Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
8,613
Total budget
₱195.8B
Average progress
98.0%
Completion rate
92.4%
Average risk score
24.2
Low risk on average, out of 100
Flagged as unusual
432
5.0% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 3,861 | ₱23.7B | 12.0 | 19 | 99.7% |
| Roads | 2,788 | ₱93.9B | 27.8 | 38 | 99.2% |
| Flood Control and Drainage | 757 | ₱34.4B | 31.5 | 11 | 98.6% |
| Bridges | 387 | ₱11.4B | 26.2 | 9 | 99.3% |
| Water Provision and Storage | 259 | ₱1.5B | 17.6 | 3 | 99.1% |
| OTHER | 249 | ₱16.5B | 75.8 | 136 | 86.6% |
| GAA 2025 SSP | 152 | ₱2.8B | 89.0 | 121 | 66.6% |
| GAA 2025 OO-1 | 90 | ₱6.2B | 92.1 | 73 | 72.7% |
| GAA 2025 OO-2 | 55 | ₱4.4B | 87.7 | 22 | 81.0% |
| Bridges, Roads | 15 | ₱1.3B | 43.9 | 0 | 98.1% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 1,168 | ₱76.4B | 39.7 | 147 | 94.9% |
| Sultan Kudarat 2nd DEO | 1,107 | ₱12.2B | 14.9 | 18 | 99.6% |
| South Cotabato 1st DEO | 1,087 | ₱15.6B | 23.4 | 40 | 98.6% |
| South Cotabato 2nd DEO | 1,084 | ₱14.1B | 16.9 | 29 | 99.2% |
| Cotabato 2nd DEO | 1,004 | ₱20.6B | 23.9 | 49 | 98.1% |
| Sarangani DEO | 940 | ₱17.8B | 25.7 | 75 | 96.2% |
| Cotabato 1st DEO | 912 | ₱14.6B | 22.8 | 27 | 99.1% |
| Sultan Kudarat 1st DEO | 572 | ₱11.8B | 24.2 | 17 | 99.3% |
| Cotabato 3rd DEO | 424 | ₱7.3B | 28.5 | 27 | 96.4% |
| Cotabato City DEO | 315 | ₱5.3B | 22.4 | 3 | 100.0% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON | 476 | ₱12.1B | 29.8 | 33 | 97.6% |
| JARGON CONSTRUCTION & SUPPLY | 344 | ₱13.2B | 30.2 | 28 | 97.8% |
| CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY) | 252 | ₱5B | 19.8 | 6 | 99.5% |
| JV CONSTECH | 206 | ₱1.5B | 14.1 | 2 | 99.9% |
| GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | 186 | ₱16.9B | 42.6 | 14 | 99.1% |
| RDEN CONSTRUCTION & SUPPLY | 151 | ₱2B | 22.5 | 3 | 99.5% |
| VERGUZ CONSTRUCTION | 146 | ₱1B | 16.2 | 2 | 99.0% |
| ROBETH CONST. AND DEV'T. CORP. (FORMERLY: ROBETH GEN. MDSE. CONST. & SUPPLY) | 142 | ₱2.7B | 20.7 | 4 | 98.9% |
| LTB BUILDERS & CONSTRUCTION | 138 | ₱961.7M | 13.7 | 3 | 100.0% |
| FFJJ CONSTRUCTION | 137 | ₱6.2B | 29.7 | 3 | 98.7% |
| COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME | 132 | ₱1.5B | 14.1 | 2 | 99.9% |
| J-1 BUILDERS CORPORATION (FORMERLY: J-ONE BUILDERS | 127 | ₱1.4B | 17.0 | 2 | 99.7% |
| ABU CONSTRUCTION | 126 | ₱9.5B | 39.0 | 11 | 98.6% |
| LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | 118 | ₱7.9B | 37.1 | 2 | 99.9% |
| SAREX BUILDERS AND SUPPLY | 117 | ₱718.7M | 18.0 | 5 | 99.1% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25M00001CONSTRUCTION OF MAGPET (PANGAO-AN - DON PANACA) TO DAVAO CITY VIA SALAYSAY (INDAWHONG-BALLAH-MASAWANG) TO LUMONDAO (JUNCTION BUKIDNON TO DAVAO) ROAD, STA. 0+000 - STA. 3+240, MAGPET, NORTH COTABATO | Region XII | PLUS CONSTRUCTION INDUSTRIES CORP. | On-Going | ₱125.9M | 26% | High risk95 | Flagged0.050 |
| 25MC0045CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 3, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Cotabato 2nd DEO | RAKKI CORPORATIONRELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY) | On-Going | ₱112.3M | 39% | High risk95 | Flagged0.041 |
| 25ME0020REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SARANGANI - DAVAO DEL SUR COASTAL RD K1678+940 - K1679+160, MALAPATAN, SARANGANI PROVINCE | Sarangani DEO | RFP BUILDERS CONSTRUCTION AND SUPPLIES CORPORATIONREYDAN BUILDERS | On-Going | ₱93.6M | 37% | High risk95 | Flagged0.035 |
| 25M00239PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1735 + 813 - K1738 + 574, GLAN, SARANGANI PROVINCE | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱95.3M | 99% | High risk95 | Flagged0.016 |
| 25M00038ROAD WIDENING - MAHARLIKA HIGHWAY( DIGOS-MAKAR RD) - K1631 + 653 - K1634 + 200, GENERAL SANTOS CITY | Region XII | JDRC CONSTRUCTION & SUPPLIES, CORP. | On-Going | ₱72M | 79% | High risk95 | Flagged0.015 |
| 25MC0044CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 2, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Cotabato 2nd DEO | LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON | On-Going | ₱112.2M | 53% | High risk95 | Flagged0.038 |
| 25M00238PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1703 +824 - K1706 +581 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱85.6M | 34% | High risk95 | Flagged0.034 |
| 25M00237PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1691 + 570 - K1693 + 137 (WITH-IN STATION LIMITS), GLAN, SARANGANI PROVINCE | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱85.5M | 86% | High risk95 | Flagged0.019 |
| 25M00240PREVENTIVE MAINTENANCE - SARANGGANI - DAVAO DEL SUR COASTAL RD - K1706 + 581 - K1709 + 330 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱90.4M | 92% | High risk95 | Flagged0.019 |
| 25M00176PREVENTIVE MAINTENANCE - DEMOLOC-LITTLE BAGUIO-ALABEL RD - K1660+000 - K1661+073 (P00910283MN), ALABEL, SARANGANI | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱94.3M | 94% | High risk95 | Flagged0.017 |
| 25ME0016REPLACEMENT OF KALAONG BR. 3 (B01276MN) ALONG MAITUM - LAKE SEBU RD, MAITUM, SARANGANI PROVINCE | Sarangani DEO | CHARIFER BUILDERS, INC. | On-Going | ₱67.4M | 71% | High risk95 | Flagged0.018 |
| 25M00021CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS -MAHARLIKA HIGHWAY (MARBEL-MAKAR RD) - K1669 + 243 - K1670 + 000, POLOMOLOK, SOUTH COTABATO | Region XII | DRU CONSTRUCTIONSALMEGA BUILDERS | On-Going | ₱90.9M | 89% | High risk95 | Flagged0.014 |
| 25M00252PREVENTIVE MAINTENANCE - JCT DIGOS-BUAYAN AIRPORT RD (S00247MN) - K1652 + 473 - K1653 + 239, GENERAL SANTOS CITY | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱94.7M | 82% | High risk95 | Flagged0.021 |
| 25MI0029BUKIDNON-COTABATO RD - K1629 + 413 - K1629 + 530 | Cotabato 3rd DEO | P.L. SEBASTIAN CONSTRUCTION, INC. (FORMERLY: P.L. SEBASTIAN CONSTRUCTION) | On-Going | ₱74.3M | 100% | High risk95 | —-0.000 |
| 25MC0014CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DOROLUMAN - PRESIDENT ROXAS - KADINGILAN ROAD, COTABATO | Cotabato 2nd DEO | JARGON CONSTRUCTION & SUPPLY | On-Going | ₱77M | 62% | High risk95 | Flagged0.020 |
| 25MB0082CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - ALBERT MORROW BLVD - K1650 + 521 - K1653 + 055 | South Cotabato 1st DEO | LHE CONSTRUCTION & INDUSTRIAL SERVICES, INC. (FORMERLY: LHE CONSTRUCTION & ENG'G. SERVICES)REYDAN BUILDERS | On-Going | ₱94.1M | 76% | High risk95 | Flagged0.022 |
| 25ME0021CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - SARANGANI - DAVAO DEL SUR COASTAL RD - K1657+000 - K1658+685, ALABEL, SARANGANI PROVINCE | Sarangani DEO | MCHAI CONSTRUCTION AND HARDWARE SUPPLYREYDAN BUILDERS | On-Going | ₱140.4M | 26% | High risk95 | Flagged0.042 |
| 25ME0115CONSTRUCTION OF MULTI-PURPOSE BUILDING, (MALAPATAN COLLEGE OF SCIENCE AND TECHNOLOGY), MALAPATAN, SARANGANI PROVINCE | Sarangani DEO | EDCL CONSTRUCTION AND SUPPLYRELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY) | On-Going | ₱49.5M | 49% | High risk95 | Flagged0.037 |
| 25MB0002CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - MAKAR-KIAMBA RD - K1660 + 662 - K1662 + 000 | South Cotabato 1st DEO | DELLOSA DESIGN BUILDERS CORP.(FORMERLY:DELLOSA DESIGN-BUILD SERVICES) | On-Going | ₱63.9M | 62% | High risk95 | Flagged0.023 |
| 25MI0030BUKIDNON-COTABATO RD - K1630 + 100 - K1630 + 300 | Cotabato 3rd DEO | P.L. SEBASTIAN CONSTRUCTION, INC. (FORMERLY: P.L. SEBASTIAN CONSTRUCTION) | On-Going | ₱79.3M | 36% | High risk95 | Flagged0.025 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24M00049COMPLETION OF THE UNIVERSITY GYMNASIUM (PHASE 2), MSU-GENERAL SANTOS-MINDANAO STATE UNIVERISTY, GENERAL SANTOS CITY | Region XII | FREDEN CONSTRUCTION | On-Going | ₱74.4M | 27% | High risk79 | Flagged0.076 |
| 24M00315CONSTRUCTION OF FLOOD CONTROL/REVETMENT ALONG RIO-GRANDE DE MINDANAO (UPSTREAM); LIBUNGAN-GAMBAR SECTION, STA. 0+000.00 - STA. 0+245.00, NORTHERN KABUNTALAN, MAGUINDANAO | Region XII | PATE-KHAY CONSTRUCTION | On-Going | ₱47.7M | 12% | High risk88 | Flagged0.074 |
| 24M00311PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) - K1592+339 - K1593+000, K1594+000 - K1595+000, K1601+000 - K1601+394, K1604+000 - K1605+000, MALUNGON, SARANGANI | Region XII | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | On-Going | ₱241M | 100% | High risk86 | Flagged0.074 |
| 24M00287CONSTRUCTION OF THE TWO STOREY REGIONAL OFFICE BUILDING OF DOLE XII, KORONADAL CITY | Region XII | PLUS CONSTRUCTION INDUSTRIES CORP. | On-Going | ₱59.6M | 23% | High risk87 | Flagged0.074 |
| 25MG0118CONSTRUCTION OF THE PROVINCIAL SATTELITE AUDIT OFFICE (PSAO)-SOUTH COTABATO AT BARANGAY PARAISO, CITY OF KORONADAL, SOUTH COTABATO | South Cotabato 2nd DEO | REYDAN BUILDERS | On-Going | ₱25.8M | 4% | High risk87 | Flagged0.074 |
| 25MH0118CONCRETING OF HIGHWAY BRGY. JCT. POLOY-POLOY TO BRGY. RAGANDANG FMR, BRGY. POLOY-POLOY AND BRGY. RAGANDANG, LEBAK, SULTAN KUDARAT | Sultan Kudarat 2nd DEO | PSN CONSTRUCTION & SUPPLY | On-Going | ₱14.5M | 21% | High risk85 | Flagged0.066 |
| 24ME0126CONCRETING OF BRGY. BLAAN FMR, BRGY. BLAAN, MALUNGON, SARANGANI PROVINCE | Sarangani DEO | EC SOLICON BUILDERS & SUPPLY, INC. | On-Going | ₱49.7M | 38% | High risk88 | Flagged0.065 |
| 25MG0111CONSTRUCTION OF SCHOOL BUILDING, KORONADAL NATIONAL COMPREHENSIVE HIGH SCHOOL, KORONADAL CITY, SOUTH COTABATO | South Cotabato 2nd DEO | ALEXANDER BUILDERS | On-Going | ₱19.8M | 26% | High risk87 | Flagged0.065 |
| 24M00319CONSTRUCTION OF ROAD, STA 0+000 - STA 1+200, BARANGAY SOLON, SULTAN MASTURA, MAGUINDANAO DEL NORTE | Region XII | MUST ENTERPRISES | On-Going | ₱18.7M | 23% | High risk87 | Flagged0.065 |
| 25MB0098CONCRETING OF BRGY. UPPER LABAY FMR, BRGY. UPPER LABAY, GENERAL SANTOS CITY, SOUTH COTABATO | South Cotabato 1st DEO | JLH CONSTRUCTION INC. | On-Going | ₱14.9M | 34% | High risk87 | Flagged0.061 |
| 24MD0089CONCRETING OF JUNCTION PROVINCIAL ROAD AT BARANGAY SILIK TO PAIDU PULANGI, PIKIT, NORTH COTABATO | Cotabato 1st DEO | H-ROYAL CONSTRUCTION | On-Going | ₱91.4M | 95% | High risk89 | Flagged0.060 |
| 24M00284CONSTRUCTION OF SUPER HEALTH CENTERS - BANGA SUPER HEALTH CENTER, BANGA, SOUTH COTABATO | Region XII | DEDASE CONSTRUCTION SERVICES | On-Going | ₱9.9M | 30% | High risk87 | Flagged0.060 |
| 25MH0128CONSTRUCTION OF SCHOOL BUILDING, GUINTALES INTEGRATED SCHOOL, BRGY. POLOY-POLOY, LEBAK, SULTAN KUDARAT | Sultan Kudarat 2nd DEO | PSN CONSTRUCTION & SUPPLY | On-Going | ₱9.6M | 32% | High risk84 | Flagged0.059 |
| 24M00327ROAD CONCRETING FROM SITIO TATAS TO SITIO KAKAL, STA. 0+020 - STA. 0+680, STA. 0+860- STA. 1+400, BARANGAY LIMBALOD, DATU MONTAWAL, MAGUINDANAO DEL SUR | Region XII | ANGKAT CONSTRUCTION AND SUPPLIES | On-Going | ₱24.3M | 53% | High risk87 | Flagged0.058 |
| 25MC0102CONSTRUCTION OF SCHOOL BUILDING (ONE (1) STOREY THREE (3) CLASSROOM), AT ASUNCION ELEMENTARY SCHOOL, BARANGAY POBLACION, MAKILALA, COTABATO | Cotabato 2nd DEO | LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON | On-Going | ₱7.2M | 52% | High risk87 | Flagged0.058 |
| 24M00328ROAD CONCRETING IN SITIO BAYA TO SITIO DAGADANGEN, BARANGAY KILANGAN, PAGALUNGAN, MAGUINDANAO DEL SUR | Region XII | ANGKAT CONSTRUCTION AND SUPPLIES | On-Going | ₱39.3M | 1% | Medium risk45 | Flagged0.058 |
| 22M00060OFF-CARRIAGEWAY IMPROVEMENT - MARBEL-MAKAR RD - K1664+000 - K1665+487, K1667+038 K1667+670, K1667+780 - K1671+980, POLOMOLOK, SOUTH COTABATO | Region XII | HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG | On-Going | ₱91.6M | 0% | High risk73 | Flagged0.058 |
| 25MC0104CONSTRUCTION OF SCHOOL BUILDING (ONE (1) STOREY TWO (2) CLASSROOM), AT NEW CEBU ELEMENTARY SCHOOL, BARANGAY NEW CEBU MAKILALA, COTABATO | Cotabato 2nd DEO | LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON | On-Going | ₱4.8M | 45% | High risk81 | Flagged0.057 |
| 25MH0129CONSTRUCTION OF SCHOOL BUILDING, KUDEN NATIONAL HIGH SCHOOL, BRGY. KUDEN, SEN. NINOY AQUINO, SULTAN KUDARAT | Sultan Kudarat 2nd DEO | FOUR S CONSTRUCTION SERVICES | On-Going | ₱9.9M | 37% | High risk87 | Flagged0.057 |
| 24M00281CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - NORALA SUPER HEALTH CENTER, SOUTH COTABATO | Region XII | CMJ STAR CONSTRUCTION | On-Going | ₱9.6M | 51% | High risk87 | Flagged0.056 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 501 | 17M00007ROAD UPGRADING (UNPAVED TO PAVED) ALONG SNA-LEBAK-KALAMANSIG ROAD, K1857+700 - K1859+000 (CHAINAGE 10698 - CHAINAGE 12000), K1859+973 - K1862+230 (CHAINAGE 12973 - CHAINAGE 15231), TINALON SECTION, SNA, SULTAN KUDARAT | Region XII | ED1SON DEVELOPMENT & CONSTRUCTION INC.PALMARES CONSTRUCTION & GENERAL MERCHANDISE CORP. (FORMERLY: PALMARES GENERAL MERCHANDISE) | Completed | ₱144.7M | 100% | High risk70 | —-0.008 |
| 502 | 17M00010ROAD UPGRADING (UNPAVED TO PAVED) ALONG SNA-LEBAK-KALAMANSIG ROAD, TINALON, SULTAN KUDARAT, K1866+182 TO K1868+352, (CHAINAGE 19181 TO CHAINAGE 21351) | Region XII | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | Completed | ₱144.7M | 100% | High risk70 | —-0.006 |
| 503 | 17M00001ROAD UPGRADING (UNPAVED TO PAVED) OF AWANG UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, K1978+(-072)- K1980+080 (CHAINAGE 807-CHAINAGE 2959), PALIMBANG, SULTAN KUDARAT | Region XII | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | Completed | ₱144.6M | 100% | High risk70 | —-0.009 |
| 504 | 18ME0031CONST./IMPROVEMENT OF MALALAG-KIAYAP-ZION-BATIAN ROAD LEADING TO ZION-BATIAN ECOSITE, INCLUDING BRIDGE @ BRGY. BATIAN, MAITUM, SARANGANI PROVINCE | Sarangani DEO | F.H. GOPITEO CONSTRUCTION & SUPPLY | Completed | ₱33.8M | 100% | High risk70 | —-0.024 |
| 505 | 17M00008ROAD UPGRADING (UNPAVED TO PAVED) ALONG SNA-LEBAK-KALAMANSIG ROAD, K1862+230 TO K1864+471, (CHAINAGE 15231 TO CHAINAGE 17471), TINALIN SECTION, SNA, SULTAN KUDARAT | Region XII | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | Completed | ₱144.7M | 100% | High risk69 | —-0.011 |
| 506 | 23M00032ROAD WIDENING - DIGOS-MAKAR RD - K1592 + (-322) - K1594 + 000, MALUNGON, SARANGANI | Region XII | EULOGIA CONSTRUCTION DEVELOPMENT CORP.RC CORTES ENGINEERING SERVICES | Completed | ₱77.2M | 100% | High risk69 | —-0.025 |
| 507 | 17MB0034IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG N1, DIGOS-MAKAR ROAD, K1638+063.7-K1638+515 & K1639+257-K1639+717 | South Cotabato 1st DEO | GRECO CONSTRUCTION AND SUPPLYR.O. BUILDERS & DEVELOPMENT CORPORATION | Completed | ₱26.3M | 100% | High risk69 | —-0.029 |
| 508 | 17M00017ROAD UPGRADING (UNPAVED TO PAVED) ALONG DEMOLOC-LITTLE BAGUIO-ALABEL ROAD, K1682+900 TO K1684+340, (CHAINAGE 25676 TO CHAINAGE 27116), ALABEL, SARANGANI | Region XII | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | Completed | ₱138.4M | 100% | High risk69 | —-0.006 |
| 509 | 17MB0001IMPROVEMENT/WIDENING OF NATIONAL ROADS ALONG FILIPINO-AMERICAN FRIENDSHIP AVENUE, K1662+456-K1663+479, BRGY. CALUMPANG, GENERAL SANTOS CITY | South Cotabato 1st DEO | TSQUARE CONSTRUCTION CORPORATION (FORMERLY:T-SQUARE BUILDERS) | Completed | ₱30.1M | 100% | High risk69 | —-0.027 |
| 510 | 17MB0035OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS, DIGOS-MAKAR ROAD, K1652+381-K1653+697, K1653+837-K1654+878, SOUTH COTABATO | South Cotabato 1st DEO | F.H. GOPITEO CONSTRUCTION & SUPPLY | Completed | ₱25.5M | 100% | High risk69 | —-0.027 |
| 511 | 23ME0039WIDENING OF NAGPAN PARALLEL BR. ALONG DIGOS-MAKAR ROAD, MALUNGON, SARANGANI PROVINCE | Sarangani DEO | TSQUARE CONSTRUCTION CORPORATION (FORMERLY:T-SQUARE BUILDERS) | Completed | ₱17.4M | 100% | High risk69 | —-0.031 |
| 512 | 25MD0066CONSTRUCTION OF RAINWATER COLLECTOR SYSTEM IN PUBLIC FACILITIES, MALAMOTE NHS, MIDSAYAP, UPPER BULANAN ES, MIDSAYAP, FLAUTA ES, MIDSAYAP, LOPE T. QUIAL SR. CES, LIBUNGAN, SINAWINGAN ES, LIBUNGAN, KAWILIHAN ES, ALEOSAN, TAGUAN ES, ALEOSAN, PIGCAWAYAN CES, | Cotabato 1st DEO | LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON | On-Going | ₱2.6M | 98% | High risk69 | —-0.009 |
| 513 | 23MB0082CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM, BARANGAY LABANGAL, GENERAL SANTOS CITY, SOUTH COTABATO | South Cotabato 1st DEO | RL ANTONNE BUILDERS | Completed | ₱24.7M | 100% | High risk69 | —-0.028 |
| 514 | 17M00004ROAD UPGRADING (UNPAVED TO PAVED) ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, PALIMBANG, SULTAN KUDARAT, K1983+999 TO K1985+000, (CHAINAGE 6879 TO CHAINAGE 7780), K1990+717-K1992+809 (CHAINAGE 13596-CHAINAGE15688) | Region XII | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | Completed | ₱144.7M | 100% | High risk69 | —-0.009 |
| 515 | 24M00308PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) (S00231MN) - K1640+000 - K1641+500, GENERAL SANTOS CITY | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱173.7M | 83% | High risk69 | Flagged0.035 |
| 516 | 21ME0052REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE ALONG MAITUM-LAKE SEBU ROAD K1778+050 - K1778+100, K1778+150 - K1778+210, K1778+250 - 1778+290; MAITUM, SARANGANI PROVINCE | Sarangani DEO | F.H. GOPITEO CONSTRUCTION & SUPPLY | Completed | ₱33.8M | 100% | High risk68 | —-0.028 |
| 517 | 17ME0076REHAB. OF NATIONAL ROADS W/ SLIPS, COLLAPSE & LANSLIDE, SDSCR (1739+825 - K1739+950, K1742+190 - K1742+232, K1745+211.5 - K1745+251.5, K1749+220 - K1749+260), GLAN, SARANGANI PROVINCE | Sarangani DEO | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | Completed | ₱34.3M | 100% | High risk68 | —-0.026 |
| 518 | 17MB0033RETRIFITTING/STRENGTHENING OF PERMANENT BRIDGES, BUAYAN BRIDGE (BO1031MN) ALONG BUAYAN-GLAN ROAD, SOUTH COTABATO | South Cotabato 1st DEO | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | Completed | ₱29.4M | 100% | High risk68 | —-0.027 |
| 519 | 19MB0111CONSTRUCTION OF UNDERGROUND DRAINAGE WITH CURB AND GUTTER COR. DARIMCO ST. PUROK DARIMCO TO DAPROZA AVE. PUROK ACHARON, GEN. SANTOS CITY | South Cotabato 1st DEO | GENSAN TOMI BUILDERS INC. | Completed | ₱9.9M | 100% | High risk68 | —-0.028 |
| 520 | 23MB0127ROAD CONSTRUCTION INCLUDING DRAINAGE AT PUROK SAN VICENTE, BRGY. LABANGAL, GENERAL SANTOS CITY | South Cotabato 1st DEO | VERGUZ CONSTRUCTION | Completed | ₱9.9M | 100% | High risk68 | —-0.029 |
| 521 | 19MB0131WIDENING/CONCRETING WITH DRAINAGE IMPROVEMENT ALONG JCT. DIGOS MAKAR ROAD - MABUHAY ROAD, GEN. SANTOS CITY | South Cotabato 1st DEO | KGD BUILDERS INC. | Completed | ₱14.8M | 100% | High risk68 | —-0.028 |
| 522 | 24M00309PREVENTIVE MAINTENANCE -MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) (S00231MN) - K1641+500 - K1643+000, GENERAL SANTOS CITY | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱173.4M | 100% | High risk68 | Flagged0.032 |
| 523 | 23MB0083CONSTRUCTION OF ROAD WITH DRAINAGE SYSTEM, CITY HEIGHTS, GENERAL SANTOS CITY | South Cotabato 1st DEO | J.G. ORANZA CONSTRUCTION | Completed | ₱4.9M | 100% | High risk68 | —-0.027 |
| 524 | 17M00003ROAD UPGRADING (UNPAVED TO PAVED ALONG AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, PALIMBANG, SULTAN KUDARAT, K1982+299 TO K1983+999, (CHAINAGE 5179 TO CHAINAGE 6879) | Region XII | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | Completed | ₱144.7M | 100% | High risk68 | —-0.008 |
| 525 | 17M00002ROAD UPGRADING (UNPAVED TO PAVED) OF AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI ROAD, K1980+080 - K1982+299, (CHAINAGE 2959 - CHAINAGE 5179), PALIMBANG, SULTAN KUDARAT | Region XII | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | Completed | ₱144.7M | 100% | High risk68 | —-0.009 |