Cross-referencing the ledgers…
Cross-referencing the ledgers…
Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
14,420
Total budget
₱313.4B
Average progress
92.3%
Completion rate
79.4%
Average risk score
46.6
Medium risk on average, out of 100
Flagged as unusual
983
6.8% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 5,429 | ₱115.3B | 46.1 | 264 | 93.1% |
| Buildings and Facilities | 4,320 | ₱37.7B | 38.0 | 110 | 93.0% |
| Flood Control and Drainage | 2,922 | ₱100.8B | 52.6 | 116 | 94.6% |
| Bridges | 992 | ₱37.8B | 51.4 | 121 | 89.5% |
| Water Provision and Storage | 226 | ₱1.7B | 36.5 | 20 | 95.8% |
| GAA 2025 SSP | 200 | ₱4.4B | 94.3 | 190 | 57.0% |
| OTHER | 179 | ₱5.9B | 75.3 | 101 | 78.4% |
| GAA 2025 OO-1 | 66 | ₱2.6B | 86.6 | 39 | 67.9% |
| Bridges, Roads | 50 | ₱5B | 59.4 | 5 | 84.6% |
| GAA 2025 OO-2 | 36 | ₱2.1B | 86.1 | 17 | 74.1% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Ilocos Norte 1st DEO | 2,403 | ₱36.5B | 58.8 | 269 | 86.9% |
| Region I | 1,972 | ₱125.3B | 56.0 | 236 | 85.4% |
| Pangasinan 3rd DEO | 1,930 | ₱31.2B | 41.9 | 92 | 91.8% |
| Pangasinan 2nd DEO | 1,465 | ₱16.2B | 38.0 | 90 | 93.1% |
| Pangasinan 1st DEO | 1,331 | ₱19.9B | 37.1 | 40 | 97.3% |
| Ilocos Norte 2nd DEO | 1,084 | ₱15B | 48.3 | 91 | 91.3% |
| Ilocos Sur 2nd DEO | 976 | ₱16B | 43.3 | 30 | 97.3% |
| Pangasinan 4th DEO | 968 | ₱13.5B | 41.2 | 32 | 96.7% |
| La Union 2nd DEO | 828 | ₱19.2B | 42.9 | 27 | 99.1% |
| La Union 1st DEO | 732 | ₱11B | 43.9 | 37 | 96.7% |
| Ilocos Sur 1st DEO | 731 | ₱9.8B | 42.8 | 39 | 96.5% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| ALCEL CONSTRUCTION | 435 | ₱10.1B | 37.8 | 20 | 95.7% |
| VILLAR GENERAL CONSTRUCTION AND SUPPLIES | 401 | ₱7.6B | 42.0 | 28 | 98.0% |
| BJMJB CONSTRUCTION & SUPPLY | 393 | ₱6B | 65.5 | 50 | 79.4% |
| BET CONSTRUCTION & SUPPLY | 369 | ₱12.3B | 45.1 | 6 | 97.7% |
| JONIK TRADING & CONSTRUCTION | 363 | ₱4.3B | 34.4 | 9 | 96.9% |
| MIGHTYWAY CONSTRUCTION AND SUPPLY | 346 | ₱3B | 36.3 | 17 | 93.4% |
| MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY | 338 | ₱8.9B | 54.5 | 32 | 89.7% |
| E.E. MADAYAG CONSTRUCTION | 312 | ₱3.4B | 39.8 | 3 | 99.1% |
| ALPHATEC CHEMICAL CORPORATION | 288 | ₱10.1B | 54.6 | 32 | 87.2% |
| FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP. | 287 | ₱6.3B | 45.9 | 12 | 94.2% |
| JEUSMACK BUILDERS & CONSTRUCTION SUPPLY | 260 | ₱3.3B | 39.5 | 14 | 94.6% |
| NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY | 239 | ₱6.8B | 51.2 | 29 | 89.2% |
| J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.) | 239 | ₱3B | 37.6 | 12 | 91.2% |
| ZEDIK BUILDERS | 230 | ₱2.5B | 49.0 | 21 | 92.4% |
| AQUINO-DELA CRUZ ENGINEERING & CONSTRUCTION | 219 | ₱7.5B | 47.4 | 7 | 94.4% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AA0530CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE, BARANGAY 55-C VIRA, LAOAG CITY, I.N. | Ilocos Norte 1st DEO | BJMJB CONSTRUCTION & SUPPLY | On-Going | ₱4.8M | 75% | High risk97 | Flagged0.026 |
| 25AB0111BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD CONNECTING PEDRO ST. AND VERGARA ST. BRGY. SAN MIGUEL, SAN NICOLAS, ILOCOS NORTE | Ilocos Norte 2nd DEO | VCD CONSTRUCTION | On-Going | ₱4.8M | 35% | High risk97 | Flagged0.037 |
| 25AA0233SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF CABARITAN BRIDGE, BARANGAY CABARITAN, DUMALNEG, ILOCOS NORTE | Ilocos Norte 1st DEO | MARAPAO-EVANGELISTA, ARCHITECT, ENGINEERS, BUILDERS | On-Going | ₱4.8M | 57% | High risk97 | Flagged0.034 |
| 25AA0537CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF DRAINAGE CANAL STRUCTUREM BARANGAY 32-C LA PAZ EAST, LAOAG CITY, I.N | Ilocos Norte 1st DEO | MARAPAO-EVANGELISTA, ARCHITECT, ENGINEERS, BUILDERS | On-Going | ₱4.8M | 2% | High risk97 | Flagged0.048 |
| 25AB0137BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUBA, PAOAY, ILOCOS NORTE | Ilocos Norte 2nd DEO | REMIGIO GENERAL CONSTRUCTION | On-Going | ₱4.8M | 83% | High risk97 | Flagged0.022 |
| 25AA0544CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF BOX CULVERT, BARANGAY 57 PILA, LAOAG CITY, ILOCOS NORTE | Ilocos Norte 1st DEO | KHAY ALI CONSTRUCTION | On-Going | ₱4.8M | 0% | High risk97 | Flagged0.048 |
| 25AB0124BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY DARIWDIW, CITY OF BATAC, ILOCOS NORTE | Ilocos Norte 2nd DEO | SHAWIN KONSTRAK CONSTRUCTION AND CONSTRUCTION SUPPLY | On-Going | ₱4.8M | 61% | High risk97 | Flagged0.030 |
| 25AB0152BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. SALBANG, PAOAY, ILOCOS NORTE | Ilocos Norte 2nd DEO | RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY | On-Going | ₱4.8M | 51% | High risk97 | Flagged0.032 |
| 25A00519SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), REHABILITATION OF FLOOD CONTROL STRUCTURE, DRAINAGE STRUCTURE AND SMALL WATER IMPOUNDING PROJECT (SWIP), BARANGAY 20, SAN PABLO, SAN NICOLAS, ILOCOS NORTE | Region I | A.B. TAYLAN CONST. & DEVT. (FORMERLY: ADSM CONST.)EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | On-Going | ₱140.4M | 0% | High risk96 | Flagged0.063 |
| 25AB0165BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BARANAGAY PAGULUDAN-SALINDEG, CURRIMAO, ILOCOS NORTE | Ilocos Norte 2nd DEO | ASTRO BUILDERS AND CONSTRUCTION RESOURCES INC. | On-Going | ₱4.8M | 21% | High risk96 | Flagged0.041 |
| 25AB0146BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL) BRGY. MANALPAC, SOLSONA ILOCOS NORTE | Ilocos Norte 2nd DEO | RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY | On-Going | ₱4.8M | 45% | High risk96 | Flagged0.033 |
| 25A00521BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNATORIUM, SOCIO-CULTURAL AND SPORTS DEVELOPMENT CENTER), MARIANO MARCOS STATE UNIVERSITY - BATAC CAMPUS, CITY OF BATAC, ILOCOS NORTE | Region I | ECDI ENGINEERING & CONSTRUCTION | On-Going | ₱144.1M | 1% | High risk96 | Flagged0.063 |
| 25AB0110BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD CONNECTING SITIO NAMURTAAN, CAPANGDANAN TO BRGY. BOMITOG, BANNA, ILOCOS NORTE | Ilocos Norte 2nd DEO | BJMJB CONSTRUCTION & SUPPLY | On-Going | ₱4.9M | 50% | High risk96 | Flagged0.031 |
| 25AB0120'BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES,CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY PAGULUDAN-SALINDEG, CURRIMAO, ILOCOS NORTE | Ilocos Norte 2nd DEO | ASTRO BUILDERS AND CONSTRUCTION RESOURCES INC. | On-Going | ₱4.8M | 11% | High risk96 | Flagged0.046 |
| 25AB0154BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MAGNUANG, BATAC CITY ILOCOS NORTE | Ilocos Norte 2nd DEO | MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY | On-Going | ₱4.8M | 34% | High risk96 | Flagged0.036 |
| 25A00232SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - IMPROVEMENT OF ROAD AT BARANGAYS LUBNAC, PARPAROROC, VISAYA, DIPILAT, DAGUPAN, AND TAMDAGAN, VINTAR, ILOCOS NORTE | Region I | HEKLER BUILDERS CORP. | On-Going | ₱215M | 17% | High risk96 | Flagged0.070 |
| 25AB0133BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MASINTOC, PAOAY, ILOCOS NORTE | Ilocos Norte 2nd DEO | DJCM CONSTRUCTION CORPORATION (FORMERLY: DJCM CONSTRUCTION) | On-Going | ₱4.8M | 52% | High risk96 | Flagged0.033 |
| 25AB0030BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY QUILLING NORTE, BATAC CITY, ILOCOS NORTE | Ilocos Norte 2nd DEO | MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY | On-Going | ₱4.9M | 29% | High risk96 | Flagged0.037 |
| 25AB0056BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TAPAO TIGUE, CURRIMAO, ILOCOS NORTE | Ilocos Norte 2nd DEO | RCD GEN. CONTRACTOR & CONSTRUCTION SUPPLY | On-Going | ₱4.9M | 100% | High risk96 | Flagged0.015 |
| 25AB0106BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, MARIANO MARCOS STATE UNIVERSITY - BATAC CAMPUS, CITY OF BATAC, ILOCOS NORTE | Ilocos Norte 2nd DEO | MEGAPOLITAN BUILDERS AND CONSTRUCTION SUPPLY | On-Going | ₱48M | 42% | High risk96 | Flagged0.035 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AA0491IMPLEMENTATION AND MONITORING OF PAMANA PROJECT - CONSTRUCTION/CONCRETING OF PASUQUIN-TADAO-BANGUI-DADAOR LOCAL ACCESS ROAD IN PASUQUIN, ILOCOS NORTE | Ilocos Norte 1st DEO | R.A. PAHATI CONST. & SUPPLY, INC. | On-Going | ₱152.8M | 38% | High risk87 | Flagged0.089 |
| 24A00673ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, AGOO-BAGUIO CITY ROAD - K0244 + 605 - K0247 + 435 (PACKAGE 05) | Region I | PHESCO, INCORPORATED | On-Going | ₱81.2M | 0% | High risk87 | Flagged0.083 |
| 25AA0634CONCRETING OF SITIO UDAPA, BRGY. PAAYAS FMR, BURGOS, ILOCOS NORTE | Ilocos Norte 1st DEO | LINEAR CONSTRUCTION CORP. | On-Going | ₱48.2M | 0% | High risk89 | Flagged0.082 |
| 23A00438CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG MARUSAY RIVER AND TRIBUTARIES, CALASIAO, PANGASINAN (PACKAGE 2) | Region I | RS RODRIGUEZ CONSTRUCTION & SUPPLIESJHI CONSTRUCTION & SUPPLY | On-Going | ₱96.5M | 0% | High risk72 | Flagged0.080 |
| 23AH0196CONSTRUCTION OF MULTI-PURPOSE GYM(POBLACION, LABRADOR),BRGY. POBLACION | Pangasinan 2nd DEO | BONIMAR CONSTRUCTION ENTERPRISES | On-Going | ₱3.9M | 0% | High risk69 | Flagged0.080 |
| 23AH0181CONSTRUCTION OF ROAD AT BRGY. ANONANG, SAN FABIAN, PANGASINAN | Pangasinan 2nd DEO | J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.) | On-Going | ₱4.8M | 0% | High risk86 | Flagged0.079 |
| 23AH0180CONSTRUCTION OF ROAD AT BRGY. TAPUAC, DAGUPAN CITY, PANGASINAN | Pangasinan 2nd DEO | ZOTA TRADING & CONSTRUCTION | On-Going | ₱4.8M | 0% | High risk87 | Flagged0.079 |
| 23AH0175COMPLETION OF MULTI-PURPOSE BUILDING BIKERS DEN BRGY. LOBONG,SAN JACINTO,PANGASINAN | Pangasinan 2nd DEO | J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.) | On-Going | ₱2.9M | 0% | High risk78 | Flagged0.079 |
| 23AH0179CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING AT BRGY. PUGARO, DAGUPAN CITY, PANGASINAN | Pangasinan 2nd DEO | J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.) | On-Going | ₱3.9M | 0% | High risk75 | Flagged0.079 |
| 21AH0148CONCRETING OF BRGY.BUENLAG TO BRGY.ALITAYA FMR,BRGY.BUENLAG AND BRGY.ALITAYA,MANGALDAN,PANGASINAN | Pangasinan 2nd DEO | J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.) | On-Going | ₱12.2M | 0% | Medium risk60 | Flagged0.078 |
| 25AA0633CONCRETING OF BRGY. PASNGAL-BRGY. CADARATAN FMR, BACARRA, ILOCOS NORTE | Ilocos Norte 1st DEO | TRI-LINE BUILDERS | On-Going | ₱19.3M | 0% | High risk90 | Flagged0.078 |
| 21AH0160CONCRETING OF BRGY. ARAMAL FMR, BRGY. ARAMAL, SAN FABIAN, PANGASINAN | Pangasinan 2nd DEO | J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.) | On-Going | ₱11.8M | 0% | Medium risk59 | Flagged0.077 |
| 21AH0150CONCRETING OF BRGY.MAASIN FMR, BRGY. MAASIN, MANGALDAN, PANGASINAN | Pangasinan 2nd DEO | J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.) | On-Going | ₱13.1M | 0% | Medium risk60 | Flagged0.077 |
| 23AH0198CONSTRUCTION OF MULTI-PURPOSE BUILDING(CABELDATAN,BASISTA),BRGY. CABELDATAN | Pangasinan 2nd DEO | BONIMAR CONSTRUCTION ENTERPRISES | On-Going | ₱4.5M | 0% | High risk72 | Flagged0.077 |
| 23AA0438CONCRETING OF BRGY. STA. MARIA FMR, BRGY.STA. MARIA, PIDDIG, ILOCOS NORTE | Ilocos Norte 1st DEO | PERRC INC. (FORMERLY: P.E.R.R.C. CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱58.7M | 0% | High risk68 | Flagged0.077 |
| 23AH0191CONSTRUCTION OF MULTI-PURPOSE BUILDING(LOPEZ, MANGATAREM),BRGY. LOPEZ | Pangasinan 2nd DEO | BONIMAR CONSTRUCTION ENTERPRISES | On-Going | ₱4.8M | 0% | High risk87 | Flagged0.077 |
| 23AH0194CONSTRUCTION OF COVERED COURT (BARACBAC,MANGATAREM),BRGY. BUNAGAN | Pangasinan 2nd DEO | SHYKA CONSTRUCTION TRADING | On-Going | ₱4.8M | 0% | High risk87 | Flagged0.077 |
| 23AH0195CONSTRUCTION OF COVERED COURT (BARACBAC,MANGATAREM),BRGY. BARACBAC | Pangasinan 2nd DEO | SHYKA CONSTRUCTION TRADING | On-Going | ₱4.8M | 0% | High risk87 | Flagged0.077 |
| 23AH0193CONSTRUCTION OF COVERED COURT (LAWAK-LANGKA,MANGATAREM),BRGY. LAWAK LANGKA | Pangasinan 2nd DEO | SHYKA CONSTRUCTION TRADING | On-Going | ₱4.8M | 0% | High risk87 | Flagged0.077 |
| 23AH0192CONSTRUCTION OF MULTI-PURPOSE BUILDING (CALUMBOYAN, MANGATAREM) BRGY. CALUMBOYAN NORTE | Pangasinan 2nd DEO | BONIMAR CONSTRUCTION ENTERPRISES | On-Going | ₱4.8M | 0% | High risk87 | Flagged0.077 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 326 | 25AH0050CONSTRUCTION(COMPLETION)OF MULTI-PURPOSE BUILDING,BARANGAY BAGUINAY,MANAOAG, PANGASINAN | Pangasinan 2nd DEO | J.G. GARCIA CONSTRUCTION & SUPPLY (FOR: J.G. GARCIA CONST.) | Completed | ₱2.9M | 100% | High risk82 | —-0.021 |
| 327 | 25AG0024FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF EMBANKMENT PROTECTION AT DOLAOAN CIS, ANDA, PANGASINAN | Pangasinan 1st DEO | CEGON 88 CONSTRUCTION INC. | On-Going | ₱14.4M | 78% | High risk82 | —-0.002 |
| 328 | 24AA0137CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CONSTRUCTION OF TARRAG-CARAMUANGEN ROAD LEADING TO DARNA FALLS, PAGUDPUD, ILOCOS NORTE | Ilocos Norte 1st DEO | 11-16 CONSTRUCTION | On-Going | ₱92.3M | 77% | High risk81 | Flagged0.028 |
| 329 | 23A00181CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP),CAPARISPISAN-CAUNAYAN-BALAOI TOURISM ROAD, PAGUDPUD, ILOCOS NORTE | Region I | VIKING CONSTRUCTION & SUPPLIES | On-Going | ₱96.5M | 75% | High risk81 | Flagged0.038 |
| 330 | 24AE0103SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE - CONSTRUCTION OF SLOPE PROTECTION, BARANGAY SAGAYAD - BARANGAY SEVILLA, STA. 0+000 - STA. 0+347.6, SAN FERNANDO CITY, LA UNION | La Union 1st DEO | ANORE CONSTRUCTION | On-Going | ₱144.6M | 93% | High risk81 | Flagged0.020 |
| 331 | 25AA0427SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD, BARANGAY CARUSIPAN, PASUQUIN, ILOCOS NORTE | Ilocos Norte 1st DEO | JC-08 BUILDERS CORPORATION | On-Going | ₱4.8M | 100% | High risk81 | —-0.025 |
| 332 | 25AA0433CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB OF ROAD, BRGY 14 CALAMBEG, PIDDIG, I.N. PHASE 2 | Ilocos Norte 1st DEO | SOLID NORTH CONSTRUCTION | On-Going | ₱4.8M | 0% | High risk81 | Flagged0.009 |
| 333 | 25AA0301CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RIVERSIDE ROAD, LOING-CABAROAN, PIDDIG, I.N. | Ilocos Norte 1st DEO | NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
| 334 | 25AA0304CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB OF RD, BARANGAY 14 CALAMBEG, PIDDIG, ILOCOS NORTE | Ilocos Norte 1st DEO | SOLID NORTH CONSTRUCTION | On-Going | ₱4.8M | 0% | High risk81 | Flagged0.009 |
| 335 | 25AA0262CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF RD, BARANGAY BALAOI, PAGUDPUD, I.N. | Ilocos Norte 1st DEO | BJMJB CONSTRUCTION & SUPPLY | On-Going | ₱4.8M | 0% | High risk81 | Flagged0.009 |
| 336 | 25AA0421SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD, BARANGAY BADUANG, PAGUDPUD, ILOCOS NORTE | Ilocos Norte 1st DEO | MARAPAO-EVANGELISTA, ARCHITECT, ENGINEERS, BUILDERS | On-Going | ₱4.8M | 100% | High risk81 | —-0.024 |
| 337 | 25AA0296CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF RD, BARANGAY LIBNAOAN, PIDDIG, I.N. | Ilocos Norte 1st DEO | TRI-LINE BUILDERS | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
| 338 | 25AA0300CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHAB OF ROAD, BARANGAY 13 LIBNAOAN, PIDDIG, I.N. | Ilocos Norte 1st DEO | JEMIS CONSTRUCTION | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
| 339 | 25AA0261SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY BURAYOC, PAGUDPUD, ILOCOS NORTE | Ilocos Norte 1st DEO | BJMJB CONSTRUCTION & SUPPLY | On-Going | ₱4.8M | 73% | High risk81 | —-0.013 |
| 340 | 25AA0422SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD, BARANGAY LIGAYA, PAGUDPUD, ILOCOS NORTE | Ilocos Norte 1st DEO | MARAPAO-EVANGELISTA, ARCHITECT, ENGINEERS, BUILDERS | On-Going | ₱4.8M | 100% | High risk81 | —-0.025 |
| 341 | 17A00031CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGES (TO MORE THAN 2 LANES), PASUQUIN BRIDGE (B00529LZ) ALONG MANILA NORTH ROAD | Region I | BUSILAC BUILDERS INC. | On-Going | ₱75.3M | 59% | High risk81 | Flagged0.054 |
| 342 | 25AA0297CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY 10 ARUA-AY, PIDDIG, I.N. | Ilocos Norte 1st DEO | SOLID NORTH CONSTRUCTION | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
| 343 | 25AA0224CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD, BARANGAY SAOIT, BURGOS, I.N. | Ilocos Norte 1st DEO | JEMIS CONSTRUCTION | On-Going | ₱4.8M | 100% | High risk81 | —-0.024 |
| 344 | 25AA0423SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD, BARANGAY SUBEC, PAGUDPUD, ILOCOS NORTE | Ilocos Norte 1st DEO | JC-08 BUILDERS CORPORATION | On-Going | ₱4.8M | 100% | High risk81 | —-0.025 |
| 345 | 25AA0236CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF AY-AYO BOULEVARD, BRGY KALAW, DUMALNEG, I.N. | Ilocos Norte 1st DEO | MARAPAO-EVANGELISTA, ARCHITECT, ENGINEERS, BUILDERS | On-Going | ₱4.8M | 36% | High risk81 | —-0.002 |
| 346 | 25AA0308CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RD, BARANGAY 19 STO. TOMAS, SARRAT, I.N. | Ilocos Norte 1st DEO | RED JEWEL BUILDERS | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.008 |
| 347 | 25AA0432CONVE AND SPE SUP PROG - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS RDS AND/OR BR FROM THE NATL RD/S LEADING TO MAJOR/STRA PUBLIC BLDG/FACILITIES - REHAB OF BIMMANGA - MANGITAYAG ROAD, BARANGAY 4 BIMMANGA, PIDDIG, ILOCOS NORTE | Ilocos Norte 1st DEO | NORTH TECH BUILDERS AND CONSTRUCTION SUPPLY | On-Going | ₱4.7M | 0% | High risk81 | Flagged0.009 |
| 348 | 25AA0284SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY ESTANCIA, PASUQUIN, ILOCOS NORTE | Ilocos Norte 1st DEO | ABEIAN CONSTRUCTION | On-Going | ₱4.8M | 100% | High risk81 | —-0.025 |
| 349 | 25AA0368SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD, BARANGAY NO. 47, BENGCAG, LAOAG CITY, ILOCOS NORTE | Ilocos Norte 1st DEO | JC-08 BUILDERS CORPORATION | On-Going | ₱4.8M | 100% | High risk81 | —-0.026 |
| 350 | 25AA0231CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL RD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF RD, BARANGAY BARBAQUESO, CARASI, I.N. | Ilocos Norte 1st DEO | ABG CONSTRUCTION AND GENERAL SERVICES | On-Going | ₱4.7M | 68% | High risk81 | —-0.012 |