.7B | 39.8 | 28 | 98.3% |
| Aklan DEO | 1,336 | ₱20.5B | 37.2 | 36 | 94.7% |
| Iloilo 3rd DEO | 1,061 | ₱14.1B | 39.5 | 40 | 95.2% |
| Antique DEO | 1,032 | ₱19.7B | 40.8 | 61 | 96.7% |
| Region VI | 971 | ₱69.6B | 55.9 | 203 | 87.0% |
| Iloilo 1st DEO | 944 | ₱16.7B | 44.4 | 80 | 94.1% |
| Iloilo City DEO | 788 | ₱11.2B | 38.4 | 50 | 91.2% |
| Iloilo 4th DEO | 699 | ₱13.4B | 40.9 | 25 | 98.1% |
| Guimaras DEO | 690 | ₱11.1B | 36.2 | 52 | 97.4% |
| Capiz 2nd DEO | 633 | ₱12.6B | 45.3 | 63 | 92.6% |
| Capiz 1st DEO | 599 | ₱8.7B | 41.4 | 22 | 94.5% |
| Iloilo 6th DEO | 92 | ₱2.4B | 66.2 | 26 | 63.9% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| IBC INTERNATIONAL BUILDERS CORPORATION | 407 | ₱33B | 57.9 | 58 | 88.9% |
| A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) | 357 | ₱17.2B | 56.7 | 62 | 88.5% |
| S.T. SALCEDO CONSTRUCTION CORP.(FORMERLY: SHAK CONSTRUCTION & SUPPLY) | 300 | ₱5.5B | 40.4 | 31 | 95.5% |
| J.E. TICO CONSTRUCTION CO., INC. (FORMERLY: JET CO | 234 | ₱9.8B | 51.5 | 37 | 90.2% |
| FIRST MAKEEN CONSTRUCTION | 199 | ₱862.1M | 28.2 | 1 | 98.9% |
| F. GURREA CONSTRUCTION, INCORPORATED | 194 | ₱14.1B | 56.2 | 21 | 90.5% |
| G.F. ROVERO MERCHANDISING | 189 | ₱3B | 40.0 | 4 | 96.1% |
| KIRSKAT VENTURE | 178 | ₱3.4B | 40.2 | 3 | 98.4% |
| VIRGIN BUILDERS CONSTRUCTION | 171 | ₱1.7B | 37.4 | 7 | 92.9% |
| 1 BEATUS BUILDERS CORP. | 170 | ₱1.5B | 39.8 | 6 | 97.0% |
| ALJ CONSTRUCTION AND SUPPLY | 160 | ₱461.7M | 21.5 | 7 | 99.8% |
| WOODLAND CONSTRUCTION & SUPPLY, INC. | 158 | ₱4.4B | 38.8 | 4 | 97.7% |
| JHALL MARKETING & SERVICES | 152 | ₱655.6M | 33.8 | 3 | 95.9% |
| WINCES CONSTRUCTION & SUPPLY | 141 | ₱732.6M | 29.4 | 0 | 100.0% |
| AUDRIC CONSTRUCTION & SUPPLY | 119 | ₱830.8M | 31.9 | 1 | 100.0% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25GI0069CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, BARANGAY MANASA, ALIMODIAN, ILOILO (SITE 3) | Iloilo 4th DEO | M.S. RAMOS CONSTRUCTION INC. (FORMERLY: M.S. RAMOS | On-Going | ₱96M | 82% | High risk96 | Flagged0.027 |
| 25GB0048CONSTRUCTION OF SAN REMIGIO-BUGO ROAD CONNECTING - ODIONG-SIBALOM-SAN REMIGIO-LEON ROAD, ANTIQUE | Antique DEO | KYRO BUILDERS, INC. | On-Going | ₱144.6M | 57% | High risk96 | Flagged0.042 |
| 25GJ0023CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG CALAJUNAN CREEK, BARANGAY CALAJUNAN, ILOILO CITY | Iloilo City DEO | A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) | On-Going | ₱125.9M | 86% | High risk96 | Flagged0.032 |
| 25G00072CONSTRUCTION OF SLOPE PROTECTION WORK ALONG DUNGON CREEK, ILOILO CITY | Region VI | IBC INTERNATIONAL BUILDERS CORPORATION | On-Going | ₱128.6M | 3% | High risk96 | Flagged0.056 |
| 25GP0010PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG ILOILO-CAPIZ RD (NEW ROUTE) - K0078+165-K0079+373,K0080+800 - K0081+692 | Capiz 2nd DEO | F. GURREA CONSTRUCTION, INCORPORATED | On-Going | ₱121.3M | 69% | High risk96 | Flagged0.037 |
| 25GB0067PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - BANTAYAN - SN PEDRO - CUBAY RD - K0104+000 - K0106+103, ANTIQUE | Antique DEO | IBC INTERNATIONAL BUILDERS CORPORATION | On-Going | ₱93.6M | 37% | High risk96 | Flagged0.021 |
| 25GF0087CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MIAGAO, ILOILO | Iloilo 1st DEO | A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) | On-Going | ₱139.8M | 58% | High risk96 | Flagged0.042 |
| 25GF0088CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, SAN JOAQUIN, ILOILO | Iloilo 1st DEO | RINEL CONSTRUCTION SERVICES | On-Going | ₱139.8M | 40% | High risk96 | Flagged0.046 |
| 25G00008CONSTRUCTION OF MAGUGBA BRIDGE, BARANGAY POBLACION, LIBACAO, AKLAN | Region VI | A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) | On-Going | ₱192.6M | 38% | High risk96 | Flagged0.050 |
| 25GF0089CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, TIGBAUAN, ILOILO | Iloilo 1st DEO | RINEL CONSTRUCTION SERVICES | On-Going | ₱139.8M | 30% | High risk96 | Flagged0.048 |
| 25G00063WIDENING OF PERMANENT BRIDGES- JALAUR BRIDGE (B00194PN) ALONG ILOILO- CAPIZ (NEW ROUTE) | Region VI | ALLENCON DEVELOPMENT CORPORATION | On-Going | ₱122M | 7% | High risk96 | Flagged0.034 |
| 25GE0046CONSTRUCTION OF CONCRETE ROAD - IMPROVEMENT OF ALAGUISOC-PIÑA ROAD, BARANGAY ALAGUISOC, JORDAN AND BARANGAY PIÑA, BUENAVISTA, GUIMARAS | Guimaras DEO | J.E. TICO CONSTRUCTION CO., INC. (FORMERLY: JET CO | On-Going | ₱62.6M | 98% | High risk96 | Flagged0.013 |
| 25GH0082CONSTRUCTION OF CONCRETE ROAD - BALASAN DIVERSION RD, BALASAN, PACKAGE 1, ILOILO | Iloilo 3rd DEO | CONTE BUILDERS & CONSTRUCTION SUPPLY | On-Going | ₱130.1M | 78% | High risk95 | Flagged0.017 |
| 25GG0097CONSTRUCTION OF MULTI - PURPOSE BUILDING, DUMANGAS, ILOILO | Iloilo 2nd DEO | CONTE BUILDERS & CONSTRUCTION SUPPLY | On-Going | ₱49.4M | 100% | High risk95 | Flagged0.013 |
| 25G00081PASSI BYPASS ROAD, ILOILO | Region VI | A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) | On-Going | ₱86.4M | 24% | High risk95 | Flagged0.022 |
| 25GG0195PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - ILOILO - CAPIZ (NEW ROUTE) - K0037 + 780 - K0039 + 619 | Iloilo 2nd DEO | ALLENCON DEVELOPMENT CORPORATION | On-Going | ₱81.9M | 24% | High risk95 | Flagged0.021 |
| 25GI0065REHABILITATION OF ROAD, BRGY. CAFÉ TO BRGY. BITAOG-TAYTAY, STA. BARBARA, ILOILO | Iloilo 4th DEO | 1 BEATUS BUILDERS CORP. | On-Going | ₱49.4M | 68% | High risk95 | Flagged0.025 |
| 25G00076INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG AKLAN EAST RD- K0286+071- K0290+170 | Region VI | SILVERRIA CONSTRUCTION AND CONSTRUCTION SUPPLY COMPANY, OPC | On-Going | ₱47.8M | 23% | High risk95 | Flagged0.032 |
| 25GH0145CONSTRUCTION OF ROAD - JUNCTION BAROTAC VIEJO - LEMERY ROAD SITIO - BANGON - BANGON - RIZAL ROAD CONNECTING NRJ ILOILO BAROTAC VIEJO - SAN RAFAEL ROAD, BAROTAC VIEJO, ILOILO | Iloilo 3rd DEO | A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) | On-Going | ₱79M | 23% | High risk95 | Flagged0.042 |
| 25G00069REPLACEMENT OF PERMANENT WEAK BRIDGES- OYUNGAN BR. (B00135PN) ALONG ILOILO- ANTIQUE RD | Region VI | MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. | On-Going | ₱96.4M | 45% | High risk95 | Flagged0.019 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23G00107CONSTRUCTION OF COLLEGE OF LAW BUILDING | Region VI | NATIONSTAR DEVELOPMENT CORPORATION (FOR: CASMOR CONSTRUCTION CORPORATION) | On-Going | ₱393.8M | 24% | High risk92 | Flagged0.101 |
| 18GD0101CONCRETING OF FARM TO MILL ROAD, BRGY. YATINGAN-SITIO SAN JOSE, BRGY. HIPONA ROAD | Capiz 1st DEO | MBM CONSTRUCTION | On-Going | ₱6.4M | 0% | High risk65 | Flagged0.087 |
| 18GD0103CONCRETING OF FARM TO MILL ROAD, SITIO SAN JOSE, BRGY. HIPONA-BRGY. BANATE ROAD | Capiz 1st DEO | MBM CONSTRUCTION | On-Going | ₱6.4M | 0% | High risk65 | Flagged0.087 |
| 18GD0102CONCRETING OF FARM TO MILL ROAD, BRGY. IBACA-BRGY. CUBAY ROAD | Capiz 1st DEO | NANA BUILDERS | On-Going | ₱6.4M | 0% | High risk64 | Flagged0.087 |
| 23GF0159IMPROVEMENT OF TUBUNGAN NATIONAL HIGH SCHOOL INCLUDING SOLAR FACILITIES BGY TENIENTE BENITO, MUNICIPALITY OF TUBUNGAN, ILOILO | Iloilo 1st DEO | ASIA STRUCTURAL DEVELOPER CORPORATION | On-Going | ₱7.2M | 0% | High risk89 | Flagged0.083 |
| 20GD0115CONCRETING OF FARM-TO-MILL ROAD, SITIO ESPERANZA, BRGY. BINUNTUCAN TO BRGY. CABUNGAHAN ROAD, PONTEVEDRA, CAPIZ | Capiz 1st DEO | NANA BUILDERS | On-Going | ₱5.7M | 0% | High risk65 | Flagged0.082 |
| 23GF0160IMPROVEMENT OF MIAGAO CENTRAL ELEMENTARY SCHOOL INCLUDING SOLAR FACILITIES BGY UBOS ILAWOD, MUNICIPALITY OF MIAGAO, ILOILO | Iloilo 1st DEO | ASIA STRUCTURAL DEVELOPER CORPORATION | On-Going | ₱7.2M | 0% | High risk89 | Flagged0.080 |
| 23GF0158IMPROVEMENT OF IGBARAS NATIONAL HIGH SCHOOL INCLUDING SOLAR FACILITIES BGY 4, MUNICIPALITY OF IGBARAS, ILOILO | Iloilo 1st DEO | ASIA STRUCTURAL DEVELOPER CORPORATION | On-Going | ₱7.2M | 0% | High risk89 | Flagged0.080 |
| 21G00205BORACAY DRAINAGE IMPROVEMENT PROJECT, BORACAY ISLAND, MALAY, AKLAN | Region VI | MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. | On-Going | ₱171.9M | 9% | High risk74 | Flagged0.079 |
| 23GF0157IMPROVEMENT OF BOTONG CABANBANAN NATIONAL HIGH SCHOOL INCLUDING SOLAR FACILITIES BGY BOTONG, MUNICIPALITY OF OTON, ILOILO | Iloilo 1st DEO | ASIA STRUCTURAL DEVELOPER CORPORATION | On-Going | ₱7.2M | 0% | High risk89 | Flagged0.079 |
| 23GF0155IMPROVEMENT OF CAMANGAHAN NATIONAL HIGH SCHOOL INCLUDING SOLAR FACILITIES BGY CAMANGAHAN, MUNICIPALITY OF GUIMBAL, ILOILO | Iloilo 1st DEO | ASIA STRUCTURAL DEVELOPER CORPORATION | On-Going | ₱7.2M | 0% | High risk89 | Flagged0.079 |
| 23GF0161IMPROVEMENT OF OTON NATIONAL HIGH SCHOOL INCLUDING SOLAR FACILITIES BGY POBLACION NORTH, MUNICIPALITY OF OTON, ILOILO | Iloilo 1st DEO | ASIA STRUCTURAL DEVELOPER CORPORATION | On-Going | ₱7.2M | 0% | High risk89 | Flagged0.079 |
| 24GE0065CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING IN NUEVA VALENCIA NATIONAL HIGH SCHOOL, BRGY. POBLACION, NUEVA VALENCIA, GUIMARAS | Guimaras DEO | A MAQUILING CONSTRUCTION AND SUPPLY | On-Going | ₱15.7M | 0% | High risk89 | Flagged0.077 |
| 25GJ0060CONSTRUCTION OF 2-STOREY 6-CLASSROOM SCHOOL BUILDING IN BO. OBRERO NATIONAL HIGH SCHOOL, ILOILO | Iloilo City DEO | ABELARDE BUILDERS AND SUPPLY | On-Going | ₱19.9M | 7% | High risk89 | Flagged0.074 |
| 25GA0150CONSTRUCTION OF SCHOOL BUILDING, LASERNA INTEGRATED SCHOOL, BARANGAY LASERNA, NABAS, AKLAN | Aklan DEO | ABELARDE BUILDERS AND SUPPLY | On-Going | ₱6.9M | 15% | High risk87 | Flagged0.074 |
| 25GP0055CONCRETING OF BRGY. JAMBAD TO BRGY. TINAYTAYAN FMR, BRGY. JAMBAD AND BRGY. TINAYTAYAN, DUMARAO, CAPIZ | Capiz 2nd DEO | 7 JL HARDWARE & CONSTRUCTION SUPPLIES | On-Going | ₱14.9M | 0% | High risk88 | Flagged0.073 |
| 24G00142LGU HOSPITALS - MALAY DISTRICT HOSPITAL, AKLAN | Region VI | MAKANA BUILDERS & SUPPLY | On-Going | ₱19.8M | 21% | High risk84 | Flagged0.073 |
| 24GH0181CONCRETING OF SITIO BAIRAN, BRGY. MALAYU-AN FMR, BRGY. MALAYU-AN, AJUY, ILOILO | Iloilo 3rd DEO | BRPRIME CONSTRUCTION SUPPLIES | On-Going | ₱5M | 3% | High risk87 | Flagged0.072 |
| 25GP0052CONCRETING OF BRGY. DACUTON FMR, BRGY. DACUTON, DUMARAO, CAPIZ | Capiz 2nd DEO | PANAY EAST COAST CONSTRUCTION & SUPPLY | On-Going | ₱24.8M | 17% | High risk88 | Flagged0.071 |
| 25GP0054CONCRETING OF BRGY. BUNGSUAN FMR, BRGY. BUNGSUAN, DUMARAO, CAPIZ | Capiz 2nd DEO | PANAY EAST COAST CONSTRUCTION & SUPPLY | On-Going | ₱24.8M | 18% | High risk89 | Flagged0.071 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 376 | 23GB0046SAN JOSE PORT RD - K0096 + (-079) - K0096 +864 | Antique DEO | SETTLERS BUILDERS | On-Going | ₱16.8M | 60% | High risk78 | Flagged0.025 |
| 377 | 24GP0052ROAD WIDENING ILOILO-CAPIZ RD (OLD ROUTE) K0087+820 - K0088+176, K0088+214 - K0088+474 | Capiz 2nd DEO | A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) | On-Going | ₱42.7M | 73% | High risk78 | Flagged0.008 |
| 378 | 24GP0064CONSTRUCTION OF MULTI-PURPOSE BUILDING(EVACUATION CENTER), BRGY. STA. CRUZ, DUMALAG, CAPIZ | Capiz 2nd DEO | 3 A'S & J CONSTRUCTION | On-Going | ₱7.9M | 100% | High risk78 | —-0.005 |
| 379 | 21GH0073OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING / CONSTRUCTION - PASSI - SN RAFAEL - LEMERY - SARA RD - K0069+095 - K0069+531, K0069+701 - K0070+593, K0074+493 - K0076+034, K0076+360 - K0076+784, SAN RAFAEL, ILOILO | Iloilo 3rd DEO | C'ZARLES CONSTRUCTION & SUPPLY | Completed | ₱51.7M | 100% | High risk78 | —-0.029 |
| 380 | 24GP0012ROAD WIDENING- ILOILO- CAPIZ RD (NEW ROUTE)- K0088+382 - K0088+523, K0089+204 - K0089+339 | Capiz 2nd DEO | GAA (IT) INTERNATIONAL TRADE WV COMPANY (FORMERLY: G.A ALL I.T SOLUTIONS COMPANY) | On-Going | ₱18.6M | 23% | High risk78 | Flagged0.026 |
| 381 | 25GB0045CONSTRUCTION OF CONCRETE ROAD-BRGY. CAMANCIJAN- BRGY. ALOJIPAN ROAD LEADING TO MT. MADIA-AS CULASI, ANTIQUE | Antique DEO | KYMEARL CONSTRUCTION SERVICES | On-Going | ₱9.8M | 98% | High risk78 | —-0.007 |
| 382 | 24GP0006CONSTRUCTION OF CONCRETE ROAD- CONSTRUCTION OF ROAD, SITIO LUBLUB, BARANGAY CONSOLACION, DUMALAG, APIZ | Capiz 2nd DEO | SLW8 BUILDERS | On-Going | ₱9.8M | 92% | High risk78 | Flagged0.005 |
| 383 | 22GG0109CONSTRUCTION OF CONCRETE ROAD - JCT. RUMAGAYRAY - SAN ENRIQUE ROAD LEADING PUTI-AN WALL CLIMBING, SAN ENRIQUE, ILOILO | Iloilo 2nd DEO | A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) | Completed | ₱38.5M | 100% | High risk78 | —-0.025 |
| 384 | 24GP0018ROAD WIDENING - ILOILO-CAPIZ RD (NEW ROUTE) - K0096+069 - K0096+715 | Capiz 2nd DEO | MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. | On-Going | ₱34.2M | 91% | High risk78 | Flagged0.005 |
| 385 | 25GG0009CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING, BARANGAY GAMA PEQUENO, CALINOG, ILOILO | Iloilo 6th DEO | MJ BARCELONA CONSTRUCTION AND SUPPLY | Completed | ₱3M | 100% | High risk78 | —-0.020 |
| 386 | 25GE0034RECONSTRUCTION TO CONCRETE PAVEMENT-GUIMARAS CIRCUMFERENTIAL RD (S00028GR) CHAINAGE 0-CHAINAGE 26, CHAINAGE 0-CHAINAGE 62, CHAINAGE 95-CHAINAGE 152 | Guimaras DEO | SILVERGRACES CONSTRUCTION AND CONSTRUCTION SUPPLY | Completed | ₱6.3M | 100% | High risk78 | —-0.032 |
| 387 | 22GP0081CONSTRUCTION OF CONCRETE ROAD - ACCESS ROAD LEADING TO NABAYE FALLS, BRGY. DURAN, DUMALAG, CAPIZ | Capiz 2nd DEO | KERGEL BUILDERS | Completed | ₱17.4M | 100% | High risk78 | —-0.032 |
| 388 | 23GE0026REHABILITATION/MAJOR REPAIR OF BRIDGE-MANTASIC BR. (B00004GR) ALONG GUIMARAS CIRCUMFERENTIAL RD | Guimaras DEO | SKAB DRAGON CONSTRUCTION SERVICES CO. | On-Going | ₱7.8M | 96% | High risk78 | Flagged0.014 |
| 389 | 18GP0064CONSTRUCTION OF CONCRETE ROAD - DUMALAG - PINAMALATICAN - MAMBUSAO, CAPIZ | Capiz 2nd DEO | MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. | Completed | ₱32.4M | 100% | High risk78 | —-0.027 |
| 390 | 24GP0024REHABILITATION OF PAVED ROAD- GUINTAS- PINAMALATICAN ROAD, CAPIZ | Capiz 2nd DEO | PANAY EAST COAST CONSTRUCTION & SUPPLYA.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) | On-Going | ₱39.2M | 91% | High risk78 | Flagged0.005 |
| 391 | 24GP0029WIDENING OF BRIDGE - IBIAN BR. (B00235PN) ALONG ILOILO-CAPIZ RD (NEW ROUTE) | Capiz 2nd DEO | A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) | On-Going | ₱32.2M | 35% | High risk78 | Flagged0.023 |
| 392 | 24GP0055WIDENING OF BRIDGE - SIGMA BR. (B00233PN) ALONG ILOILO-CAPIZ RD (NEW ROUTE) | Capiz 2nd DEO | A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) | On-Going | ₱39M | 0% | High risk78 | Flagged0.031 |
| 393 | 21GG0127CONSTRUCTION OF SEA WALL/STORM SURGE PROTECTION WITH EMBANKMENT/ ROAD CONCRETING, BANATE, ILOILO | Iloilo 2nd DEO | F. GURREA CONSTRUCTION, INCORPORATED | Completed | ₱49M | 100% | High risk78 | —-0.028 |
| 394 | 17GD0030IMP/WIDENING OF NATL RD-SEC RD,ILO EAST COAST-CPZ RD K0134+458-K0135+270,K0137+484.45-K0138+656.45.. | Capiz 1st DEO | KIRSKAT VENTURE | Completed | ₱90.8M | 100% | High risk78 | —-0.013 |
| 395 | 21GH0081CONSTRUCTION OF CONCRETE ROAD - BAROTAC VIEJO BYPASS ROAD, ILOILO | Iloilo 3rd DEO | F. GURREA CONSTRUCTION, INCORPORATED | Completed | ₱49M | 100% | High risk77 | —-0.025 |
| 396 | 24G00071CONSTRUCTION OF MULTIPURPOSE FACILITIES, MALAY, AKLAN PACKAGE 1 | Region VI | IBC INTERNATIONAL BUILDERS CORPORATION | On-Going | ₱296.2M | 0% | High risk77 | Flagged0.044 |
| 397 | 23GP0015CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, BARANGAY MALONOY, DUMARAO, CAPIZ | Capiz 2nd DEO | AAM CONSTRUCTION | Completed | ₱9.9M | 100% | High risk77 | —-0.031 |
| 398 | 17GD0029IMP/WIDENING OF NATL RD-SEC RD, ILO EAST COAST-CPZ RD K0152+111-K0152+897,K0153+000-K0154+173,ETC.. | Capiz 1st DEO | SILVER DRAGON CONSTRUCTION & LUMBER & GLASS SUPPLY INC. | Completed | ₱90.8M | 100% | High risk77 | —-0.012 |
| 399 | 17GE0035WIDENING OF BRIDGE-LANGAB BR. (B00005GR) ALONG GUIMARAS CIRCUMFERENTIAL ROAD | Guimaras DEO | J.E. TICO CONSTRUCTION CO., INC. (FORMERLY: JET CO | Completed | ₱23.3M | 100% | High risk77 | —-0.028 |
| 400 | 25GG0089CONSTRUCTION (COMPLETION) OF MULTI - PURPOSE BUILDING, BARANGAY IGANG, POTOTAN, ILOILO | Iloilo 6th DEO | MDG CONSTRUCTION | Completed | ₱2.4M | 100% | High risk77 | —-0.019 |