Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
12,331
Total budget
₱350.4B
Average progress
94.3%
Completion rate
78.8%
Average risk score
46.4
Medium risk on average, out of 100
Flagged as unusual
853
6.9% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 4,879 | ₱161.4B | 47.3 | 123 | 95.0% |
| Buildings and Facilities | 3,615 | ₱36.1B | 36.5 | 46 | 96.6% |
| Flood Control and Drainage | 1,660 | ₱70.5B | 48.9 | 32 | 95.3% |
| Bridges | 883 | ₱21.5B | 44.2 | 50 | 95.4% |
| OTHER | 468 | ₱37.6B | 81.6 | 311 | 78.3% |
| Water Provision and Storage | 429 | ₱3B | 33.0 | 5 | 98.8% |
| GAA 2025 SSP | 213 | ₱5.3B | 94.4 | 200 | 72.1% |
| GAA 2025 OO-1 | 108 | ₱8.1B | 92.7 | 69 | 65.8% |
| GAA 2025 OO-2 | 58 | ₱5.5B | 92.1 | 16 | 69.6% |
| Bridges, Roads | 18 | ₱1.4B | 56.6 | 1 | 99.9% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 1,162 | ₱114.5B | 62.7 | 277 | 84.4% |
| Eastern Samar DEO | 1,102 | ₱18.3B | 41.0 | 62 | 98.0% |
| Southern Leyte 1st DEO | 1,068 | ₱26.2B | 43.2 | 49 | 98.1% |
| Leyte 4th DEO | 1,052 | ₱25.8B | 40.4 | 41 | 97.5% |
| Biliran DEO | 1,022 | ₱18.4B | 46.3 | 53 | 95.2% |
| Samar 1st DEO | 929 | ₱25.2B | 46.2 | 38 | 97.8% |
| Leyte 3rd DEO | 849 | ₱12.7B | 40.8 | 14 | 96.3% |
| Leyte 1st DEO | 832 | ₱20.6B | 47.7 | 58 | 89.7% |
| Northern Samar 1st DEO | 818 | ₱12.3B | 44.2 | 83 | 89.7% |
| Leyte 2nd DEO | 784 | ₱14.5B | 45.8 | 25 | 98.1% |
| Leyte 5th DEO | 777 | ₱15B | 45.1 | 16 | 98.8% |
| Northern Samar 2nd DEO | 633 | ₱15.6B | 48.6 | 33 | 97.9% |
| Samar 2nd DEO | 618 | ₱16.2B | 48.3 | 40 | 94.7% |
| Tacloban City DEO | 616 | ₱13.9B | 46.7 | 42 | 84.7% |
| Southern Leyte 2nd DEO | 69 | ₱1.1B | 59.3 | 22 | 69.7% |
Exhibit C
Joint-venture projects count toward each partner.
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00169SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF MAYDOLONG - BASEY ROAD, EASTERN SAMAR | Region VIII | CHRIZMARIE BUILDERS AND CONSTRUCTION SUPPLY | On-Going | ₱158.1M | 16% | High risk97 | Flagged0.045 |
| 25IL0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, LIMASAWA CIR | Southern Leyte 1st DEO | EZJONES CONSTRUCTION INC. | On-Going | ₱144.8M | 52% | High risk96 | Flagged0.035 |
| 25I00016SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SAN JUANICO BR) - K0681+800 - K0682+330, K0682+345 - K0682+960, K0683+000 - K0684+461 | Region VIII | NFH CONSTRUCTION & SUPPLYVCD CONSTRUCTION AND SUPPLY | On-Going | ₱161.3M | 96% | High risk96 | Flagged0.022 |
| 25I00119SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF COASTAL ROAD, BARANGAY PEPELITAN - BARANGAY SABANG NORTH, BORONGAN CITY | Region VIII | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)TUBIGAN BUILDERS | On-Going | ₱96.4M | 56% | High risk96 | Flagged0.028 |
| 25IH0086CONSTRUCTION OF WATER SYSTEM, CATARMAN NORTHERN SAMAR | Northern Samar 1st DEO | SMU CONSTRUCTION AND SUPPLYM.J. APIN BUILDERS | On-Going | ₱96.5M | 25% | High risk96 | Flagged0.036 |
| 25IJ0053CSSP: CONSTRUCTION OF BUAO BRIDGE, BARANGAY BUAO, GANDARA, SAMAR | Samar 1st DEO | B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) | On-Going | ₱98.9M | 11% | High risk96 | Flagged0.039 |
| 25IF0011CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 11+700 - STA. 11+810, ALBUERA, LEYTE | Leyte 4th DEO | EZJONES CONSTRUCTION INC.JB KONSTRUKTURA COMPANY | On-Going | ₱144.6M | 89% | High risk96 | Flagged0.025 |
| 25IF0017CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG JARO - RUBAS - ORMOC RAOD (ORMOC CITY SIDE), STA. 9+180 - STA. 9+230, LEYTE | Leyte 4th DEO | EZJONES CONSTRUCTION INC. | On-Going | ₱144.6M | 93% | High risk96 | Flagged0.024 |
| 25IF0015CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 10+480 - STA. 10+580, ALBUERA, LEYTE | Leyte 4th DEO | EZJONES CONSTRUCTION INC. | On-Going | ₱144.6M | 90% | High risk96 | Flagged0.024 |
| 25IF0018CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 10+700 - STA. 10+790, ALBUERA, LEYTE | Leyte 4th DEO | EZJONES CONSTRUCTION INC. | On-Going | ₱144.6M | 91% | High risk96 | Flagged0.024 |
| 25IF0007CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 10+580 - STA. 10+700, ALBUERA, LEYTE | Leyte 4th DEO | EZJONES CONSTRUCTION INC.JB KONSTRUKTURA COMPANY | On-Going | ₱144.6M | 90% | High risk96 | Flagged0.024 |
| 25IL0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, LIMASAWA CIR | Southern Leyte 1st DEO | EZJONES CONSTRUCTION INC. | On-Going | ₱96.4M | 75% | High risk96 | Flagged0.024 |
| 25IL0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, LIMASAWA CIR | Southern Leyte 1st DEO | EZJONES CONSTRUCTION INC. | On-Going | ₱96.4M | 75% | High risk96 | Flagged0.024 |
| 25I00121SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF ROAD, PHASE 2, BARANGAY NATO - BARANGAY BONGDO, TAFT, EASTERN SAMAR | Region VIII | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) | On-Going | ₱48.2M | 77% | High risk96 | Flagged0.013 |
| 25IL0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF PANCIL - AURORA - CADARU | Southern Leyte 1st DEO | JQD CONSTRUCTION & GENERAL SERVICES | On-Going | ₱96.5M | 53% | High risk96 | Flagged0.030 |
| 25IH0033CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, PHASE II, BARANGAY MACAGTAS, CATARMAN, NORTHERN SAMAR | Northern Samar 1st DEO | SMU CONSTRUCTION AND SUPPLY | On-Going | ₱49.5M | 53% | High risk96 | Flagged0.022 |
| 25IL0010CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF PANCIL - AURORA - CA | Southern Leyte 1st DEO | JQD CONSTRUCTION & GENERAL SERVICES | On-Going | ₱49M | 91% | High risk96 | Flagged0.010 |
| 25IB0098CONSTRUCTION OF ROAD BARANGAY CAN-ATO TO BARANGAY BORAC TO BARANGAY CANDOROS TO BARANGAY MAGTINO, LLORENTE, EASTERN SAMAR | Eastern Samar DEO | DRAGON CONSTRUCTION | On-Going | ₱49.2M | 30% | High risk96 | Flagged0.025 |
| 25IB0053CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAFT MUNICIPAL HALL PHASE 2, BARANGAY POBLACION, TAFT, EASTERN SAMAR | Eastern Samar DEO | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) | On-Going | ₱48.9M | 35% | High risk96 | Flagged0.025 |
| 25IB0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAN-AVID MUNICIPAL HALL PHASE 2 BARANGAY POBLACION, CAN-AVID, EASTERN SAMAR | Eastern Samar DEO | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) | On-Going | ₱48.9M | 42% | High risk96 | Flagged0.025 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23I00224SIPAG - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - ROAD OPENING AND CONCRETING OF BURAUEN SOUTHEAST SEMI-CIRCUMFERENTIAL ROAD TRAVERSING BRGY. POBLACION | Region VIII | FAIRCHILD BUILDERS & DEVELOPERS, INC.EZJONES CONSTRUCTION INC. | On-Going | ₱144.7M | 25% | High risk91 | Flagged0.088 |
| 24I00399CLUSTER 14: 1.) ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG ROAD - K0811+951 - K0812+085; 2.) ASSET PRESERVATION - REHABILITATION/ RECONS | Region VIII | EZJONES CONSTRUCTION INC. | On-Going | ₱192.9M | 35% | High risk92 | Flagged0.085 |
| 24I00388NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-2 | Region VIII | AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) | On-Going | ₱182.9M | 21% | High risk92 | Flagged0.085 |
| 17I00070CONSTRUCTION OF LOPE DE VEGA - SILVINO LOBOS ROAD (PHASE 4), 12 KM. - CONSTRUCTION / OPENING / CONCRETE PAVING OF ROAD, NORTHERN SAMAR 1ST LD | Region VIII | RHYES BUILDERS & SUPPLY | On-Going | ₱100M | 97% | High risk91 | Flagged0.082 |
| 24I00401NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-1 | Region VIII | CHUCON BUILDERS CORPORATION (FORMERLY: CHU CONSTRUCTION) | On-Going | ₱182.9M | 33% | High risk92 | Flagged0.082 |
| 24I00405NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-1 | Region VIII | AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) | On-Going | ₱187.6M | 50% | High risk92 | Flagged0.080 |
| 24I00390NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-2 | Region VIII | AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) | On-Going | ₱182.5M | 49% | High risk92 | Flagged0.080 |
| 24I00396NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE SYSTEM, PACKAGE C, BARANGAY CANDAHUG, PALO, LEYTE | Region VIII | AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) | On-Going | ₱136.8M | 28% | High risk92 | Flagged0.079 |
| 24I00391MAJOR EXPANSION OF THE LEARNING RESOURCE CENTER - LEYTE NORMAL UNIVERSITY, PATERNO, STREET, TACLOBAN CITY | Region VIII | KALIPAYAN BUILDERS AND CONSTRUCTION SUPPLY | On-Going | ₱94.5M | 28% | High risk93 | Flagged0.075 |
| 23I00223CONSTRUCTION OF BRGY. PAYPAYON FLOOD CONTROL, ORAS, EATERN SAMAR | Region VIII | JGO BUILDERS | On-Going | ₱134.6M | 77% | High risk92 | Flagged0.074 |
| 23I00216CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM) INCLUDING ROAD RIGHT OF WAY, PHASE 1-B, TACLOBAN CITY | Region VIII | EZJONES CONSTRUCTION INC. | On-Going | ₱134.8M | 92% | High risk92 | Flagged0.072 |
| 24II0101CONCRETING OF BRGY. MABINI-VICTORY ROAD (ALONG LAS NAVAS-MATUGUINAO ROAD) PHASE 3, BRGY. MABINI-TAYLOR-VICTORY-EL EMPON-POPONTON-CUENCO ROAD, LAS NAVAS, NORTHERN SAMAR | Northern Samar 2nd DEO | 5GG CONSTRUCTION (FORMERLY: 5G GALVEZ CONSTRUCTION AND SUPPLY) | On-Going | ₱97.9M | 55% | High risk92 | Flagged0.071 |
| 24IC0201RENOVATION OF EXISTING REGIONAL HAVEN FOR WOMEN ADMIN BUILDING, PALO, LEYTE | Leyte 1st DEO | BUILDLOCAL CONSTRUCTION INC. | On-Going | ₱14.9M | 0% | High risk90 | Flagged0.070 |
| 24IC0174CONCRETING OF BRGY. HUPIT FMR, BRGY. HUPIT, ALANGALANG, LEYTE | Leyte 1st DEO | B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) | On-Going | ₱11.9M | 0% | High risk89 | Flagged0.068 |
| 25IC0201CONCRETING OF FMR AT BRGY. TALOLORA TO BRGY. AMANLURAN, TANAUAN, LEYTE | Leyte 1st DEO | LATORRE BUILDERS & CONSTRUCTION | On-Going | ₱14.9M | 0% | High risk90 | Flagged0.068 |
| 25II0060CONSTRUCTION OF SCHOOL BUILDING, LIBERTAD ELEMENTARY SCHOOL, GAMAY, NORTHERN SAMAR | Northern Samar 2nd DEO | EFC DEVELOPMENT CORPORATION | On-Going | ₱5M | 0% | High risk89 | Flagged0.068 |
| 24IJ0102(RE-ADVERTISED) CONSTRUCTION OF BRGY. MADUROTO BRIDGE (ALONG MATUGUINAO - LAS NAVAS ROAD) PHASE IV - BRGY. MADUROTO, MATUGUINAO, SAMAR | Samar 1st DEO | NORTHERN BUILDERSETAN CONSTRUCTION | On-Going | ₱98M | 62% | High risk92 | Flagged0.068 |
| 24IL0107FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG ASUNCION - BENIT SECTION, MALITBOG, SOUTHERN LEYTE | Southern Leyte 1st DEO | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)ON POINT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ON POINT CONSTRUCTION) | On-Going | ₱120.5M | 72% | High risk92 | Flagged0.068 |
| 23I00226SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES FACILITIES - REPAIR/REHABILITATION OF HIMANGLOS RIVER BANK PROTECTION (REVETMENT) (BARUGO) | Region VIII | FAIRCHILD BUILDERS & DEVELOPERS, INC. | On-Going | ₱96.4M | 80% | High risk93 | Flagged0.068 |
| 24IJ0094CONCRETING OF BRGY. LIMARAYON TO BRGY. NAVARRO FMR, BRGY. LIMARAYON, CALBAYOG CITY, SAMAR | Samar 1st DEO | SFORT BUILDERS | On-Going | ₱10.9M | 0% | High risk89 | Flagged0.067 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 451 | 25IL0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES, COMPLETION OF MULTI-PURPOSE BUILDING, MOHON, MACROHON, SOUTHERN LEYTE | Southern Leyte 1st DEO | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) | On-Going | ₱3M | 100% | High risk89 | Flagged0.005 |
| 452 | 24I00387CONSTRUCTION OF STUDENT'S DORMITORY - MAIN CAMPUS - NORTHWEST SAMAR STATE UNIVERSITY, NWSSU MAIN CAMPUS, CALBAYOG CITY, SAMAR | Region VIII | BCG DESIGN AND CONSTRUCTION | On-Going | ₱13.5M | 92% | High risk89 | Flagged0.041 |
| 453 | 24I00364CONSTRUCTION OF CRIMINOLOGY LABORATORY BUILDING, GUIUAN CAMPUS EASTERN SAMAR STATE UNIVERSITY | Region VIII | AGB CONSTRUCTION AND SUPPLY | On-Going | ₱14.9M | 95% | High risk89 | Flagged0.044 |
| 454 | 23IF0111CONSTRUCTION OF 1-UNIT 1 STOREY 3 CLASSROOM SCHOOL BUILDING, PUERTOBELLO NATIONAL HIGH SCHOOL, BARANGAY PUERTOBELLO, MERIDA, LEYTE | Leyte 4th DEO | CIRCLE Z VENTURES & DEVELOPMENT CORP. | Completed | ₱7.5M | 100% | High risk88 | Flagged0.008 |
| 455 | 25ID0058ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS PALO-CARIGARA-ORMOC RD - K0959 + 500 - K0960 + 443,CARIGARA,LEYTE | Leyte 2nd DEO | DUROS DEVELOPMENT CORP. | Completed | ₱65M | 100% | High risk88 | —-0.036 |
| 456 | 25II0053CONSTRUCTION OF SITIO KANKINAWAY - SITIO LAOANGAN - SITIO ROMBANG TO SITIO ILONG BUKID, BRGY. CABABTO-AN FMR (PHASE III), BRGY. 7 AND BRGY. CABABTO-AN, PAMBUJAN, NORTHERN SAMAR | Northern Samar 2nd DEO | EFC DEVELOPMENT CORPORATION | On-Going | ₱14.9M | 89% | High risk88 | Flagged0.044 |
| 457 | 24I00408CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - GANDARA SUPER HEALTH CENTER, SAMAR | Region VIII | BCG DESIGN AND CONSTRUCTION | On-Going | ₱11.9M | 6% | High risk88 | Flagged0.065 |
| 458 | 24IJ0093CONCRETING OF BRGY. MACUGO TO BRGY. NALIHUGAN FMR, BRGY. MACUGO AND BRGY. NALIHUGAN, GANDARA, SAMAR | Samar 1st DEO | DANILORSO CORP. OPERATING UNDER THE NAME OF DRS BUILDERS AND CONSTRUCTION SUPPLIES | On-Going | ₱5M | 0% | High risk88 | Flagged0.067 |
| 459 | 25IB0129CONCRETING OF BRGY. 02 POBLACION TO BRGY. SAN ROQUE TO BRGY. BANUYO FMR, BRGY. 02 POBLACION, SAN ROQUE AND BANUYO, MERCEDES, EASTERN SAMAR | Eastern Samar DEO | AICON INDUSTRIES | On-Going | ₱5M | 99% | High risk88 | Flagged0.042 |
| 460 | 25IH0071CONSTRUCTION OF ROAD, BRGY. ARELLANO TO BRGY. SOMOROY, BOBON, NORTHERN SAMAR | Northern Samar 1st DEO | ND CARANZO BUILDERS AND CONSTRUCTION SUPPLY | On-Going | ₱3M | 27% | High risk88 | Flagged0.025 |
| 461 | 24I00305CONCRETING OF SITIO DAGMOL, BRGY. SALVACION FMR, BRGY. SALVACION, HINUNANGAN, SOUTHERN LEYTE | Region VIII | FFJJ CONSTRUCTION | On-Going | ₱19.9M | 100% | High risk88 | Flagged0.043 |
| 462 | 25IN0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - CONSTRUCTION (COMPLETION) OF PUBLIC WATER SUPPLY SYSTEM (LEVEL II), BARANGAY MABICAY, SOGOD, SOUTHERN LEYTE | Southern Leyte 2nd DEO | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) | On-Going | ₱1.9M | 0% | High risk88 | Flagged0.035 |
| 463 | 24I00304CONCRETING OF BRGY. TINAAN TO BRGY. CAHAYAG FMR, BRGY. TINAAN AND BRGY. CAHAYAG, SAN FRANCISCO, SOUTHERN LEYTE | Region VIII | FFJJ CONSTRUCTION | On-Going | ₱14.9M | 87% | High risk88 | Flagged0.049 |
| 464 | 25IH0072CONSTRUCTION OF SCHOOL BUILDING, NENITA NATIONAL HIGH SCHOOL, BRGY. NENITA, MONDRAGON, NORTHERN SAMAR | Northern Samar 1st DEO | EFC DEVELOPMENT CORPORATION | On-Going | ₱9.9M | 75% | High risk88 | Flagged0.046 |
| 465 | 25II0061CONSTRUCTION OF SCHOOL BUILDING, OLERAS ELEMENTARY SCHOOL, LAOANG, NORTHERN SAMAR | Northern Samar 2nd DEO | EFC DEVELOPMENT CORPORATION | On-Going | ₱5M | 0% | High risk88 | Flagged0.067 |
| 466 | 25IB0134CONCRETING OF BRGY. ABEJAO TO BRGY. SEGUINON FMR, BRGY. ABEJAO AND BRGY. SEGUINON, SALCEDO, EASTERN SAMAR | Eastern Samar DEO | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) | On-Going | ₱5M | 90% | High risk88 | Flagged0.045 |
| 467 | 24I00283CONSTRUCTION OF 1 UNIT 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN MAGAUPAS ELEMENTARY SCHOOL, BRGY. MAGAUPAS, LILOAN, SOUTHERN LEYTE | Region VIII | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) | On-Going | ₱6.6M | 100% | High risk88 | Flagged0.043 |
| 468 | 25IA0108CONSTRUCTION OF BAGONGBONG FLOOD CONTROL, BARANGAY SALANGI, ALMERIA, BILIRAN | Biliran DEO | M.B. ANG CONSTRUCTION & SUPPLY | On-Going | ₱19.6M | 98% | High risk87 | —-0.020 |
| 469 | 24IC0169CONCRETING OF BRGY. SAN FRANCISCO WEST FMR, BRGY. SAN FRANCISCO WEST, ALANGALANG, LEYTE | Leyte 1st DEO | CALIFORNIAROCK CONSTRUCTION | Completed | ₱11.9M | 100% | High risk87 | Flagged0.008 |
| 470 | 25IF0047ASSET PRESERVATION - PREVENTIVE MAINTENANCE- PRIMARY ROADS - ORMOC - BAYBAY - SOUTHERN LEYTE BDRY RD - K1031+785 - K1032+129 | Leyte 4th DEO | AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) | Completed | ₱21.2M | 100% | High risk87 | —-0.040 |
| 471 | 25IJ0017OO2: CONTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER, PHASE II, BARANGAY PIZARRO, GANDARA, SAMAR | Samar 1st DEO | ETAN CONSTRUCTION | On-Going | ₱42.8M | 82% | High risk87 | —-0.014 |
| 472 | 25IH0084CONCRETING OF BRGY. SAN ISIDRO TO BRGY. SAN JUAN FMR, BRGY. SAN ISIDRO AND BRGY. SAN JUAN, LAVEZARES, NORTHERN SAMAR | Northern Samar 1st DEO | CATARMAN BUILDERS CONSTRUCTION | On-Going | ₱9.8M | 1% | High risk87 | Flagged0.064 |
| 473 | 23I00165CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, HIMBANGAN ELEMENTARY SCHOOL, SAINT BERNARD, SOUTHERN LEYTE | Region VIII | FFJJ CONSTRUCTION | Completed | ₱6.1M | 100% | High risk87 | Flagged0.014 |
| 474 | 19IB0245REHABILITATION/RECONSTRUCTION OF CIRCUMFERENCIAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG, BRGY. DOMROG, GEN. MACARTHUR, EASTERN SAMAR | Eastern Samar DEO | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) | Completed | ₱26.1M | 100% | High risk87 | Flagged0.014 |
| 475 | 25IG0022CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY RIVILLA, BATO, LEYTE | Leyte 5th DEO | GPK CONSTRUCTION AND SUPPLY | Completed | ₱2M | 100% | High risk87 | —-0.026 |