Cross-referencing the ledgers…
Cross-referencing the ledgers…
Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
13,539
Total budget
₱420.7B
Average progress
97.5%
Completion rate
87.2%
Average risk score
38.6
Medium risk on average, out of 100
Flagged as unusual
376
2.8% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 5,187 | ₱46.7B | 24.9 | 20 | 98.9% |
| Roads | 4,974 | ₱221.6B | 44.6 | 40 | 97.9% |
| Flood Control and Drainage | 1,045 | ₱60.2B | 48.4 | 15 | 97.6% |
| Bridges | 988 | ₱36.8B | 44.7 | 26 | 97.3% |
| Water Provision and Storage | 657 | ₱5.1B | 28.8 | 2 | 99.2% |
| OTHER | 270 | ₱22.9B | 75.4 | 111 | 92.9% |
| GAA 2025 SSP | 199 | ₱5.4B | 93.9 | 119 | 71.6% |
| GAA 2025 OO-1 | 104 | ₱7.2B | 92.0 | 40 | 70.9% |
| Bridges, Roads | 59 | ₱11B | 59.0 | 0 | 99.4% |
| GAA 2025 OO-2 | 56 | ₱3.8B | 89.0 | 3 | 81.1% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 2,767 | ₱221.5B | 50.3 | 165 | 95.1% |
| Bukidnon 2nd DEO | 1,419 | ₱21.9B | 31.2 | 18 | 99.1% |
| Bukidnon 1st DEO | 1,107 | ₱20.7B | 34.8 | 23 | 98.1% |
| Misamis Oriental 1st DEO | 1,078 | ₱22.1B | 36.2 | 29 | 98.6% |
| Misamis Oriental 2nd DEO | 953 | ₱18.4B | 34.8 | 27 | 96.7% |
| Lanao del Norte 1st DEO | 907 | ₱17.4B | 34.7 | 10 | 98.8% |
| Bukidnon 3rd DEO | 890 | ₱15.1B | 34.2 | 3 | 99.2% |
| Lanao del Norte 2nd DEO | 873 | ₱13.7B | 34.5 | 12 | 99.3% |
| Misamis Occidental 2nd DEO | 846 | ₱24.8B | 44.0 | 29 | 95.6% |
| Misamis Occidental 1st DEO | 791 | ₱11.7B | 32.7 | 14 | 97.6% |
| Camiguin DEO | 597 | ₱10.1B | 37.9 | 5 | 99.4% |
| Cagayan de Oro City 1st DEO | 590 | ₱11B | 36.3 | 20 | 97.9% |
| Cagayan de Oro City 2nd DEO | 498 | ₱8.6B | 37.0 | 6 | 98.2% |
| Iligan City DEO | 165 | ₱3.1B | 43.8 | 5 | 96.0% |
| Bukidnon 4th DEO | 58 | ₱985.5M | 50.4 | 10 | 81.5% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| M. MONTESCLAROS ENTERPRISES, INC. | 718 | ₱63.7B | 54.4 | 49 | 95.2% |
| CAGALAWAN ENTERPRISES | 381 | ₱4.6B | 28.3 | 8 | 98.9% |
| EQUI-PARCO CONSTRUCTION COMPANY | 329 | ₱36.9B | 56.3 | 21 | 97.3% |
| LANAO BUILDER AND ENTERPRISES | 274 | ₱12.8B | 48.6 | 7 | 96.3% |
| MAFIL BUILDERS, INC. | 274 | ₱2.7B | 32.5 | 3 | 98.6% |
| ULTICON BUILDERS, INC. | 272 | ₱39.4B | 59.9 | 28 | 93.4% |
| JEJOR'S CONSTRUCTION CORPORATION | 265 | ₱19.2B | 53.0 | 14 | 95.5% |
| VEN RAY CONSTRUCTION CORPORATION | 248 | ₱17.9B | 51.8 | 5 | 95.4% |
| MINDANAO ROCK | 218 | ₱12.9B | 49.4 | 1 | 99.7% |
| SHEEN-SHEEN CONSTRUCTION CORPORATION (FORMERLY: SHEEN-SHEEN CONSTRUCTION) | 186 | ₱2.1B | 35.4 | 4 | 99.2% |
| NDP CONSTRUCTION DEVELOPMENT | 183 | ₱1.9B | 29.0 | 2 | 98.8% |
| JT GAMOLO CONSTRUCTION, INCORPORATION (FORMERLY:J.T. GAMOLO CONSTRUCTION) | 172 | ₱6.7B | 46.2 | 6 | 96.0% |
| XY BUILDERS | 161 | ₱1.1B | 24.9 | 1 | 99.5% |
| ALEBON GENUINE MERCHANDISING INCORPORATED | 151 | ₱1.3B | 25.0 | 3 | 100.0% |
| TRIPARCO DEVELOPMENT CORPORATION | 148 | ₱12.9B | 57.5 | 11 | 94.3% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00227CONSTRUCTION OF ROAD TO EARTH SKY RESORT, BARANGAY IMBAYAO, MALAYBALAY CITY, BUKIDNON | Region X | SUPREA PHILS. DEVELOPMENT CORP. | On-Going | ₱95.5M | 48% | High risk96 | Flagged0.022 |
| 25KL0128CONSTRUCTION OF ROAD FROM BARANGAY DULONG, LIBERTAD TO BARANGAY QUEZON, GITAGUM, LEADING TO MISAMIS ORIENTAL WEST DIVERSION ROAD (MOWDR), MISAMIS ORIENTAL | Misamis Oriental 2nd DEO | CAGALAWAN ENTERPRISES | On-Going | ₱95.5M | 92% | High risk96 | Flagged0.008 |
| 25KK0063CONSTRUCTION OF BALATUKAN RIVER FLOOD CONTROL PROJECT AT BRGY. MANDANGOA, BALINGASAG, MISAMIS ORIENTAL | Misamis Oriental 1st DEO | RAMISES CONSTRUCTION | On-Going | ₱95.5M | 70% | High risk96 | Flagged0.015 |
| 25KK0060CONSTRUCTION OF FLOOD CONTROL STRUCTURE (DOWNSTREAM OF CABULAWAN BRIDGE, LAGONGLONG, MISAMIS ORIENTAL (PHASE 2) | Misamis Oriental 1st DEO | JEJOR'S CONSTRUCTION CORPORATION | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.008 |
| 25K00398CONSTRUCTION OF ACCESS ROAD LEADING TO CONFLICT AFFECTED AREAS, CANAYAN-MANALOG SECTION, PACKAGE 2, BUKIDNON | Region X | M. MONTESCLAROS ENTERPRISES, INC. | On-Going | ₱141.8M | 46% | High risk96 | Flagged0.031 |
| 25K00197CONSTRUCTION OF JCT. CAMP KIBARITAN-PANGANTUCAN - JCT GUINOYURAN-VALENCIA ROAD, PACKAGE 11, BUKIDNON | Region X | M. MONTESCLAROS ENTERPRISES, INC. | On-Going | ₱141.8M | 0% | High risk96 | Flagged0.043 |
| 25K00406CONSTRUCTION OF CONRETE ROAD, MAT-I - LUBILAN, NAAWAN TO MISAMIS ORIENTAL WEST DIVERSION ROAD, (OPOL TO LUGAIT), PACKAGE 8, MISAMIS ORIENTAL | Region X | ULTICON BUILDERS, INC. | On-Going | ₱238.3M | 21% | High risk96 | Flagged0.046 |
| 25KJ0094ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES, CONSTRUCTION OF ROAD, GANDAWAN TO BRGY. LAKE DUMINAGAT PROPER, DON VICTORIANO, MISAMIS OCCIDENTAL | Misamis Occidental 2nd DEO | WEISENWORK CONSTRUCTION | On-Going | ₱106.2M | 54% | High risk96 | Flagged0.020 |
| 25K00192CONSTRUCTION OF ROAD, BUBONG (LANAO DEL SUR) - KAPAI (LANAO DEL SUR) - TAGOLOAN (LANAO DEL NORTE) ROAD, PACKAGE 1, LANAO DEL SUR | Region X | FP ALONTO CONSTRUCTION SERVICES | On-Going | ₱93.1M | 52% | High risk96 | Flagged0.019 |
| 25KF0025SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF CONCRETE ROAD, BRGY. KATIPUNAN, SAPAD - BRGY. MAHAYAHAY, KAPATAGAN, LDN | Lanao del Norte 2nd DEO | LANAO BUILDER AND ENTERPRISES | On-Going | ₱48.5M | 100% | High risk95 | —-0.004 |
| 25KL0124CONSTRUCTION OF CARABAO VALLEY ROAD, BARANGAY AWANG, OPOL, MISAMIS ORIENTAL | Misamis Oriental 2nd DEO | MLS JC CONSTRUCTION SERVICES | On-Going | ₱48.5M | 45% | High risk95 | Flagged0.011 |
| 25KA0087INSTALLATION OF ROAD SAFETY DEVICES ALONG SAYRE HIGHWAY- K1522+000 - K1525+207BRGY. CABANGAHAN - BRGY. BANGCUD, MALAYBALAY CITY, BUKIDNON 2ND LD | Bukidnon 1st DEO | R.A. PAHATI CONST. & SUPPLY, INC. | On-Going | ₱47.5M | 90% | High risk95 | Flagged0.001 |
| 25KI0062SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS - SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION BYPASS ROAD BRGY. CORALAS-MIALEM, MUNICIPALITY OF JIMENEZ, MISAMIS OCCIDENTAL. | Misamis Occidental 1st DEO | HSO PROPERTY DEVELOPMENT AND CONSTRUCTION CORPORATION | On-Going | ₱95.1M | 35% | High risk95 | Flagged0.021 |
| 25KG0023CONSTRUCTION OF ROAD, BARANGAY SAN ANTONIO TO TUBARAN, TUBOD,LANAO DEL NORTE | Lanao del Norte 1st DEO | INSTA BUILDERS & SUPPLIES CORP | On-Going | ₱46.7M | 96% | High risk95 | —-0.004 |
| 25K00328CONSTRUCTION OF JCT. SAYRE HIGHWAY TO BARANGAY MIARAY - BARANGAY DOLOROSA, DANGCAGAN - BARANGAY BALOCBOCAN ROAD (PACKAGE 4), KITAOTAO, BUKIDNON | Region X | RODNET BUILDERS, INC. | On-Going | ₱94.8M | 75% | High risk95 | Flagged0.017 |
| 25K00042CONSTRUCTION OF JCT. SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY-COTABATO BDRY) TO BARANGAY MIARAY-BARANGAY DOLOROSA, DANGCAGAN-BARANGAY BALOCBOCAN ROAD, PACKAGE 3, BUKIDNON | Region X | RODNET BUILDERS, INC. | On-Going | ₱94.8M | 82% | High risk95 | Flagged0.014 |
| 25KL0113CONCRETING OF BINIGWAYAN-MALAORO ROAD, BARANGAY MALANANG, OPOL, MISAMIS ORIENTAL | Misamis Oriental 2nd DEO | MLS JC CONSTRUCTION SERVICES | On-Going | ₱48.6M | 47% | High risk95 | Flagged0.012 |
| 25KL0117CONSTRUCTION OF DRAINAGE, BARANGAY POBLACION AND BARANGAY TABOC, OPOL, MISAMIS ORIENTAL | Misamis Oriental 2nd DEO | MLS JC CONSTRUCTION SERVICES | On-Going | ₱48.6M | 72% | High risk95 | Flagged0.007 |
| 25K00348PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY( MALABANG-DOBLESTON-TUKURAN RD) - K1979 + 748 - K1981 + 737 | Region X | LANAO BUILDER AND ENTERPRISES | On-Going | ₱48.8M | 100% | High risk95 | —-0.004 |
| 25KK0017INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD - K1292 + 000 - K1293 + 000, K1282 + 650 -K1284 + 040 | Misamis Oriental 1st DEO | ROAD EDGE TRADING & DEVELOPMENT SERVICES | On-Going | ₱48.5M | 60% | High risk95 | Flagged0.012 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23K00318CONSTRUCTION OF DAMULOG-BAGOR-KADINGILAN BY-PASS ROAD, PACKAGE 4, BUKIDNON | Region X | M. MONTESCLAROS ENTERPRISES, INC. | On-Going | ₱188.8M | 62% | High risk88 | Flagged0.083 |
| 24K00519ACCESS ROAD LEADING TO BUKIDNON AIRPORT (JCT. KKK ROAD/LANGCATAON PANGANTUCAN-JCT DON CARLOS-KADINGILAN ROAD/SAN NICOLAS (LANGCATAON, PANGANTUCAN-KAWILIHAN-MAHAYAHAY-PUALAS, DON CARLOS SECTION), PACKAGE 9, BUKIDNON | Region X | ULTICON BUILDERS, INC. | On-Going | ₱190.6M | 80% | High risk89 | Flagged0.076 |
| 24KL0123NORTHEASTERN MISAMIS GENERAL HOSPITAL VILLANUEVA, MISAMIS ORIENTAL | Misamis Oriental 2nd DEO | JORVIVS CONSTRUCTION CORPORATIONMIKKIL CONSTRUCTION | On-Going | ₱148.5M | 55% | High risk89 | Flagged0.074 |
| 24K00529CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BALATUKAN RIVER, PACKAGE 1, BALINGASAG, MISAMIS ORIENTAL | Region X | VEN RAY CONSTRUCTION CORPORATION | On-Going | ₱143.9M | 72% | High risk89 | Flagged0.069 |
| 25KA0093CONSTRUCTION OF SCHOOL BUILDING, BUKIDNON NATIONAL HIGH SCHOOL, MALAYBALAY CITY, BUKIDNON , BUKIDNON NATIONAL HIGH SCHOOL, MALAYBALAY CITY, BUKIDNON | Bukidnon 1st DEO | MAFIL BUILDERS, INC. | On-Going | ₱19.3M | 10% | High risk84 | Flagged0.068 |
| 23KB0157CONSTRUCTION OF ROAD, JCT. SAYRE HIGHWAY (JCT. BUKIDNON-DAVAO CITY RD-COTABATO BDRY)-BARANGAY MAICAN, DAMULOG-SITIO RAPAGAS-SITIO STA. CRUZ, BARANGAY BALAORO ROAD, KADINGILAN (PACKAGE III) | Bukidnon 2nd DEO | RFB CONSTRUCTION CORPORATION | On-Going | ₱94.8M | 65% | High risk87 | Flagged0.067 |
| 24KB0139CONCRETING OF MALOOS TO SITIO SINAYAWAN, BRGY SINUDA FMR, BRGY. SINUDA, KITAOTAO, BUKIDNON | Bukidnon 2nd DEO | ULTICON BUILDERS, INC. | On-Going | ₱98.8M | 79% | High risk89 | Flagged0.067 |
| 24K00471COMPLETION OF INFORMATION TECHNOLOGY BUILDING-NORTHERN BUKIDNON STATE COLLEGE | Region X | CAGALAWAN ENTERPRISES | On-Going | ₱37.4M | 27% | High risk84 | Flagged0.062 |
| 24K00475CONSTRUCTION OF THREE-STOREY ENGINEERING BUILDING, PHASE III-CAMIGUIN POLYTECHNIC STATE COLLEGE | Region X | L & L CONSTRUCTION | On-Going | ₱19.9M | 18% | High risk86 | Flagged0.061 |
| 24KL0128CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, OPOL, MISAMIS ORIENTAL | Misamis Oriental 2nd DEO | MLS JC CONSTRUCTION SERVICES | On-Going | ₱98.7M | 64% | High risk90 | Flagged0.061 |
| 24KL0127CONSTRUCTION OF GOVERNMENT BUILDING (PHASE II) BARANGAY MALANANG, OPOL, MISAMIS ORIENTAL | Misamis Oriental 2nd DEO | MLS JC CONSTRUCTION SERVICES | On-Going | ₱96.3M | 72% | High risk90 | Flagged0.058 |
| 24K00554CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 3, VALENCIA CITY, BUKIDNON | Region X | M. MONTESCLAROS ENTERPRISES, INC. | On-Going | ₱189M | 57% | High risk72 | Flagged0.056 |
| 24K00552CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 13, MISAMIS ORIENTAL | Region X | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱237.6M | 61% | High risk72 | Flagged0.055 |
| 24K00553CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 14, MISAMIS ORIENTAL | Region X | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱237.6M | 61% | High risk72 | Flagged0.055 |
| 24K00550CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 11, MISAMIS ORIENTAL | Region X | RAMISES CONSTRUCTIONEQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱237.6M | 61% | High risk72 | Flagged0.055 |
| 24K00520CONSTRUCTION OF FLOOD MITIGATION STRUCTURE WITHIN LUMBAYAO (ALONG PULANGI RIVER), BARANGAY LUMBAYAO, SECTION, VALENCIA CITY | Region X | M. MONTESCLAROS ENTERPRISES, INC. | On-Going | ₱179.5M | 67% | High risk72 | Flagged0.054 |
| 25K00426CONSTRUCTION OF ONE (1) UNIT 4-STOREY 12 DOORS QUARTERING FACILITY FOR OFFICER'S QUARTERS | Region X | DL ENTERPRISES | On-Going | ₱111.3M | 0% | Medium risk47 | Flagged0.054 |
| 23K00331CONSTRUCTION OF SAYRE HIGHWAY PARALLEL ROAD, MARAMAG SECTION, PACKAGE 1, MARAMAG, BUKIDNON | Region X | M. MONTESCLAROS ENTERPRISES, INC. | On-Going | ₱188.7M | 16% | High risk65 | Flagged0.053 |
| 24K00551CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TAGOLOAN RIVER, PACKAGE 12, MISAMIS ORIENTAL | Region X | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱237.6M | 65% | High risk72 | Flagged0.053 |
| 24K00535CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PULANGUI RIVER, UPSTREAM OF NEW BATANGAN BR., PACKAGE 2, VALENCIA CITY, BUKIDNON | Region X | M. MONTESCLAROS ENTERPRISES, INC. | On-Going | ₱189M | 92% | High risk72 | Flagged0.050 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 851 | 25K00317CONSTRUCTION OF ROAD, JCT. TAGOLOAN - MISAMIS ORIENTAL BDRY. - JCT. PUERTO - CLAVERIA ROAD, PACKAGE 6, MISAMIS ORIENTAL | Region X | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱189.1M | 51% | High risk62 | —-0.022 |
| 852 | 25K00311CONSTRUCTION OF ROAD, JCT. TAGOLOAN - MISAMIS ORIENTAL BDRY. - JCT. PUERTO - CLAVERIA ROAD, PACKAGE 5, MISAMIS ORIENTAL | Region X | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱189.1M | 61% | High risk62 | —-0.023 |
| 853 | 25K00133CONSTRUCTION OF JCT. CAMP KIBARITAN-PANGANTUCAN - JCT GUINOYURAN-VALENCIA ROAD, PACKAGE 10, BUKIDNON | Region X | M. MONTESCLAROS ENTERPRISES, INC. | On-Going | ₱141.7M | 0% | High risk62 | —-0.010 |
| 854 | 25K00321CONSTRUCTION OF ROAD, JCT. BCIR - JCT SH-MANOLO FORTICH-LIBONA-INDAHAG RD ALTERNATE DIVERSION ROAD, PACKAGE 5, BUKIDNON | Region X | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱189.1M | 60% | High risk62 | —-0.021 |
| 855 | 23K00217CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM-ROLL-IT),NORTHERN BUKIDNON AGRI-INDUSTRIAL ECONOMIC ZONE ROAD NETWORK DEVELOPMENT PROJECT, MANOLO FORTI | Region X | M. MONTESCLAROS ENTERPRISES, INC. | Completed | ₱282.5M | 100% | High risk62 | —-0.046 |
| 856 | 18K00200CLUSTER 3 CONSTRUCTION OF MISSING LINKS/ NEW ROADS, BUKIDNON | Region X | PREMIUM MEGASTRUCTURES INC. | Completed | ₱276.4M | 100% | High risk62 | —-0.050 |
| 857 | 21K00191CONST./REPAIR/REHAB./IMPRVT. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PRIJECTS, CONCRETING OF ROAD, BARANGAY MEDALLO, MUNICIPALITY OF SAPANG DALAGA CONNECTING TO BARANGAY MALIGUBAAN, MUNICIPALITY OF CONCEPTION, MISAMIS OCCIDENTAL | Region X | MINDANAO ROCK | Completed | ₱157.1M | 100% | High risk62 | —-0.065 |
| 858 | 18K00161CONST. OF BYPASS/DIVERSION ROAD,SAYRE HIGHWAY PARALLEL ROAD II(MANOLO FORTICH-VALENCIA CITY SECTION) | Region X | M. MONTESCLAROS ENTERPRISES, INC. | Completed | ₱153.8M | 100% | High risk62 | —-0.066 |
| 859 | 25K00416CONSTRUCTION OF ROAD AT LAGUINDINGAN-ILIGAN CITY ALTERNATE ROAD, PACKAGE 2, MISAMIS ORIENTAL | Region X | ULTICON BUILDERS, INC. | On-Going | ₱293.4M | 30% | High risk62 | —-0.006 |
| 860 | 18K00209CLUSTER 12 CONST./IMPRVT. OF ACCESS ROADS LEADING TO AIRPORTS, BUKIDNON | Region X | ULTICON BUILDERS, INC. | Completed | ₱373.3M | 100% | High risk62 | —-0.031 |
| 861 | 22K00054CONSTRUCTION OF DRAINAGE SYSTEM (CARMEN CATCHMENT), VILLARIN ST.-MAX Y. SUNIEL ST., PACKAGE 12, SEGMENT 1:STA.0+144.00-STA.1+051.041; SEGMENT 2:STA.0+000.00-STA.0+904.407, CAGAYAN DE ORO CITY | Region X | C'ZARLES CONSTRUCTION & SUPPLY | On-Going | ₱135.9M | 100% | High risk62 | —-0.011 |
| 862 | 22K00073CONSTRUCTION OF DRAINAGE SYSTEM (BONBON-KAUSWAGAN SECTION), PACKAGE 12, STA. 0+000.00 - STA. 0+010.00 (SECTION 1); STA.0+010.00 - STA.1+536.00 (SECTION 2) | Region X | GICAR CONSTRUCTION, INC. | Completed | ₱134.6M | 100% | High risk62 | —-0.049 |
| 863 | 19K00080ROAD WIDENING, BARANDIAS-DOMINOROG ROAD, K1600+485 - K1605+292, BUKIDNON | Region X | PYRAMID CONSOLIDATED BUILDERS & GEN. MDSE. | Completed | ₱157M | 100% | High risk62 | —-0.069 |
| 864 | 25K00110CONSTRUCTION OF BY-PASS AND DIVERSION ROADS SAYRE HIGHWAY PARALLEL ROAD II (MANOLO FORTICH-VALENCIA CITY SECTION) , PACKAGE 43, BUKIDNON | Region X | M. MONTESCLAROS ENTERPRISES, INC. | On-Going | ₱179.6M | 26% | High risk62 | —-0.011 |
| 865 | 23K00274CONSTRUCTION OF BY-PASS AND DIVERSION ROADS/ SAYRE HIGHWAY PARALLEL ROAD II (MANOLO FORTICH-VALENCIA CITY SECTION), PACKAGE 17, BUKIDNON | Region X | M. MONTESCLAROS ENTERPRISES, INC. | Completed | ₱188.4M | 100% | High risk62 | —-0.054 |
| 866 | 24K00515CONST. OF BYPASS AND DIVERSION ROADS, CONSTRUCTION OF ROAD, MAT-I-LUBILANM NAAWAN TO MISAMIS ORIENTAL WEST DIVERSION ROAD, (OPOL TO LUGAIT)-PACKAGE 3, MISAMIS ORIENTAL | Region X | ULTICON BUILDERS, INC. | On-Going | ₱190.6M | 61% | High risk62 | —-0.020 |
| 867 | 24K00181CONSTRUCTION OF ROAD, MAT-I-LUBILAN, NAAWAN TO MISAMIS ORIENTAL WEST DIVERSION ROAD (OPOL TO LUGAIT) PACKAGE 6, MISAMIS ORIENTAL | Region X | ULTICON BUILDERS, INC. | On-Going | ₱228.7M | 95% | High risk62 | —-0.021 |
| 868 | 24K00180CONSTRUCTION OF ROAD, MAT-I-LUBILAN, NAAWAN TO MISAMIS ORIENTAL WEST DIVERSION ROAD (OPOL TO LUGAIT) PACKAGE 5, MISAMIS ORIENTAL | Region X | ULTICON BUILDERS, INC. | On-Going | ₱228.8M | 95% | High risk62 | —-0.022 |
| 869 | 24K00219CONSTRUCTION OF ROAD, MAT-I-LUBILAN, NAAWAN TO MISAMIS ORIENTAL WEST DIVERSION ROAD, (OPOL TO LUGAIT), MISAMIS ORIENTAL (PACKAGE 4) | Region X | ULTICON BUILDERS, INC. | On-Going | ₱195.6M | 100% | High risk62 | —-0.027 |
| 870 | 24KK0051CONSTRUCTION OF ODIONGAN BRIDGE 2, GINGOOG CITY, MISAMIS ORIENTAL | Misamis Oriental 1st DEO | LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) | Completed | ₱143.3M | 100% | High risk62 | —-0.032 |
| 871 | 22K00277CONSTRUCTION OF KIBAWE - ARAKAN ROAD, PACKAGE 5, BUKIDNON | Region X | ULTICON BUILDERS, INC. | Completed | ₱141.4M | 100% | High risk62 | —-0.066 |
| 872 | 25K00267CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARAMAG-MARADUGAO RD (UPSTREAM AND DOWNSTREAM) OF MULETA BRIDGE, PACKAGE 3, PANGANTUCAN, BUKIDNON | Region X | C'ZARLES CONSTRUCTION & SUPPLY | On-Going | ₱94.5M | 70% | High risk62 | —-0.027 |
| 873 | 25K00268CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARAMAG-MARADUGAO RD (UPSTREAM AND DOWNSTREAM) OF MULETA BRIDGE, PACKAGE 4, PANGANTUCAN, BUKIDNON | Region X | C'ZARLES CONSTRUCTION & SUPPLY | On-Going | ₱94.5M | 70% | High risk62 | —-0.027 |
| 874 | 25K00342PREVENTIVE MAINTENANCE-SECONDARY ROADS MALAYBALAY CITY BYPASS ROAD, PACKAGE 4 | Region X | M. MONTESCLAROS ENTERPRISES, INC. | On-Going | ₱283.5M | 43% | High risk62 | —-0.008 |
| 875 | 25K00394CONSTRUCTION OF MALAYBALAY CIRCUMFERENTAL ROAD, PACKAGE 9, MALAYBALAY CITY, BUKIDNON | Region X | ULTICON BUILDERS, INC. | On-Going | ₱238.3M | 40% | High risk62 | —-0.012 |