Cross-referencing the ledgers…
Cross-referencing the ledgers…
Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
13,644
Total budget
₱484.5B
Average progress
92.9%
Completion rate
75.6%
Average risk score
52.2
Medium risk on average, out of 100
Flagged as unusual
656
4.8% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 5,063 | ₱204.6B | 54.8 | 81 | 92.5% |
| Buildings and Facilities | 4,257 | ₱65.6B | 42.7 | 137 | 95.1% |
| Flood Control and Drainage | 2,534 | ₱148.2B | 56.1 | 75 | 95.4% |
| Bridges | 626 | ₱19.9B | 53.2 | 36 | 91.5% |
| Water Provision and Storage | 507 | ₱5.7B | 44.5 | 17 | 92.2% |
| OTHER | 351 | ₱22.1B | 76.9 | 150 | 85.9% |
| GAA 2025 SSP | 149 | ₱6.6B | 94.3 | 110 | 56.6% |
| GAA 2025 OO-1 | 75 | ₱3.9B | 93.5 | 39 | 59.2% |
| GAA 2025 OO-2 | 50 | ₱4.4B | 91.0 | 10 | 69.5% |
| Bridges, Roads | 32 | ₱3.3B | 65.4 | 1 | 77.7% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Albay 2nd DEO | 1,789 | ₱65.3B | 59.1 | 131 | 87.3% |
| Region V | 1,715 | ₱146.9B | 63.3 | 240 | 81.8% |
| Camarines Norte DEO | 1,281 | ₱26.6B | 43.8 | 31 | 95.4% |
| Albay 3rd DEO | 871 | ₱21.1B | 54.4 | 59 | 89.9% |
| Camarines Sur 4th DEO | 842 | ₱18.4B | 46.8 | 16 | 97.5% |
| Sorsogon DEO | 817 | ₱43.4B | 60.2 | 24 | 95.8% |
| Catanduanes DEO | 800 | ₱12.8B | 43.8 | 14 | 97.7% |
| Camarines Sur 5th DEO | 783 | ₱20.3B | 44.0 | 14 | 97.8% |
| Sorsogon 2nd DEO | 774 | ₱27B | 54.7 | 40 | 94.3% |
| Masbate 2nd DEO | 682 | ₱14.6B | 48.2 | 11 | 96.4% |
| Camarines Sur 1st DEO | 634 | ₱12.7B | 39.7 | 9 | 96.7% |
| Camarines Sur 2nd DEO | 621 | ₱21.4B | 49.8 | 10 | 98.5% |
| Camarines Sur 3rd DEO | 608 | ₱9.4B | 43.2 | 22 | 96.2% |
| Masbate 3rd DEO | 520 | ₱10.1B | 51.5 | 16 | 91.6% |
| Albay 1st DEO | 491 | ₱25.7B | 59.6 | 10 | 97.7% |
| Masbate 1st DEO | 416 | ₱8.8B | 53.6 | 9 | 97.2% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | 594 | ₱41.5B | 62.9 | 50 | 88.2% |
| SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | 416 | ₱43.1B | 67.6 | 45 | 88.9% |
| CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. | 291 | ₱22.6B | 63.2 | 18 | 92.9% |
| STEVEN CONSTRUCTION & SUPPLY | 262 | ₱11.6B | 55.1 | 12 | 97.2% |
| G.C.I. CONSTRUCTION AND DEV'T. CORP. | 238 | ₱24.3B | 63.8 | 22 | 88.7% |
| BICOL GOLDROCK CONSTRUCTION CORPORATION | 227 | ₱13.8B | 57.2 | 12 | 91.2% |
| NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION | 220 | ₱7.7B | 57.9 | 21 | 81.0% |
| BRENTMIN ROOFING ENTERPRISE | 215 | ₱9.9B | 51.7 | 11 | 91.6% |
| EUS CONSTRUCTION | 188 | ₱9.3B | 57.2 | 9 | 93.1% |
| 128 DRAGON CONSTRUCTION AND SUPPLIES | 174 | ₱3.6B | 47.1 | 1 | 96.2% |
| MUNTOPAR BUILDERS CORP. | 166 | ₱9.7B | 61.9 | 16 | 88.8% |
| AREMAR CONSTRUCTION CORPORATION | 158 | ₱12.2B | 64.6 | 12 | 85.7% |
| SPRING STAR CONSTRUCTION AND SUPPLY | 141 | ₱5.4B | 54.4 | 1 | 97.2% |
| JAEJR ELECTRICAL, CONSTRUCTION & SUPPLY | 136 | ₱1.1B | 46.1 | 9 | 88.5% |
| ALNINO CONSTRUCTION & SUPPLY CORPORATION (FORMERLY: AL NINO CONSTRUCTION & SUPPLY) | 128 | ₱7.1B | 58.6 | 8 | 94.9% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25FC0023CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY CABUSAY, LABO CAMARINES NORTE | Camarines Norte DEO | WAYCON BUILDERS AND CONSTRUCTION SUPPLY CORP. (FOR:WAYCON BUILDERS & CONSTRUCTION SUPPLY) | On-Going | ₱140.4M | 69% | High risk96 | Flagged0.021 |
| 25FO0092CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITATION OF STA. CRUZ - PINTOR | Albay 3rd DEO | DN'D CONSTRUCTION AND DEVELOPMENT | On-Going | ₱93.6M | 26% | High risk96 | Flagged0.026 |
| 25FG0067CONSTRUCTION OF SAGÑAY RIVER FLOOD MITIGATION STRUCTURE, BRGY. BURACAN, SAGÑAY, CAMARINES SUR | Camarines Sur 4th DEO | ALRO CONSTRUCTION & DEVELOPMENT CORP. | On-Going | ₱95M | 34% | High risk96 | Flagged0.023 |
| 25FD0097CONSTRUCTION OF SITIO CENTRO WEST COASTAL ROAD, BARANGAY ANIB, SIPOCOT, CAMARINES SUR | Camarines Sur 1st DEO | NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | On-Going | ₱141.1M | 0% | High risk96 | Flagged0.039 |
| 25FM0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY | Masbate 1st DEO | A3 CONSTRUCTION & SUPPLY | On-Going | ₱93.6M | 68% | High risk96 | Flagged0.015 |
| 25F00389CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES-CONSTRUCTION OF SITIO COBCOBAN, BARANGAY CALAMPINAY COASTAL ROAD, SIPOCOT, CAMARINES SUR, | Region V | NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | On-Going | ₱215M | 2% | High risk96 | Flagged0.050 |
| 25F00010CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN JOSE, LI | Region V | PHILWORKS CONSTRUCTION & SUPPLY | On-Going | ₱146.7M | 99% | High risk96 | Flagged0.009 |
| 25FD0095CONSTRUCTION OF SITIO CALONGGO COASTAL ROAD, BARANGAY SAN VICENTE, SIPOCOT, CAMARINES SUR | Camarines Sur 1st DEO | NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | On-Going | ₱140.1M | 0% | High risk96 | Flagged0.039 |
| 25FB0034SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD, BARANGAY MINA TO BARANGAY GOTOB TO BARANGAY LIGBAN, CAMALIG | Albay 2nd DEO | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱93.5M | 57% | High risk96 | Flagged0.017 |
| 25FK0069CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF BRGY. TAGBAC-BRGY. PAWALA ROAD, DONSOL, SORSOGON ( | Sorsogon DEO | CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. | On-Going | ₱95.5M | 17% | High risk96 | Flagged0.030 |
| 25FB0004SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF RIDGE ROAD, CAWAYAN TO MALOBAGO, MANITO, ALBAY | Albay 2nd DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱93.4M | 68% | High risk96 | Flagged0.014 |
| 25F00118CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD DIKE, BARANGAY HICMING, VIRAC, CATANDUANES, | Region V | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱187.2M | 77% | High risk96 | Flagged0.025 |
| 25FD0023CONSTRUCTION OF BRIDGE, PACKAGE 2, BARANGAY MANSALAYA TO BARANGAY KINALANGAN, DEL GALLEGO, CAMARINES SUR | Camarines Sur 1st DEO | A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D | On-Going | ₱136.9M | 25% | High risk96 | Flagged0.033 |
| 25FO0087CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TALISAY RIVER FLOOD MITIGATION STRUCTURE, BRGY SAN JUAN AND BRGY PISTOLA, | Albay 3rd DEO | DSB CONSTRUCTION & SUPPLY, INC. (FORMERLY: DSB CO | On-Going | ₱96.6M | 0% | High risk96 | Flagged0.034 |
| 25F00377CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES-CONSTRUCTION OF COASTAL ROAD, BARANGAY MALOBAGO, RAPU-RAPU, ALBAY, RAPU-RAPU, ALBAY (2ND LEGISLATIVE DISTRICT) | Region V | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱154.4M | 66% | High risk96 | Flagged0.024 |
| 25F00272CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-IMPROVEMENT OF ROAD, BARANGAY LIGUAN TO BARANGAY MANCAO, RAPU-RAPU, A | Region V | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱96M | 48% | High risk96 | Flagged0.021 |
| 25F00273CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-IMPROVEMENT OF ROAD, BARANGAY LIGUAN TO BARANGAY TINOCAWAN, RAPU-RAPU | Region V | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱96M | 50% | High risk96 | Flagged0.021 |
| 25FL0049CONSTRUCTION OF ROAD, PACKAGE I, BARANGAY RIZAL - BARANGAY BENTUCO, GUBAT, SORSOGON | Sorsogon 2nd DEO | MUNTOPAR BUILDERS CORP. | On-Going | ₱140.4M | 68% | High risk96 | Flagged0.023 |
| 25F00117CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL WITH ROAD DIKE, BARANGAY VIGA, RAPU-RAPU, | Region V | ACIER & BETON CONSTRUCTION | On-Going | ₱141.6M | 80% | High risk96 | Flagged0.017 |
| 25FK0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ROAD (PHASE I), BRGY. SAN J | Sorsogon DEO | TR CONSTRUCTION CORPORATION (FOR: TR CONSTRUCTION)KM88 CONSTRUCTION INC (FORMERLY: KM14 CONSTRUCTION INC) | On-Going | ₱140.4M | 72% | High risk96 | Flagged0.020 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17FO0201CLUSTER XV-2017: CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT/RESTORATION/UPGRADING OF VARIOUS INFRASTRUCTURES IN LIGAO CITY | Albay 3rd DEO | 4DOVE BUILDERS CORPORATION | On-Going | ₱629.1K | 0% | High risk68 | Flagged0.087 |
| 17FO0053CLUSTER XIII-2017: REPAIR/REHABILITATION/IMPROVEMENT OF INFRASTRUCTURE INCLUDING LOCAL PROJECTS IN THE 3RD DISTRICT OF ALBAY | Albay 3rd DEO | BUILDWAYS CONSTRUCTION & SUPPLY | On-Going | ₱2.4M | 0% | High risk79 | Flagged0.087 |
| 24F00516CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, NEW CAPITOL COMPLEX, PILI, CAMARINES SUR, PILI, CAMARINES SUR (3RD LEGISLA | Region V | R.K.X. ODIAMAR CONSTRUCTION | On-Going | ₱193.9M | 20% | High risk92 | Flagged0.082 |
| 24F00515CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION-CONSTRUCTION OF COASTAL ROAD, SITIO MAUNA TO SITIO BICAL ROAD LEADING TO DECLARED T | Region V | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱144.3M | 7% | High risk91 | Flagged0.080 |
| 24F00517CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG- MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL AND RESILIENCE PROGRAM-CONSTRUCTION OF CAMARINES SUR ICONIC CAPITOL BUILDING(PHASE 3), PILI, | Region V | NATIONSTAR DEVELOPMENT CORPORATION (FOR: CASMOR CONSTRUCTION CORPORATION) | On-Going | ₱190.9M | 40% | High risk92 | Flagged0.074 |
| 23F00441CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP): SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONSTRUCTION OF FLOOD CONTROL, BARANGAY MOCONG, BASUD, CAMARINES NORTE (P | Region V | EUS CONSTRUCTIONVINHAR CONSTRUCTION & MARKETING (FOR. VINHAR CONST | On-Going | ₱144.7M | 51% | High risk92 | Flagged0.072 |
| 20F00142REHABILITATION/RESTORATION OF WARAS RIVER FLOOD CONTROL PROJECT, (STA. ELENA-STA. LUCIA SECTION), NABUA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | PHILWORKS CONSTRUCTION & SUPPLY | On-Going | ₱176.6M | 0% | High risk78 | Flagged0.071 |
| 24F00370CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF SEAWALL WITH ROAD DIKE, BARANGAY CARACARAN, RAPU-RAPU, | Region V | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱284.3M | 85% | High risk91 | Flagged0.070 |
| 24F00507ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL IN BRGY. SAN ANTONIO, LABO-BRGY. FABRICA (MATOG | Region V | EUS CONSTRUCTION | On-Going | ₱140.4M | 37% | High risk90 | Flagged0.069 |
| 19F00099PROPOSED CONSTRUCTION/RENOVATION OF VARIOUS NEDA FACILITIES, ARIMBAY, LEGAZPI CITY | Region V | DSB CONSTRUCTION & SUPPLY, INC. (FORMERLY: DSB CO | On-Going | ₱40.4M | 0% | Medium risk51 | Flagged0.069 |
| 23FA0080CONSTRUCTION OF 2STY6CL, TABACO NATIONAL HIGH SCHOOL, TABACO CITY, ALBAY | Albay 1st DEO | 3RB CONSTRUCTION & SUPPLY | On-Going | ₱21.1M | 0% | High risk88 | Flagged0.066 |
| 24F00482CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY PAGSANGAHAN, BA | Region V | NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | On-Going | ₱234M | 89% | High risk92 | Flagged0.065 |
| 17FO0096CLUSTER XVIII-2017: REHABILITATION/REPAIR/IMPROVEMENT/RESTORATION/UPGRADING OF GUINOBATAN RURAL HEALTH UNIT (RHU) & GUINOBATAN MUNICIPAL HALL | Albay 3rd DEO | SULVIR ENGINEERING AND CONSTRUCTION | On-Going | ₱1.7M | 0% | Low risk28 | Flagged0.064 |
| 17FO0180REPAIR/REHABILITATION OF DAY CARE CENTER, CHILD DEVELOPMENT CENTER IN PIODURAN | Albay 3rd DEO | 4DOVE BUILDERS CORPORATION | On-Going | ₱462.9K | 0% | Low risk25 | Flagged0.064 |
| 17FO0094REHABILITATION/REPAIR/IMPROVEMENT/RESTORATION/UPGRADING OF POLANGUI SLAUGHTERHOUSE | Albay 3rd DEO | ZHEANTELLE CONSTRUCTION CORP. | On-Going | ₱4M | 0% | Low risk30 | Flagged0.064 |
| 17FO0093REHABILITATION/REPAIR/IMPROVEMENT/RESTORATION/UPGRADING OF POLANGUI PUBLIC MARKET | Albay 3rd DEO | ZHEANTELLE CONSTRUCTION CORP. | On-Going | ₱3.4M | 0% | Low risk28 | Flagged0.064 |
| 24FO0139CY 2024 BASIC EDUCATION FACILITIES FUND (BEFF) - CONSTRUCTION OF CLASSROOMS - CONSTRUCTION OF 2-STOREY 8-CLASSROOM AND 2 UNITS 4-STOREY 20-CLASSROOM SCHOOL BUILDINGS AT MARCIAL O. RAÑOLA MEMORIAL SCHOOL, GUINOBATAN, ALBAY | Albay 3rd DEO | TWINCARE BUILDERS INC. | On-Going | ₱145.4M | 61% | High risk91 | Flagged0.064 |
| 24FN0091OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCT., BICOL RIVER REV'T WALL, BRGY. STO. NIÑO SEC., BULA, CAMSUR | Camarines Sur 5th DEO | JTC CRUZ CONSTRUCTION CO., INC. | On-Going | ₱144.8M | 63% | High risk92 | Flagged0.064 |
| 24FN0092OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONST. OF FLOOD CONTROL STRUCT., BICOL RIVER REV'T WALL, BRGY. SAN RAMON SEC., BULA, CAMSUR | Camarines Sur 5th DEO | JUSTBILT BUILDERS | On-Going | ₱144.8M | 63% | High risk92 | Flagged0.064 |
| 19F00115REPAIR AND MAINTENANCE OF LABO REVETMENT BRGY. ANAHAW, LABO, CAMARINES NORTE, CAMARINES NORTE 1ST LEGISLATIVE DISTRICT | Region V | HGG BUILDERS & SUPPLY | On-Going | ₱108.1M | 0% | High risk78 | Flagged0.064 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 876 | 17FD0102CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG BICOL RIVER, BRGY. BALIUAG NUEVO, MINALABAC, CAMARINES SUR | Camarines Sur 2nd DEO | NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | Completed | ₱97M | 100% | High risk71 | —-0.047 |
| 877 | 22FB0263CSSP: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - SAN JOAQUIN-PAWA-BOGTONG ROAD LEADING TO LEGAZPI CITY AIRPORT, LEGAZPI CITY, ALBAY, PACKAGE III | Albay 2nd DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)FGO CONSTRUCTION | On-Going | ₱93.6M | 49% | High risk71 | Flagged0.002 |
| 878 | 23FA0069CONSTRUCTION OF ROAD, BAHI TO DAMACAN, BACACAY, ALBAY | Albay 1st DEO | SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION)MACROPRIME BUILDERS CORPORATION (FORMERLY: MORANTE BUILDERS & SUPPLY) | Completed | ₱144.8M | 100% | High risk71 | —-0.078 |
| 879 | 22F00003OO2- PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/IMPROVEMENT OF BAGONG SAN ROQUE FLOOD CONTROL, STO. DOMINGO, ALBAY, STO, DOMINGO, ALB | Region V | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | Completed | ₱138.4M | 100% | High risk71 | —-0.067 |
| 880 | 22FB0299CONSTRUCTION OF LEGAZPI CITY WATER SYSTEM FOR VARIOUS BARANGAYS, LEGAZPI CITY, ALBAY | Albay 2nd DEO | NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATIONM.J. APIN BUILDERS | On-Going | ₱96M | 24% | High risk71 | Flagged0.009 |
| 881 | 17F00003MFO1-IMPROVEMENT/WIDENING OF NATIONAL ROADS - PRIMARY ROADS DAANG MAHARLIKA (LZ), LABO, CAMARINES NORTE PROVINCE | Region V | ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)PARTIDO CONSTRUCTION & SUPPLY | Completed | ₱130M | 100% | High risk71 | —-0.036 |
| 882 | 22F00020OO2-PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF QUINALE A RIVER FLOOD MITIGATION STRUCTURE(POLANGUI AND LIBON SECTION), ALBAY, PO | Region V | RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES | Completed | ₱192.7M | 100% | High risk71 | —-0.055 |
| 883 | 24F00025ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-WIDENING OF PERMANENT BRIDGES-BANAO BR. (B00290LZ) ALONG DAANG MAHARLIKA (LZ) (PHASE II), GUINOBATAN, ALBAY (3RD LEGISLATIVE DISTRICT) | Region V | LEGAZPI PREMIUM DEVELOPMENT CORPORATION | On-Going | ₱94.5M | 7% | High risk71 | —-0.003 |
| 884 | 19F00015OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF MISSING LINKS/NEW ROADS-BACON-MANITO ROAD, SORSOGON, BACON, SORSOGON CITY, SORSOGON (1ST LEGISLATIVE DISTRICT) | Region V | TR CONSTRUCTION CORPORATION (FOR: TR CONSTRUCTION) | Completed | ₱144.7M | 100% | High risk71 | —-0.070 |
| 885 | 25FA0025CONST. OF DPWH-ABAY 1ST DISTRICT ENGINEERING OFFICE, TABACO CITY, ALBAY (MAIN BLDG.) PHASE I | Albay 1st DEO | SANRHO BUILDERS, INC.(FOR. SANRHO CONST. AND SUPPL | On-Going | ₱93.6M | 59% | High risk71 | —-0.037 |
| 886 | 19FO0084CONSTRUCTION OF GROUND SILL DAM ALONG TOBGON RIVER, UPSTREAM OF TOBGON BRIDGE, LIGAO CITY, ALBAY | Albay 3rd DEO | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱93.1M | 100% | High risk71 | —-0.011 |
| 887 | 24FO0055ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE OF LUKSONG RIVER, ZONE 4 S | Albay 3rd DEO | RAMARPLUS INCORPORATED (FORMERLY RAMAR ENTERPRISES | On-Going | ₱93.1M | 96% | High risk71 | —-0.041 |
| 888 | 19FO0079CONSTRUCTION OF LIGAO FLOOD CONTROL ALONG TOBGON RIVER, UPSTREAM OF TOBGON BRIDGE, LIGAO CITY, ALBAY | Albay 3rd DEO | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | Completed | ₱93.1M | 100% | High risk71 | —-0.077 |
| 889 | 18FB0107CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD MITIGATION SYSTEM ALONG QUIRANGAY RIVER, CAMALIG, ALBAY | Albay 2nd DEO | NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | Completed | ₱93.1M | 100% | High risk71 | —-0.077 |
| 890 | 16F00096CONSTRUCTION/REHABILITATION/IMPROVEMENT OF BICOL RIVER FLOOD CONTROL, MABOLO SECTION, BRGY. MABOLO; AND TRIANGULO SECTION, BRGY. TRIANGULO, NAGA CITY, CAMARINES SUR 3RD LD | Region V | G.C.I. CONSTRUCTION AND DEV'T. CORP.E. GARCIA CONSTRUCTION CORP.(FOR. E. GARCIA CONST | Completed | ₱97.5M | 100% | High risk71 | —-0.047 |
| 891 | 22FB0265CONSTRUCTION OF DARAGA WATER SYSTEM FOR VARIOUS BARANGAYS, DARAGA, ALBAY | Albay 2nd DEO | NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATIONM.J. APIN BUILDERS | On-Going | ₱96M | 91% | High risk71 | —-0.010 |
| 892 | 24FB0186SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION - CONSTRUCTION OF ROCK CAUSEWAY AT MOROCBOROCAN, RAPU-RAPU, ALBAY | Albay 2nd DEO | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLYAC8 BUILDERS | On-Going | ₱139.6M | 75% | High risk71 | —-0.026 |
| 893 | 24FB0270CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BIGAO TO SITIO BANASIAN, SAN RAMON, DARAGA, ALBAY | Albay 2nd DEO | FIRST OMB CONSTRUCTION AND DEVELOPMENT CORP. | On-Going | ₱65.5M | 43% | High risk71 | Flagged0.003 |
| 894 | 24FB0107OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF UPPER TUMPA RIVER FLOOD CONTROL STRUCTURE, PHASE 1, TUMPA, CAMALIG, ALBAY | Albay 2nd DEO | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱115.8M | 50% | High risk71 | —-0.022 |
| 895 | 24FB0160OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF PADANG FLOOD CONTROL STRUCTURE, PADANG, LEGAZPI CITY, ALBAY | Albay 2nd DEO | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱112.1M | 61% | High risk71 | —-0.026 |
| 896 | 24FB0164OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF UPPER TUMPA RIVER FLOOD CONTROL STRUCTURE, PHASE 2, TUMPA, CAMALIG, ALBAY | Albay 2nd DEO | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱112.1M | 60% | High risk71 | —-0.026 |
| 897 | 24FB0141SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SALUGAN-QUIRANGAY LAHAR STRUCTURE, PHASE 1, CAMALIG, ALBAY | Albay 2nd DEO | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱111.8M | 70% | High risk71 | —-0.031 |
| 898 | 24FB0145OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BUDIAO-MIISI RIVER FLOOD CONTROL STRUCTURE,PACKAGE 1,BUDIAO AND MIISI, DARAGA,ALBAY | Albay 2nd DEO | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱112.1M | 76% | High risk71 | —-0.035 |
| 899 | 24FB0156OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF BUDIAO-MIISI RIVER FLOOD CONTROL STRUCTURE, PACKAGE 2, BUDIAO AND MIISI, DARAGA, | Albay 2nd DEO | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱112.1M | 81% | High risk71 | —-0.037 |
| 900 | 24FB0108OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF RIVER PROTECTION DIKE ALONG BARANGAY BURGOS, DARAGA, ALBAY | Albay 2nd DEO | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY | On-Going | ₱115.8M | 95% | High risk71 | —-0.039 |