Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
8,793
Total budget
₱315.2B
Average progress
96.0%
Completion rate
88.6%
Average risk score
38.3
Medium risk on average, out of 100
Flagged as unusual
507
5.8% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 3,392 | ₱159.3B | 41.4 | 77 | 96.0% |
| Buildings and Facilities | 2,892 | ₱25B | 26.6 | 52 | 98.1% |
| Flood Control and Drainage | 1,201 | ₱94.9B | 48.0 | 122 | 94.5% |
| Bridges | 625 | ₱16.3B | 38.4 | 17 | 97.3% |
| Water Provision and Storage | 328 | ₱1.7B | 24.8 | 7 | 99.2% |
| GAA 2025 SSP | 140 | ₱4.8B | 92.5 | 120 | 72.0% |
| OTHER | 87 | ₱5.1B | 73.2 | 56 | 88.7% |
| GAA 2025 OO-1 | 74 | ₱3.7B | 89.1 | 45 | 74.0% |
| Bridges, Roads | 29 | ₱2.9B | 54.3 | 5 | 85.1% |
| GAA 2025 OO-2 | 25 | ₱1.5B | 89.4 | 6 | 74.9% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Mindoro Oriental DEO | 1,268 | ₱21.7B | 33.3 | 34 | 97.7% |
| Romblon DEO | 1,117 | ₱39.6B | 41.0 | 56 | 97.9% |
| Region IV-B | 1,045 | ₱159.6B | 59.0 | 241 | 82.4% |
| Southern Mindoro DEO | 970 | ₱14.2B | 34.6 | 31 | 98.1% |
| Palawan 1st DEO | 960 | ₱13.5B | 33.1 | 38 | 98.0% |
| Palawan 2nd DEO | 958 | ₱14.4B | 33.0 | 46 | 97.9% |
| Mindoro Occidental DEO | 955 | ₱22.3B | 39.1 | 22 | 95.9% |
| Marinduque DEO | 917 | ₱21.2B | 37.5 | 22 | 98.8% |
| Palawan 3rd DEO | 603 | ₱8.7B | 30.6 | 17 | 98.7% |
Exhibit C
Joint-venture projects count toward each partner.
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25EH0163CONSTRUCTION OF ROAD, SITIO EAST MAAMBONG, BARANGAY MAGSAYSAY TO SITIO CAPDANG BARANGAY AGMANIC, STA. FE, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱140.2M | 69% | High risk96 | Flagged0.031 |
| 25EH0161CONSTRUCTION OF ROAD, SITIO MAGSUPOT TO SITIO ILAYA, BARANGAY CALAGONSAO, ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱140.2M | 73% | High risk96 | Flagged0.029 |
| 25EH0080CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CANTINGAS, SAN FERNANDO, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱145.5M | 93% | High risk96 | Flagged0.024 |
| 25EH0087CONSTRUCTION OF ROAD, ODIONGAN ROAD LEADING TO TUGDAN AIRPORT, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱142.6M | 63% | High risk96 | Flagged0.035 |
| 25EH0088CONSTRUCTION OF ROAD, ALCANTARA TO ODIONGAN, ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱142.7M | 63% | High risk96 | Flagged0.034 |
| 25EH0079CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO CABANGAHAN BARANGAY CARMEN, SAN AGUSTIN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱145.5M | 100% | High risk96 | Flagged0.023 |
| 25EH0111CONSTRUCTION OF REVETMENT STRUCTURE ALONG PATO-O RIVER (PHASE 2), ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱139.8M | 22% | High risk96 | Flagged0.043 |
| 25EH0110CONSTRUCTION OF REVETMENT STRUCTURE ALONG PATO-O RIVER, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱139.7M | 27% | High risk96 | Flagged0.042 |
| 25ED0041CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CAMANSIHAN, CALAPAN CITY, ORIENTAL MINDORO | Mindoro Oriental DEO | SILVERWOLVES CONSTRUCTION CORPORATION | On-Going | ₱96.2M | 87% | High risk95 | Flagged0.018 |
| 25ED0109INSTALLATION OF STREET LIGHTS ALONG CALAPAN SOUTH ROAD K0007+400 -K0021+000, CALAPAN - NAUJAN, ORIENTAL MINDORO | Mindoro Oriental DEO | MG SAMIDAN CONSTRUCTION | Completed | ₱95.1M | 100% | High risk95 | —-0.008 |
| 25ED0015CONSTRUCTION OF ROAD DIKE, BARANGAY BAGONG BUHAY, NAUJAN, ORIENTAL MINDORO | Mindoro Oriental DEO | SILVERWOLVES CONSTRUCTION CORPORATION | On-Going | ₱95M | 71% | High risk95 | Flagged0.023 |
| 25ED0043CONSTRUCTION OF ROAD DIKE ALONG BAGTU RIVER, BARANGAY ARANGIN, NAUJAN, ORIENTAL MINDORO | Mindoro Oriental DEO | SILVERWOLVES CONSTRUCTION CORPORATION | On-Going | ₱109.2M | 54% | High risk95 | Flagged0.032 |
| 25EH0042CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, SITIO RIVERSIDE, BARANGAY TABOBO-AN, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱137.9M | 69% | High risk95 | Flagged0.031 |
| 25ED0016CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO CAGUISIKAN, BARANGAY GUTAD, CALAPAN CITY, ORIENTAL MINDORO | Mindoro Oriental DEO | SILVERWOLVES CONSTRUCTION CORPORATIONLUX DRAGON CONSTRUCTION CORPORATION | On-Going | ₱96.6M | 40% | High risk95 | Flagged0.031 |
| 25EE0075CONSTRUCTION OF TARADUNGAN BRIDGE ALONG TAMARBONG-TARADUNGAN-ILAN-CAPAYAS ROAD ROXAS, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱98.8M | 21% | High risk95 | Flagged0.053 |
| 25ED0147REHABILITATION OF ROAD, BARANGAY STA. ISABEL - BARANGAY TAWAGAN, CALAPAN CITY, ORIENTAL MINDORO | Mindoro Oriental DEO | UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP. | On-Going | ₱96.5M | 84% | High risk95 | Flagged0.019 |
| 25ED0108INSTALLATION OF STREET LIGHTS ALONG CALAPAN SOUTH ROAD K0047+200 - K0060+800, SOCORRO, ORIENTAL MINDORO | Mindoro Oriental DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱96.5M | 81% | High risk95 | Flagged0.021 |
| 25ED0114REHABILITATION OF SUGUI - PALHI ROAD, TIBAG - PACHOCA - WAWA ROAD, CALAPAN CITY, ORIENTAL MINDORO (PHASE 2) | Mindoro Oriental DEO | STX ENTERPRISES | On-Going | ₱96M | 57% | High risk95 | Flagged0.029 |
| 25EH0153CONSTRUCTION OF ROAD, SITIO PALATE TO BARANGAY PANIQUE, ODIONGAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱93.5M | 65% | High risk95 | Flagged0.026 |
| 25EH0154CONSTRUCTION OF ROAD, BARANGAY LAWAN TO BARANGAY SAN ISIDRO (PHASE 2), ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱93.5M | 81% | High risk95 | Flagged0.021 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23EE0137CONSTRUCTION OF BUSUANG TO CARAMAY FMR, CARAMAY, ROXAS, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱14.9M | 0% | Medium risk59 | Flagged0.074 |
| 23EE0138CONSTRUCTION OF SITIO NALBOT TO ARADO FMR, POBLACION, TAYTAY, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱14.9M | 0% | High risk60 | Flagged0.071 |
| 24EE0151CONSTRUCTION OF SCHOOL BUILDING, PAG-ASA ELEMENTARY SCHOOL BUILDING PAG-ASA, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱49.7M | 81% | High risk86 | Flagged0.069 |
| 24EF0084CONST. OF SCHOOL BLDG., PUNANG ES BLDG. IN SOFRONIO ESPANOLA, PAL., SOFRONIO ESPANOLA, PAL. | Palawan 2nd DEO | KIR KONSTRUCTICON BUILDERS AND SUPPLY INC. (FORMERLY: KONSTRUCTION BUILDERS AND SUPPLY) | On-Going | ₱19.9M | 96% | High risk84 | Flagged0.068 |
| 24E00262CONCRETING OF SITIO LAMOT BABOY, BRGY. PINAGLABANAN FMR, QUEZON, PALAWAN | Region IV-B | IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) | On-Going | ₱35M | 82% | High risk84 | Flagged0.067 |
| 23EE0139CONSTRUCTION OF SAN NICOLAS TO SITIO CANIOGAN FMR, CORON, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱14.9M | 0% | Medium risk58 | Flagged0.064 |
| 24EH0170CONSTRUCTION OF STORM SURGE PROTECTION/CAUSEWAY ALONG POBLACION SEAPORT, ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱144.8M | 87% | High risk90 | Flagged0.062 |
| 23EF0116CONSTRUCTION OF RIVERBANK PROTECTION RIVER CONTROL DIKE ALONG COLBY RIVER (RIGHT SIDE), RIZAL, PALAWAN | Palawan 2nd DEO | IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) | On-Going | ₱96.5M | 95% | High risk64 | Flagged0.061 |
| 24EH0171CONSTRUCTION OF SHORE PROTECTION/CAUSEWAY POBLACION, ALCANTARA, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱141.9M | 86% | High risk90 | Flagged0.061 |
| 24E00226ROMBLON STATE UNIVERSITY- CONSTRUCTION OF THE HEALTH AND WELLNESS BUILDING, PHASE I, ODIONGAN, ROMBLON | Region IV-B | PERFORMANCE BUILDERS & DEVELOPERS CORPORATION | On-Going | ₱14.1M | 37% | High risk86 | Flagged0.057 |
| 23E00311ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG QUEZON-PUNTA BAJA ROAD, K0147+414-K0150+465, PALAWAN | Region IV-B | NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC | On-Going | ₱202.6M | 66% | High risk66 | Flagged0.057 |
| 23E00306SUSTANABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF POBLACION-TAGUMPAY DIVERSION ROAD LEADING TO CORON CRUISE PORT, PACKAGE 1 | Region IV-B | MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION) | On-Going | ₱280.2M | 20% | High risk64 | Flagged0.057 |
| 24EH0179CONSTRUCTION OF LUMBANG WESTE FLOOD CONTROL STRUCTURE ALONG LUMBANG RIVER PHASE 2, CAJIDIOCAN, ROMBLON | Romblon DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱130.4M | 100% | High risk90 | Flagged0.057 |
| 25EF0087CONST. OF PEDESTRIAN OVERPASS-PUERTO PRINCESA SOUTH ROAD K090+1075, NARRA, PALAWAN | Palawan 2nd DEO | L.D. DEMAALA CORPORATION | On-Going | ₱22.1M | 12% | High risk94 | Flagged0.056 |
| 24EE0144PACKAGE 2-CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDINGS IN:1. SAN FERNANDO NATIONAL HIGH SCHOOL, BARANGAY SAN FERNANDO2. DIAPILA NATIONAL HIGH SCHOOL, BARANGAY TENEGUIBAN, EL NIDO, PALAWAN | Palawan 1st DEO | E.V. VILLAOS TRADING & CONSTRUCTION | On-Going | ₱9.9M | 88% | High risk85 | Flagged0.055 |
| 25EB0117CONCRETING OF BRGY. SALVACION FMR, BRGY. SALVACION, RIZAL, OCCIDENTAL MINDORO | Mindoro Occidental DEO | MIGHTY DRAGON BUILDERS INC. | On-Going | ₱14.9M | 55% | High risk86 | Flagged0.055 |
| 25EG0014CONSTRUCTION OF ROAD, APORAWAN TO SITIO DAAN, 00+000.00 - 02+098.00, ABORLAN, PALAWAN | Palawan 3rd DEO | IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) | On-Going | ₱103.4M | 29% | High risk95 | Flagged0.055 |
| 23E00310ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- PREVENTIVE MAINTENANCE (ASDPHALT OVERLAY) ALONG PPSR JCT. (ABO-ABO)-QUEZON ROAD, K0139+568-K0142+730, PALAWAN | Region IV-B | NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC | On-Going | ₱173.7M | 71% | High risk64 | Flagged0.055 |
| 25ED0210CONSTRUCTION OF SCHOOL BUILDING, ORIENTAL MINDORO NATIONAL HIGH SCHOOL, SAN VICENTE EAST, CALAPAN CITY, ORIENTAL MINDORO | Mindoro Oriental DEO | MIDR CONSTRUCTION AND SUPPLIES | On-Going | ₱19.3M | 60% | High risk87 | Flagged0.054 |
| 25EE0075CONSTRUCTION OF TARADUNGAN BRIDGE ALONG TAMARBONG-TARADUNGAN-ILAN-CAPAYAS ROAD ROXAS, PALAWAN | Palawan 1st DEO | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱98.8M | 21% | High risk95 | Flagged0.053 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 601 | 23E00160SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONST. OF ROAD, BRGY. STA. ROSA II PROVINCIAL ROAD, SITIO CALAMANSIAN, BACO, OR. MIN | Region IV-B | RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY) | On-Going | ₱116.8M | 0% | High risk66 | Flagged0.004 |
| 602 | 24E00035FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES SND DRAINAGE SYSTEMS- CONST. OF ROAD DIKE/ESPLANADE ALONG SITIO ANDUYANAN, PALUAN, OCC. MINDORO | Region IV-B | AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129) | Completed | ₱289.5M | 100% | High risk66 | —-0.031 |
| 603 | 23E00311ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE- SECONDARY ROADS- PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG QUEZON-PUNTA BAJA ROAD, K0147+414-K0150+465, PALAWAN | Region IV-B | NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC | On-Going | ₱202.6M | 66% | High risk66 | Flagged0.057 |
| 604 | 24E00173SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF TAGBUAYA RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN | Region IV-B | IVY MICHELLE CONSTRUCTION AND TRADING INC. (FORMERLY:IVY MICHELLE TRADING & CONTRUCTION) | On-Going | ₱193M | 74% | High risk66 | Flagged0.025 |
| 605 | 24E00172SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITUIES- CONST. OF PUNANG RIVER FLOOD CONTROL STRUCTURE, SOFRONIO, ESPANOLA, PALAWAN | Region IV-B | YURICH BUILDERS AND CONSTRUCTION SUPPLY INC. | Completed | ₱193M | 100% | High risk66 | —-0.021 |
| 606 | 23E00007SUSTAINABLE INFRASTRCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF GASAN SHORE PROTECTION/BOULEVARD, GASAN, MARINDUQUE | Region IV-B | PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.R.R. ENCABO CONSTRUCTORS INCORPORATED (FORMERLY RR | On-Going | ₱185.9M | 42% | High risk66 | Flagged0.013 |
| 607 | 25E00003CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE, BOAC RIVER (UPSTREAM-RIGHTSIDE), BOAC, MARINDUQUE | Region IV-B | ZUIDEN BUILDERS INC.MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP. (FORMERLY:MARKBILT CONSTRUCTION) | On-Going | ₱184.7M | 70% | High risk66 | —-0.007 |
| 608 | 23E00009SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF BUENAVISTA SHORE PROTECTION/BOULEVARD, BRGY. TUNGIB-LIPATA, BUENAVISTA, MARINDUQUE | Region IV-B | HGG BUILDERS & SUPPLY | Completed | ₱193M | 100% | High risk66 | —-0.044 |
| 609 | 17E00072ROAD UPGRADING (UNPAVED TO PAVED) OF PARPAGOHA (MARIGONDON)-BINOOG ROAD K0023+585-K0025+741, TABLAS, ROMBLON | Romblon DEO | ED1SON DEVELOPMENT & CONSTRUCTION INC. | Completed | ₱96.5M | 100% | High risk66 | —-0.043 |
| 610 | 24E00117FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF PALUAN SHORE PROTECTION AND CAUSEWAY DEVELOPMENT, SITIO IPOL SECTION, OCCIDENTAL MINDORO | Region IV-B | D.T. RECIO INCORPORATED | Completed | ₱289.5M | 100% | High risk66 | —-0.031 |
| 611 | 23E00120SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF SOUTHERN MINDORO COASTAL ROAD, PINAMALAYAN SECTION, PINAMALAYAN, ORIENTAL MINDORO | Region IV-B | ANORE CONSTRUCTION | On-Going | ₱207.5M | 85% | High risk66 | Flagged0.004 |
| 612 | 21E00079CLUSTER 4: CONST. OF FLOOD CONTROL STRUCTURES/FACILITIES, STA. 0+000-STA. 0+486; STA. 0+439 (L/S), ROMBLON, 4.1. VIILP- CONST. OF TUBURAN FLOOD CONTROL, STA. 0+000-STA. 0+486, TUBURAN, ODIONGAN, 4.2. VIILP- CONST. OF TUGUIS FLOOD CONTROL ALONG LOOC (COGON | Region IV-B | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)FFJJ CONSTRUCTION | Completed | ₱173.6M | 100% | High risk66 | —-0.048 |
| 613 | 17E00021IMPRVMNT/WIDENINGOF F.B.REYES(BUSUANGA-CORON) RD.,K0014+278-K0017+843, CORON, PALAWAN | Region IV-B | ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION) | Completed | ₱129.6M | 100% | High risk66 | —-0.029 |
| 614 | 17E00020IMPRVMNT/WIDENINGOF F.B.REYES(BUSUANGA-CORON)RD. K0011+(-387)-K0012+180; K0012+196-K0014+278 W/EXC. | Region IV-B | ONE HUNDRED PERCENT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:BCT TRADING & CONSTRUCTION) | Completed | ₱129.7M | 100% | High risk66 | —-0.029 |
| 615 | 23E00123SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG CARATAO RIVER, BULALACAO, OR. MINDORO | Region IV-B | G.C.I. CONSTRUCTION AND DEV'T. CORP.AC8 BUILDERS | On-Going | ₱209.5M | 9% | High risk66 | Flagged0.022 |
| 616 | 23E00191SUSTAINABLE INFRASTRUCTURE PROECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF COASTAL ROAD/BOULEVARD & CAUSEWAY FOR TOURISM ALONG CARMEN PORT, SAN AGUSTIN, ROMBLON | Region IV-B | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | Completed | ₱289.5M | 100% | High risk66 | —-0.034 |
| 617 | 24E00118FLOOD MANAGEMENT PROGRAM- CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONST. OF RIVER CONTROL STRUCTURE ALONG PARPAGOHA RIVER, UPSTREAM, TABLAS ISLAND, ROMBLON | Region IV-B | YPR GEN. CONTRACTOR AND CONSTRUCTION SUPPLY INC. | Completed | ₱289.5M | 100% | High risk66 | —-0.036 |
| 618 | 25E00108FLOOD MANAGEMENT PROGRAM- CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONST. OF SLOPE PROTECTION STRUCTURE (TALOG BRIDGE), TAYTAY, PALAWAN | Region IV-B | JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | On-Going | ₱139M | 75% | High risk66 | —-0.004 |
| 619 | 23E00125SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG BONGABONG RIVER, SAN ISIDRO-SAN JOSE SECTION, BONGABONG, OR. MINDORO | Region IV-B | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | Completed | ₱217.1M | 100% | High risk66 | —-0.042 |
| 620 | 23E00124SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF ROAD DIKE/ESPLANADE ALONG BONGABONG RIVER, ANILAO-MINA DE ORO SECT., BONGABONG, R. MINDORO | Region IV-B | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | Completed | ₱217.1M | 100% | High risk66 | —-0.042 |
| 621 | 23E00129SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF TORRIJOS SEAWALL, BRGY. POBLACION SECTION, TORRIJOS, MARINDUQUE | Region IV-B | HGG BUILDERS & SUPPLY | Completed | ₱241.2M | 100% | High risk66 | —-0.039 |
| 622 | 23E00130SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF TORRIJOS SEAWALL, BRGY. MARLANGGA SECTION, TORRIJOS, MARINDUQUE | Region IV-B | HGG BUILDERS & SUPPLY | Completed | ₱241.2M | 100% | High risk66 | —-0.039 |
| 623 | 20E00097CLUSTER 4 - CONSTRUCTION OF MISSING LINKS / NEW ROADS SUMBILING STA. 0+000 - 10+000, PALAWAN | Region IV-B | NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC | Completed | ₱106.1M | 100% | High risk66 | Flagged0.008 |
| 624 | 23E00036REPLACEMENT OF PERMANENT WEAK BRIDGES- ALAG MALAKI BRIDGE (B00181MR) ALONG CALAPAN NORTH ROAD, ORIENTAL MINDORO | Region IV-B | ARCONIC INC.MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. | Completed | ₱202.6M | 100% | High risk66 | —-0.021 |
| 625 | 23E00010SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF TORIJOS SHORE PROTECTION/BOULEVARD, BRGY. POBLACION, TORIJOS, MARINDUQUE | Region IV-B | HGG BUILDERS & SUPPLY | Completed | ₱193M | 100% | High risk66 | —-0.043 |