Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
7,430
Total budget
₱276B
Average progress
96.2%
Completion rate
87.5%
Average risk score
38.3
Medium risk on average, out of 100
Flagged as unusual
537
7.2% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 2,689 | ₱136.5B | 39.7 | 34 | 97.2% |
| Buildings and Facilities | 2,548 | ₱19.4B | 23.9 | 19 | 98.6% |
| Flood Control and Drainage | 799 | ₱51.3B | 42.9 | 17 | 97.5% |
| Bridges | 518 | ₱22.4B | 40.1 | 18 | 96.9% |
| OTHER | 256 | ₱17.2B | 77.0 | 141 | 88.1% |
| GAA 2025 SSP | 224 | ₱7.6B | 93.8 | 202 | 72.5% |
| Water Provision and Storage | 196 | ₱2.4B | 28.1 | 7 | 97.7% |
| GAA 2025 OO-1 | 89 | ₱6.5B | 90.6 | 72 | 70.8% |
| Bridges, Roads | 64 | ₱8B | 50.4 | 7 | 95.6% |
| GAA 2025 OO-2 | 47 | ₱4.7B | 89.9 | 20 | 82.6% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 1,198 | ₱141.4B | 52.2 | 166 | 91.4% |
| Surigao del Sur 1st DEO | 924 | ₱18.3B | 34.8 | 77 | 97.9% |
| Surigao del Norte 2nd DEO | 870 | ₱23.3B | 38.7 | 62 | 94.0% |
| Butuan City DEO | 812 | ₱14.7B | 35.1 | 47 | 95.3% |
| Surigao del Norte 1st DEO | 799 | ₱19.7B | 32.6 | 29 | 98.0% |
| Dinagat Islands DEO | 637 | ₱8.2B | 35.0 | 31 | 98.0% |
| Surigao del Sur 2nd DEO | 596 | ₱15.7B | 36.9 | 47 | 98.1% |
| Agusan del Sur 2nd DEO | 593 | ₱11.8B | 35.7 | 35 | 98.2% |
| Agusan del Norte DEO | 518 | ₱12.6B | 35.1 | 14 | 98.6% |
| Agusan del Sur 1st DEO | 483 | ₱10.3B | 37.1 | 29 | 98.0% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| EQUI-PARCO CONSTRUCTION COMPANY | 370 | ₱45.1B | 51.0 | 42 | 92.7% |
| TRIPARCO DEVELOPMENT CORPORATION | 269 | ₱27.3B | 51.0 | 37 | 90.6% |
| RADIAN CONSTRUCTION AND SUPPLY | 210 | ₱1.3B | 31.5 | 9 | 98.6% |
| ADFIL CORPORATION | 193 | ₱19.9B | 49.7 | 10 | 97.1% |
| LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) | 177 | ₱11.9B | 49.6 | 26 | 95.2% |
| J.M. LUCIANO CONSTRUCTION, INC. | 170 | ₱17B | 51.3 | 20 | 97.3% |
| BOOMETRIX DEVELOPMENT CORP. | 167 | ₱11B | 42.0 | 9 | 92.4% |
| A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D | 141 | ₱4.1B | 44.1 | 8 | 95.9% |
| RAMISES CONSTRUCTION | 134 | ₱7.5B | 41.0 | 5 | 96.6% |
| C.V. CONSTRUCTION & DEVELOPMENT | 130 | ₱2.4B | 38.0 | 12 | 95.1% |
| CARTESIAN BUILDERS CORPORATION (FORMERLY: CARTESIAN BUILDERS) | 129 | ₱2.6B | 31.4 | 2 | 99.1% |
| ROWIE'S CONSTRUCTION | 127 | ₱2B | 44.2 | 22 | 97.3% |
| MRS BUILDERS AND SUPPLY | 125 | ₱785.5M | 24.2 | 3 | 99.6% |
| JMT CONSTRUCTION | 124 | ₱4.6B | 39.9 | 4 | 96.5% |
| ARQ BUILDERS | 123 | ₱9B | 48.2 | 21 | 88.4% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00064CONSTRUCTION OF AGUSAN DEL NORTE/ AGUSAN DEL SUR NORTH-SOUTH LATERAL ROAD, (LAS NIEVES, AGUSAN DEL NORTE - KAPALONG, DAVAO DEL NORTE), PACKAGE 6, AGUSAN DEL SUR | Region XIII | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱286M | 52% | High risk96 | Flagged0.048 |
| 25N00063CONSTRUCTION OF AGUSAN DEL NORTE/ AGUSAN DEL SUR NORTH-SOUTH LATERAL ROAD, (LAS NIEVES, AGUSAN DEL NORTE - KAPALONG, DAVAO DEL NORTE), PACKAGE 5, AGUSAN DEL SUR | Region XIII | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱287.7M | 70% | High risk96 | Flagged0.045 |
| 25N00058CONSTRUCTION OF STA. IRENE - SAN MIGUEL ROAD, AGUSAN DEL SUR | Region XIII | J.M. LUCIANO CONSTRUCTION, INC. | On-Going | ₱187.3M | 98% | High risk96 | Flagged0.030 |
| 25N00059CONSTRUCTION OF BYPASS ROAD, MAGKIANGKANG, VILLA UNDAYON-NEW SALEM-MT CARMEL MT. ARARAT, PACKAGE 3, AGUSAN DEL SUR | Region XIII | ARQ BUILDERS | On-Going | ₱192M | 82% | High risk96 | Flagged0.033 |
| 25N00257(CLUSTER I) 1.) TUBAY-CABADBARAN COASTAL ROAD (CONSTRUCTION OF BRIDGE), AGUSAN DEL NORTE, 2.) CONSTRUCTION OF TUBAY-CABADBARAN BRIDGE, TUBAY, AGUSAN DEL NORTE | Region XIII | ARQ BUILDERSROMA CONSTRUCTION & DEVELOPMENT CORPORATION | On-Going | ₱335.3M | 55% | High risk96 | Flagged0.043 |
| 25NH0008CONST. OF BRIDGE, BARANGAY BOLHOON, SAN MIGUEL, SURIGAO DEL SUR | Surigao del Sur 1st DEO | LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.022 |
| 25NH0021CONSTRUCTION OF ROAD, PUROK 1, 4, AND 5, BARANGAY STA. CRUZ, CARMEN, SURIGAO DEL SUR | Surigao del Sur 1st DEO | ROWIE'S CONSTRUCTION | On-Going | ₱48.5M | 95% | High risk96 | Flagged0.014 |
| 25NH0057CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BAYAN, MARIHATAG, SURIGAO DEL SUR | Surigao del Sur 1st DEO | CM TAN CONSTRUCTION | On-Going | ₱48.1M | 97% | High risk96 | Flagged0.019 |
| 25NC0036CONSTRUCTION OF NRJ SARMIENTO, TRENTO - BISLIG BYPASS ROAD, AGUSAN DEL SUR | Agusan del Sur 2nd DEO | J.M. LUCIANO CONSTRUCTION, INC. | On-Going | ₱47.6M | 92% | High risk96 | Flagged0.021 |
| 25NC0015CONSTRUCTION OF ROAD, NRJ OSMEÑA-COMOTA-LYDIA ROAD, LA PAZ, AGUSAN DEL SUR | Agusan del Sur 2nd DEO | J.M. LUCIANO CONSTRUCTION, INC. | On-Going | ₱47.5M | 80% | High risk96 | Flagged0.020 |
| 25NC0005CONSTRUCTION OF HINATUAN-BUNAWAN-ROSARIO BYPASS ROAD, AGUSAN DEL SUR | Agusan del Sur 2nd DEO | J.M. LUCIANO CONSTRUCTION, INC. | On-Going | ₱47.5M | 97% | High risk96 | Flagged0.016 |
| 25NI0019CONSTRUCTION OF BANK REVETMENT ALONG BAHI RIVER (BAHI BRIDGE SECTION), BAROBO, SURIGAO DEL SUR | Surigao del Sur 2nd DEO | LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) | On-Going | ₱143.2M | 89% | High risk96 | Flagged0.031 |
| 25N00230NRJ BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD TO NRJ BUTUAN CITY-MALAYBALAY RD VIA (BITAN-AGAN-NONG-NONG-BIT-OS DIVERSION ROAD), BUTUAN CITY | Region XIII | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱240M | 1% | High risk96 | Flagged0.057 |
| 25N00060AGUSAN DEL NORTE/ AGUSAN DEL SUR NORTH - SOUTH LATERAL ROAD, (LAS NIEVES, AGUSAN DEL NORTE-KAPALONG, DAVAO DEL NORTE), AGUSAN DEL SUR 1ST LD | Region XIII | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱48.1M | 90% | High risk96 | Flagged0.014 |
| 25NH0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CARRASCAL, SURIGAO DEL SUR | Surigao del Sur 1st DEO | J.M. LUCIANO CONSTRUCTION, INC. | On-Going | ₱143.3M | 92% | High risk96 | Flagged0.025 |
| 25NH0058CONSTRUCTION OF NURCIA SEAWALL, LANUZA, SURIGAO DEL SUR | Surigao del Sur 1st DEO | LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) | On-Going | ₱48.5M | 92% | High risk96 | Flagged0.017 |
| 25NH0072CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PUROK LANSONES I, BARANGAY SAN AGUSTIN, TANDAG CITY, SURIGAO DEL SUR | Surigao del Sur 1st DEO | J.M. LUCIANO CONSTRUCTION, INC. | On-Going | ₱48.5M | 100% | High risk96 | Flagged0.013 |
| 25NI0065CONSTRUCTION OF CAGUYAO BRIDGE, BISLIG CITY, SURIGAO DEL SUR | Surigao del Sur 2nd DEO | DAN-BEL CONSTRUCTION & SUPPLY | On-Going | ₱48.5M | 74% | High risk96 | Flagged0.029 |
| 25N00243CONSTRUCTION OF STA. IRENE-SAN MIGUEL ROAD, (PACKAGE 4), SURIGAO DEL SUR | Region XIII | J.M. LUCIANO CONSTRUCTION, INC. | On-Going | ₱140.4M | 62% | High risk96 | Flagged0.034 |
| 25NI0050CONSTRUCTION OF GAMUT - UNIDAD ROAD SECTION, BAROBO, SURIGAO DEL SUR | Surigao del Sur 2nd DEO | EMG CONSTRUCTION | On-Going | ₱48M | 89% | High risk96 | Flagged0.021 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24N00226DAANG MAHARLIKA (SURIGAO-AGUSAN SECT)- K1218+878.50-K1222+079.22 | Region XIII | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱193M | 53% | High risk90 | Flagged0.077 |
| 25NC0052CONCRETING OF FMR AT NRJ BRGY. PASTA TO BRGY. BUENASUERTE, SAN FRANCISCO, AGUSAN DEL SUR | Agusan del Sur 2nd DEO | ALCT CONSTRUCTION AND SUPPLY | On-Going | ₱9.6M | 0% | High risk86 | Flagged0.075 |
| 25NH0137CONSTRUCTION OF TWO (2) STOREY TEN (10) CLASSROOM SCHOOL BUILDING, CANTILAN NATIONAL HIGH SCHOOL, BRGY. MAGASANG, CANTILAN, SURIGAO DEL SUR | Surigao del Sur 1st DEO | RJ CONSTRUCTION & SUPPLY | On-Going | ₱24.4M | 15% | High risk87 | Flagged0.074 |
| 24N00214CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG LAKE MAINIT-TUBAY RIVER BASIN, TUBAY, AGUSAN DEL NORTE | Region XIII | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱193M | 76% | High risk90 | Flagged0.070 |
| 24ND0168CONSTRUCTION OF 3-STOREY 9-CLASSROOM SCHOOL BUILDING AT PEDRO D. DUNCANO NATIONAL HIGH SCHOOL, BUTUAN CITY, AGUSAN DEL NORTE | Butuan City DEO | REYROSE CONSTRUCTION & SUPPLY DEV'T CORP. (FOR: REY ROSE CONST. & SUPPLY) | On-Going | ₱47.3M | 1% | High risk88 | Flagged0.070 |
| 24N00224DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS-AGUSAN DEL NORTE PROVINCIAL HOSPITAL, AGUSAN DEL NORTE | Region XIII | REYROSE CONSTRUCTION & SUPPLY DEV'T CORP. (FOR: REY ROSE CONST. & SUPPLY) | On-Going | ₱49.7M | 2% | High risk88 | Flagged0.070 |
| 25NG0111CONCRETING OF BRGY. MAPAWA TO BRGY. SILOP FMR, BRGY. MAPAWA AND BRGY. SILOP, SURIGAO CITY, SURIGAO DEL NORTE | Surigao del Norte 2nd DEO | A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D | On-Going | ₱59.3M | 12% | High risk89 | Flagged0.069 |
| 24NI0099CONCRETING OF SAN ANTONIO - TABON (JUNCTION OF SAN ANTONIO ALTERNATE HIGHWAY OT ABIJOD TO TABON JUNCTION NATIONAL HIGHWAY), BISLIG CITY, SURIGAO DEL SUR | Surigao del Sur 2nd DEO | MN BAYALAS CONSTRUCTIONSVTS BUILDERS AND SUPPLY | On-Going | ₱48.3M | 65% | High risk86 | Flagged0.066 |
| 24N00210CONSTRUCTION OF DRAINAGE SYSTEM ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD, BUTUAN CITY AIRPORT TO LIBERTAD BRIDGE (BOTH SIDES), BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱96.3M | 61% | High risk89 | Flagged0.064 |
| 24N00128CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, PHASE 2, LUNA SECTION, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | SANTECH BUILDERS CORPORATION | On-Going | ₱192.7M | 95% | High risk91 | Flagged0.063 |
| 24N00211CONSTRUCTION OF BUENAVISTA POBLACION SEAWALL PROTECTION, BUENAVISTA, AGUSAN DEL NORTE | Region XIII | JD-RG CONSTRUCTION AND SUPPLIES CORP. (FORMERLY: JD-RG CONSTRUCTION CORPORATION) | On-Going | ₱149.6M | 89% | High risk89 | Flagged0.062 |
| 25N00234CONSTRUCTION OF SAN LUIS-BINICALAN-ZAMBOANGUITA ROAD, BRGY. MAHAYAHAY, SAN LUIS, AGUSAN DEL SUR (PACKAGE 3) | Region XIII | ULTICON BUILDERS, INC. | On-Going | ₱342.3M | 8% | High risk95 | Flagged0.061 |
| 24NI0098CONSTRUCTION OF RIVER BANK PROTECTION ALONG HINATUAN RIVER (MALIXI SECTION), TAGBINA, SURIGAO DEL SUR | Surigao del Sur 2nd DEO | LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) | On-Going | ₱96.5M | 97% | High risk88 | Flagged0.061 |
| 25N00235CONSTRUCTION OF SAN LUIS-BINICALAN-ZAMBOANGUITA ROAD, BRGY. MAHAYAHAY, SAN LUIS, AGUSAN DEL SUR (PACKAGE 4) | Region XIII | ULTICON BUILDERS, INC. | On-Going | ₱293.4M | 8% | High risk95 | Flagged0.060 |
| 24NH0123CONST. OF SAN AGUSTIN SUR SEAWALL, TANDAG CITY, SURIGAO DEL SUR | Surigao del Sur 1st DEO | EVENPAR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: EVEN PAR CONST. CO. INC.)GICAR CONSTRUCTION, INC. | On-Going | ₱96.5M | 96% | High risk90 | Flagged0.060 |
| 25NB0058CONSTRUCTION OF SCHOOL BUILDING, PATIN-AY CENTRAL ELEMENTARY SCHOOL, BRGY. PATIN-AY, PROSPERIDAD, AGUSAN DEL SUR | Agusan del Sur 1st DEO | GIOVANNI CONSTRUCTION | On-Going | ₱9.8M | 53% | High risk86 | Flagged0.060 |
| 24N00198COMPLETION OF COLLEGE OF ENGINEERING AND INFORMATION SCIENCES INTEGRATED LABORATORY CENTER, PHASE 1- AGUSAN DEL SUR STATE COLLEGE OF AGRICULTURE AND TECHNOLOGY | Region XIII | THEARIS BUILDERS & SUPPLY | On-Going | ₱29.8M | 74% | High risk87 | Flagged0.059 |
| 25NI0039CONSTRUCTION OF SCHOOL BUILDING, GREENFIELD ELEMENTARY SCHOOL, STA. JUANA, TAGBINA, SURIGAO DEL SUR | Surigao del Sur 2nd DEO | ROCK DIWATA BUILDERS, INC. | On-Going | ₱9.9M | 63% | High risk86 | Flagged0.059 |
| 24N00209CONSTRUCTION OF MAIN DRAINAGE CANAL ALONG MONTILLA JCT MONTILLA BOULEVARD-SALVADOR CALO STREET TO COA MAIN DRAINAGE CANAL, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱96.5M | 80% | High risk90 | Flagged0.059 |
| 24NB0094INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG NRJ AWA-LIANGA ROAD - K1291+(-852) - K1298+000, PROSPERIDAD, AGUSAN DEL SUR | Agusan del Sur 1st DEO | ZLREJ TRADING AND CONSTRUCTION CORPORATION | On-Going | ₱96.4M | 97% | High risk89 | Flagged0.058 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 651 | 23NG0090INSTALLATION OF SOLAR STREET LIGHTS ALONG DAANG MAHARLIKA (SURIGAO-AGUSAN SECT.), (SURIGAO DEL NORTE SIDE), SURIGAO DEL NORTE/SURIGAO CITY, SURIGAO DEL NORTE | Surigao del Norte 2nd DEO | GICAR CONSTRUCTION, INC. | On-Going | ₱94.1M | 90% | Medium risk59 | Flagged0.008 |
| 652 | 17NG0068CONSTRUCTION OF SAN ROQUE SWIP DATU RIVER PILAR, SURIGAO DEL NORTE | Surigao del Norte 1st DEO | R. SEMILLA CONSTRUCTION & MARKETING | Completed | ₱11.7M | 100% | Medium risk58 | —-0.011 |
| 653 | 16NF0126CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS OF MAINIT LAKEWALL/MAINIT, SURIGAO DEL NORTE, STA.0+360.00 - STA.0+730.60, STA.0+020.00 - STA.0+206.00 | Surigao del Norte 2nd DEO | FFJJ CONSTRUCTION | Completed | ₱49M | 100% | Medium risk58 | —-0.048 |
| 654 | 17NA0014CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-RECHANNELING OF PUYO RIVER, BRGY. BANGONAY, MAGSAYSAY AND CUYAGO, JABONGA, AGUSAN DEL NORTE, STA. 0+000 -STA.0+762.92 | Agusan del Norte DEO | EQUI-PARCO CONSTRUCTION COMPANY | Completed | ₱48.2M | 100% | Medium risk58 | —-0.047 |
| 655 | 18N00105CONCRETING OF EXISTING GRAVEL ROAD, SITIO SAN ROQUE ROAD WITH CONSTRUCTION OF 2 BRIDGES, MAHABA, MARIHATAG, SURIGAO DEL SUR | Region XIII | VICTORIA DEVELOPMENT AND VENTURES CORP. (FOR: VICTORIA DEV'T AND CONST. CORP.) | Completed | ₱171.1M | 100% | Medium risk58 | Flagged0.016 |
| 656 | 17NH0047CONSTRUCTION OF PANDANON SWIP, TANDAG, SURIGAO DEL SUR | Surigao del Sur 1st DEO | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | Completed | ₱12.2M | 100% | Medium risk58 | —-0.014 |
| 657 | 17NH0048COMPLETION OF DANIOG RIVER FLOOD CONTROL DIKE BARANGAY AGSAM, LANUZA, SURIGAO DEL SUR | Surigao del Sur 1st DEO | TRIPARCO DEVELOPMENT CORPORATION | Completed | ₱48.2M | 100% | Medium risk58 | —-0.039 |
| 658 | 25NG0009CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS (KALSADA TUNGO SA PALIPARAN, RILES AT DAUNGAN PROGRAM - KATUPARAN) - NRJ CAGNIOG-CAYUTAN-CANLANIPA PORT ROAD LEADING TO SURIGAO CITY PORT/SURIGAO CITY, SURIGAO DEL NORTE | Surigao del Norte 2nd DEO | ROMZ BUILDERS | On-Going | ₱4.1M | 25% | Medium risk58 | Flagged0.014 |
| 659 | 17NG0077CONSTRUCTION OF WATER SYSTEM (LEVEL II) SIARGAO, SURIGAO DEL NORTE | Surigao del Norte 1st DEO | CARTESIAN BUILDERS CORPORATION (FORMERLY: CARTESIAN BUILDERS) | Completed | ₱4.8M | 100% | Medium risk58 | —-0.019 |
| 660 | 23N00173CONSTRUCTION OF SAN LUIS-BINICALAN-ZAMBOANGUITA ROAD, BRGY. ANGELES, LA PAZ, AGUSAN DEL SUR (PACKAGE 16) | Region XIII | ULTICON BUILDERS, INC. | On-Going | ₱247.5M | 89% | Medium risk58 | —-0.014 |
| 661 | 23N00175CONSTRUCTION OF SAN LUIS-BINICALAN-ZAMBOANGUITA ROAD, BRGY. MAHAYAHAY, SAN LUIS, AGUSAN DEL SUR (PACKAGE 2) | Region XIII | ULTICON BUILDERS, INC. | On-Going | ₱247.5M | 93% | Medium risk58 | —-0.014 |
| 662 | 25N00121EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/BUKIDNON AGUSAN-MALAYBALAY ROAD, PACKAGE 11, AGUSAN DEL SUR | Region XIII | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱286M | 76% | Medium risk57 | —-0.021 |
| 663 | 23N00174CONSTRUCTION OF SAN LUIS-BINICALAN-ZAMBOANGUITA ROAD, BRGY. MAHAYAHAY, SAN LUIS, AGUSAN DEL SUR (PACKAGE 1) | Region XIII | ULTICON BUILDERS, INC. | On-Going | ₱247.5M | 90% | Medium risk57 | —-0.013 |
| 664 | 18N00059CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SURIGAO-AGUSAN WEST COASTAL ROAD, PACKAGE B, INCL. ROW AND BRIDGE, SAN FRANCISCO, SURIGAO DEL NORTE | Region XIII | EQUI-PARCO CONSTRUCTION COMPANYTRIPARCO DEVELOPMENT CORPORATION | Completed | ₱179.9M | 100% | Medium risk57 | —-0.046 |
| 665 | 16N00051CONSTRUCTION OF REGIONAL EVACUATION CENTER, BAAN KM. 3, BUTUAN CITY | Region XIII | LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) | Completed | ₱34.3M | 100% | Medium risk57 | —-0.047 |
| 666 | 23NG0099ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - DAANG MAHARLIKA (SURIGAO-AGUSAN SECTION) - K1126+982.75 - K1127+903.08, BRGY. BONIFACIO, SURIGAO CITY, SURIGAO DEL NORTE | Surigao del Norte 2nd DEO | SANTECH BUILDERS CORPORATION | On-Going | ₱96.4M | 0% | Medium risk57 | Flagged0.032 |
| 667 | 24N00168CONSTRUCTION OF BUNAWAN-VERUELA-SANTA JOSEFA ROAD, AGUSAN DEL SUR (PHASE 10) | Region XIII | ULTICON BUILDERS, INC. | On-Going | ₱297M | 63% | Medium risk57 | —-0.009 |
| 668 | 17NF0125CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, KINABUTAN RIVER FLOOD CONTROL (1ST APPROACH UPSTREAM)/BRGY. LUNA, SURIGAO CITY, SURIGAO DEL NORTE, K 0+111 - K 0+394 | Surigao del Norte 2nd DEO | CTB CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY : CTB ENGINEERING CONSTRUCTION)CHARLZ CONSTRUCTION, INC. | Completed | ₱29.3M | 100% | Medium risk57 | —-0.048 |
| 669 | 24N00144AGUSAN DEL NORTE/AGUSAN DEL SUR NORTH-SOUTH LATERAL ROAD, (LAS NIEVES, AGUSAN DEL NORTE-KAPALONG, DAVAO DEL NORTE), LA PAZ- LORETO SECTION, PACKAGE 3, AGUSAN DEL SUR | Region XIII | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱289.5M | 91% | Medium risk57 | —-0.014 |
| 670 | 16NF0146CONSTRUCTION OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, KINABUTAN RIVER CONTROL / SURIGAO CITY, SURIGAO DEL NORTE, STA.0+351.20-STA.0+566.80 | Surigao del Norte 2nd DEO | CHARLZ CONSTRUCTION, INC. | Completed | ₱19.6M | 100% | Medium risk56 | —-0.047 |
| 671 | 23N00189CONSTRUCTION OF REGIONAL EVACUATION CENTER | Region XIII | MARK ANTHONY CONSTRUCTION & SUPPLY | On-Going | ₱31.5M | 0% | Medium risk56 | Flagged0.007 |
| 672 | 23N00188REPAIR/ REHABILITATION AND IMPROVEMENT OF SURIGAO CITY BOULEVARD AND WHARF | Region XIII | A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. DMONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. | Completed | ₱193M | 100% | Medium risk56 | —-0.037 |
| 673 | 23N00181CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, SERNA SECTION, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | SANTECH BUILDERS CORPORATIONGICAR CONSTRUCTION, INC. | Completed | ₱193M | 100% | Medium risk56 | —-0.038 |
| 674 | 24N00163EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/ BUKIDNON AGUSAN-MALAYBALAY ROAD, PACKAGE 10, AGUSAN DEL SUR | Region XIII | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱193M | 86% | Medium risk56 | —-0.029 |
| 675 | 17NG0062CONSTRUCTION OF FLOOD MITIGATION STRUCTURE CONSTRUCTION OF TUBURAN FLOOD CONTROL, BRGY. TUBURAN , DEL CARMEN, SURIGAO DEL NORTE | Surigao del Norte 1st DEO | MONOLITHIC CONSTRUCTION & CONCRETE PRODUCTS, INC. | Completed | ₱18.7M | 100% | Medium risk56 | —-0.038 |