Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
12,331
Total budget
₱350.4B
Average progress
94.3%
Completion rate
78.8%
Average risk score
46.4
Medium risk on average, out of 100
Flagged as unusual
853
6.9% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 4,879 | ₱161.4B | 47.3 | 123 | 95.0% |
| Buildings and Facilities | 3,615 | ₱36.1B | 36.5 | 46 | 96.6% |
| Flood Control and Drainage | 1,660 | ₱70.5B | 48.9 | 32 | 95.3% |
| Bridges | 883 | ₱21.5B | 44.2 | 50 | 95.4% |
| OTHER | 468 | ₱37.6B | 81.6 | 311 | 78.3% |
| Water Provision and Storage | 429 | ₱3B | 33.0 | 5 | 98.8% |
| GAA 2025 SSP | 213 | ₱5.3B | 94.4 | 200 | 72.1% |
| GAA 2025 OO-1 | 108 | ₱8.1B | 92.7 | 69 | 65.8% |
| GAA 2025 OO-2 | 58 | ₱5.5B | 92.1 | 16 | 69.6% |
| Bridges, Roads | 18 | ₱1.4B | 56.6 | 1 | 99.9% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 1,162 | ₱114.5B | 62.7 | 277 | 84.4% |
| Eastern Samar DEO | 1,102 | ₱18.3B | 41.0 | 62 | 98.0% |
| Southern Leyte 1st DEO | 1,068 | ₱26.2B | 43.2 | 49 | 98.1% |
| Leyte 4th DEO | 1,052 | ₱25.8B | 40.4 | 41 | 97.5% |
| Biliran DEO | 1,022 | ₱18.4B | 46.3 | 53 | 95.2% |
| Samar 1st DEO | 929 | ₱25.2B | 46.2 | 38 | 97.8% |
| Leyte 3rd DEO | 849 | ₱12.7B | 40.8 | 14 | 96.3% |
| Leyte 1st DEO | 832 | ₱20.6B | 47.7 | 58 | 89.7% |
| Northern Samar 1st DEO | 818 | ₱12.3B | 44.2 | 83 | 89.7% |
| Leyte 2nd DEO | 784 | ₱14.5B | 45.8 | 25 | 98.1% |
| Leyte 5th DEO | 777 | ₱15B | 45.1 | 16 | 98.8% |
| Northern Samar 2nd DEO | 633 | ₱15.6B | 48.6 | 33 | 97.9% |
| Samar 2nd DEO | 618 | ₱16.2B | 48.3 | 40 | 94.7% |
| Tacloban City DEO | 616 | ₱13.9B | 46.7 | 42 | 84.7% |
| Southern Leyte 2nd DEO | 69 | ₱1.1B | 59.3 | 22 | 69.7% |
Exhibit C
Joint-venture projects count toward each partner.
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00169SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF MAYDOLONG - BASEY ROAD, EASTERN SAMAR | Region VIII | CHRIZMARIE BUILDERS AND CONSTRUCTION SUPPLY | On-Going | ₱158.1M | 16% | High risk97 | Flagged0.045 |
| 25IL0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, LIMASAWA CIR | Southern Leyte 1st DEO | EZJONES CONSTRUCTION INC. | On-Going | ₱144.8M | 52% | High risk96 | Flagged0.035 |
| 25I00016SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MAHARLIKA HIGHWAY (SN ISIDRO - SAN JUANICO BR) - K0681+800 - K0682+330, K0682+345 - K0682+960, K0683+000 - K0684+461 | Region VIII | NFH CONSTRUCTION & SUPPLYVCD CONSTRUCTION AND SUPPLY | On-Going | ₱161.3M | 96% | High risk96 | Flagged0.022 |
| 25I00119SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF COASTAL ROAD, BARANGAY PEPELITAN - BARANGAY SABANG NORTH, BORONGAN CITY | Region VIII | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)TUBIGAN BUILDERS | On-Going | ₱96.4M | 56% | High risk96 | Flagged0.028 |
| 25IH0086CONSTRUCTION OF WATER SYSTEM, CATARMAN NORTHERN SAMAR | Northern Samar 1st DEO | SMU CONSTRUCTION AND SUPPLYM.J. APIN BUILDERS | On-Going | ₱96.5M | 25% | High risk96 | Flagged0.036 |
| 25IJ0053CSSP: CONSTRUCTION OF BUAO BRIDGE, BARANGAY BUAO, GANDARA, SAMAR | Samar 1st DEO | B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) | On-Going | ₱98.9M | 11% | High risk96 | Flagged0.039 |
| 25IF0011CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 11+700 - STA. 11+810, ALBUERA, LEYTE | Leyte 4th DEO | EZJONES CONSTRUCTION INC.JB KONSTRUKTURA COMPANY | On-Going | ₱144.6M | 89% | High risk96 | Flagged0.025 |
| 25IF0017CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG JARO - RUBAS - ORMOC RAOD (ORMOC CITY SIDE), STA. 9+180 - STA. 9+230, LEYTE | Leyte 4th DEO | EZJONES CONSTRUCTION INC. | On-Going | ₱144.6M | 93% | High risk96 | Flagged0.024 |
| 25IF0015CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 10+480 - STA. 10+580, ALBUERA, LEYTE | Leyte 4th DEO | EZJONES CONSTRUCTION INC. | On-Going | ₱144.6M | 90% | High risk96 | Flagged0.024 |
| 25IF0018CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 10+700 - STA. 10+790, ALBUERA, LEYTE | Leyte 4th DEO | EZJONES CONSTRUCTION INC. | On-Going | ₱144.6M | 91% | High risk96 | Flagged0.024 |
| 25IF0007CONSTRUCTION OF BURAUEN-ALBUERA ROAD, STA. 10+580 - STA. 10+700, ALBUERA, LEYTE | Leyte 4th DEO | EZJONES CONSTRUCTION INC.JB KONSTRUKTURA COMPANY | On-Going | ₱144.6M | 90% | High risk96 | Flagged0.024 |
| 25IL0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, LIMASAWA CIR | Southern Leyte 1st DEO | EZJONES CONSTRUCTION INC. | On-Going | ₱96.4M | 75% | High risk96 | Flagged0.024 |
| 25IL0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, LIMASAWA CIR | Southern Leyte 1st DEO | EZJONES CONSTRUCTION INC. | On-Going | ₱96.4M | 75% | High risk96 | Flagged0.024 |
| 25I00121SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF ROAD, PHASE 2, BARANGAY NATO - BARANGAY BONGDO, TAFT, EASTERN SAMAR | Region VIII | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) | On-Going | ₱48.2M | 77% | High risk96 | Flagged0.013 |
| 25IL0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF PANCIL - AURORA - CADARU | Southern Leyte 1st DEO | JQD CONSTRUCTION & GENERAL SERVICES | On-Going | ₱96.5M | 53% | High risk96 | Flagged0.030 |
| 25IH0033CONSTRUCTION OF ROAD WITH DRAINAGE STRUCTURE, PHASE II, BARANGAY MACAGTAS, CATARMAN, NORTHERN SAMAR | Northern Samar 1st DEO | SMU CONSTRUCTION AND SUPPLY | On-Going | ₱49.5M | 53% | High risk96 | Flagged0.022 |
| 25IL0010CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF PANCIL - AURORA - CA | Southern Leyte 1st DEO | JQD CONSTRUCTION & GENERAL SERVICES | On-Going | ₱49M | 91% | High risk96 | Flagged0.010 |
| 25IB0098CONSTRUCTION OF ROAD BARANGAY CAN-ATO TO BARANGAY BORAC TO BARANGAY CANDOROS TO BARANGAY MAGTINO, LLORENTE, EASTERN SAMAR | Eastern Samar DEO | DRAGON CONSTRUCTION | On-Going | ₱49.2M | 30% | High risk96 | Flagged0.025 |
| 25IB0053CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAFT MUNICIPAL HALL PHASE 2, BARANGAY POBLACION, TAFT, EASTERN SAMAR | Eastern Samar DEO | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) | On-Going | ₱48.9M | 35% | High risk96 | Flagged0.025 |
| 25IB0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAN-AVID MUNICIPAL HALL PHASE 2 BARANGAY POBLACION, CAN-AVID, EASTERN SAMAR | Eastern Samar DEO | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION) | On-Going | ₱48.9M | 42% | High risk96 | Flagged0.025 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23I00224SIPAG - ACCESS ROADS AND/OR BRIDGES FROM NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - ROAD OPENING AND CONCRETING OF BURAUEN SOUTHEAST SEMI-CIRCUMFERENTIAL ROAD TRAVERSING BRGY. POBLACION | Region VIII | FAIRCHILD BUILDERS & DEVELOPERS, INC.EZJONES CONSTRUCTION INC. | On-Going | ₱144.7M | 25% | High risk91 | Flagged0.088 |
| 24I00399CLUSTER 14: 1.) ASSET PRESERVATION - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - PANGPANG-PALAPAG-MAPANAS-GAMAY-LAPINIG ROAD - K0811+951 - K0812+085; 2.) ASSET PRESERVATION - REHABILITATION/ RECONS | Region VIII | EZJONES CONSTRUCTION INC. | On-Going | ₱192.9M | 35% | High risk92 | Flagged0.085 |
| 24I00388NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-2 | Region VIII | AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) | On-Going | ₱182.9M | 21% | High risk92 | Flagged0.085 |
| 17I00070CONSTRUCTION OF LOPE DE VEGA - SILVINO LOBOS ROAD (PHASE 4), 12 KM. - CONSTRUCTION / OPENING / CONCRETE PAVING OF ROAD, NORTHERN SAMAR 1ST LD | Region VIII | RHYES BUILDERS & SUPPLY | On-Going | ₱100M | 97% | High risk91 | Flagged0.082 |
| 24I00401NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE B-1 | Region VIII | CHUCON BUILDERS CORPORATION (FORMERLY: CHU CONSTRUCTION) | On-Going | ₱182.9M | 33% | High risk92 | Flagged0.082 |
| 24I00405NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROAD - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-1 | Region VIII | AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) | On-Going | ₱187.6M | 50% | High risk92 | Flagged0.080 |
| 24I00390NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF ROAD, TACLOBAN - PALO DIVERSION ROAD INCLUDING DRAINAGE SYSTEM, PACKAGE C-2 | Region VIII | AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) | On-Going | ₱182.5M | 49% | High risk92 | Flagged0.080 |
| 24I00396NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - CONSTRUCTION OF TACLOBAN - PALO DIVERSION ROAD INCLUDING CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE SYSTEM, PACKAGE C, BARANGAY CANDAHUG, PALO, LEYTE | Region VIII | AQUALINE CONSTRUCTION CORPORATION (FORMERLY: AQUALINE CONSTRUCTION) | On-Going | ₱136.8M | 28% | High risk92 | Flagged0.079 |
| 24I00391MAJOR EXPANSION OF THE LEARNING RESOURCE CENTER - LEYTE NORMAL UNIVERSITY, PATERNO, STREET, TACLOBAN CITY | Region VIII | KALIPAYAN BUILDERS AND CONSTRUCTION SUPPLY | On-Going | ₱94.5M | 28% | High risk93 | Flagged0.075 |
| 23I00223CONSTRUCTION OF BRGY. PAYPAYON FLOOD CONTROL, ORAS, EATERN SAMAR | Region VIII | JGO BUILDERS | On-Going | ₱134.6M | 77% | High risk92 | Flagged0.074 |
| 23I00216CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SUHI RIVER (DOWNSTREAM) INCLUDING ROAD RIGHT OF WAY, PHASE 1-B, TACLOBAN CITY | Region VIII | EZJONES CONSTRUCTION INC. | On-Going | ₱134.8M | 92% | High risk92 | Flagged0.072 |
| 24II0101CONCRETING OF BRGY. MABINI-VICTORY ROAD (ALONG LAS NAVAS-MATUGUINAO ROAD) PHASE 3, BRGY. MABINI-TAYLOR-VICTORY-EL EMPON-POPONTON-CUENCO ROAD, LAS NAVAS, NORTHERN SAMAR | Northern Samar 2nd DEO | 5GG CONSTRUCTION (FORMERLY: 5G GALVEZ CONSTRUCTION AND SUPPLY) | On-Going | ₱97.9M | 55% | High risk92 | Flagged0.071 |
| 24IC0201RENOVATION OF EXISTING REGIONAL HAVEN FOR WOMEN ADMIN BUILDING, PALO, LEYTE | Leyte 1st DEO | BUILDLOCAL CONSTRUCTION INC. | On-Going | ₱14.9M | 0% | High risk90 | Flagged0.070 |
| 24IC0174CONCRETING OF BRGY. HUPIT FMR, BRGY. HUPIT, ALANGALANG, LEYTE | Leyte 1st DEO | B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION) | On-Going | ₱11.9M | 0% | High risk89 | Flagged0.068 |
| 25IC0201CONCRETING OF FMR AT BRGY. TALOLORA TO BRGY. AMANLURAN, TANAUAN, LEYTE | Leyte 1st DEO | LATORRE BUILDERS & CONSTRUCTION | On-Going | ₱14.9M | 0% | High risk90 | Flagged0.068 |
| 25II0060CONSTRUCTION OF SCHOOL BUILDING, LIBERTAD ELEMENTARY SCHOOL, GAMAY, NORTHERN SAMAR | Northern Samar 2nd DEO | EFC DEVELOPMENT CORPORATION | On-Going | ₱5M | 0% | High risk89 | Flagged0.068 |
| 24IJ0102(RE-ADVERTISED) CONSTRUCTION OF BRGY. MADUROTO BRIDGE (ALONG MATUGUINAO - LAS NAVAS ROAD) PHASE IV - BRGY. MADUROTO, MATUGUINAO, SAMAR | Samar 1st DEO | NORTHERN BUILDERSETAN CONSTRUCTION | On-Going | ₱98M | 62% | High risk92 | Flagged0.068 |
| 24IL0107FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG ASUNCION - BENIT SECTION, MALITBOG, SOUTHERN LEYTE | Southern Leyte 1st DEO | PABLO S. LABASBAS CONSTRUCTION CORPORATION (FORMERLY: PABLOS. LABASBAS CONSTRUCTION CORPORATION)ON POINT CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY:ON POINT CONSTRUCTION) | On-Going | ₱120.5M | 72% | High risk92 | Flagged0.068 |
| 23I00226SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES FACILITIES - REPAIR/REHABILITATION OF HIMANGLOS RIVER BANK PROTECTION (REVETMENT) (BARUGO) | Region VIII | FAIRCHILD BUILDERS & DEVELOPERS, INC. | On-Going | ₱96.4M | 80% | High risk93 | Flagged0.068 |
| 24IJ0094CONCRETING OF BRGY. LIMARAYON TO BRGY. NAVARRO FMR, BRGY. LIMARAYON, CALBAYOG CITY, SAMAR | Samar 1st DEO | SFORT BUILDERS | On-Going | ₱10.9M | 0% | High risk89 | Flagged0.067 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 476 | 18II0087CONSTRUCTION OF RCDG BRIDGE (DOUBLE LANE) AT SANTA POTENCIANA, MAPANAS, NORTHERN SAMAR | Northern Samar 2nd DEO | WERR CORPORATION INTERNATIONAL | Completed | ₱35.3M | 100% | High risk87 | Flagged0.020 |
| 477 | 19II0110REPAIR/REHABILITATION OF NATIONAL ROAD, ALONG CATARMAN - LAOANG ROAD, BANTAYAN - SAN ROQUE SECTION, SITIO NAPERES, SAN ROQUE, N. SAMAR K0768+694 - K0768+808, SAN ROQUE, NORTHERN SAMAR | Northern Samar 2nd DEO | JUPA CONSTRUCTION | Completed | ₱30M | 100% | High risk86 | Flagged0.014 |
| 478 | 23I00171CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, BUENAVISTA ELEMENTARY SCHOOL, PINTUYAN, SOUTHERN LEYTE | Region VIII | ZTATIK BUILDER INC. | On-Going | ₱5M | 98% | High risk86 | Flagged0.051 |
| 479 | 25IG0025CONSTRUCTION OF FLOOD CONTROL/PROTECTION WORK OF DAM, TAGBAWTO CIS, HILONGOS, LEYTE | Leyte 5th DEO | C N E CONSTRUCTION | On-Going | ₱14.5M | 93% | High risk86 | —-0.016 |
| 480 | 24IJ0088CONSTRUCTION OF 1-STOREY 2-CLASSROOM SCHOOL BUILDING, LAMBAO ELEMENTARY SCHOOL, BRGY. LAMBAO, STA. MARGARITA, SAMAR | Samar 1st DEO | DANILORSO CORP. OPERATING UNDER THE NAME OF DRS BUILDERS AND CONSTRUCTION SUPPLIES | Completed | ₱5.9M | 100% | High risk86 | Flagged0.009 |
| 481 | 25II0023CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, REHAB. OF LAS NAVAS FLOOD CONTROL STRUCTURE AND DRAINAGE SYSTEM, CATUBIG RIVER BASIN, LAS NAVAS, NORTHERN SAMAR | Northern Samar 2nd DEO | 5GG CONSTRUCTION (FORMERLY: 5G GALVEZ CONSTRUCTION AND SUPPLY) | On-Going | ₱34.3M | 97% | High risk86 | —-0.015 |
| 482 | 25IN0004FLOOD MITIGATION PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL/PROTECTION WORK OF DAM, BUAC CIS, SOGOD SOUTHERN LEYTE | Southern Leyte 2nd DEO | FFJJ CONSTRUCTION | On-Going | ₱14.5M | 71% | High risk86 | —-0.008 |
| 483 | 25IC0091CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY KATIPUNAN, STA. FE, LEYTE | Leyte 1st DEO | BASESOLIDA CONSTRUCTION AND SUPPLIES | Completed | ₱5.9M | 100% | High risk86 | —-0.028 |
| 484 | 25IK0037CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY DOLONGAN, BASEY, SAMAR | Samar 2nd DEO | ETAN CONSTRUCTION | On-Going | ₱33.2M | 80% | High risk85 | —-0.012 |
| 485 | 24II0093CONSTRUCTION OF MODIFIED DEPED-DPWH STANDARD 1-STOREY, 3-CLASSROOM SCHOOL BUILDING (WITH TOILET ATTACHED) AT SIMORA ES, PALAPAG, NORTHERN SAMAR | Northern Samar 2nd DEO | EFC DEVELOPMENT CORPORATION | Completed | ₱9.9M | 100% | High risk85 | Flagged0.011 |
| 486 | 24I00207CLUSTER 4: 1. NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - WRIGHT - TAFT - BORONGAN RD - K0887+800 - K0887+890 (RS); 2. NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS - WRIGHT - TAFT - BORONGAN RD - K0887+890 | Region VIII | EZJONES CONSTRUCTION INC. | On-Going | ₱293.8M | 94% | High risk85 | Flagged0.032 |
| 487 | 22I00090SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITES - CONSTRUCTION OF JUNCTION NATIONAL ROAD BRGY. CAROLINA, CAN-AVID - DOLORES - MASLOG ROAD, (BRGY. MAGSAYSAY - BRGY. MAGONGBONG - BRGY. GAP-A | Region VIII | B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION)JGO BUILDERS | On-Going | ₱238.6M | 91% | High risk85 | Flagged0.043 |
| 488 | 24IK0079CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BASEY-MAYDOLONG ROAD, BASEY SECTION, SAMAR | Samar 2nd DEO | NORTHERN BUILDERSETAN CONSTRUCTION | On-Going | ₱270.5M | 56% | High risk85 | Flagged0.042 |
| 489 | 24I00156CLUSTER 6: 1. NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - SAN RICARDO - BILATAN RD - K1101+595 - K1101+625 AND OTHER SIX (6) LOCATIONS, SOUTHERN LEYTE | Region VIII | EZJONES CONSTRUCTION INC. | On-Going | ₱331.6M | 87% | High risk85 | Flagged0.036 |
| 490 | 24I00158CLUSTER 7: NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - SAN RICARDO - BILATAN RD - K1101+830 - K1101+860; AND SIX (6) OTHER LOCATIONS | Region VIII | EZJONES CONSTRUCTION INC. | On-Going | ₱331.6M | 93% | High risk85 | Flagged0.034 |
| 491 | 25ID0062ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS PALO-CARIGARA -ORMOC RD - K0963 +226 K0963 + 827, CAPOOCAN,LEYTE | Leyte 2nd DEO | DUROS DEVELOPMENT CORP. | Completed | ₱25.4M | 100% | High risk85 | —-0.040 |
| 492 | 24I00035CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+219 - K0945+549, EASTERN SAMAR | Region VIII | B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION)JGO BUILDERS | On-Going | ₱144.7M | 40% | High risk85 | Flagged0.039 |
| 493 | 24I00033CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+549 - K0945+879, EASTERN SAMAR | Region VIII | B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION)JGO BUILDERS | On-Going | ₱144.6M | 50% | High risk85 | Flagged0.036 |
| 494 | 24I00037CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0945+879 - K0946+187, EASTERN SAMAR | Region VIII | B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION)AICON INDUSTRIES | On-Going | ₱144.7M | 73% | High risk85 | Flagged0.030 |
| 495 | 24I00036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+187 - K0946+517, EASTERN SAMAR | Region VIII | B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION)AICON INDUSTRIES | On-Going | ₱144.6M | 90% | High risk85 | Flagged0.027 |
| 496 | 24I00038CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN - GUIUAN RD. - K0946+517 - K0946+847, EASTERN SAMAR | Region VIII | B. VICENCIO BUILDERS (BVB), INC. (FORMERLY:B. VICENCIO CONSTRUCTION)AICON INDUSTRIES | On-Going | ₱144.7M | 94% | High risk85 | Flagged0.026 |
| 497 | 24I00061SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF BAROBO BRIDGE, LLORENTE, EASTERN SAMAR | Region VIII | ACME BUILDERS CORPORATIONAICON INDUSTRIES | On-Going | ₱144.6M | 80% | High risk85 | Flagged0.027 |
| 498 | 24I00258SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, SITIO KALAWIT - BARANGAY CADIAN, ORAS, EATERN SAMAR | Region VIII | CHRIZMARIE BUILDERS AND CONSTRUCTION SUPPLY | On-Going | ₱168.8M | 85% | High risk85 | Flagged0.022 |
| 499 | 22I00100CLUSTER 3: PROJECT 1. CONST. OF CAUSEWAY, SECTION 3.18, STA. 1+970 - STA. 2+040, TACLOBAN CITY, LEYTE; PROJECT 2. CONST. OF CAUSEWAY, SECTION 3.19, STA. 2+040 - STA. 2+133, TACLOBAN CITY, LEYTE; PROJECT 3. CONST. OF CAUSEWAY, SECTION 3.20, STA. 2+133 - ST | Region VIII | L.N.R. CONSTRUCTIONSUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) | On-Going | ₱311.9M | 88% | High risk85 | Flagged0.045 |
| 500 | 24I00327LOCAL PROGRAM (LP) - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - NATIONAL BUILDING PROGRAM - CONSTRUCTION OF TACLOBAN AIRPORT PASSENGER TERMINAL BUILDING PHASE 3, TACLOBAN CITY | Region VIII | OCTAGON CONCRETE SOLUTIONS INC. | On-Going | ₱964.3M | 84% | High risk85 | Flagged0.035 |