Cross-referencing the ledgers…
Cross-referencing the ledgers…
Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
20,647
Total budget
₱539.8B
Average progress
93.2%
Completion rate
81.6%
Average risk score
46.1
Medium risk on average, out of 100
Flagged as unusual
537
2.6% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 7,664 | ₱237.4B | 46.7 | 83 | 93.4% |
| Buildings and Facilities | 7,264 | ₱91.7B | 40.2 | 107 | 94.1% |
| Flood Control and Drainage | 3,020 | ₱123.4B | 49.4 | 43 | 92.3% |
| Bridges | 1,001 | ₱31.2B | 48.3 | 32 | 93.6% |
| Water Provision and Storage | 681 | ₱4.4B | 36.7 | 8 | 95.7% |
| OTHER | 580 | ₱26.1B | 70.7 | 130 | 91.9% |
| GAA 2025 SSP | 194 | ₱6.4B | 93.8 | 103 | 71.2% |
| GAA 2025 OO-1 | 101 | ₱6.4B | 93.2 | 26 | 77.4% |
| Bridges, Roads | 91 | ₱10.4B | 62.0 | 5 | 84.0% |
| GAA 2025 OO-2 | 51 | ₱2.3B | 89.9 | 0 | 73.6% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Batangas 4th DEO | 2,790 | ₱48.9B | 43.3 | 35 | 97.7% |
| Quezon 4th DEO | 1,687 | ₱30.6B | 42.0 | 29 | 98.4% |
| Cavite 1st DEO | 1,566 | ₱46.3B | 53.7 | 104 | 87.7% |
| Batangas 3rd DEO | 1,425 | ₱22.8B | 40.4 | 34 | 91.8% |
| Batangas 2nd DEO | 1,372 | ₱34.1B | 44.3 | 37 | 91.8% |
| Batangas 1st DEO | 1,323 | ₱21.7B | 39.9 | 9 | 93.9% |
| Quezon 1st DEO | 1,308 | ₱30B | 39.6 | 22 | 97.1% |
| Rizal 1st DEO | 1,256 | ₱23.9B | 48.8 | 30 | 87.9% |
| Laguna 2nd DEO | 1,167 | ₱32.6B | 48.0 | 19 | 89.2% |
| Quezon 2nd DEO | 1,135 | ₱30.9B | 49.2 | 41 | 96.1% |
| Quezon 3rd DEO | 1,032 | ₱30.4B | 51.1 | 27 | 96.9% |
| Region IV-A | 1,017 | ₱91.9B | 57.5 | 81 | 80.2% |
| Laguna 3rd DEO | 788 | ₱15.6B | 45.5 | 14 | 93.1% |
| Rizal 2nd DEO | 785 | ₱18.1B | 46.2 | 12 | 95.0% |
| Cavite 3rd DEO | 728 | ₱32B | 52.5 | 17 | 89.7% |
| Laguna 1st DEO | 679 | ₱15.9B | 45.0 | 12 | 96.4% |
| Cavite 2nd DEO | 589 | ₱14.2B | 47.1 | 14 | 94.5% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) | 464 | ₱22.2B | 54.7 | 34 | 91.2% |
| R.A. MENDIOLA CONSTRUCTION & DEVELOPER | 431 | ₱8.6B | 41.3 | 15 | 96.5% |
| GREENFIELD CONSTRUCTION | 363 | ₱2.4B | 37.8 | 3 | 93.9% |
| VICMAR CONSTRUCTION, INC. | 343 | ₱10.1B | 46.2 | 6 | 91.9% |
| V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL | 336 | ₱17.8B | 54.4 | 7 | 91.3% |
| JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | 326 | ₱13.7B | 48.2 | 5 | 94.9% |
| JEMAK CONSTRUCTION & SUPPLY | 274 | ₱8.4B | 48.5 | 3 | 97.7% |
| DZEE BUILDERS AND CONSTRUCTION SUPPLY | 264 | ₱1.8B | 35.4 | 0 | 99.3% |
| N.B. AVILA CONSTRUCTION | 251 | ₱7.9B | 49.2 | 9 | 95.7% |
| RAPID FOREMOST CONST. CO. | 230 | ₱9B | 46.5 | 4 | 98.1% |
| ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED. | 223 | ₱6B | 51.7 | 7 | 96.3% |
| OIC CONZTRUCT AND SUPPLY CORPORATION(FORMERLY:OIC CONST.) | 222 | ₱2.2B | 34.7 | 1 | 96.7% |
| POWER K CONSTRUCTION SUPPLY & SERVICES | 220 | ₱5.1B | 43.0 | 3 | 95.0% |
| 6 JEWELS CONSTRUCTION | 210 | ₱1.2B | 33.9 | 0 | 100.0% |
| OMNICON BUILDERS | 207 | ₱9.9B | 53.2 | 9 | 89.3% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DJ0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF QUEZON INDUSTRIAL HIGHWAY | Quezon 2nd DEO | ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED. | On-Going | ₱94.5M | 62% | High risk96 | Flagged0.014 |
| 25DK0074CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT RD K0129 + (-302) - K0140 + 000 | Quezon 1st DEO | UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP. | On-Going | ₱143M | 100% | High risk96 | Flagged0.008 |
| 25DL0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF ALABAT DISTRICT HOSPITAL, ALABAT, QUEZON | Quezon 4th DEO | R.A. MENDIOLA CONSTRUCTION & DEVELOPER | On-Going | ₱96M | 90% | High risk96 | Flagged0.005 |
| 25DM0123INSTALLATION OF SOLAR STREET LIGHTS ALONG MULANAY - SN FRANCISCO RD - K0295 + 509 - K0302 + 000 | Quezon 3rd DEO | UNIMAX STEEL STRUCTURE AND CONSTRUCTION CORP. | On-Going | ₱93.6M | 97% | High risk96 | Flagged0.002 |
| 25D00039CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES (DSWD) BRGY. MARAWOY, LIPA CITY, BATANGAS | Region IV-A | EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION | On-Going | ₱141.7M | 2% | High risk96 | Flagged0.037 |
| 25DE0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, MAHACOT WEST - MAHACOT | Batangas 2nd DEO | TCSC CORP. | On-Going | ₱144.8M | 84% | High risk96 | Flagged0.015 |
| 25DM0158CONSTRUCTION (COMPLETION) OF MUNICIPAL HALL, PITOGO, QUEZON | Quezon 3rd DEO | R.A. MENDIOLA CONSTRUCTION & DEVELOPERRPS BUILDERS GENERAL CONTRACTOR CORP. | On-Going | ₱144M | 55% | High risk96 | Flagged0.024 |
| 25DK0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT ROAD, K0144+000-K0152+000 | Quezon 1st DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱96.8M | 55% | High risk96 | Flagged0.015 |
| 25DP0016CSSP - (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF ROAD, BALINACON - MALINAO ROAD, BARANGAY POBLACION III TO BARANGAY KANURAN LAZAAN, NAGCARLAN, LAGUNA | Laguna 3rd DEO | READYCON TRADING & CONSTRUCTION CORP. | On-Going | ₱101.3M | 100% | High risk96 | Flagged0.000 |
| 25DM0151CONSTRUCTION OF MULTI-PURPOSE BUILDING, BONDOC PENINSULA DISTRICT HOSPITAL, CATANAUAN, QUEZON | Quezon 3rd DEO | R.A. MENDIOLA CONSTRUCTION & DEVELOPER | On-Going | ₱93.5M | 25% | High risk96 | Flagged0.024 |
| 25DL0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SANTA MONICA-SAN R | Quezon 4th DEO | R.A. MENDIOLA CONSTRUCTION & DEVELOPER | On-Going | ₱93.3M | 39% | High risk96 | Flagged0.018 |
| 25DQ0084CONSTRUCTION OF RIVERWALL AND OTHER IMPROVEMENT WORKS ALONG BACOOR RIVER, PHASE 1, CITY OF BACOOR, CAVITE | Cavite 3rd DEO | RIMJ CONSTRUCTION SUPPLIES AND SERVICES (FOR: ROMINA CONSTRUCTION)ROAD EDGE TRADING & DEVELOPMENT SERVICES | On-Going | ₱96M | 30% | High risk96 | Flagged0.022 |
| 25DE0095CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, DULANGAN-TALON-ABIACAO | Batangas 2nd DEO | TCSC CORP. | On-Going | ₱144.8M | 87% | High risk96 | Flagged0.015 |
| 25DE0101CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, ALAGAO-MALINDIG ROAD, | Batangas 2nd DEO | TCSC CORP. | On-Going | ₱144.8M | 82% | High risk96 | Flagged0.016 |
| 25DE0102CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, BARANGAY MALINDIG, BAU | Batangas 2nd DEO | TCSC CORP. | On-Going | ₱144.8M | 83% | High risk96 | Flagged0.016 |
| 25DL0130ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE- TERTIARY ROADS, MSR JCT LOPEZ-CATANAUAN RD., K0233+745-K0235+200, K0235+350-K0236+128, LOPEZ, QUEZON | Quezon 4th DEO | WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) | On-Going | ₱93.1M | 72% | High risk96 | Flagged0.001 |
| 25DE0096CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, IMPROVEMENT OF ROAD, MANGGAHAN-SAN MARTIN-S | Batangas 2nd DEO | TCSC CORP. | On-Going | ₱144.8M | 84% | High risk96 | Flagged0.015 |
| 25DM0145ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN. NARCISO RD - K0259 + 000 - K0252 + 500, QUEZON | Quezon 3rd DEO | WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) | On-Going | ₱93.6M | 71% | High risk96 | Flagged0.003 |
| 25DM0103ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - SN FRANCISCO-SN ANDRES-SN NARCISO RD - K0312+541 - K0316+000 | Quezon 3rd DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱93.6M | 74% | High risk96 | Flagged0.002 |
| 25DM0088ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA-PITOGO-MULANAY-SN NARCISO RD - K0232+379 - K0233+700, K0234+371 - K0236+ 850, K0237+789 - K0238+200 | Quezon 3rd DEO | ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED. | On-Going | ₱93.6M | 77% | High risk96 | —-0.001 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20DF0196CONSTRUCTION OF BRIDGE AT MALAGASANG II, IMUS, CAVITE | Cavite 1st DEO | N.B. AVILA CONSTRUCTION | On-Going | ₱6.8M | 0% | High risk84 | Flagged0.086 |
| 24DJ0235CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (LUCENA GENERAL HOSPITAL), LUCENA CITY, QUEZON | Quezon 2nd DEO | WYDERWAYS BUILDERS AND SUPPLIES | On-Going | ₱144M | 22% | High risk89 | Flagged0.076 |
| 17DF0180UPGRADING OF ELECTRICAL POWER; STP RECYCLING SYSTEM FOR DR. OLIVIA SALAMANCA MEMORIAL HOSPITAL, CAVITE CITY AND KAWIT KALAYAAN HOSPITAL, KAWIT, CAVITE | Cavite 1st DEO | R2A CONSTRUCTION & TRADING CORPORATION | On-Going | ₱11.3M | 2% | Medium risk46 | Flagged0.070 |
| 23DF0200CONSTRUCTION OF PEDESTRIAN OVERPASS ALONG KAWIT-NOVELETA DIVERSION ROAD, TABON 1, KAWIT, CAVITE | Cavite 1st DEO | N. LIM DY CONSTRUCTION | On-Going | ₱24.1M | 32% | High risk85 | Flagged0.064 |
| 24DJ0209OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE-SECONDARY ROADS, LUCENA-DALAHICAN PORT RD - K0134+009 - K0134+446 | Quezon 2nd DEO | WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) | On-Going | ₱35.7M | 0% | High risk87 | Flagged0.064 |
| 24D00287DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS - SINILOAN INFIRMARY HOSPITAL, LAGUNA | Region IV-A | 11 DIAMOND EAGLE CONSTRUCTION CORPORATION (FORMERLY:11 DIAMOND EAGLE CONSTRUCTION) | On-Going | ₱14.7M | 0% | High risk85 | Flagged0.063 |
| 25DM0166CONCRETING OF BRGY. QUEZON FMR, BRGY. QUEZON, PITOGO, QUEZON | Quezon 3rd DEO | TONWAY BUILDERS AND SUPPLY | On-Going | ₱29.8M | 15% | High risk87 | Flagged0.063 |
| 24DF0321CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING (PUBLIC MARKET), PHASE II, IMUS CITY, CAVITE | Cavite 1st DEO | MICLOVER GENERAL CONSTRUCTION & IRON WORKS | On-Going | ₱49M | 17% | High risk84 | Flagged0.062 |
| 25DM0159OPENING AND CONCRETING OF BRGY. ILAYANG WASAY TO BRGY. IBABANG WASAY TO BRGY. PINAMASAGAN FMR, BRGYS. ILAYANG WASAY, IBABANG WASAY AND PINAMASAGAN, BUENAVISTA, QUEZON | Quezon 3rd DEO | J & R MENDENILLA CONSTRUCTION SUPPLY & GEN. MDSE. | On-Going | ₱39.5M | 1% | High risk87 | Flagged0.061 |
| 24D00303CONSTRUCTION OF TAGAYTAY TOURIST (ICONIC TOWER) (PHASE 8), BRGY. KAYBAGAL SOUTH, TAGAYTAY CITY, CAVITE | Region IV-A | DEVEX INCORPORATED | On-Going | ₱194.1M | 0% | Medium risk59 | Flagged0.061 |
| 24D00290DOH HEALTH FACIITIES ENHANCEMENT PROGRAM (HFEP) OTHER FACILITIES - SINILOAN DIALYSIS CENTER, LAGUNA | Region IV-A | 11 DIAMOND EAGLE CONSTRUCTION CORPORATION (FORMERLY:11 DIAMOND EAGLE CONSTRUCTION) | On-Going | ₱5.9M | 0% | High risk85 | Flagged0.061 |
| 25DE0191CONCRETING OF BRGY. NAGTALUNTONG FMR (PHASE I), BRGY. NAGTALUNTONG, LOBO, BATANGAS | Batangas 2nd DEO | TCSC CORP. | On-Going | ₱14.9M | 0% | High risk86 | Flagged0.060 |
| 24DE0247CLUSTER - CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES: 1. CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BAGONG TUBIG, SAN LUIS, BATANGAS (PHA | Batangas 2nd DEO | VICMAR CONSTRUCTION, INC. | On-Going | ₱5.8M | 0% | High risk85 | Flagged0.059 |
| 23DF0206CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIESCONSTRUCTION OF SLOPE PROTECTION AT ALAPAN, CITY OF IMUS, CAVITE | Cavite 1st DEO | MOTIONTRADE DEVELOPMENT CORPORATION | On-Going | ₱19.1M | 0% | High risk66 | Flagged0.057 |
| 24DJ0157CONSTRUCTION OF 4STY12CL, LUCENA DALAHICAN NATIONAL HIGH SCHOOL - BARRA ANNEX, LUCENA CITY, QUEZON | Quezon 2nd DEO | WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) | On-Going | ₱48.2M | 46% | High risk88 | Flagged0.056 |
| 24DL0182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF AGOHO - MARILAG ROAD, CALAUAG, QUEZON (PACKAGE D) | Quezon 4th DEO | R.A. MENDIOLA CONSTRUCTION & DEVELOPER | On-Going | ₱93.8M | 68% | High risk90 | Flagged0.055 |
| 24DD0308CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PINAGKAWITAN NATIONAL HIGH SCHOOL, BARANGAY PINAGKAWITAN, LIPA CITY, BAT | Batangas 4th DEO | M.V. CALDO CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY: M.V. CALDO ENGINEERING CONSTRUCTION AND S)C.T. LEONCIO CONSTRUCTION & TRADING | On-Going | ₱78.7M | 54% | High risk87 | Flagged0.055 |
| 19DF0060ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM,NETWORK DEVELOPMENT, CONSTRUCTION OF MISSING LINKS/NEW ROADS-GENERALAGUINALDO-MAGALLANES-NASUGBU ROAD (EAST-WEST ROAD), AMADEO SECTION,CAVITE | Cavite 1st DEO | J.M. MALIGAYA CONSTRUCTION CORP. (FORMERLY: J.M. MALIGAYA CONSTRUCTION & CONSTRUCTION SUPPLY) | On-Going | ₱96.5M | 20% | High risk73 | Flagged0.054 |
| 24D00308CONSTRUCTION OF DEPARTMENT OF SOCIAL WELFARE AND DEVELOPMENT REGION 4A - REGIONAL OFFICE, MARAWOY, LIPA CITY, BATANGAS (PACKAGE B) | Region IV-A | EFREN RAMIREZ CONSTRUCTION AND GENERAL SERVICES CORPORATION | On-Going | ₱145.5M | 0% | Medium risk58 | Flagged0.054 |
| 23DG0075OPENING & CONC OF BRGY MARAHAN2 TO BRGY TAYWANAK ILAYA TO BRGY TAYWANAK IBABA FMR BRGY MARAHAN 2 | Cavite 2nd DEO | HAUSLAND CONSTRUCTION | On-Going | ₱25.1M | 80% | High risk84 | Flagged0.052 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 851 | 17DQ0062LOCALLY FUNDED PROJECTS - LOCAL INFRASTRUCTURE PROGRAM (LIP) - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES, CONSTRUCTION/REHABILITATION/REPAIR OF MULTI-PURPOSE BUILDING (BACOOR CITY HALL OF JUSTICE), BACOOR, CAVITE AND CONSTRUCTION OF MULTI- | Cavite 3rd DEO | ALMAKAR BUILDERS & METAL WORKS | Completed | ₱19.8M | 100% | High risk71 | —-0.072 |
| 852 | 24DJ0138CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, GOVERNMENT COMPLEX, BARANGAY BULAKIN II, DOLORES, QUEZON | Quezon 2nd DEO | ROMHEAD S.J. BUILDERS AND DEVELOPMENT INCORPORATED. | On-Going | ₱9.9M | 76% | High risk71 | —-0.028 |
| 853 | 20DO0045LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDING AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY PLAZA ALDEA, TANAY, RIZAL | Rizal 2nd DEO | LARD BUILDERS | Completed | ₱4.9M | 100% | High risk71 | —-0.073 |
| 854 | 24DN0085REHABILITATION OF ROAD WITH DRAINAGE SYSTEM, M.L. QUEZON ST., BARANGAY DALIG AND BARANGAY SAN ROQUE ANTIPOLO CITY, RIZAL (SECOND DISTRICT) | Rizal 1st DEO | H FRANCISCO CONSTRUCTION AND SUPPLY | On-Going | ₱9.9M | 49% | High risk71 | Flagged0.010 |
| 855 | 25DC0160CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI PURPOSE BUILDING AT BRGY. DARASA, TANAUAN CITY, BATANGAS | Batangas 3rd DEO | V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL | On-Going | ₱11.6M | 31% | High risk71 | —-0.023 |
| 856 | 17D00023ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA ROAD K0266+025 - K0266+838, K0269+862-K0270+088 & | Region IV-A | RAPID FOREMOST CONST. CO.R.T.Y. CONSTRUCTION | Completed | ₱144.7M | 100% | High risk71 | —-0.044 |
| 857 | 17D00024ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL ROAD STRATEGIES, TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA ROAD, K0262+323-K0266+025, BUENAVISTA, QUEZON | Region IV-A | R.T.Y. CONSTRUCTION | Completed | ₱144.7M | 100% | High risk71 | —-0.045 |
| 858 | 17D00025ROAD UPGRADING (UNPAVED TO PAVED) BASED ON GRAVEL STRATEGIES TRAFFIC BENCHMARK FOR UPGRADING TO PAVED ROAD STANDARDS (HDM-4 PROJECT ANALYSIS) ALONG CATANAUAN-BUENAVISTA ROAD, K0272+067-K0275+840, BUENAVISTA, QUEZON | Region IV-A | R.T.Y. CONSTRUCTION | Completed | ₱144.7M | 100% | High risk71 | —-0.048 |
| 859 | 18DC0054ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRA | Batangas 3rd DEO | V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL | Completed | ₱49M | 100% | High risk71 | —-0.048 |
| 860 | 16DE0185MFO-2 FLOOD MANAGEMENT SERVICES, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG CALUMPANG RIVER, BATANGAS CITY, 5TH LD | Batangas 2nd DEO | TCSC CORP. | Completed | ₱49M | 100% | High risk71 | —-0.059 |
| 861 | 18DF0078LOCAL PROGRAM - CONSTRUCTION/REPAIR/ REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, BUILDINGS AND OTHER STRUCTURES,MULTIPURPOSE/FACILITIES, COMPLETION OF GRANDSTAND/STADIUM AND SPORTS FACILITIES PHASE II, MALAGASANG 1-G, | Cavite 1st DEO | NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | Completed | ₱91.5M | 100% | High risk71 | —-0.032 |
| 862 | 24DN0055BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MAYAMOT ANTIPOLO CITY, RIZAL (FIRST DISTRICT) | Rizal 1st DEO | STREAMLINE BUILDERS CORPORATION | On-Going | ₱19.2M | 31% | High risk71 | —-0.009 |
| 863 | 24DN0014FY 2024 DPWH INFRASTRUCTURE PROGRAM - BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), ABA HOMES, BARANGAY DALIG ANTIPOLO CITY, RIZAL (SECOND DISTRICT) | Rizal 1st DEO | E.L. ANOLIN CONSTRUCTION | On-Going | ₱5M | 96% | High risk71 | —-0.033 |
| 864 | 24DF0128ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMROAD WIDENING - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0060 + (-318) - K0060 + 728 | Cavite 1st DEO | J.M. MALIGAYA CONSTRUCTION CORP. (FORMERLY: J.M. MALIGAYA CONSTRUCTION & CONSTRUCTION SUPPLY) | On-Going | ₱56.2M | 0% | High risk71 | —-0.003 |
| 865 | 17DC0020MFO-1 NATIONAL ROAD NETWORK SERVICES, NETWORK DEVELOPMENT, IMPROVEMENT/WIDENING OF NATIONAL ROADS, S | Batangas 3rd DEO | ED1SON DEVELOPMENT & CONSTRUCTION INC. | Completed | ₱118.4M | 100% | High risk71 | —-0.027 |
| 866 | 20DD0084LOCAL PROGRAM, CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION/REHABILITATION/IMPROVEMENT OF QUILO-QUILO-SAN CARLOS ROAD, PADRE GARCIA, BATANGAS | Batangas 4th DEO | IKM BUILDERS AND CONSTRUCTION SUPPLY CORPORATION (FORMERLY: IKM BUILDERS & CONSTRUCTION SUPPLY)JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) | Completed | ₱47.5M | 100% | High risk71 | —-0.042 |
| 867 | 25DF0132CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIESCONSTRUCTION OF R1 - AGUINALDO SHRINE AND | Cavite 1st DEO | NEWINGTON BUILDERS, INC.(FOR: E. GARDIOLA CONSTRUCREDINEX CONSTRUCTION AND TRADING, INC. | On-Going | ₱74.8M | 0% | High risk71 | —-0.016 |
| 868 | 25DF0180ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMASSET PRESERVATION PROGRAMPREVENTIVE MAINTENANCE - SECONDARY ROADSNOVELETA-NAIC-TAGAYTAY RD - K0036 + 097 - K0037 + 286 | Cavite 1st DEO | READYCON TRADING & CONSTRUCTION CORP. | On-Going | ₱70.2M | 51% | High risk71 | —-0.030 |
| 869 | 25D00051CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) ACCESS ROAD LEADING TO TAYAK HILLS, TANAW DE RIZAL, LAGUNA | Region IV-A | L.P.O. ENTERPRISES | On-Going | ₱14.2M | 0% | High risk71 | Flagged0.012 |
| 870 | 17D00064CONSTRUCTION/REHABILITATION OF ACCESSIBILITY FACILITIES FOR PHYSICALLY CHALLENGED PERSONS OF C-6, RIZAL 1ST L.D., RIZAL PROVINCE | Region IV-A | R.A. PAHATI CONST. & SUPPLY, INC. | Completed | ₱19.3M | 100% | High risk71 | —-0.049 |
| 871 | 17DQ0064LOCALLY FUNDED PROJECTS - LOCAL INFRASTRUCTURE PROGRAM (LIP) - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES, CONSTRUCTION/COMPLETION OF LIVELIHOOD CENTER IN BRGY. SAN NICOLAS, BACOOR CITY, CAVITE AND CONSTRUCTION OF BACOOR CITY JAIL, BACOOR | Cavite 3rd DEO | MICLOVER GENERAL CONSTRUCTION & IRON WORKS | Completed | ₱23.5M | 100% | High risk71 | —-0.073 |
| 872 | 25DC0159CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING AT BARANGAY TINURIK, TANAUAN CITY, BATANGAS | Batangas 3rd DEO | V.R. PATRON BUILDERS & DEVELOPERS CORP. (PREVIOUSL | On-Going | ₱19.4M | 31% | High risk71 | —-0.023 |
| 873 | 24D00102CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, SOUTH LUZON EXPRESSWAY (SLEX) NORTHBOUND EXIT INTERCHANGE, SAN PEDRO CITY, LAGUNA,PHASE2 | Region IV-A | S.D. PLATON CONSTRUCTION, INC. | Completed | ₱77.2M | 100% | High risk71 | —-0.038 |
| 874 | 17D00063CONSTRUCTION OF EVACUATION CENTER AT TANAUAN CITY, BATANGAS PROVINCE | Region IV-A | PROTECH CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | Completed | ₱33.4M | 100% | High risk71 | —-0.069 |
| 875 | 19DN0062CONCRETING OF ROAD, BRGY. JANOSA, BINANGONAN, RIZAL | Rizal 1st DEO | FLAG CONSTRUCTION CORPORATION(FOR. FLAG CONSTRUCTI | Completed | ₱4.8M | 100% | High risk71 | —-0.043 |