Cross-referencing the ledgers…
Cross-referencing the ledgers…
Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
13,644
Total budget
₱484.5B
Average progress
92.9%
Completion rate
75.6%
Average risk score
52.2
Medium risk on average, out of 100
Flagged as unusual
656
4.8% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 5,063 | ₱204.6B | 54.8 | 81 | 92.5% |
| Buildings and Facilities | 4,257 | ₱65.6B | 42.7 | 137 | 95.1% |
| Flood Control and Drainage | 2,534 | ₱148.2B | 56.1 | 75 | 95.4% |
| Bridges | 626 | ₱19.9B | 53.2 | 36 | 91.5% |
| Water Provision and Storage | 507 | ₱5.7B | 44.5 | 17 | 92.2% |
| OTHER | 351 | ₱22.1B | 76.9 | 150 | 85.9% |
| GAA 2025 SSP | 149 | ₱6.6B | 94.3 | 110 | 56.6% |
| GAA 2025 OO-1 | 75 | ₱3.9B | 93.5 | 39 | 59.2% |
| GAA 2025 OO-2 | 50 | ₱4.4B | 91.0 | 10 | 69.5% |
| Bridges, Roads | 32 | ₱3.3B | 65.4 | 1 | 77.7% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Albay 2nd DEO | 1,789 | ₱65.3B | 59.1 | 131 | 87.3% |
| Region V | 1,715 | ₱146.9B | 63.3 | 240 | 81.8% |
| Camarines Norte DEO | 1,281 | ₱26.6B | 43.8 | 31 | 95.4% |
| Albay 3rd DEO | 871 | ₱21.1B | 54.4 | 59 | 89.9% |
| Camarines Sur 4th DEO | 842 | ₱18.4B | 46.8 | 16 | 97.5% |
| Sorsogon DEO | 817 | ₱43.4B | 60.2 | 24 | 95.8% |
| Catanduanes DEO | 800 | ₱12.8B | 43.8 | 14 | 97.7% |
| Camarines Sur 5th DEO | 783 | ₱20.3B | 44.0 | 14 | 97.8% |
| Sorsogon 2nd DEO | 774 | ₱27B | 54.7 | 40 | 94.3% |
| Masbate 2nd DEO | 682 | ₱14.6B | 48.2 | 11 | 96.4% |
| Camarines Sur 1st DEO | 634 | ₱12.7B | 39.7 | 9 | 96.7% |
| Camarines Sur 2nd DEO | 621 | ₱21.4B | 49.8 | 10 | 98.5% |
| Camarines Sur 3rd DEO | 608 | ₱9.4B | 43.2 | 22 | 96.2% |
| Masbate 3rd DEO | 520 | ₱10.1B | 51.5 | 16 | 91.6% |
| Albay 1st DEO | 491 | ₱25.7B | 59.6 | 10 | 97.7% |
| Masbate 1st DEO | 416 | ₱8.8B | 53.6 | 9 | 97.2% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | 594 | ₱41.5B | 62.9 | 50 | 88.2% |
| SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | 416 | ₱43.1B | 67.6 | 45 | 88.9% |
| CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. | 291 | ₱22.6B | 63.2 | 18 | 92.9% |
| STEVEN CONSTRUCTION & SUPPLY | 262 | ₱11.6B | 55.1 | 12 | 97.2% |
| G.C.I. CONSTRUCTION AND DEV'T. CORP. | 238 | ₱24.3B | 63.8 | 22 | 88.7% |
| BICOL GOLDROCK CONSTRUCTION CORPORATION | 227 | ₱13.8B | 57.2 | 12 | 91.2% |
| NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION | 220 | ₱7.7B | 57.9 | 21 | 81.0% |
| BRENTMIN ROOFING ENTERPRISE | 215 | ₱9.9B | 51.7 | 11 | 91.6% |
| EUS CONSTRUCTION | 188 | ₱9.3B | 57.2 | 9 | 93.1% |
| 128 DRAGON CONSTRUCTION AND SUPPLIES | 174 | ₱3.6B | 47.1 | 1 | 96.2% |
| MUNTOPAR BUILDERS CORP. | 166 | ₱9.7B | 61.9 | 16 | 88.8% |
| AREMAR CONSTRUCTION CORPORATION | 158 | ₱12.2B | 64.6 | 12 | 85.7% |
| SPRING STAR CONSTRUCTION AND SUPPLY | 141 | ₱5.4B | 54.4 | 1 | 97.2% |
| JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY | 136 | ₱1.1B | 46.1 | 9 | 88.5% |
| ALNINO CONSTRUCTION & SUPPLY CORPORATION (FORMERLY: AL NINO CONSTRUCTION & SUPPLY) | 128 | ₱7.1B | 58.6 | 8 | 94.9% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FC0023CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CABUSAY, LABO CAMARINES NORTE | Camarines Norte DEO | WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) | On-Going | ₱140.4M | 69% | High risk96 | Flagged0.021 |
| 25FO0092CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF STA. CRUZ - PINTOR | Albay 3rd DEO | DN'D CONSTRUCTION AND DEVELOPMENT | On-Going | ₱93.6M | 26% | High risk96 | Flagged0.026 |
| 25FG0067CONSTRUCTION OF SAGÑAY RIVER FLOOD MITIGATION STRUCTURE, BRGY. BURACAN, SAGÑAY, CAMARINES SUR | Camarines Sur 4th DEO | ALRO CONSTRUCTION & DEVELOPMENT CORP. | On-Going | ₱95M | 34% | High risk96 | Flagged0.023 |
| 25FD0097CONSTRUCTION OF SITIO CENTRO WEST COASTAL ROAD, BARANGAY ANIB, SIPOCOT, CAMARINES SUR | Camarines Sur 1st DEO | NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | On-Going | ₱141.1M | 0% | High risk96 | Flagged0.039 |
| 25FM0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY | Masbate 1st DEO | A3 CONSTRUCTION & SUPPLY | On-Going | ₱93.6M | 68% | High risk96 | Flagged0.015 |
| 25F00389CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES-CONSTRUCTION OF SITIO COBCOBAN, BARANGAY CALAMPINAY COASTAL ROAD, SIPOCOT, CAMARINES SUR, | Region V | NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | On-Going | ₱215M | 2% | High risk96 | Flagged0.050 |
| 25F00010CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN JOSE, LI | Region V | PHILWORKS CONSTRUCTION & SUPPLY | On-Going | ₱146.7M | 99% | High risk96 | Flagged0.009 |
| 25FD0095CONSTRUCTION OF SITIO CALONGGO COASTAL ROAD, BARANGAY SAN VICENTE, SIPOCOT, CAMARINES SUR | Camarines Sur 1st DEO | NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | On-Going | ₱140.1M | 0% | High risk96 | Flagged0.039 |
| 25FB0034SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY MINA TO BARANGAY GOTOB TO BARANGAY LIGBAN, CAMALIG | Albay 2nd DEO | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱93.5M | 57% | High risk96 | Flagged0.017 |
| 25FK0069CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRGY. TAGBAC-BRGY. PAWALA ROAD, DONSOL, SORSOGON ( | Sorsogon DEO | CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. | On-Going | ₱95.5M | 17% | High risk96 | Flagged0.030 |
| 25FB0004SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF RIDGE ROAD, CAWAYAN TO MALOBAGO, MANITO, ALBAY | Albay 2nd DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱93.4M | 68% | High risk96 | Flagged0.014 |
| 25F00118CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD DIKE, BARANGAY HICMING, VIRAC, CATANDUANES, | Region V | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱187.2M | 77% | High risk96 | Flagged0.025 |
| 25FD0023CONSTRUCTION OF BRIDGE, PACKAGE 2, BARANGAY MANSALAYA TO BARANGAY KINALANGAN, DEL GALLEGO, CAMARINES SUR | Camarines Sur 1st DEO | A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D | On-Going | ₱136.9M | 25% | High risk96 | Flagged0.033 |
| 25FO0087CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TALISAY RIVER FLOOD MITIGATION STRUCTURE, BRGY SAN JUAN AND BRGY PISTOLA, | Albay 3rd DEO | DSB CONSTRUCTION & SUPPLY, INC. (FORMERLY: DSB CO | On-Going | ₱96.6M | 0% | High risk96 | Flagged0.034 |
| 25F00377CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES-CONSTRUCTION OF COASTAL ROAD, BARANGAY MALOBAGO, RAPU-RAPU, ALBAY, RAPU-RAPU, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱154.4M | 66% | High risk96 | Flagged0.024 |
| 25F00272CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-IMPROVEMENT OF ROAD, BARANGAY LIGUAN TO BARANGAY MANCAO, RAPU-RAPU, A | Region V | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱96M | 48% | High risk96 | Flagged0.021 |
| 25F00273CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-IMPROVEMENT OF ROAD, BARANGAY LIGUAN TO BARANGAY TINOCAWAN, RAPU-RAPU | Region V | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱96M | 50% | High risk96 | Flagged0.021 |
| 25FL0049CONSTRUCTION OF ROAD, PACKAGE I, BARANGAY RIZAL - BARANGAY BENTUCO, GUBAT, SORSOGON | Sorsogon 2nd DEO | MUNTOPAR BUILDERS CORP. | On-Going | ₱140.4M | 68% | High risk96 | Flagged0.023 |
| 25F00117CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL WITH ROAD DIKE, BARANGAY VIGA, RAPU-RAPU, | Region V | ACIER & BETON CONSTRUCTION | On-Going | ₱141.6M | 80% | High risk96 | Flagged0.017 |
| 25FK0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD (PHASE I), BRGY. SAN J | Sorsogon DEO | TR CONSTRUCTION CORPORATION (FOR: TR CONSTRUCTION)KM88 CONSTRUCTION INC (FORMERLY: KM14 CONSTRUCTION INC) | On-Going | ₱140.4M | 72% | High risk96 | Flagged0.020 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17FO0201CLUSTER XV-2017: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT/RESTORATION/UPGRADING OF VARIOUS INFRASTRUCTURES IN LIGAO CITY | Albay 3rd DEO | 4DOVE BUILDERS CORPORATION | On-Going | ₱629.1K | 0% | High risk68 | Flagged0.087 |
| 17FO0053CLUSTER XIII-2017: REPAIR/REHABILITATION/IMPROVEMENT OF INFRASTRUCTURE INCLUDING LOCAL PROJECTS IN THE 3RD DISTRICT OF ALBAY | Albay 3rd DEO | BUILDWAYS CONSTRUCTION & SUPPLY | On-Going | ₱2.4M | 0% | High risk79 | Flagged0.087 |
| 24F00516CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, NEW CAPITOL COMPLEX, PILI, CAMARINES SUR, PILI, CAMARINES SUR (3RD LEGISLA | Region V | R.K.X. ODIAMAR CONSTRUCTION | On-Going | ₱193.9M | 20% | High risk92 | Flagged0.082 |
| 24F00515CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD, SITIO MAUNA TO SITIO BICAL ROAD LEADING TO DECLARED T | Region V | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱144.3M | 7% | High risk91 | Flagged0.080 |
| 24F00517CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG- MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM-CONSTRUCTION OF CAMARINES SUR ICONIC CAPITOL BUILDING(PHASE 3), PILI, | Region V | NATIONSTAR DEVELOPMENT CORPORATION (FOR: CASMOR CONSTRUCTION CORPORATION) | On-Going | ₱190.9M | 40% | High risk92 | Flagged0.074 |
| 23F00441CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL, BARANGAY MOCONG, BASUD, CAMARINES NORTE (P | Region V | EUS CONSTRUCTIONVINHAR CONSTRUCTION & MARKETING (FOR. VINHAR CONST | On-Going | ₱144.7M | 51% | High risk92 | Flagged0.072 |
| 20F00142REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (STA. ELENA-STA. LUCIA SECTION), NABUA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | PHILWORKS CONSTRUCTION & SUPPLY | On-Going | ₱176.6M | 0% | High risk78 | Flagged0.071 |
| 24F00370CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL WITH ROAD DIKE, BARANGAY CARACARAN, RAPU-RAPU, | Region V | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱284.3M | 85% | High risk91 | Flagged0.070 |
| 24F00507ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL IN BRGY. SAN ANTONIO, LABO-BRGY. FABRICA (MATOG | Region V | EUS CONSTRUCTION | On-Going | ₱140.4M | 37% | High risk90 | Flagged0.069 |
| 19F00099PROPOSED CONSTRUCTION/RENOVATION OF VARIOUS NEDA FACILITIES, ARIMBAY, LEGAZPI CITY | Region V | DSB CONSTRUCTION & SUPPLY, INC. (FORMERLY: DSB CO | On-Going | ₱40.4M | 0% | Medium risk51 | Flagged0.069 |
| 23FA0080CONSTRUCTION OF 2STY6CL, TABACO NATIONAL HIGH SCHOOL, TABACO CITY, ALBAY | Albay 1st DEO | 3RB CONSTRUCTION & SUPPLY | On-Going | ₱21.1M | 0% | High risk88 | Flagged0.066 |
| 24F00482CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PAGSANGAHAN, BA | Region V | NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | On-Going | ₱234M | 89% | High risk92 | Flagged0.065 |
| 17FO0096CLUSTER XVIII-2017: REHABILITATION/REPAIR/IMPROVEMENT/RESTORATION/UPGRADING OF GUINOBATAN RURAL HEALTH UNIT (RHU) & GUINOBATAN MUNICIPAL HALL | Albay 3rd DEO | SULVIR ENGINEERING AND CONSTRUCTION | On-Going | ₱1.7M | 0% | Low risk28 | Flagged0.064 |
| 17FO0180REPAIR/REHABILITATION OF DAY CARE CENTER, CHILD DEVELOPMENT CENTER IN PIODURAN | Albay 3rd DEO | 4DOVE BUILDERS CORPORATION | On-Going | ₱462.9K | 0% | Low risk25 | Flagged0.064 |
| 17FO0094REHABILITATION/REPAIR/IMPROVEMENT/RESTORATION/UPGRADING OF POLANGUI SLAUGHTERHOUSE | Albay 3rd DEO | ZHEANTELLE CONSTRUCTION CORP. | On-Going | ₱4M | 0% | Low risk30 | Flagged0.064 |
| 17FO0093REHABILITATION/REPAIR/IMPROVEMENT/RESTORATION/UPGRADING OF POLANGUI PUBLIC MARKET | Albay 3rd DEO | ZHEANTELLE CONSTRUCTION CORP. | On-Going | ₱3.4M | 0% | Low risk28 | Flagged0.064 |
| 24FO0139CY 2024 BASIC EDUCATION FACILITIES FUND (BEFF) - CONSTRUCTION OF CLASSROOMS - CONSTRUCTION OF 2-STOREY 8-CLASSROOM AND 2 UNITS 4-STOREY 20-CLASSROOM SCHOOL BUILDINGS AT MARCIAL O. RAÑOLA MEMORIAL SCHOOL, GUINOBATAN, ALBAY | Albay 3rd DEO | TWINCARE BUILDERS INC. | On-Going | ₱145.4M | 61% | High risk91 | Flagged0.064 |
| 24FN0091OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCT., BICOL RIVER REV'T WALL, BRGY. STO. NIÑO SEC., BULA, CAMSUR | Camarines Sur 5th DEO | JTC CRUZ CONSTRUCTION CO., INC. | On-Going | ₱144.8M | 63% | High risk92 | Flagged0.064 |
| 24FN0092OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCT., BICOL RIVER REV'T WALL, BRGY. SAN RAMON SEC., BULA, CAMSUR | Camarines Sur 5th DEO | JUSTBILT BUILDERS | On-Going | ₱144.8M | 63% | High risk92 | Flagged0.064 |
| 19F00115REPAIR AND MAINTENANCE OF LABO REVETMENT BRGY. ANAHAW, LABO, CAMARINES NORTE, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT | Region V | HGG BUILDERS & SUPPLY | On-Going | ₱108.1M | 0% | High risk78 | Flagged0.064 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 476 | 24FN0084CSSP:BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN ROQUE, IRIGA CITY, CAMARINES SUR | Camarines Sur 5th DEO | IRIGA JETSTONE CONSTRUCTION, INC. (FORMERLY:IRIGA JETSTONE CONSTRUCTION) | On-Going | ₱47.8M | 32% | High risk78 | Flagged0.006 |
| 477 | 24F00509CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF COASTAL ROAD AND SHORE P | Region V | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLYSUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱279.4M | 8% | High risk78 | Flagged0.045 |
| 478 | 17F00006MFO1-NATIONAL ROAD NETWORK SERVICES IMPROVEMENT/WIDENING OF NATIONAL ROADS, DAANG MAHARLIKA (LZ), CAMARINES NORTE | Region V | ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)KV CONSTRUCTION & SUPPLY CORP. (FORMERLY KV CONSTRUCTION & SUPPLY) | Completed | ₱144.7M | 100% | High risk78 | —-0.008 |
| 479 | 24F00512CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD AND SHORE PROTECTION AT BUHATAN TO ALIMSOG (PACKAGE 2) | Region V | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱144.3M | 47% | High risk78 | Flagged0.017 |
| 480 | 23F00446CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF SALVACION COASTAL ROAD AND SHORE PROTECTION (PACKAGE 1), STO. DOMINGO, ALBAY, | Region V | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱154.4M | 63% | High risk78 | Flagged0.019 |
| 481 | 23F00445CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD AND SHORE PROTECTION AT SALVACION TO BUHATAN (PACKAGE 1), STO. DOMIN | Region V | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLYKENZAI BUILDERS CORPORATION | On-Going | ₱202.6M | 89% | High risk78 | Flagged0.020 |
| 482 | 24F00145CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRIDGE, BARANGAY COLASI, | Region V | 515 LIFE CONSTRUCTION CORP. | On-Going | ₱46.8M | 78% | High risk78 | —-0.007 |
| 483 | 25FL0052CONST/IMPRVT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM RD INFRA PROG - TRIP) | Sorsogon 2nd DEO | AREMAR CONSTRUCTION CORPORATION | On-Going | ₱62.4M | 88% | High risk78 | —-0.004 |
| 484 | 25FL0044CONST/IMPRVT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM RD. INFRA. PROGRAM -) | Sorsogon 2nd DEO | AREMAR CONSTRUCTION CORPORATION | On-Going | ₱62.4M | 90% | High risk78 | —-0.005 |
| 485 | 24F00374CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SLOPE PROTECTION OF CAGBULACAO-TANAGAN RIDGE ROAD, BACA | Region V | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱284.6M | 76% | High risk78 | Flagged0.025 |
| 486 | 23F00434CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF ROAD DIKE ALONG OBI RIVER UPSTREAM STA. 5+313-STA. 5+813 OBI, CARAMORAN, | Region V | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLYBAM CONSTRUCTION | On-Going | ₱140.4M | 99% | High risk78 | Flagged0.028 |
| 487 | 24F00494ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIBAGOAN RIVER (DOWNSTREAM RIGH | Region V | ALRO CONSTRUCTION & DEVELOPMENT CORP. | On-Going | ₱121.7M | 5% | High risk78 | Flagged0.041 |
| 488 | 24F00496ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SIBAGOAN RIVER (UPSTREAM/LEFT S | Region V | ALRO CONSTRUCTION & DEVELOPMENT CORP. | On-Going | ₱121.7M | 67% | High risk78 | Flagged0.029 |
| 489 | 24F00495ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-LIGAO-PIO DURAN RD-K0510+665-K0510+815, LIGAO CITY, ALBAY (3RD LEGISLATIVE D | Region V | HGG BUILDERS & SUPPLY | On-Going | ₱159.1M | 38% | High risk78 | Flagged0.018 |
| 490 | 22FG0015CONSTRUCTION OF BY PASS AND DIVERSION ROAD, JCT. NATO - SABANG COASTAL ROAD (TAGAS BRIDGE 2) CAMARINES SUR | Camarines Sur 4th DEO | E.A. SANCHO CONST. INC. (FORM. E.A. SANCHO CONST.) | Completed | ₱49M | 100% | High risk78 | —-0.035 |
| 491 | 24F00373CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONCRETING OF CAGBULACAO-TANAGAN ROAD, BACACAY | Region V | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱161.1M | 83% | High risk78 | Flagged0.011 |
| 492 | 23FK0006CLUSTER IV-CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES_FACITLITIES-1.) REHABILITATION OF SEAWALL, BRGY. BORORAN, DONSOL, 2.) CONSTRUCTION OF SEAWALL, SITIO DANCAL | Sorsogon DEO | CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. | Completed | ₱71.7M | 100% | High risk78 | —-0.030 |
| 493 | 25FK0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP)-DONSOL-PILAR-CASTILLA-SORSOGON CITY (DONPICASO) TOURISM HIGHWAY, SORSOGON, PACKAGE IV C | Sorsogon DEO | ALNINO CONSTRUCTION & SUPPLY CORPORATION (FORMERLY: AL NINO CONSTRUCTION & SUPPLY) | On-Going | ₱47.3M | 44% | High risk78 | Flagged0.004 |
| 494 | 23F00377ORGANIZATIONAL OUTCOME 1 (OO1): ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE -WIDENING OF PERMANENT BRIDGES-DAET BR. 1(B00492LZ) ALONG TAGAS-DAET-POBLACION-MAGANG ROAD, DAET, CAMARINES NORTE (2ND LEGISLATIVE DISTRICT) | Region V | WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION) | On-Going | ₱36.7M | 58% | High risk78 | Flagged0.010 |
| 495 | 24F00247CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BARANGAY SAN ISIDRO-COBANGBANG-MAMBALITE ROAD | Region V | ARIK CONSTRUCTION | On-Going | ₱19.2M | 96% | High risk78 | —-0.009 |
| 496 | 24F00360CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTIPURPOSE BUILDING, CAMARINES NORTE STATE COLLEGE/UNIVERSITY OF CAMARINES NORTE, DAET, CAMARINE | Region V | O.L. DE LEON CONSTRUCTION | On-Going | ₱38.9M | 94% | High risk78 | —-0.011 |
| 497 | 24FC0058CONSTRUCTION OF CAMAGSAAN BRIDGE, CAPALONGA, CAMARINES NORTE, BRGY. CAMAGSAAN, CAPALONGA, CAMARINES NORTE | Camarines Norte DEO | WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY)BRENTMIN ROOFING ENTERPRISE | On-Going | ₱64.3M | 77% | High risk78 | Flagged0.000 |
| 498 | 22FC0013NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - LABO BYPASS ROAD, CAMARINES NORTE, LABO, CAMARINES NORTE | Region V | EUS CONSTRUCTION | On-Going | ₱88.8M | 61% | High risk77 | Flagged0.022 |
| 499 | 25F00454LOCALLY-FUNDED PROJECTS-NATIONAL BUILDING PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTION OF DPWH CAMARINES NORTE-SUB DEO (QAS)MATERIALS TESTING LABORATORY BUILDING, F. PIMENTEL AVENUE, DAET, CAMARINES NORTE, DAET, CAMARINES NO | Region V | MAN CONSTRUCTION SUPPLY & SERVICES | On-Going | ₱24.1M | 71% | High risk77 | —-0.005 |
| 500 | 16F00093CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORT, AIRPORT AND DECLARED TOURISM DESTINATIONS, A. TO DECLARED TOURISM DESTINATION PRES. CORY AQUINO BOULEVARD LEADING TO BAGASBAS BEACH A. CORY AQUINO BRIDGE 1, BRGY. BAGASBAS, DAET, CAMARINES NORTE | Region V | VARIN CONSTRUCTION AND HARDWARE SUPPLY (FORMERLY: VC VARIN CONSTRUCTION AND HARDWARE SUPPLY)ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762) | Completed | ₱57.9M | 100% | High risk77 | —-0.031 |