Cross-referencing the ledgers…
Cross-referencing the ledgers…
Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
14,386
Total budget
₱406.4B
Average progress
92.7%
Completion rate
83.9%
Average risk score
45.9
Medium risk on average, out of 100
Flagged as unusual
336
2.3% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 5,821 | ₱138.9B | 43.4 | 98 | 92.1% |
| Roads | 4,028 | ₱82.7B | 43.8 | 9 | 93.7% |
| Flood Control and Drainage | 3,372 | ₱147.7B | 49.1 | 24 | 94.1% |
| Bridges | 446 | ₱12.6B | 45.0 | 7 | 91.4% |
| OTHER | 360 | ₱13.5B | 53.7 | 57 | 94.0% |
| GAA 2025 SSP | 184 | ₱5.7B | 90.2 | 125 | 66.6% |
| Water Provision and Storage | 104 | ₱402.4M | 26.7 | 1 | 98.1% |
| GAA 2025 OO-2 | 36 | ₱2.5B | 83.2 | 3 | 74.7% |
| GAA 2025 OO-1 | 31 | ₱1.9B | 89.5 | 11 | 68.2% |
| Bridges, Roads | 4 | ₱445.3M | 60.5 | 1 | 75.0% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Metro Manila 1st DEO | 3,141 | ₱81B | 45.1 | 27 | 94.3% |
| Metro Manila 3rd DEO | 2,325 | ₱55.1B | 46.3 | 65 | 90.4% |
| Quezon City 1st DEO | 1,867 | ₱46.1B | 46.3 | 40 | 91.2% |
| North Manila DEO | 1,584 | ₱55B | 46.7 | 30 | 95.3% |
| Las Piñas-Muntinlupa DEO | 1,065 | ₱22.2B | 44.3 | 12 | 93.6% |
| Quezon City 2nd DEO | 1,053 | ₱27.3B | 44.6 | 24 | 93.7% |
| South Manila DEO | 1,053 | ₱26.5B | 43.8 | 21 | 94.6% |
| Metro Manila 2nd DEO | 1,048 | ₱24B | 46.5 | 17 | 92.4% |
| Malabon-Navotas DEO | 880 | ₱22.5B | 45.1 | 24 | 95.1% |
| National Capital Region | 370 | ₱46.7B | 56.8 | 76 | 71.9% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| AARCON BUILDERS | 277 | ₱6B | 44.5 | 1 | 92.7% |
| TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) | 265 | ₱2.8B | 42.1 | 10 | 89.6% |
| IM CONSTRUCTION CORPORATION | 234 | ₱6.8B | 48.6 | 7 | 94.0% |
| ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) | 228 | ₱11B | 49.4 | 3 | 96.0% |
| ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196) | 218 | ₱10.4B | 48.8 | 1 | 95.9% |
| JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS | 210 | ₱4.4B | 46.0 | 9 | 92.4% |
| LE BRON CONSTRUCTION | 195 | ₱12.2B | 52.9 | 17 | 76.5% |
| B. VALENCERINA TRADING & CONSTRUCTION | 187 | ₱1.3B | 35.8 | 1 | 97.7% |
| FRAMECON BUILDERS | 184 | ₱2.9B | 45.2 | 5 | 86.2% |
| MRB11 CONSTRUCTION CORPORATION (FORMERLY:MRB CONS | 171 | ₱8.6B | 51.3 | 2 | 94.3% |
| PHILIPPINE CHEMSTEEL INDUSTRIES, INC. | 169 | ₱4.8B | 46.5 | 1 | 99.5% |
| C.L. MORALES CONSTRUCTION AND TRADING | 155 | ₱1.7B | 41.3 | 0 | 90.3% |
| ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908) | 153 | ₱3B | 38.9 | 0 | 99.1% |
| E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION & TRADING | 142 | ₱3.6B | 47.0 | 1 | 93.9% |
| J. SIMEON CONSTRUCTION | 139 | ₱7.4B | 49.1 | 0 | 93.6% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OE0077INSTALLATION OF SOLAR LED STREETLIGHTS AT A. RIVERA ST. - C000.00 TO C945.45, TAYUMAN ST. - K0007 + (-562.60) TO K0007 + 282 AND HERMOSA ST. - C000.00 TO C622.83, MANILA CITY | North Manila DEO | JIIK CONSTRUCTION SERVICES | On-Going | ₱94.6M | 52% | High risk95 | Flagged0.023 |
| 25OE0068REHABILITATION OF DELPAN (MUELLE) PUMPING STATION, MANILA CITY | North Manila DEO | JIIK CONSTRUCTION SERVICES | On-Going | ₱94.6M | 100% | High risk95 | Flagged0.007 |
| 25OG0097REHABILITATION OF ROAD, BARANGAY SAN ROQUE, QUEZON CITY | Quezon City 2nd DEO | TOPNOTCH CATALYST BUILDERS INC. | On-Going | ₱94.5M | 67% | High risk95 | Flagged0.018 |
| 25OE0076INSTALLATION OF SOLAR LED STREETLIGHTS AT QUIRICADA ST. - CHAINAGE 0 TO CHAINAGE 731.80, TAYUMAN ST. - K0007 + 299.0 TO K0008 + 000.00 AND MUELLE DELA INDUSTRIA ST. - K0003 + (-375) TO K0004 + 472, MANILA CITY | North Manila DEO | AL-AMEN BUILDERS | On-Going | ₱94.9M | 63% | High risk95 | Flagged0.021 |
| 25OH0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREET LIGHT ALONG NEW PANADEROS ST. FROM MANDALUYONG/MANILA BOUNDARY TO F. CALDERON ST., MANILA CITY | South Manila DEO | AL-AMEN BUILDERS | On-Going | ₱95.3M | 27% | High risk95 | Flagged0.028 |
| 25OH0100INSTALLATION OF SOLAR LED STREETLIGHTS WITHIN BARANGAYS 649 TO 828, PRES. QUIRINO AVE (FROM TAFT AVE. TO SOUTH SUPERHIGHWAY), SOUTH SUPERHIGHWAY (FROM ZOBEL ROXAS ST. TO P. QUIRINO AVE), P. FAURA ST. (SAN MARCELINO ST. TO ROXAS BLVD.), ESCODA ST. (FROM TA | South Manila DEO | AL-AMEN BUILDERS | On-Going | ₱145.2M | 40% | High risk95 | Flagged0.031 |
| 25OF0163REHABILITATION OF ROAD ALONG BARANGAY LAGRO, PACKAGE 1A, QUEZON CITY | Quezon City 1st DEO | LE BRON CONSTRUCTION | On-Going | ₱94.5M | 47% | High risk95 | Flagged0.026 |
| 25OB0353CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY WACKWACK PACKAGE 7, MANDALUYONG CITY | Metro Manila 1st DEO | VIRAC NRC CONSTRUCTION | On-Going | ₱97M | 55% | High risk95 | Flagged0.022 |
| 25OF0165REHABILITATION OF ROAD ALONG BARANGAY STA. MONICA, PACKAGE 1A, QUEZON CITY | Quezon City 1st DEO | LE BRON CONSTRUCTION | On-Going | ₱94.4M | 43% | High risk95 | Flagged0.026 |
| 25OF0157IMPROVEMENT OF DRAINAGE SYSTEMS AT BRGY. HOLY SPIRIT, QUEZON CITY | Quezon City 1st DEO | MRB11 CONSTRUCTION CORPORATION (FORMERLY:MRB CONS | On-Going | ₱94.6M | 61% | High risk95 | Flagged0.022 |
| 25OE0083INSTALLATION OF SOLAR LED STREETLIGHTS ALONG NAGTAHAN FLYOVER (B03338LZ) AND MABINI BRIDGE (B01733LZ) INCLUDING APPROACHES, MANILA CITY | North Manila DEO | JIIK CONSTRUCTION SERVICES | On-Going | ₱105.9M | 15% | High risk95 | Flagged0.037 |
| 25OH0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREETLIGHT WITHIN BRGY. 649 TO 828, RAILROAD ST (CHAINAGE 0 - 855), MURALLA ST (CHAINAGE 0 - 1355), GEN LUNA S | South Manila DEO | JIIK CONSTRUCTION SERVICES | On-Going | ₱143.1M | 49% | High risk95 | Flagged0.030 |
| 25OC0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA | Metro Manila 2nd DEO | AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129) | On-Going | ₱94.6M | 15% | High risk95 | Flagged0.037 |
| 25OC0129CONSTRUCTION OF REVETMENT ALONG PARAÑAQUE RIVER MOUTH (NORTH SIDE), PHASE 2,PARAÑAQUE CITY, METRO MANILA | Metro Manila 2nd DEO | K84 CONSTRUCTION AND DEVELOPMENT CORPORATIONEGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | On-Going | ₱94.6M | 18% | High risk95 | Flagged0.036 |
| 25OD0179REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BARANGAY 28 (PHASE 1), CALOOCAN CITY | Metro Manila 3rd DEO | AYLAN CONSTRUCTION & TRADING | On-Going | ₱48M | 51% | High risk95 | Flagged0.016 |
| 25OD0180REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BARANGAY 28 (PHASE 2), CALOOCAN CITY | Metro Manila 3rd DEO | AYLAN CONSTRUCTION & TRADING | On-Going | ₱48M | 58% | High risk95 | Flagged0.015 |
| 25OA0070CONSTRUCTION OF C-4 FLOOD GATE (PHASE 1), NAVOTAS CITY | Malabon-Navotas DEO | IM CONSTRUCTION CORPORATION | On-Going | ₱47.5M | 47% | High risk95 | Flagged0.016 |
| 25OF0162REHABILITATION OF ROAD ALONG BARANGAY BAGBAG, PACKAGE 1A, QUEZON CITY | Quezon City 1st DEO | LE BRON CONSTRUCTION | On-Going | ₱94.6M | 46% | High risk95 | Flagged0.026 |
| 25OF0136IMPROVEMENT OF ROADS AT BARANGAY LAGRO, QUEZON CITY | Quezon City 1st DEO | LE BRON CONSTRUCTION | On-Going | ₱97M | 51% | High risk95 | Flagged0.025 |
| 25OC0054CONSTRUCTION OF DRAINAGE MAIN ALONG ESTRELLA STREET FROM EDSA TOWARDS PASIG RIVER, BARANGAY GUADALUPE VIEJO,MAKATI CITY, METRO MANILA | Metro Manila 2nd DEO | TWO DIMENSION CONSTRUCTION | On-Going | ₱48.5M | 0% | High risk95 | Flagged0.028 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23O00090PROPOSED DESIGN AND BUILD FOR THE CONSTRUCTION OF NEW FOOD AND DRUG ADMINISTRATION OFFICE | National Capital Region | KAEL CONSTRUCTION AND SUPPLY | On-Going | ₱1.8B | 37% | High risk79 | Flagged0.087 |
| 20OG0117FUNDING REQUIREMENT FOR THE RESILIENCE INSTITUTE, U.P. DILIMAN, QUEZON CITY | Quezon City 2nd DEO | MRB11 CONSTRUCTION CORPORATION (FORMERLY:MRB CONS | On-Going | ₱48.8M | 0% | High risk82 | Flagged0.082 |
| 19Z00038PROPOSED MANILA BAY REHABILITATION PROGRAM (DREDGING AND DISPOSAL OF SOLID WASTE OR SLUDGE WASTE USING OCEAN-BASED METHODOLOGY INCLUDING CONSTRUCTION/EXTENSION OF THREE (3) DRAINAGE OUTFALLS) | National Capital Region | MSB VITUG CONSTRUCTIONMAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION) | On-Going | ₱502.3M | 95% | High risk78 | Flagged0.078 |
| 23O00068CONSTRUCTION OF THE NBI MAIN BUILDING (PHASE I) | National Capital Region | ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)TOPNOTCH CATALYST BUILDERS INC. | On-Going | ₱447.7M | 0% | Medium risk58 | Flagged0.071 |
| 18OG0133CONSTRUCTION OF FACULTY AND STAFF HOUSING, UP DILIMAN, QUEZON CITY | Quezon City 2nd DEO | FLORIDABLANCA CONSTRUCTION AND DEVELOPMENT CORPORATIONM.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | On-Going | ₱193.3M | 0% | High risk65 | Flagged0.067 |
| 20O00077CONSTRUCTION OF BRIDGE ACROSS PARANAQUE RIVER ADJACENT TO THE PARANAQUE INTEGRATED TERMINAL EXCHANGE (PITX), DON GALO, PARANAQUE CITY | National Capital Region | J.H. PAJARA CONSTRUCTION CORPORATION | On-Going | ₱18.9M | 0% | Medium risk49 | Flagged0.066 |
| 23O00099CONSTRUCTION OF MULTI-PURPOSE BUILDING FOR JOINT-STAFF BILLETING | National Capital Region | SPIDERONE CONSTRUCTION COMPANY LTD. | On-Going | ₱609.5M | 0% | Medium risk57 | Flagged0.065 |
| 22O00090MANILA BAY REHABILITATION PROGRAM: CONSTRUCTION OF A SOLAR-POWERED SEWAGE TREATMENT PLANT ALONG THE LAS PIÑAS RIVER | National Capital Region | DRAGONHART CONSTRUCTION ENTERPRISE, INC.KAEL CONSTRUCTION AND SUPPLY | On-Going | ₱199M | 76% | High risk77 | Flagged0.062 |
| 22O00113RENOVATION OF EXISTING FOOD AND DRUG ADMINISTRATION EXPERIMENTAL ANIMAL HOUSE (EAH) BUILDING TO BECOME VACCINE AND BIOLOGICAL TESTING LABORATORY | National Capital Region | MILES TRADING AND CONSTRUCTION | On-Going | ₱126.1M | 0% | Medium risk54 | Flagged0.062 |
| 18OG0140FUNDING FOR THE RESILIENCE INSTITUTE FOR DRRM, UP DILIMAN, QUEZON CITY | Quezon City 2nd DEO | FLORIDABLANCA CONSTRUCTION AND DEVELOPMENT CORPORATIONM.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | On-Going | ₱388.1M | 39% | High risk65 | Flagged0.061 |
| 18OG0134REHABILITATION, RENOVATION, AND MODERNIZATION OF THE GONZALES HALL, UNIVERSITY LIBRARY, UP DILIMAN, QUEZON CITY | Quezon City 2nd DEO | FLORIDABLANCA CONSTRUCTION AND DEVELOPMENT CORPORATIONM.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | On-Going | ₱401.9M | 48% | High risk64 | Flagged0.061 |
| 22O00092MANILA BAY REHABILITATION PROGRAM : CONSTRUCTION OF A SOLAR-POWERED STP - VITAS RIVER | National Capital Region | DRAGONHART CONSTRUCTION ENTERPRISE, INC.KAEL CONSTRUCTION AND SUPPLY | On-Going | ₱222.9M | 88% | High risk77 | Flagged0.061 |
| 22O00091MANILA BAY REHABILITATION PROGRAM : CONSTRUCTION OF A SOLAR-POWERED STP - SAN JUAN RIVER | National Capital Region | DRAGONHART CONSTRUCTION ENTERPRISE, INC.KAEL CONSTRUCTION AND SUPPLY | On-Going | ₱222.9M | 88% | High risk78 | Flagged0.061 |
| 20O00105CONSTRUCTION OF DRAINAGE SYSTEM/OUTFALL EXTENSION AT MANILA BAY | National Capital Region | PREMIUM MEGASTRUCTURES INC.DRAGONHART CONSTRUCTION ENTERPRISE, INC. | On-Going | ₱258.6M | 77% | High risk74 | Flagged0.057 |
| 24O00209CONSTRUCTION/COMPLETION OF NANGKA SUPER HEALTH CENTER | National Capital Region | JORDAN RIVER CONSTRUCTION AND DEVELOPMENT CORPORATION | On-Going | ₱5.8M | 0% | High risk80 | Flagged0.056 |
| 24O00207REPAIR/REHABILITATION OF CONCEPCION UNO SUPER HEALTH CENTER | National Capital Region | JORDAN RIVER CONSTRUCTION AND DEVELOPMENT CORPORATION | On-Going | ₱5.8M | 0% | High risk78 | Flagged0.056 |
| 24OA0086CONSTRUCTION OF FOUR (4) STOREY, EIGHT (8) CLASSROOM SCHOOL BUILDING, NINOY AQUINO ELEMENTARY SCHOOL, MALABON CITY | Malabon-Navotas DEO | C.B. TAMPENGCO CONSTRUCTION & SUPPLY | On-Going | ₱42.9M | 51% | High risk74 | Flagged0.054 |
| 18O00026CONST. OF ONE UNIT TWELVE STOREY PNU CONVENTION AND TRAINING CENTER (PNUCTC) BUILDINGS (PHASE I) PNU COMPOUND, TAFT AVENUE, MANILA (PARTIAL CONSTRUCTION ONLY) | National Capital Region | FLORIDABLANCA CONSTRUCTION AND DEVELOPMENT CORPORATION | On-Going | ₱226.1M | 70% | High risk64 | Flagged0.053 |
| 18OE0269CONSTRUCTION OF FOUR (4) STOREY TWENTY EIGHT (28) CLASSROOM SCHOOL BUILDING AT MABINI ELEMENTARY SCHOOL QUIAPO, MANILA CITY (BASED ON 2017 PLAN, REVISED 3-24-17) | North Manila DEO | SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.G.F. FABIAN CONSTRUCTION | Completed | ₱221M | 100% | High risk71 | Flagged0.052 |
| 18OG0126CONSTRUCTION OF FACULTY CENTER (CAL), UP DILIMAN, QUEZON CITY | Quezon City 2nd DEO | FLORIDABLANCA CONSTRUCTION AND DEVELOPMENT CORPORATIONM.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | On-Going | ₱576.9M | 88% | High risk65 | Flagged0.052 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 25OC0040ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -PRIMARY ROADS - PARAÑAQUE-SUCAT RD - K0017 + 663 -K0016 + 000PARAÑAQUE CITY, METRO MANILA | Metro Manila 2nd DEO | AARCON BUILDERS | On-Going | ₱21.6M | 95% | High risk86 | —-0.017 |
| 202 | 25OC0039ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS-PARAÑAQUE-SUCAT RD - K0016 + 234- K0016 + 349PARAÑAQUE CITY, METRO MANILA | Metro Manila 2nd DEO | AARCON BUILDERS | On-Going | ₱6.6M | 0% | High risk85 | Flagged0.009 |
| 203 | 25OD0281CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY 187, ZONE 16, DISTRICT 3, CALOOCAN CITY | Metro Manila 3rd DEO | JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS | On-Going | ₱4.8M | 26% | High risk85 | Flagged0.020 |
| 204 | 25OD0264CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG YAKAL ST., 177, CALOOCAN CITY | Metro Manila 3rd DEO | AVE-MIRA CONSTRUCTION AND TRADING | Completed | ₱9.5M | 100% | High risk85 | —-0.032 |
| 205 | 25OB0454IMPROVEMENT OF LAGUNA LAKESHORE AREA, BARANGAY LOWER BICUTAN, TAGUIG CITY (PHASE II) | Metro Manila 1st DEO | TOPNOTCH CATALYST BUILDERS INC.CORE CHECK CONSTRUCTION INC. | On-Going | ₱94.1M | 49% | High risk85 | —-0.004 |
| 206 | 25O00107REHABILITATION AND IMPROVEMENT OF RETARDING POND AT TAPAYAN PUMPING STATION AND TRIBUTARIES, PASIG CITY | National Capital Region | E. F. CHUA CONSTRUCTION, INC. | On-Going | ₱189.1M | 38% | High risk85 | Flagged0.012 |
| 207 | 25OB0291INSTALLATION OF ROAD SAFETY DEVICES AT BARANGAY CONCEPCION DOS, MARIKINA CITY | Metro Manila 1st DEO | M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) | On-Going | ₱9.5M | 100% | High risk85 | —-0.005 |
| 208 | 25OH0051ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM- CONSTRUCTION - MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-REHABILITATION/UPGRADING OF EDSA PUMPING STATION, PASAY CITY | South Manila DEO | E. F. CHUA CONSTRUCTION, INC. | On-Going | ₱143.1M | 99% | High risk85 | —-0.010 |
| 209 | 25OB0279BANK IMPROVEMENT ALONG MARIKINA RIVER (PACKAGE 22), PASIG CITY | Metro Manila 1st DEO | HALREY CONSTRUCTION INC. | On-Going | ₱46.8M | 100% | High risk84 | —-0.026 |
| 210 | 25OD0163CONSTRUCTION OF ROADS INCLUDING DRAINAGE ALONG KAMIAS ST., BRGY. 179, CALOOCAN CITY | Metro Manila 3rd DEO | IM CONSTRUCTION CORPORATION | Completed | ₱7.7M | 100% | High risk84 | —-0.033 |
| 211 | 25OH0141REHABILITATION OF MULTI-PURPOSE BUILDING, JUAN SUMULONG ELEMENTARY SCHOOL, BARANGAY 132, ZONE 13, PASAY CITY | South Manila DEO | VITES CONSTRUCTION & DEVELOPMENT CORP. | Completed | ₱4.8M | 100% | High risk84 | —-0.032 |
| 212 | 25OD0204REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), (PHASE 2), BARANGAY 184, CALOOCAN CITY | Metro Manila 3rd DEO | IM CONSTRUCTION CORPORATION | On-Going | ₱5.8M | 66% | High risk83 | Flagged0.010 |
| 213 | 25OD0343CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG BARANGAY 175, CALOOCAN CITY (PHASE 2) | Metro Manila 3rd DEO | KING EIGHT BUILDERS AND SUPPLY | Completed | ₱9.5M | 100% | High risk83 | —-0.032 |
| 214 | 25OD0296REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), PHOENIX CIELITO, BARANGAY 177, CALOOCA CITY | Metro Manila 3rd DEO | FRAMECON BUILDERS | On-Going | ₱4.8M | 100% | High risk83 | —-0.003 |
| 215 | 25OA0085CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, SAN ROQUE ELEMENTARY SCHOOL, BARANGAY SAN ROQUE, NAVOTAS CITY | Malabon-Navotas DEO | P7 BUILDERS INC. | On-Going | ₱2.9M | 100% | High risk82 | —-0.003 |
| 216 | 25OD0266CONSTRUCTION OF FLOOD CONTROL WALL ALONG BANKS OF CREEK, NORTH OLYMPUS, BRGY. 172, CALOOCAN CITY | Metro Manila 3rd DEO | KING EIGHT BUILDERS AND SUPPLY | On-Going | ₱28.9M | 60% | High risk82 | —-0.012 |
| 217 | 20OG0117FUNDING REQUIREMENT FOR THE RESILIENCE INSTITUTE, U.P. DILIMAN, QUEZON CITY | Quezon City 2nd DEO | MRB11 CONSTRUCTION CORPORATION (FORMERLY:MRB CONS | On-Going | ₱48.8M | 0% | High risk82 | Flagged0.082 |
| 218 | 25OB0096CONSTRUCTION (COMPLETION) OF FLOOD CONTROL STRUCTURE ALONG ERMITAÑO CREEK, BARANGAY ADDITION HILLS, SAN JUAN CITY | Metro Manila 1st DEO | DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) | On-Going | ₱21.9M | 85% | High risk81 | —-0.019 |
| 219 | 25OB0307REHABILITATION OF RANCHO 3 ROAD NETWORK, BARANGAY CONCEPCION DOS, MARIKINA CITY | Metro Manila 1st DEO | W. GOMEZ TRADING AND CONSTRUCTION | Completed | ₱9.3M | 100% | High risk81 | —-0.034 |
| 220 | 25OD0308CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (BARANGAY HALL EXTENSION BUILDING), BARANGAY 145, CALOOCAN CITY | Metro Manila 3rd DEO | FRAMECON BUILDERS | On-Going | ₱3.8M | 94% | High risk81 | Flagged0.000 |
| 221 | 25OE0133REHABILITATION OF DRAINAGE ALONG P. SANCHEZ ST., MANILA CITY | North Manila DEO | LE BRON CONSTRUCTION | On-Going | ₱16.3M | 81% | High risk81 | —-0.019 |
| 222 | 24OD0319REHABILITATION OF MULTI-PURPOSE BUILDING (COVERED COURT), PHASE 2, BARANGAY 186, CALOOCAN CITY | Metro Manila 3rd DEO | AVE-MIRA CONSTRUCTION AND TRADING | On-Going | ₱17.1M | 85% | High risk80 | Flagged0.037 |
| 223 | 25OB0328REHABILITATION OF CONCEPCION ELEMENTARY SCHOOL, BARANGAY CONCEPCION UNO, MARIKINA CITY | Metro Manila 1st DEO | AMR CONSTRUCTION INC. | Completed | ₱9.7M | 100% | High risk80 | —-0.032 |
| 224 | 24O00209CONSTRUCTION/COMPLETION OF NANGKA SUPER HEALTH CENTER | National Capital Region | JORDAN RIVER CONSTRUCTION AND DEVELOPMENT CORPORATION | On-Going | ₱5.8M | 0% | High risk80 | Flagged0.056 |
| 225 | 25OB0276REHABILITATION OF DRAINAGE SYSTEM INCLUDING ROADS AT NAPICO AND VICINITY, BARANGAY MANGGAHAN (PHASE 1), PASIG CITY | Metro Manila 1st DEO | 816 EMBER CONSTRUCTION CORPORATION | On-Going | ₱18.7M | 73% | High risk80 | —-0.017 |