Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
11,989
Total budget
₱395B
Average progress
96.5%
Completion rate
83.7%
Average risk score
41.0
Medium risk on average, out of 100
Flagged as unusual
750
6.3% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 4,621 | ₱48.7B | 27.8 | 60 | 98.4% |
| Roads | 4,471 | ₱204.1B | 47.5 | 179 | 96.0% |
| Flood Control and Drainage | 1,199 | ₱62.5B | 48.6 | 28 | 97.5% |
| Bridges | 501 | ₱20B | 41.2 | 28 | 97.4% |
| Water Provision and Storage | 453 | ₱2.7B | 33.8 | 13 | 97.7% |
| OTHER | 412 | ₱23.1B | 71.5 | 206 | 91.2% |
| Bridges, Roads | 134 | ₱21.9B | 64.3 | 51 | 91.6% |
| GAA 2025 SSP | 124 | ₱5.1B | 94.3 | 121 | 65.0% |
| GAA 2025 OO-1 | 42 | ₱3.2B | 92.8 | 40 | 61.6% |
| GAA 2025 OO-2 | 32 | ₱3.8B | 93.3 | 24 | 65.5% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Davao de Oro 1st DEO | 2,056 | ₱34.1B | 32.6 | 78 | 98.8% |
| Davao City DEO | 1,876 | ₱47.3B | 41.2 | 66 | 97.5% |
| Region XI | 1,449 | ₱163.4B | 57.4 | 308 | 89.3% |
| Davao del Norte DEO | 1,315 | ₱21.4B | 30.6 | 8 | 99.9% |
| Davao del Sur DEO | 1,146 | ₱24.6B | 40.5 | 57 | 96.6% |
| Davao Oriental 1st DEO | 1,075 | ₱25.2B | 43.6 | 29 | 95.8% |
| Davao Occidental DEO | 938 | ₱22B | 36.9 | 22 | 99.4% |
| Davao City 2nd DEO | 926 | ₱18.2B | 39.4 | 37 | 99.4% |
| Davao Oriental 2nd DEO | 762 | ₱20.1B | 44.9 | 41 | 95.0% |
| Davao de Oro 2nd DEO | 316 | ₱13.9B | 52.3 | 47 | 92.0% |
| Davao del Norte 2nd DEO | 82 | ₱2.9B | 67.4 | 35 | 69.5% |
| Davao City 3rd DEO | 48 | ₱1.8B | 70.4 | 22 | 75.5% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY) | 482 | ₱32.3B | 52.1 | 39 | 94.0% |
| AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC. | 341 | ₱5.4B | 38.4 | 26 | 95.1% |
| TWO DEGREES CONSTRUCTION AND SUPPLY | 317 | ₱2.5B | 31.4 | 18 | 97.9% |
| LLM UNIFIED BUILDERS & TRADING CORP. (FORMERLY:LLM CONCRETE PRODUCTS) | 233 | ₱1.8B | 21.8 | 3 | 99.4% |
| ROSBILL CONSTRUCTION AND SUPPLY | 231 | ₱9B | 47.6 | 34 | 89.3% |
| FFJJ CONSTRUCTION | 211 | ₱10.7B | 46.5 | 13 | 99.3% |
| AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC. | 208 | ₱9.7B | 44.4 | 13 | 97.3% |
| LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | 187 | ₱9.1B | 47.0 | 3 | 99.1% |
| MARK ANTHONY CONSTRUCTION & SUPPLY | 177 | ₱2.4B | 33.1 | 15 | 97.0% |
| ULTICON BUILDERS, INC. | 174 | ₱43.3B | 63.2 | 54 | 92.5% |
| R.A. PAHATI CONST. & SUPPLY, INC. | 163 | ₱11.7B | 55.6 | 14 | 95.7% |
| DISEM CONSTRUCTION AND SUPPLY | 161 | ₱2.1B | 37.0 | 12 | 94.3% |
| METRO GEAR CONSTRUCTION CORP. | 160 | ₱8.1B | 40.2 | 14 | 95.0% |
| THREE W BUILDERS, INC. | 157 | ₱11.7B | 52.0 | 17 | 97.5% |
| DOUBLE J CONSTRUCTION AND SUPPLY | 144 | ₱2.1B | 36.7 | 7 | 98.1% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25L00132INSTALLATION OF STREETLIGHTS WITH ROAD SAFETY FACILITIES ALONG PADADA - KIBLAWAN - MATANAO RD, DAVAO DEL SUR | Region XI | TKS BUILDERS & SUPPLIESTEDDIE CONSTRUCTION DEVELOPMENT, INC. | On-Going | ₱93.7M | 12% | High risk96 | Flagged0.045 |
| 25LF0142CONSTRUCTION OF ROAD, FROM JUNCTION TO SITIO CABYAWAN BARANGAY MERCEDES, CARAGA, DAVAO ORIENTAL | Davao Oriental 1st DEO | ROSBILL CONSTRUCTION AND SUPPLYSTARBUILDERS CONSTRUCTION | On-Going | ₱95M | 54% | High risk96 | Flagged0.039 |
| 25LA0070CONSTRUCTION OF REVETMENT ALONG TUNGA CREEK, MABINI, DAVAO DE ORO | Davao de Oro 1st DEO | AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC. | On-Going | ₱95.6M | 84% | High risk96 | Flagged0.022 |
| 25LF0141CONSTRUCTION OF ROAD, FROM JUNCTION SAKUAN TO BARANGAY ALVAR TO SITIO BANTOLINAO BARANGAY PALMA GIL TO SITIO BANTOLINAO, BARANGAY PICHON, CARAGA, DAVAO ORIENTAL | Davao Oriental 1st DEO | ROSBILL CONSTRUCTION AND SUPPLYSTARBUILDERS CONSTRUCTION | On-Going | ₱95.1M | 50% | High risk96 | Flagged0.040 |
| 25LF0144CONSTRUCTION OF ROAD, LAMIAWAN-SANGAB ROAD, BARANGAY PICHON CARAGA, DAVAO ORIENTAL | Davao Oriental 1st DEO | ROSBILL CONSTRUCTION AND SUPPLYSTARBUILDERS CONSTRUCTION | On-Going | ₱95M | 56% | High risk96 | Flagged0.039 |
| 25LD0166CONSTRUCTION OF ROAD, SITIO TALAMBATO, BARANGAY ASBANG TO BARANGAY ASINAN, MATANAO, DAVAO DEL SUR | Davao del Sur DEO | MAGAR CONSTRUCTION AND SUPPLYBJAM PRIME BUILDERS OPC | On-Going | ₱140.4M | 44% | High risk96 | Flagged0.038 |
| 25LD0153CONSTRUCTION OF FLOOD MITIGATION STRUCTURE-REVETMENT ALONG BALATUKAN RIVER (MAGSAYSAY BRIDGE UPSTREAM & DOWNSTREAM SECTION, PHASE 1), MAGSAYSAY, DAVAO DEL SUR | Davao del Sur DEO | TKS BUILDERS & SUPPLIES | On-Going | ₱98.5M | 76% | High risk96 | Flagged0.025 |
| 25LJ0134CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 5, DAVAO DEL NORTE | Davao del Norte 2nd DEO | NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUC | On-Going | ₱96M | 6% | High risk96 | Flagged0.048 |
| 25LD0162CONSTRUCTION OF FLOOD MITIGATING STRUCTURE AT DIGOS RIVER (DIGOS TO RUPARAN SECTION), DIGOS CITY, DAVAO DEL SUR | Davao del Sur DEO | ED1SON DEVELOPMENT & CONSTRUCTION INC.MINDALIFI CONSTRUCTION AND SUPPLY | On-Going | ₱98M | 49% | High risk96 | Flagged0.033 |
| 25LJ0131CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 2, DAVAO DEL NORTE | Davao del Norte 2nd DEO | MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. | On-Going | ₱97M | 47% | High risk96 | Flagged0.035 |
| 25LJ0135CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE (EARTH DIKE) ALONG TAGUM LIBUGANON RIVER BASIN, CARMEN - B.E. JUALI, STO. TOMAS, DAVAO DEL NORTE, SECTION 1, DAVAO DEL NORTE | Davao del Norte 2nd DEO | MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. | On-Going | ₱97.2M | 54% | High risk96 | Flagged0.033 |
| 25LJ0113CONSTRUCTION OF FLOOD CONTROL MITIGATION STRUCTURE AT SADPUDON CREEK PHASE 3, CARMEN, DAVAO DEL NORTE | Davao del Norte 2nd DEO | KANAWAY BUILDERS CORPORATION | On-Going | ₱142.6M | 41% | High risk96 | Flagged0.042 |
| 25LF0135CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL ROAD. (STA. FELOMINA SECTION), CATEEL, DAVAO ORIENTAL | Davao Oriental 1st DEO | ABU CONSTRUCTION | On-Going | ₱97.8M | 37% | High risk96 | Flagged0.044 |
| 25LD0160CONSTRUCTION OF CONCRETE ROAD, BARANGAY POB.-MALANO-BOB-BRGY. BARAYONG-BALA, MAGSAYSAY, DAVAO DEL SUR | Davao del Sur DEO | TKS BUILDERS & SUPPLIES | On-Going | ₱122.5M | 46% | High risk96 | Flagged0.036 |
| 25LI0068CONSTRUCTION OF ROAD, PANANSALAN, COMPOSTELA, DAVAO DE ORO | Davao de Oro 2nd DEO | AB APONESTO CONSTRUCTION PARTS AND SUPPLY, INC. | On-Going | ₱144.7M | 9% | High risk96 | Flagged0.060 |
| 25LF0145CONSTRUCTION OF COASTAL PROTECTION, PROTECTING SURIGAO DEL SUR BDRY.-DAVAO ORIENTAL COASTAL RD (SAN LUIS SECTION), CARAGA, DAVAO ORIENTAL | Davao Oriental 1st DEO | ABU CONSTRUCTION | On-Going | ₱146.7M | 27% | High risk96 | Flagged0.053 |
| 25LG0072CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG LOGDECK RIVER, LUPON, DAVAO ORIENTAL | Davao Oriental 2nd DEO | MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. | On-Going | ₱98M | 16% | High risk96 | Flagged0.051 |
| 25LJ0104CONSTRUCTION OF ROAD, JUNCTION IGACOS CIRCUMFERENTIAL ROAD, PHASE 2, BARANGAY CAMUDMUD TO BARANGAY SAN ISIDRO, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Davao del Norte 2nd DEO | BJAM PRIME BUILDERS OPCHI-VIEW RESOURCES & DEVELOPMENT CORPORATION | On-Going | ₱93.6M | 28% | High risk96 | Flagged0.040 |
| 25LJ0105CONSTRUCTION OF ROAD, PHASE 2, BARANGAY SAN ISIDRO, BABAK DISTRICT, ISLAND GARDEN CITY OF SAMAL, DAVAO DEL NORTE | Davao del Norte 2nd DEO | ROSBILL CONSTRUCTION AND SUPPLY | On-Going | ₱94.9M | 28% | High risk96 | Flagged0.040 |
| 25LI0041CONSTRUCTION OF ROAD, BARANGAY RIZAL - BARANGAY BAYLO, MONKAYO, DAVAO DE ORO | Davao de Oro 2nd DEO | MINDALIFI CONSTRUCTION AND SUPPLYABU CONSTRUCTION | On-Going | ₱143.3M | 54% | High risk96 | Flagged0.044 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24LG0069CONSTRUCTION OF 1-STOREY 3-CLASSROOM SCHOOL BUILDING IN TIBLAWAN NATIONAL HIGH SCHOOL, BARANGAY TIBLAWAN, GOVERNOR GENEROSO, DAVAO ORIENTAL | Davao Oriental 2nd DEO | RAKKI CORPORATION | On-Going | ₱9.9M | 0% | High risk86 | Flagged0.093 |
| 24LG0066CONSTRUCTION OF 1-STOREY 3 CLASSROOM SCHOOL BUILDING IN MAPUTI NATIONAL HIGH SCHOOL, BARANGAY MAPUTI, BANAYBANAY, DAVAO ORIENTAL | Davao Oriental 2nd DEO | R. BAUDON CONSTRUCTION AND SUPPLY CO. | On-Going | ₱9.7M | 0% | High risk84 | Flagged0.093 |
| 24L00346CONSTRUCTION OF ROAD, BARANGAY MAPAANG, MACO, DAVAO DE ORO | Region XI | N.C. AGUILAR CONST. & SUPPLY INC. | On-Going | ₱74.9M | 12% | High risk89 | Flagged0.092 |
| 25L00159CONSTRUCTION OF 2-STOREY NCMF DAVAO REGIONAL OFFICE BUILDING, RGC, BAGO OSHIRO, DAVAO CITY | Region XI | MARK ANTHONY CONSTRUCTION & SUPPLY | On-Going | ₱71.3M | 2% | High risk88 | Flagged0.090 |
| 24LG0067CONSTRUCTION OF 1-STOREY 3 CLASSROOM SCHOOL BUILDING IN SUROP NATIONAL HIGH SCHOOL, BARANGAY SUROP, GOVERNOR GENEROSO, DAVAO ORIENTAL | Davao Oriental 2nd DEO | RAKKI CORPORATION | On-Going | ₱10.1M | 0% | High risk86 | Flagged0.089 |
| 25LI0047CONCRETING OF BRGY. MAGANGIT FMR (PHASE II), BRGY. MAGANGIT, NEW BATAAN, DAVAO DE ORO | Davao de Oro 2nd DEO | TWO DEGREES CONSTRUCTION AND SUPPLY | On-Going | ₱14.9M | 0% | High risk86 | Flagged0.089 |
| 25LC0065CONCRETING OF BRGY. LA FILIPINA FMR, BRGY. LA FILIPINA, TAGUM CITY, DAVAO DEL NORTE | Davao del Norte DEO | AARJG BUILDERS CORPORATION | On-Going | ₱14.9M | 6% | High risk86 | Flagged0.085 |
| 24LA0148CONSTRUCTION OF ROAD, BINABA - SAROG - MAMACAO - SABONG - LINIPUTAN - KITANG DAGAT - LINIPUTAN, LANTAWAN, BARANGAY NAPNAPAN, PANTUKAN, DAVAO DE ORO | Davao de Oro 1st DEO | GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO | On-Going | ₱95.5M | 45% | High risk90 | Flagged0.085 |
| 25LD0207CONCRETING OF BRGY. BULACAN FMR, BRGY. BULACAN, MALALAG, DAVAO DEL SUR | Davao del Sur DEO | CMBUEN CONSTRUCTION SERVICES | On-Going | ₱14.4M | 0% | High risk80 | Flagged0.082 |
| 25LD0206CONCRETING OF BRGY. CAMANCHILES FMR, BRGY. CAMANCHILES, MATANAO, DAVAO DEL SUR | Davao del Sur DEO | CMBUEN CONSTRUCTION SERVICES | On-Going | ₱14.5M | 0% | High risk81 | Flagged0.082 |
| 24L00348PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY - (S01364MN) K1480+695 - K1481+640, K1482+740 - K1482+961, (S00062MN) K1482+333 - K1482+752, (S00063MN) K1480+(-956) - K1480+(-695), DAVAO DEL NORTE | Region XI | P.L. SEBASTIAN CONSTRUCTION, INC. (FORMERLY: P.L. SEBASTIAN CONSTRUCTION) | On-Going | ₱93.6M | 61% | High risk91 | Flagged0.078 |
| 24L00294DAVAO DE ORO STATE COLLEGE - CONSTRUCTION OF A FIVE - STOREY THIRTY - CLASSROOM ADMINISTRATIVE/ACADEMIC BUILDING IN MAIN COMPOSTELA CAMPUS | Region XI | ZJN DEVELOPMENT CONSTRUCTION & SUPPLY CORPORATION | On-Going | ₱29.8M | 50% | High risk87 | Flagged0.076 |
| 24LA0150CONSTRUCTION OF ROAD, PUROK CAIMITO - SAN MIGUEL - MAPLAG - BARUNGKAG - BUKO-BUKO SA ANAY, PANTUKAN, DAVAO DE ORO (PHASE 1) | Davao de Oro 1st DEO | GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO | On-Going | ₱47.8M | 48% | High risk88 | Flagged0.075 |
| 24LA0147CONSTRUCTION/COMPLETION OF KNP BUILDING, KINGKING, PANTUKAN, DAVAO DE ORO | Davao de Oro 1st DEO | MARK ANTHONY CONSTRUCTION & SUPPLY | On-Going | ₱49.4M | 53% | High risk88 | Flagged0.073 |
| 24LA0145CONSTRUCTION OF MHO BUILDING PHASE 2, KINGKING, PANTUKAN, DAVAO DE ORO | Davao de Oro 1st DEO | N.C. AGUILAR CONST. & SUPPLY INC. | On-Going | ₱19.8M | 53% | High risk84 | Flagged0.072 |
| 24LB0118CONSTRUCTION OF 4STY20CL AT F. BUSTAMANTE NHS, DAVAO CITY, DAVAO DEL SUR | Davao City DEO | ROSBILL CONSTRUCTION AND SUPPLYPARAGON STANDARD CONSTRUCTION SVCS, INC. | On-Going | ₱86M | 89% | High risk88 | Flagged0.071 |
| 24LA0131CONCRETING OF ROAD FROM NUEVO ILOCO-MAHAYAG, MAWAB, DAVAO DE ORO | Davao de Oro 1st DEO | GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO | On-Going | ₱88.6M | 85% | High risk89 | Flagged0.070 |
| 25LG0093CONSTRUCTION OF SCHOOL BUILDING, MACAMBOL ELEMENTARY SCHOOL, BARANGAY MACAMBOL, CITY OF MATI, DAVAO ORIENTAL | Davao Oriental 2nd DEO | R. BAUDON CONSTRUCTION AND SUPPLY CO. | On-Going | ₱9.9M | 65% | High risk85 | Flagged0.070 |
| 25LG0092CONSTRUCTION OF SCHOOL BUILDING, BASO ELEMENTARY SCHOOL, BARANGAY BADAS, CITY OF MATI, DAVAO ORIENTAL | Davao Oriental 2nd DEO | R. BAUDON CONSTRUCTION AND SUPPLY CO. | On-Going | ₱9.9M | 67% | High risk85 | Flagged0.070 |
| 24LA0138CONSTRUCTION OF CONCRETE ROAD, PUROK 6 SITIO NAGAS TO PUROK 10 SITIO TAPIS, TAMBONGON, PANTUKAN, DAVAO DE ORO | Davao de Oro 1st DEO | MARK ANTHONY CONSTRUCTION & SUPPLY | On-Going | ₱38.4M | 72% | High risk86 | Flagged0.069 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 526 | 17LH0014ROAD WIDENING INCLUDING DRAINAGE AND RROW AT DAVAO-COTABATO OLD ROAD, K1526+(-)432 TO K1526+301, TORIL DISTRICT, DAVAO CITY 3RD LD K1525+522.870-K1526+298.000 | Davao City 2nd DEO | ALZAM ENTERPRISES INCORPORATED (FORMERLY: ALZAM ENTERPRISES) | Completed | ₱30.8M | 100% | High risk72 | —-0.025 |
| 527 | 18LB0022CONST./IMP. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS JCT. DAVAO COTABATO OLD ROAD BA | Davao City DEO | ARCINUE COMM'L CORPORATION | Completed | ₱32.8M | 100% | High risk72 | —-0.026 |
| 528 | 17LH0006PAVING OF SHOULDERS WITH DRAINAGE IMPROVEMENT AT BAYABAS-EDEN ROAD, TORIL DISTRICT, DAVAO CITY A) 1528+393.000-1530+280.715 | Davao City 2nd DEO | SBB CONSTRUCTION & SUPPLY, INC. (FORMERLY: SBB CON | Completed | ₱30.2M | 100% | High risk72 | —-0.027 |
| 529 | 18LB0004REHAB/MAJOR REPAIR OF DRAINAGE STRUCTURE ALONG MAGSAYSAY AVENUE K1510+(-)499-K1510+680 | Davao City DEO | DIGOS TESSTON CONST. & SUPPLIES | Completed | ₱30.7M | 100% | High risk72 | —-0.027 |
| 530 | 23LF0071MATI-TARRAGONA BYPASS (LUCATAN-TAGABAKID ROAD), DAVAO ORIENTAL | Davao Oriental 1st DEO | ECBJ EASTCOAST CONSTRUCTION | Completed | ₱32.2M | 100% | High risk71 | —-0.013 |
| 531 | 25LJ0025JCT. ROAD TUGANAY-DUJALI-KINAMAYAN TO POB NEW CASAY, RJS PUROK 5, POB CABAYANGAN TO PUROK SAMPAGUITA LEADING TO PALAYAMANAN, BARANGAY CABAY-ANGAN, B.E. DUJALI, DAVAO DEL NORTE | Davao del Norte 2nd DEO | EACN CONSTRUCTION | Completed | ₱4.8M | 100% | High risk71 | —-0.027 |
| 532 | 22LB0160CONSTRUCTION OF ROAD WITH DRAINAGE, MALASUGUE ST., TULINGAN ST., GOING TO MAMSA ST., WILFREDO AQUINO, AGDAO DISTRICT, DAVAO CITY | Davao City DEO | VIBRANIUM BUILDERS CORPORATION | Completed | ₱4.8M | 100% | High risk70 | —-0.025 |
| 533 | 24L00012INSTALLATION/APPLICATION OF SIGNAGE - WARNING, ADVISORY AND REGULATORY SIGNS, PAVEMENT MARKINGS, AND PEDESTRIAN ISLAND ALONG DAVAO - COTABATO RD (DAVAO CITY-JCT DIGOS) (S00039MN) - K1512+223 - K1521+345, (S01455MN) CHAINAGE 2488 - 3792, TALOMO (POBLACION) | Region XI | GMI88 CONSTRUCTION, INC. | On-Going | ₱4.7M | 97% | High risk70 | Flagged0.003 |
| 534 | 21L00097CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - BAYABAS - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE 1), DAVAO DEL SUR | Region XI | ALGON ENGINEERING CONSTRUCTION CORPORATION | On-Going | ₱169.8M | 95% | High risk69 | Flagged0.010 |
| 535 | 21L00098CONSTRUCTION OF ROAD, JCT. DAVAO - BUKIDNON ROAD (CALINAN SECTION) - WANGAN - SUBASTA - TAGAKPAN - TUNGKALAN - TAGURANO - BAYABAS - CATIGAN - BARACATAN - SIBULAN - TIBOLO - KAPATAGAN ROAD (PACKAGE 2), DAVAO DEL SUR | Region XI | ALGON ENGINEERING CONSTRUCTION CORPORATION | On-Going | ₱169.6M | 96% | High risk69 | Flagged0.009 |
| 536 | 20L00109ROAD UPGRADING OF NHJ BUSO - SO. PAYPAY - TAGBINONGA - SO. CALATAGAN, CALAPAGAN - SO. MATIGDAO, MARAYAG - SO. CALINAWAN, TAOCANGA ROAD, PACKAGE 1, DAVAO ORIENTAL | Region XI | THREE W BUILDERS, INC. | On-Going | ₱140.7M | 87% | High risk69 | Flagged0.018 |
| 537 | 18L00142IMPVT./CONC. OF JCT. DAVAO-BUKIDNON ROAD (CALINAN SECT.)-WANGAN-SUBASTA-TAGAKPAN-TUNGKALAN-TAGURANO- | Region XI | DREIRICH BUILDERSTHREE W BUILDERS, INC. | On-Going | ₱164.6M | 95% | High risk69 | Flagged0.016 |
| 538 | 23L00066DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE - STA. ANA. WHARF - R. CASTILLO), TIMES BEACH - ROXAS AVE. SEGMENT, DAVAO CITY | Region XI | ULTICON BUILDERS, INC.WEE ENG CONSTRUCTION, INC. | On-Going | ₱989.1M | 89% | High risk69 | Flagged0.038 |
| 539 | 19L00124CONSTRUCTION OF GRAVEL ROAD-MAWAB-MARAGUSAN-CARAGA ROAD, PACKAGE D, DAVAO ORIENTAL | Region XI | ULTICON BUILDERS, INC. | On-Going | ₱161.8M | 45% | High risk69 | Flagged0.035 |
| 540 | 22L00088CONSTRUCTION OF CONCRETE ROAD - MONKAYO-BOSTON ROAD (BOSTON SECTION), DAVAO ORIENTAL | Region XI | RELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY) | On-Going | ₱140.5M | 99% | High risk69 | Flagged0.004 |
| 541 | 20L00110ROAD UPGRADING OF NHJ BUSO - SO. PAYPAY - TAGBINONGA - SO. CALATAGAN, CALAPAGAN - SO. MATIGDAO, MARAYAG - SO. CALINAWAN, TAOCANGA ROAD, PACKAGE 2, DAVAO ORIENTAL | Region XI | THREE W BUILDERS, INC. | On-Going | ₱172.7M | 96% | High risk69 | Flagged0.026 |
| 542 | 20L00036CONSTRUCTION OF CONCRETE BRIDGE-ALTERNATE ROAD FROM REGION XI TO REGION X, PACKAGE 2E, DAVAO CITY | Region XI | ULTICON BUILDERS, INC. | On-Going | ₱157.6M | 93% | High risk69 | Flagged0.015 |
| 543 | 18L00164JCT. DAVAO-COTABATO ROAD (BANGKAL SECT.)-CATALUNAN GRANDE RD-JCT. DAVAO-BUKIDNON RD (MINTAL SECT.),I | Region XI | P.L. SEBASTIAN CONSTRUCTION, INC. (FORMERLY: P.L. SEBASTIAN CONSTRUCTION) | Completed | ₱169.8M | 100% | High risk69 | —-0.024 |
| 544 | 23L00080CONSTRUCTION OF CONCRETE ROAD - MATANAO - KIBLAWAN - PADADA ROAD, PACKAGE I, DAVAO DEL SUR | Region XI | ABU CONSTRUCTION | On-Going | ₱137.9M | 95% | High risk68 | —-0.009 |
| 545 | 18LB0019CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ROXAS AVENUE-PADRE GOMEZ ST.-PALMA GIL STREET-CAMUS STREET-LEGASPI STREET LEADING TO PEOPLE'S PARK, DAVAO CITY | Davao City DEO | SBB CONSTRUCTION & SUPPLY, INC. (FORMERLY: SBB CON | Completed | ₱22.6M | 100% | High risk68 | —-0.031 |
| 546 | 23L00023DAVAO DE ORO BYPASS ROAD (KAHAYAG - PAGSABANGAN - PANANSALAN SECTION), PHASE 1, DAVAO DE ORO | Region XI | METRO GEAR CONSTRUCTION CORP. | On-Going | ₱191.1M | 96% | High risk68 | Flagged0.006 |
| 547 | 22L00030CONSTRUCTION OF CONCRETE ROAD - PANAGA - PANDAITAN (SITIO TIBUNGOL) - PARADISE EMBAK - JCT. MABUHAY - PAÑALUM ROAD, PACKAGE 1, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | ULTICON BUILDERS, INC. | On-Going | ₱193.9M | 99% | High risk68 | Flagged0.010 |
| 548 | 18L00187CONSTRUCTION OF GRAVEL ROAD-MAWAB-MARAGUSAN-CARAGA ROAD, PACKAGE B, INCLUDING ROW, DAVAO ORIENTAL | Region XI | PREMIUM MEGASTRUCTURES INC. | On-Going | ₱142.7M | 53% | High risk68 | Flagged0.020 |
| 549 | 18L00190MATIAO-MAGSAYSAY COASTAL ROAD INCL. ROW, DAVAO ORIENTAL | Region XI | MAER SUMMIT KONSTRUKT CO. | Completed | ₱258M | 100% | High risk68 | —-0.014 |
| 550 | 22L00138CONSTRUCTION OF CONCRETE BRIDGE - NABUNTURAN - MACO ROAD (MAINIT, NABUNTURAN - MASARA, MACO), PACKAGE 34, DAVAO DE ORO | Region XI | ULTICON BUILDERS, INC.COASTLAND CONSTRUCTION & DEVELOPMENT CORP. | On-Going | ₱162.5M | 96% | High risk68 | Flagged0.007 |