Total projects
11,757
Total budget
₱275.1B
Average progress
94.8%
Completion rate
85.0%
Average risk score
40.8
Medium risk on average, out of 100
Flagged as unusual
543
4.6% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 4,575 | ₱122.6B | 43.1 | 79 | 95.6% |
| Buildings and Facilities | 4,410 | ₱36.2B | 30.4 | 52 | 97.3% |
| Flood Control and Drainage | 1,347 | ₱72.8B | 51.7 | 109 | 89.9% |
| Bridges | 516 | ₱14.7B | 45.2 | 40 | 90.5% |
| OTHER | 369 | ₱13.3B | 65.3 | 99 | 94.2% |
| Water Provision and Storage | 329 | ₱3.4B | 35.7 | 8 | 92.2% |
| GAA 2025 SSP | 126 | ₱4.7B | 93.5 | 108 | 73.9% |
| GAA 2025 OO-1 | 47 | ₱3.3B | 92.3 | 37 | 77.4% |
| GAA 2025 OO-2 | 28 | ₱3B | 92.5 | 10 | 74.0% |
| Bridges, Roads | 10 | ₱1B | 55.4 | 1 | 70.3% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bohol 3rd DEO | 1,379 | ₱24.5B | 39.7 | 63 | 98.4% |
| Bohol 1st DEO | 1,288 | ₱18.4B | 37.7 | 40 | 97.7% |
| Bohol 2nd DEO | 1,216 | ₱15.1B | 32.9 | 40 | 98.6% |
| Cebu City DEO | 1,158 | ₱18.2B | 38.5 | 28 | 95.4% |
| Cebu 1st DEO | 1,103 | ₱25B | 38.5 | 25 | 92.8% |
| Cebu 2nd DEO | 975 | ₱14.2B | 37.9 | 28 | 94.9% |
| Cebu 6th DEO | 939 | ₱23.6B | 48.0 | 61 | 94.1% |
| Cebu 5th DEO | 848 | ₱12.5B | 36.6 | 21 | 95.7% |
| Cebu 4th DEO | 844 | ₱14B | 37.8 | 14 | 97.7% |
| Cebu 3rd DEO | 779 | ₱15.8B | 42.4 | 9 | 98.5% |
| Cebu 7th DEO | 710 | ₱41.6B | 57.1 | 117 | 79.5% |
| Region VII | 518 | ₱52.3B | 58.8 | 97 | 83.2% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| QM BUILDERS | 650 | ₱43.7B | 54.3 | 62 | 82.4% |
| QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION) | 348 | ₱18B | 51.4 | 32 | 90.4% |
| WTG CONSTRUCTION & DEVELOPMENT CORPORATION | 318 | ₱19.3B | 54.8 | 12 | 93.6% |
| FIRST GRANDEUR BUILDERS INC. (FORMERLY: FIRST GRANDEUR BUILDERS) | 272 | ₱4.5B | 42.3 | 4 | 96.3% |
| RUDHIL CONSTRUCTION & ENTERPRISES, INC.(FORMERLY R | 252 | ₱3.6B | 30.4 | 4 | 99.4% |
| JANUARY BUILDERS | 218 | ₱2.2B | 31.3 | 5 | 96.4% |
| WORLDWIDE BUILDERS | 212 | ₱2.1B | 31.4 | 5 | 97.6% |
| DINAH RBS CONSTRUCTION AND SUPPLY INCORPORATED (FORMERLY: DINAH JANE CONSTRUCTION AND SUPPLY) | 208 | ₱1.9B | 35.1 | 0 | 99.2% |
| GONZALODO ENTERPRISES | 206 | ₱6.3B | 47.7 | 12 | 94.6% |
| 3N CONSTRUCTION & SUPPLY | 189 | ₱978M | 26.0 | 1 | 98.9% |
| FUENTABUILT CONSTRUCTION CORP. | 170 | ₱1.8B | 37.7 | 9 | 99.2% |
| VEN RAY CONSTRUCTION CORPORATION | 164 | ₱10B | 52.8 | 6 | 95.7% |
| MUANA CONSTRUCTION AND DEVELOPMENT CORP. (FORMERLY | 156 | ₱4.4B | 45.5 | 8 | 98.0% |
| DT&C CONSTRUCTION | 149 | ₱874.9M | 36.1 | 2 | 96.9% |
| P.B. OBIAL CONSTRUCTION | 147 | ₱4.4B | 42.9 | 3 | 98.6% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HO0013CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG VIVE RIVER, PHASE 3, RONDA, CEBU | Cebu 7th DEO | WTG CONSTRUCTION & DEVELOPMENT CORPORATION | On-Going | ₱96.2M | 95% | High risk96 | Flagged0.018 |
| 25HO0135CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, SITIO CAMBINOCOT TO | Cebu 7th DEO | QM BUILDERS | On-Going | ₱141.9M | 38% | High risk96 | Flagged0.040 |
| 25HO0149CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE, PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BRGY. KANTANGKAS- BRGY. PACULOB ROAD, DUMANJUG, CE | Cebu 7th DEO | QM BUILDERS | On-Going | ₱145.5M | 72% | High risk96 | Flagged0.033 |
| 25HB0112CONVERGENCE & SPECIAL SUPPORT PROGRAM - SPECIAL FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES, INFORMATIVE SIGNS AND SOLAR LIGHTING - SECONDARY ROADS - THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD | Bohol 3rd DEO | L.S.D. CONSTRUCTION & SUPPLIES | On-Going | ₱93.6M | 60% | High risk96 | Flagged0.031 |
| 25HB0114CONVERGENCE AND SPECIAL SUPPORT PROGRAM SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 INSTALLATION OF ROAD SAFETY DEVICES, INFORMATION SIGNS AND SOLAR LIGHTING - SECONDARY ROADS - THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL R | Bohol 3rd DEO | L.S.D. CONSTRUCTION & SUPPLIES | On-Going | ₱95.1M | 67% | High risk96 | Flagged0.029 |
| 25HB0110CONVERGENCE & SPECIAL SUPPORT PROGRAM - SPECIAL FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES, INFORMATIVE SIGNS AND SOLAR LIGHTING - SECONDARY ROADS - THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD ( | Bohol 3rd DEO | L.S.D. CONSTRUCTION & SUPPLIES | On-Going | ₱93.6M | 76% | High risk96 | Flagged0.027 |
| 25HB0123CONVERGENCE AND SPECIAL SUPPORT PROGRAM BASIC INFRASTRUCTURE PROGRAM (BIP) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES CONSTRUCTION OF ROAD, BRGY. UPPER BONBON TO BRGY. BUGHO, LOBOC, BOHOL | Bohol 3rd DEO | RL EARTH HAULING & EQUIPMENT SERVICES INC.N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) | On-Going | ₱96M | 20% | High risk96 | Flagged0.043 |
| 25HB0113CONVERGENCE AND SPECIAL SUPPORT PROGRAM SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 INSTALLATION OF ROAD SAFETY DEVICES, INFORMATIVE SIGNS AND SOLAR LIGHTING - SECONDARY ROADS - THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL R | Bohol 3rd DEO | L.S.D. CONSTRUCTION & SUPPLIES | On-Going | ₱95.1M | 76% | High risk96 | Flagged0.027 |
| 25HN0137CP: SPECIAL ROAD FUND-MVUC AS PER R.A. 11239 - INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG MCR - K0018+023 - K0020+151, K0031+765-K0034+775 (MODIFIED TO: K0011+(-634) - K0013+043, K0019+171-K0020+151, K0031+765 -K0034+775) | Cebu 6th DEO | ZLREJ TRADING AND CONSTRUCTION CORPORATION | On-Going | ₱141.9M | 83% | High risk96 | Flagged0.030 |
| 25HB0115CONVERGENCE AND SPECIAL SUPPORT PROGRAM SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 INSTALLATION OF ROAD SAFETY DEVICES, INFORMATIVE SIGNS AND SOLAR LIGHTING - SECONDARY ROADS - THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL R | Bohol 3rd DEO | L.S.D. CONSTRUCTION & SUPPLIES | On-Going | ₱95.1M | 77% | High risk96 | Flagged0.027 |
| 25HB0111CONVERGENCE & SPECIAL SUPPORT PROGRAM - SPECIAL FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES, INFORMATIVE SIGNS AND SOLAR LIGHTING - SECONDARY ROADS - THE PRESIDENT CARLOS P. GARCIA CIRCUMFERENTIAL RD ( | Bohol 3rd DEO | L.S.D. CONSTRUCTION & SUPPLIES | On-Going | ₱93.6M | 89% | High risk96 | Flagged0.022 |
| 25H00088CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, REHABILITATION OF CALAPE-PANGGANGAN ROAD IN BOHOL | Region VII | L.S.D. CONSTRUCTION & SUPPLIESMOG CONSTRUCTION INC. | On-Going | ₱163.3M | 23% | High risk96 | Flagged0.049 |
| 25HN0127SSP: SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARANGAY CASUNTINGAN TO BARANGAY CABANCALAN (PHASE 7), MANDAUE CITY, CEBU | Cebu 6th DEO | ZLREJ TRADING AND CONSTRUCTION CORPORATION | On-Going | ₱94.6M | 72% | High risk96 | Flagged0.026 |
| 25HO0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO TONGA (RIGHT SIDE), BRGY. MONTAÑEZA, MALABUYOC, CEBU | Cebu 7th DEO | CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. | On-Going | ₱97M | 82% | High risk96 | Flagged0.024 |
| 25HO0044CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO NONOK, BARANGAY MONTAÑEZA - SITIO WALO | Cebu 7th DEO | DMLC BUILDERS | On-Going | ₱99.8M | 85% | High risk96 | Flagged0.024 |
| 25HO0108CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO LINAYUGAN (LEFT SIDE), BRGY. MONTAÑEZA, MALABUYOC, CEB | Cebu 7th DEO | CENTERWAYS CONSTRUCTION AND DEVELOPMENT INC. | On-Going | ₱97.3M | 86% | High risk96 | Flagged0.023 |
| 25HC0071CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY LAPACAN SUR (INABANGA, BOHOL) TO BRGY PANG | Bohol 2nd DEO | RL EARTH HAULING & EQUIPMENT SERVICES INC.N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) | On-Going | ₱98.9M | 58% | High risk96 | Flagged0.029 |
| 25HC0055SPECIAL ROAD FUND- MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239: INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG SAGBAYAN DANAO ROAD (SDR) PASSING ALL INABANGA NATIONAL ROADS, BOHOL | Bohol 2nd DEO | CEBU 7H TECHNOCHEM INDUSTRIES, INC. | On-Going | ₱98M | 61% | High risk96 | Flagged0.029 |
| 25HC0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY. BATUAN TO BRGY OVERLAND, BUENAVISTA, BOHO | Bohol 2nd DEO | RL EARTH HAULING & EQUIPMENT SERVICES INC.N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) | On-Going | ₱98.9M | 70% | High risk96 | Flagged0.027 |
| 25HN0148SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF NANGKA-TUGBUNGGAN ROADS, CONSOLACION, CEBU (PACKAGE I) | Cebu 6th DEO | GONZALODO ENTERPRISESGBUILD SUPPLY AND DEVELOPMENT INC. | On-Going | ₱97M | 51% | High risk96 | Flagged0.030 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23H00114CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF INFECTIOUS DISEASE CENTER, VICENTE SOTTO, CEBU CITY | Region VII | QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION) | On-Going | ₱115.8M | 41% | High risk89 | Flagged0.085 |
| 23HO0254CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO POBLACION - SITIO NONOK, BRGY. MONTAÑE | Cebu 7th DEO | JUSTBILT BUILDERS | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.084 |
| 23HO0269CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO POBLACION - SITIO MAINIT, BRGY. MONTAÑ | Cebu 7th DEO | JUSTBILT BUILDERS | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.084 |
| 23HO0253- CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES,CONSTRUCTION OF REVETMENT WALL AT SITIO TUNGA, BRGY. MONTAÑEZA, MALABUYOC, C | Cebu 7th DEO | JUSTBILT BUILDERS | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.084 |
| 18HD0221CONCRETING OF SUGARCANE FARM TO MILL ROAD, JUNCTION NATIONAL HIGHWAY-BARANGAY CAPUTATAN NORTE TO BARANGAY DALINGDING TO JUNCTION MAINLINE NATIONAL HIGHWAY, BARANGAY PANUGNAWAN, MEDELLIN, CEBU | Cebu 4th DEO | GONZALODO ENTERPRISES | On-Going | ₱10.9M | 0% | Medium risk59 | Flagged0.083 |
| 24HO0164CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT WALL) AT SITIO AB | Cebu 7th DEO | NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | On-Going | ₱142.6M | 0% | High risk86 | Flagged0.082 |
| 24HO0166CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT WALL) AT SITIO | Cebu 7th DEO | NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | On-Going | ₱142.6M | 0% | High risk86 | Flagged0.082 |
| 24HO0167CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (REVETMENT WALL) AT SITIO P | Cebu 7th DEO | NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | On-Going | ₱142.6M | 0% | High risk86 | Flagged0.082 |
| 23HO0252CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT SITIO UPPER TALAYONG, BRGY. TUPAS, RONDA, CE | Cebu 7th DEO | JCM AMEG BUILDERS CORPORATION (FORMERLY: AMEG CONSTRUCTION & SUPPLY) | On-Going | ₱94.1M | 0% | High risk87 | Flagged0.082 |
| 23HO0270CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER SITIO CANSIBOG, BARANG | Cebu 7th DEO | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0271CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER, BARANGAY TUPAS, RONDA, CEBU ( | Cebu 7th DEO | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0256CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (DOWNSTREAM RIGHT SIDE), MO | Cebu 7th DEO | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0272CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION ALONG TALABA RIVER (SITIO CANSIBOG - SITI | Cebu 7th DEO | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0251CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES,CONSTRUCTION OF REVETMENT WALL AT SITIO UPPER TALAYONG, BRGY. TUPAS, RONDA, CE | Cebu 7th DEO | JCM AMEG BUILDERS CORPORATION (FORMERLY: AMEG CONSTRUCTION & SUPPLY) | On-Going | ₱94.1M | 0% | High risk87 | Flagged0.082 |
| 23HO0255CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF RIVERBANK PROTECTION AT BALA RIVER (DOWNSTREAM LEFT SIDE), MOAL | Cebu 7th DEO | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | On-Going | ₱94.6M | 0% | High risk87 | Flagged0.082 |
| 23HO0249CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. MATALAO (DOWNSTREAM), DUMANJUG, CEBU | Cebu 7th DEO | QM BUILDERS | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 23HO0250CONVERGENCE ANDSPECIAL SUPPORT PROGRAM,SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATIONSTRUCTURES PROTECTING PUBLICINFRASTRUCTURES/FACILITIES,CONSTRUCTION OF REVETMENT WALL ATBRGY. KANTANGKAS (DOWNSTREAM),DUMANJUG, CE | Cebu 7th DEO | QM BUILDERS | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 24H00175CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP)-PUBLIC WATER SUPPLY SYSTEM, CONSTRUCTION OF LEVEL III WATER SYSTEM, MADRIDEJOS, CEBU | Region VII | A.M. ORETA & CO., INC.WTG CONSTRUCTION & DEVELOPMENT CORPORATION | On-Going | ₱197.7M | 60% | High risk91 | Flagged0.080 |
| 20HD0101CONCRETING OF SUGARCANE FARM TO MILL ROAD, JUNCTION NATIONAL HGIHWAY-BRGY. CAPUTATAN NORTE TO BRGY. DALINGDING SUR TO JUNCTION MAINLINE NATIONAL HIGHWAY, BRGY. PANUGNAWAN, MEDELLIN, CEBU | Cebu 4th DEO | GONZALODO ENTERPRISES | On-Going | ₱4.3M | 0% | Low risk24 | Flagged0.078 |
| 23HO0276CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 2), DUMANJUG, CEBU | Cebu 7th DEO | QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION) | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 626 | 24HN0057OO2: CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARANGAY PAKNA-AN (LEVEL 2), MANDAUE CITY, CEBU | Cebu 6th DEO | ZLREJ TRADING AND CONSTRUCTION CORPORATION | On-Going | ₱122.9M | 91% | High risk65 | —-0.016 |
| 627 | 24HN0064OO2: FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUTUANON RIVER, BARANGAY UMAPAD (LEVEL 2), MANDAUE CITY, CEBU | Cebu 6th DEO | ZLREJ TRADING AND CONSTRUCTION CORPORATION | On-Going | ₱122.9M | 94% | High risk65 | —-0.016 |
| 628 | 25HH0035OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANANGA RIVER, PACKA | Cebu City DEO | KYLE CONSTRUCTION SERVICESBNR CONSTRUCTION & DEVELOPMENT CORP. | On-Going | ₱96M | 52% | High risk65 | —-0.022 |
| 629 | 23HO0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF FLOOD WALL STRUCTURES ALONG SITIO DAO, BARANGAY MINDANAO, MAL | Cebu 7th DEO | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | Completed | ₱95.5M | 100% | High risk65 | —-0.065 |
| 630 | 23HO0236REPAIR/REHABILITATION/RECONSTRUCTION OF MONTAÑEZA RIVER FLOOD CONTROL SYSTEM (UPSTREAM-SECTION 2), MALABUYOC, CEBU | Cebu 7th DEO | JUSTBILT BUILDERSNEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | Completed | ₱95.4M | 100% | High risk65 | —-0.065 |
| 631 | 23HO0047ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL AT BRGY. TAPON, DUMANJUG, CEBU | Cebu 7th DEO | QM BUILDERS | Completed | ₱96M | 100% | High risk65 | —-0.067 |
| 632 | 21HH0164OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITH DESILTING ALONG BUTUANON RIVER, CEBU CITY | Cebu City DEO | A.M. ORETA & CO., INC.GOWIL BUILDERS | Completed | ₱95.1M | 100% | High risk65 | —-0.069 |
| 633 | 22H00044ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - PRIMARY ROADS, N. BACALSO AVENUE (CEBU SOUTH ROAD) - K0091 + 000 - K0093 + 000, K0114+472-K0117+000, K0117+860-K0120+000 | Region VII | WTG CONSTRUCTION & DEVELOPMENT CORPORATION | Completed | ₱147.6M | 100% | High risk65 | —-0.069 |
| 634 | 23HO0016CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF FLOOD WALL STRUCTURES, BARANGAY SORSOGON - BARANGAY SALMERON | Cebu 7th DEO | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | Completed | ₱96M | 100% | High risk65 | —-0.065 |
| 635 | 24HE0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF ROAD WITH SLOPE PROTECTION AT SITIO IBA | Cebu 1st DEO | QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION) | On-Going | ₱144.6M | 35% | High risk65 | —-0.018 |
| 636 | 23HN0058CSSP: BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF AGUS ROAD INCLUDING DRAINAGE STRUCTURE, BARANGAY AGUS, LAPU-LAPU CITY, CEBU | Cebu 6th DEO | FLORIANE CONSTRUCTION CORPORATION (FORMERLY: FLORIANE CONSTRUCTION & SUPPLY) | Completed | ₱19.8M | 100% | High risk65 | —-0.030 |
| 637 | 25HO0033ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL (UPSTREAM), BARANGAY MATUTINAO, BADIAN, CE | Cebu 7th DEO | WTG CONSTRUCTION & DEVELOPMENT CORPORATION | On-Going | ₱95.8M | 94% | High risk65 | —-0.034 |
| 638 | 23HO0005CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF FLOOD WALL STRUCTURES, BARANGAY SORSOGON - BARANGAY SALMERON | Cebu 7th DEO | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | Completed | ₱95.7M | 100% | High risk65 | —-0.065 |
| 639 | 23HO0046ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG MATUTINAO RIVER (UPSTREAM), BADIAN, | Cebu 7th DEO | WTG CONSTRUCTION & DEVELOPMENT CORPORATION | Completed | ₱96M | 100% | High risk65 | —-0.066 |
| 640 | 23HO0001ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SITIO PARALE, BRGY. SORSOGON, | Cebu 7th DEO | QUIRANTE CONSTRUCTION CORPORATION (FORMERLY: QUIRANTE CONSTRUCTION) | Completed | ₱96M | 100% | High risk65 | —-0.066 |
| 641 | 23HO0025ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG MONTAÑEZA (UPSTREAM), MALABUYOC, CE | Cebu 7th DEO | QM BUILDERS | Completed | ₱95.5M | 100% | High risk65 | —-0.065 |
| 642 | 23HO0055ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT WALL ALONG ALEGRIA RIVER, ALEGRIA, CEBU | Cebu 7th DEO | QM BUILDERS | Completed | ₱96M | 100% | High risk65 | —-0.067 |
| 643 | 23HO0230REPAIR/REHABILITATION/RECONSTRUCTION OF GINATILAN RIVER FLOOD CONTROL SYSTEM, GINATILAN, CEBU, STA. 0+000.00 TO STA. 0+130.00 | Cebu 7th DEO | QM BUILDERS | Completed | ₱93.4M | 100% | High risk65 | —-0.067 |
| 644 | 25H00011OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST. OF FLOOD MITIGATION STRUCTURE, SAPANGDAKU RIVER, BARANGAY ILIHAN,TOLEDO | Region VII | QM BUILDERS | On-Going | ₱115.7M | 50% | High risk65 | —-0.020 |
| 645 | 17HF0004NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE - SECONDARY ROAD, TOLEDO-PINAMUNGAJAN-MANTALONGON ROAD (S00235CB), K0076+000 - K0078+023 | Cebu 3rd DEO | GENETIAN BUILDERS AND ENTERPRISES INCORPORATED (FORMERLY: GENETIAN BUILDERS) | Completed | ₱27M | 100% | High risk65 | —-0.030 |
| 646 | 24HF0106REHABILITATION OF FLOOD CONTROL STRUCTURE AT CAMANCHILLES RIVER, BRGY. CAPT. CLAUDIO, TOLEDO CITY | Cebu 3rd DEO | JJ &J CONSTRUCTION & GENERAL SUPPLYPLD CONSTRUCTION AND DEVELOPMENT INC. (FORMERLY: PLD CONSTRUCTION) | Completed | ₱94.6M | 100% | High risk65 | —-0.068 |
| 647 | 23HO0346ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD WALL STRUCTURES ALONG SITIO PARALE (LEFT SIDE), BAR | Cebu 7th DEO | QM BUILDERS | On-Going | ₱42.8M | 82% | High risk65 | —-0.010 |
| 648 | 22H00014ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/ NEW ROADS, ALCOY-ALEGRIA ROAD, ALCOY, CEBU | Region VII | QM BUILDERS | Completed | ₱144.7M | 100% | High risk65 | —-0.069 |
| 649 | 17H00017MF0 1-NATIONAL ROAD NETWORK SERVICES-NETWORK DEVELOPMENT, OFF CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, P00106520VS, SECONDARY ROADS, S00030BH, TAGBILARAN NORTH ROAD (TAGBILARAN-JETAFE SECT.) | Region VII | N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCTION) | Completed | ₱147M | 100% | High risk65 | —-0.038 |
| 650 | 20H00029CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATIONS,SANTA FE-MADRIDEJOS BEACH RESORTS, MADRIDEJOS, CEBU, SECTION 1: STA.00+000.00-STA.04+615.00,SECTION 2: STA.00+000-STA.01+385.00, MADR | Region VII | WTG CONSTRUCTION & DEVELOPMENT CORPORATIONROVILLA CONSTRUCTION | Completed | ₱144.7M | 100% | High risk65 | —-0.073 |