Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
12,163
Total budget
₱261.6B
Average progress
95.2%
Completion rate
84.1%
Average risk score
42.0
Medium risk on average, out of 100
Flagged as unusual
928
7.6% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 4,692 | ₱95.5B | 41.4 | 73 | 97.1% |
| Buildings and Facilities | 4,328 | ₱27.4B | 31.1 | 94 | 97.0% |
| Flood Control and Drainage | 1,486 | ₱80.7B | 51.1 | 96 | 95.7% |
| Bridges | 659 | ₱27.6B | 47.6 | 90 | 92.1% |
| GAA 2025 SSP | 324 | ₱4.4B | 94.3 | 303 | 66.0% |
| OTHER | 250 | ₱9.2B | 77.4 | 166 | 84.3% |
| Water Provision and Storage | 244 | ₱1.9B | 37.5 | 7 | 96.7% |
| GAA 2025 OO-2 | 103 | ₱8.6B | 90.9 | 61 | 76.7% |
| GAA 2025 OO-1 | 51 | ₱3.8B | 91.7 | 36 | 55.9% |
| Bridges, Roads | 26 | ₱2.4B | 54.5 | 2 | 92.7% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Isabela 4th DEO | 1,587 | ₱34.6B | 43.5 | 140 | 91.1% |
| Cagayan 2nd DEO | 1,512 | ₱23.7B | 36.3 | 65 | 98.0% |
| Isabela 3rd DEO | 1,379 | ₱29.7B | 42.3 | 64 | 97.2% |
| Cagayan 3rd DEO | 1,220 | ₱20B | 43.7 | 148 | 92.0% |
| Isabela 1st DEO | 1,097 | ₱18.9B | 42.6 | 97 | 96.6% |
| Cagayan 1st DEO | 1,052 | ₱16.3B | 42.7 | 47 | 98.2% |
| Isabela 2nd DEO | 1,003 | ₱16.4B | 38.1 | 61 | 97.3% |
| Quirino DEO | 997 | ₱12.6B | 38.0 | 23 | 98.3% |
| Nueva Vizcaya DEO | 765 | ₱20.4B | 43.4 | 67 | 97.7% |
| Region II | 566 | ₱51B | 56.7 | 136 | 82.3% |
| Nueva Vizcaya 2nd DEO | 531 | ₱12B | 41.1 | 16 | 96.8% |
| Batanes DEO | 454 | ₱5.9B | 43.9 | 64 | 90.3% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | 698 | ₱36.5B | 52.5 | 74 | 93.2% |
| DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY | 474 | ₱11.2B | 45.1 | 44 | 97.4% |
| JWU CONSTRUCTION AND SUPPLY | 306 | ₱13.8B | 55.6 | 58 | 88.4% |
| A.P.D. CONSTRUCTION, INC. (FORMERLY: APD CONSTRUCTION) | 301 | ₱10.4B | 48.5 | 9 | 97.2% |
| KMD BUILDERS AND CONST. SUPPLY | 243 | ₱1.6B | 34.5 | 0 | 100.0% |
| MAR-DEB CONSTRUCTION & DEVELOPMENT CORP. (FORMERLY: MAR-DEB CONSTRUCTION & DEVELOPMENT) | 233 | ₱8.4B | 47.8 | 12 | 97.5% |
| CAMBERWELL CONSTRUCTION AND SUPPLIES | 231 | ₱3.1B | 42.2 | 13 | 94.2% |
| TJMT CONSTRUCTION | 229 | ₱7B | 48.1 | 14 | 94.7% |
| JLL PULSAR CONSTRUCTION CORPORATION (FORMERLY: PULSAR CONSTRUCTION) | 205 | ₱7.7B | 48.1 | 14 | 95.0% |
| JANN-NORRIS CONSTRUCTION AND SUPPLIES INC. (FORMELY: JANN-NORRIS CONSTRUCTION AND SUPPLIES) | 197 | ₱9.7B | 51.9 | 21 | 94.6% |
| YZK BUILDERS | 179 | ₱1.8B | 36.0 | 6 | 98.9% |
| DALCON CONSTRUCTION | 172 | ₱12.4B | 57.1 | 37 | 90.7% |
| OCP CONSTRUCTION | 172 | ₱1.4B | 29.8 | 2 | 99.2% |
| NTL BUILDERS AND DEVELOPER | 152 | ₱3.3B | 40.0 | 9 | 90.5% |
| DOUBLE J1908 CONSTRUCTION | 147 | ₱4.2B | 54.4 | 37 | 81.7% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25BD0039BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY AGGUGADDAN, PEÑABLANCA, CAGAYAN | Cagayan 3rd DEO | QUASAR CONSTRUCTION AND SUPPLY | On-Going | ₱4.8M | 0% | High risk97 | Flagged0.036 |
| 25BD0046BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY ALIMANAO, PEÑABLANCA, CAGAYAN | Cagayan 3rd DEO | JVC CONSTRUCTION | On-Going | ₱4.8M | 45% | High risk97 | Flagged0.023 |
| 25BD0055BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PEÑABLANCA EAST CENTRAL SCHOOL, PEÑABLANCA, CAGAYAN | Cagayan 3rd DEO | 5MJ'S CONSTRUCTION | On-Going | ₱4.8M | 27% | High risk97 | Flagged0.028 |
| 25BD0060BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN ROQUE ELEMENTARY SCHOOL, PEÑABLANCA, CAGAYAN | Cagayan 3rd DEO | 5MJ'S CONSTRUCTION | On-Going | ₱4.8M | 65% | High risk97 | Flagged0.018 |
| 25BD0132BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY BUGATAY, PEÑABLANCA, CAGAYAN | Cagayan 3rd DEO | QUASAR CONSTRUCTION AND SUPPLY | On-Going | ₱4.8M | 79% | High risk97 | Flagged0.013 |
| 25BD0073BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY SAN LORENZO, IGUIG, CAGAYAN | Cagayan 3rd DEO | 5MJ'S CONSTRUCTION | On-Going | ₱4.9M | 66% | High risk97 | Flagged0.018 |
| 25BD0097SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD, BARANGAY SALAMAGUE, IGUIG, CAGAYAN | Cagayan 3rd DEO | E. GUADIZ CONSTRUCTION | On-Going | ₱4.9M | 18% | High risk97 | Flagged0.032 |
| 25BD0056BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BALIWAG ELEMENTARY SCHOOL, PEÑABLANCA, CAGAYAN | Cagayan 3rd DEO | COLORSHIELD CONSTRUCTION AND DEVELOPMENT CORP. | On-Going | ₱4.8M | 60% | High risk97 | Flagged0.021 |
| 25BD0032BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY SAN ISIDRO, IGUIG, CAGAYAN | Cagayan 3rd DEO | 5MJ'S CONSTRUCTION | On-Going | ₱4.8M | 28% | High risk97 | Flagged0.026 |
| 25BD0120SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF TUGUEGARAO CIRCUMFERENTIAL ROAD DIKE, PACKAGE 2, TUGUEGARAO CITY, CAGAYAN | Cagayan 3rd DEO | MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION) | On-Going | ₱94.6M | 16% | High risk97 | Flagged0.045 |
| 25BD0059BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY CATTAGAMAN VIEJO, TUGUEGARAO CITY, CAGAYAN | Cagayan 3rd DEO | JAKT BUILDERS INC. | On-Going | ₱4.8M | 60% | High risk97 | Flagged0.020 |
| 25BD0045BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY NATAPPIAN EAST, SOLANA, CAGAYAN | Cagayan 3rd DEO | O.D.Z. BUILDERS | On-Going | ₱4.8M | 58% | High risk97 | Flagged0.020 |
| 25BD0141SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD, BARANGAY MADDARULUG NORTE, ENRILE, CAGAYAN | Cagayan 3rd DEO | KNI88 HARDWARE AND CONSTRUCTION SUPPLY | On-Going | ₱4.8M | 0% | High risk97 | Flagged0.035 |
| 25BE0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR STRATEGIC PUBLIC BUILDINGS/ FACILITIES-REHABILITATION OF POBLACION 1-DIVISORIA | Isabela 1st DEO | EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | On-Going | ₱112.9M | 71% | High risk97 | Flagged0.030 |
| 25BD0031SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF BRGY. LANNA - SITIO NARUANG -BATU, ENRILE, CAGAYAN - PHASE II | Cagayan 3rd DEO | KNI88 HARDWARE AND CONSTRUCTION SUPPLY | On-Going | ₱4.8M | 30% | High risk97 | Flagged0.025 |
| 25BD0057SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF LOCAL ROAD, BARANGAY NATAPPIAN - BARANGAY BASI EAST, SOLANA, CAGAYAN | Cagayan 3rd DEO | DOUBLE J1908 CONSTRUCTION | On-Going | ₱4.8M | 80% | High risk97 | Flagged0.011 |
| 25BE0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF SLOPE PROTECTION WORKS ALONG CAGAYAN | Isabela 1st DEO | DALCON CONSTRUCTION | On-Going | ₱140.2M | 26% | High risk97 | Flagged0.048 |
| 25BD0029BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONVERTIBLE TO EVACUATION CENTER), BARANGAY UBONG, SOLANA, CAGAYAN | Cagayan 3rd DEO | VHT CAGAYAN BUILDERS CORPORATION | On-Going | ₱4.8M | 39% | High risk97 | Flagged0.023 |
| 25BD0101SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD, BARANGAY CADAANAN, SOLANA, CAGAYAN | Cagayan 3rd DEO | E. GUADIZ CONSTRUCTION | On-Going | ₱4.9M | 73% | High risk97 | Flagged0.013 |
| 25BD0040SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD, BARANGAY BANTAY, SOLANA, CAGAYAN | Cagayan 3rd DEO | E. GUADIZ CONSTRUCTION | On-Going | ₱4.8M | 24% | High risk97 | Flagged0.028 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23BH0235CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPEDS BASIC EDUCATIONAL FACILITIES FUND - CONSTRUCTION OF 3STY 12CL, ECHAGUE NATIONAL HIGH SCHOOL, ECHAGUE, ISABELA | Isabela 4th DEO | AYLAN CONSTRUCTION & TRADING | On-Going | ₱29.6M | 0% | High risk87 | Flagged0.082 |
| 20BA0084CONCRETING OF BRGY. DIWAN TO BRGY. DIURAN FMR PHASE III, BRGY. SAN JOAQUIN AND BRGY. KAYHUVOKAN, BASCO, BATANES | Batanes DEO | ELARALOUIS BUILDERS SUPPLY & SERVICES | On-Going | ₱11.7M | 0% | High risk60 | Flagged0.081 |
| 22BA0065CONCRETING OF SITIO PAYIN TO SITIO KUGKUG TO SITIO TUKON FMR, BRGY. CHANARIAN, BASCO, BATANES | Batanes DEO | R.L. PACANA'S CONSTRUCTION & DEVELOPMENT | On-Going | ₱11.6M | 0% | Medium risk59 | Flagged0.075 |
| 24BD0230OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BASI FLOOD CONTROL SYSTEM, PACKAGE 1, BASI, SOLANA, CAGAYAN | Cagayan 3rd DEO | A.M. ORETA & CO., INC.PRIME MASTER CONST. AND DEV'T. CORP. | On-Going | ₱95.5M | 34% | High risk91 | Flagged0.075 |
| 25BA0050CONCRETING OF GI-ARAÑI - VADINARAN FMR, BRGY. KAYUGANAN, UYUGAN, BATANES | Batanes DEO | DEKM CONSTRUCTION | On-Going | ₱14.3M | 0% | High risk83 | Flagged0.073 |
| 25BA0051CONCRETING OF VIEDECK- SITIO PASDUXAN FARM TO MARKET ROAD (FMR), BRGY. STA. ROSA, ITBAYAT, BATANES | Batanes DEO | ALDON CONSTRUCTION CORPORATION | On-Going | ₱14.5M | 2% | High risk84 | Flagged0.073 |
| 25BE0132CONCRETING OF BRGY. BUBUG FMR (PHASE II), BRGY. BUBUG, STO. TOMAS, ISABELA | Isabela 1st DEO | EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | On-Going | ₱19.3M | 9% | High risk87 | Flagged0.073 |
| 24B00157DOH - FY 2024 HEALTH CARE FACILITIES ENHANCEMENT PROGRAM (HFEP): LGU HOSPITALS: LGU HOSPITALS - APARRI PROVINCIAL HOSPITAL | Region II | TJMT CONSTRUCTION | On-Going | ₱48.3M | 27% | High risk83 | Flagged0.070 |
| 24BH0342FLOOD MANAGEMENT PROGRAM -CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF MINANTE 1 FLOOD CONTROL STRUCTURE, PHASE 2, BARANGAY MINANTE 1, CAUAYAN CITY, ISABELA | Isabela 4th DEO | EDDMARI CONSTRUCTION & TRADING | On-Going | ₱144.4M | 81% | High risk90 | Flagged0.070 |
| 25BG0171CONSTRUCTION OF SCHOOL BUILDING, ZAMORA ELEMENTARY SCHOOL, BRGY. ZAMORA, SAN MARIANO. ISABELA | Isabela 3rd DEO | ONEOFONE BUILDERS INC. | On-Going | ₱7.7M | 0% | High risk85 | Flagged0.069 |
| 19B00044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES: SIFFU BRIDGE (B01157LZ) ALONG SANTIAGO-TUGUEGARAO ROAD, ROXAS, ISABELA | Region II | ADVANCED FOUNDATION CONSTRUCTION SYSTEMS CORP.RRC CO. INC. (FORMERLY: R R C CONSTRUCTION) | On-Going | ₱542.4M | 91% | High risk83 | Flagged0.066 |
| 24BE0173ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE A | Isabela 1st DEO | EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | On-Going | ₱101.3M | 85% | High risk90 | Flagged0.065 |
| 25BE0136CONCRETING OF BRGY. MALASIN-BRGY. FELY FMR, BRGY. MALASIN AND BRGY. FELY, MACONACON, ISABELA | Isabela 1st DEO | EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | On-Going | ₱14.5M | 34% | High risk87 | Flagged0.062 |
| 20B00028ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS ROAD, PACKAGE 2, ISABELA (GOV. DY BRIDGE) | Region II | R.D. INTERIOR JUNIOR CONSTRUCTIONDRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY | On-Going | ₱579.2M | 84% | High risk83 | Flagged0.062 |
| 24B00135DOH - FY 2024 HEALTH CARE FACILITIES ENHANCEMENT PROGRAM (HFEP): OTHER HEALTH CARE FACILITIES - MILITARY HOSPITAL CAMP MELCHOR F. DELA CRUZ STATION HOSPITAL | Region II | MA TESORO CONSTRUCTION | On-Going | ₱9.9M | 32% | High risk86 | Flagged0.062 |
| 24BF0139CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF SIFFU RIVER FLOOD CONTROL PROJECT, STA. 1+400- STA. 2 + 044.50, PHASE II, BARANGAY SAN JUAN, QUIRINO, ISABELA | Isabela 2nd DEO | JWU CONSTRUCTION AND SUPPLY | On-Going | ₱96.5M | 90% | High risk90 | Flagged0.061 |
| 24BF0142OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS -CONSTRUCTION OF MAGAT RIVER FLOOD CONTROL PROJECT, BARANGAY SAN ISIDRO SECTION, LUNA, ISABELA | Isabela 2nd DEO | JWU CONSTRUCTION AND SUPPLY | On-Going | ₱96.5M | 84% | High risk90 | Flagged0.060 |
| 25BE0124CONCRETING OF BRGY. SAN ISIDRO WEST TO BRGY. DIVISORIA FMR, BRGY. SAN ISIDRO WEST AND BRGY. DIVISORIA, STA. MARIA, ISABELA | Isabela 1st DEO | PERUDIAL CONSTRUCTION | On-Going | ₱19.3M | 51% | High risk87 | Flagged0.060 |
| 25BE0130CONCRETING OF RODEO ARENA POBLACION-SITIO ANTAGAN FMR, BRGY. POBLACION AND BRGY. DALENA, SAN PABLO, ISABELA | Isabela 1st DEO | DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY | On-Going | ₱14.5M | 53% | High risk87 | Flagged0.060 |
| 24B00160DOH - FY 2024 HEALTH CARE FACILITIES ENHANCEMENT PROGRAM (HFEP): LGU HOSPITALS - LGU HOSPITALS - NORTHWESTERN CAGAYAN GENERAL HOSPITAL | Region II | J.G. YACAS CONSTRUCTION, SUPPLY AND EQUIPMENT RENTAL | On-Going | ₱37M | 62% | High risk83 | Flagged0.059 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 351 | 25BH0294ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF CALAO EAST FLOOD CONTROL STRUCTURE, SECTION 2, BRGY. C | Isabela 4th DEO | NTL BUILDERS AND DEVELOPER | On-Going | ₱70.2M | 2% | High risk93 | Flagged0.014 |
| 352 | 25BE0043ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AL | Isabela 1st DEO | DRAGON TWELVE BUILDERS & CONSTRUCTION SUPPLY | On-Going | ₱144.7M | 85% | High risk93 | Flagged0.010 |
| 353 | 25BI0038ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONT | Nueva Vizcaya DEO | DALCON CONSTRUCTION | On-Going | ₱95.5M | 100% | High risk93 | —-0.006 |
| 354 | 25BI0035ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOODMITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONT | Nueva Vizcaya DEO | DALCON CONSTRUCTION | On-Going | ₱143.3M | 95% | High risk93 | Flagged0.005 |
| 355 | 25BE0097CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SANTA MARINA, MACONACON, ISABELA | Isabela 1st DEO | EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | On-Going | ₱9.6M | 32% | High risk93 | Flagged0.025 |
| 356 | 25BF0102OO1: NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MALLIG BYPASS ROAD, PACKAGE 1, ISABELA, MALLIG, ISABELA | Isabela 2nd DEO | RRC CO. INC. (FORMERLY: R R C CONSTRUCTION) | On-Going | ₱38M | 3% | High risk93 | Flagged0.022 |
| 357 | 25BH0114BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY SAN ROQUE, JONES, ISABELA | Isabela 4th DEO | WBS CONSTRUCTION AND CONSTRUCTION SUPPLY | Completed | ₱3M | 100% | High risk93 | —-0.025 |
| 358 | 25BI0033ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCD | Nueva Vizcaya DEO | V.B. MANUBAY CONSTRUCTION | On-Going | ₱95.5M | 86% | High risk93 | —-0.003 |
| 359 | 25BD0102BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY SAMPAGUITA, SOLANA, CAGAYAN | Cagayan 3rd DEO | V.R.D.J. CONSTRUCTION | On-Going | ₱2.4M | 70% | High risk93 | Flagged0.014 |
| 360 | 25BD0011ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - TUGUEGARAO CITY-ENRILE DIVERSION ROAD, CAGAYAN | Cagayan 3rd DEO | MEGAY CONSTRUCTION INC. (FORMERLY: MEGAY CONSTRUCTION) | On-Going | ₱38.5M | 55% | High risk93 | Flagged0.008 |
| 361 | 25B00003OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CAUAYAN CITY NORTHEAST ALTERNATE ROUTE (ALICAOCAO BRIDGE AND APPROACHES), ISABELA | Region II | ADVANCED FOUNDATION CONSTRUCTION SYSTEMS CORP. | On-Going | ₱26.4M | 94% | High risk93 | —-0.006 |
| 362 | 25BH0109BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY SANTO DOMINGO, JONES, ISABELA | Isabela 4th DEO | WBS CONSTRUCTION AND CONSTRUCTION SUPPLY | Completed | ₱3M | 100% | High risk93 | —-0.023 |
| 363 | 25BB0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING BRGY. ASINGA VIA, BAGGAO, CAGAYAN | Cagayan 1st DEO | W.B. NAVARRO CONSTRUCTION & SUPPLIES CO. LTD | On-Going | ₱4.6M | 74% | High risk93 | Flagged0.015 |
| 364 | 25BF0083CONSTRUCTION/COMPLETION OF MULTI-PURPOSE BUILDING, BRGY. VIRA, ROXAS, ISABELA | Isabela 2nd DEO | JWU CONSTRUCTION AND SUPPLY | On-Going | ₱3.8M | 100% | High risk93 | Flagged0.002 |
| 365 | 25BC0006ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - ULIMA BR. 2 ALONG JCT.-LOGAC-LASAM-GAGABUTAN RD | Cagayan 2nd DEO | GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO | On-Going | ₱143.3M | 65% | High risk93 | Flagged0.021 |
| 366 | 25BH0123BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAGSAYSAY, CORDON, ISABELA | Isabela 4th DEO | JHUERS CONSTRUCTION | On-Going | ₱2.9M | 66% | High risk93 | Flagged0.015 |
| 367 | 25BH0254BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, MALVAR SPORTS COMPLEX, BARANGAY MALVAR, SANTIAGO CITY, ISABELA | Isabela 4th DEO | VBM CONSTRUCTION CORP. | On-Going | ₱3.8M | 0% | High risk93 | Flagged0.032 |
| 368 | 25BB0038CSSP - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS RDS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, PHASE 1, BARANGAY SAN ANTONIO, BAGGAO, CAGAYAN | Cagayan 1st DEO | TJMT CONSTRUCTION | Completed | ₱4.9M | 100% | High risk92 | —-0.021 |
| 369 | 25BC0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CLAVERIA DIVERSION ROAD, CAGAYAN | Cagayan 2nd DEO | OCP CONSTRUCTION | On-Going | ₱48.5M | 70% | High risk92 | Flagged0.006 |
| 370 | 25BG0101CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING IN SAN MIGUEL INTEGRATED SCHOOL - ANNEX, BARANGAY SAN MIGUEL, RAMON, ISABELA | Isabela 3rd DEO | CHU SAN CONSTRUCTION AND SUPPLY | On-Going | ₱9.6M | 93% | High risk92 | Flagged0.005 |
| 371 | 25BB0074OO2: PROTECT LIVES PROPERTIES AGAINST MAJ FLDS - FLD MANAGT PROG - CONST/REHAB OF FLD MITIGATN FACILITIES WITHIN MAJ. RIVER BASINS & PRINCIPAL RIVERS - CFMS - CONST. OF FLD CONTRL STRUCTURE ALONG CAG. RIVER, PACKAGE 6, BRGY. AGUIGUICAN, GATTARAN, CAGAYAN | Cagayan 1st DEO | TJMT CONSTRUCTION | On-Going | ₱96.5M | 96% | High risk92 | Flagged0.000 |
| 372 | 25BH0239BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, SANTIAGO CITY NATIONAL HIGH SCHOOL, BARANGAY CALAOCAN, SANTIAGO CITY, ISABELA | Isabela 4th DEO | WBS CONSTRUCTION AND CONSTRUCTION SUPPLY | On-Going | ₱3.8M | 67% | High risk92 | Flagged0.014 |
| 373 | 25B00056OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - ALONG MAHARLIKA HIGHWAY (CAGAYAN VALLEY ROAD), K0534+000 - K0534+142.80, K0534+991 - K0536+000, K0537+000 - | Region II | PRIME MASTER CONST. AND DEV'T. CORP. | On-Going | ₱32.7M | 42% | High risk92 | Flagged0.010 |
| 374 | 25BG0143CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN ALICIA WEST CENTRAL SCHOOL, BARANGAY CALAOCAN, ALICIA, ISABELA | Isabela 3rd DEO | JWU CONSTRUCTION AND SUPPLY | On-Going | ₱14.4M | 100% | High risk92 | Flagged0.001 |
| 375 | 25BH0235BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY BUCAL SUR, DINAPIGUE, ISABELA | Isabela 4th DEO | MONTE CARLO CONST. CORP. | On-Going | ₱4.8M | 100% | High risk92 | Flagged0.002 |