Cross-referencing the ledgers…
Cross-referencing the ledgers…
Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
8,613
Total budget
₱195.8B
Average progress
98.0%
Completion rate
92.4%
Average risk score
24.2
Low risk on average, out of 100
Flagged as unusual
432
5.0% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 3,861 | ₱23.7B | 12.0 | 19 | 99.7% |
| Roads | 2,788 | ₱93.9B | 27.8 | 38 | 99.2% |
| Flood Control and Drainage | 757 | ₱34.4B | 31.5 | 11 | 98.6% |
| Bridges | 387 | ₱11.4B | 26.2 | 9 | 99.3% |
| Water Provision and Storage | 259 | ₱1.5B | 17.6 | 3 | 99.1% |
| OTHER | 249 | ₱16.5B | 75.8 | 136 | 86.6% |
| GAA 2025 SSP | 152 | ₱2.8B | 89.0 | 121 | 66.6% |
| GAA 2025 OO-1 | 90 | ₱6.2B | 92.1 | 73 | 72.7% |
| GAA 2025 OO-2 | 55 | ₱4.4B | 87.7 | 22 | 81.0% |
| Bridges, Roads | 15 | ₱1.3B | 43.9 | 0 | 98.1% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 1,168 | ₱76.4B | 39.7 | 147 | 94.9% |
| Sultan Kudarat 2nd DEO | 1,107 | ₱12.2B | 14.9 | 18 | 99.6% |
| South Cotabato 1st DEO | 1,087 | ₱15.6B | 23.4 | 40 | 98.6% |
| South Cotabato 2nd DEO | 1,084 | ₱14.1B | 16.9 | 29 | 99.2% |
| Cotabato 2nd DEO | 1,004 | ₱20.6B | 23.9 | 49 | 98.1% |
| Sarangani DEO | 940 | ₱17.8B | 25.7 | 75 | 96.2% |
| Cotabato 1st DEO | 912 | ₱14.6B | 22.8 | 27 | 99.1% |
| Sultan Kudarat 1st DEO | 572 | ₱11.8B | 24.2 | 17 | 99.3% |
| Cotabato 3rd DEO | 424 | ₱7.3B | 28.5 | 27 | 96.4% |
| Cotabato City DEO | 315 | ₱5.3B | 22.4 | 3 | 100.0% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON | 476 | ₱12.1B | 29.8 | 33 | 97.6% |
| JARGON CONSTRUCTION & SUPPLY | 344 | ₱13.2B | 30.2 | 28 | 97.8% |
| CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTION AND SUPPLY) | 252 | ₱5B | 19.8 | 6 | 99.5% |
| JV CONSTECH | 206 | ₱1.5B | 14.1 | 2 | 99.9% |
| GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | 186 | ₱16.9B | 42.6 | 14 | 99.1% |
| RDEN CONSTRUCTION & SUPPLY | 151 | ₱2B | 22.5 | 3 | 99.5% |
| VERGUZ CONSTRUCTION | 146 | ₱1B | 16.2 | 2 | 99.0% |
| ROBETH CONST. AND DEV'T. CORP. (FORMERLY: ROBETH GEN. MDSE. CONST. & SUPPLY) | 142 | ₱2.7B | 20.7 | 4 | 98.9% |
| LTB BUILDERS & CONSTRUCTION | 138 | ₱961.7M | 13.7 | 3 | 100.0% |
| FFJJ CONSTRUCTION | 137 | ₱6.2B | 29.7 | 3 | 98.7% |
| COFEJOK CONSTRUCTION AND SUPPLY CORPORATION (FORME | 132 | ₱1.5B | 14.1 | 2 | 99.9% |
| J-1 BUILDERS CORPORATION (FORMERLY: J-ONE BUILDERS | 127 | ₱1.4B | 17.0 | 2 | 99.7% |
| ABU CONSTRUCTION | 126 | ₱9.5B | 39.0 | 11 | 98.6% |
| LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | 118 | ₱7.9B | 37.1 | 2 | 99.9% |
| SAREX BUILDERS AND SUPPLY | 117 | ₱718.7M | 18.0 | 5 | 99.1% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25M00001CONSTRUCTION OF MAGPET (PANGAO-AN - DON PANACA) TO DAVAO CITY VIA SALAYSAY (INDAWHONG-BALLAH-MASAWANG) TO LUMONDAO (JUNCTION BUKIDNON TO DAVAO) ROAD, STA. 0+000 - STA. 3+240, MAGPET, NORTH COTABATO | Region XII | PLUS CONSTRUCTION INDUSTRIES CORP. | On-Going | ₱125.9M | 26% | High risk95 | Flagged0.050 |
| 25MC0045CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 3, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Cotabato 2nd DEO | RAKKI CORPORATIONRELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY) | On-Going | ₱112.3M | 39% | High risk95 | Flagged0.041 |
| 25ME0020REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG SARANGANI - DAVAO DEL SUR COASTAL RD K1678+940 - K1679+160, MALAPATAN, SARANGANI PROVINCE | Sarangani DEO | RFP BUILDERS CONSTRUCTION AND SUPPLIES CORPORATIONREYDAN BUILDERS | On-Going | ₱93.6M | 37% | High risk95 | Flagged0.035 |
| 25M00239PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1735 + 813 - K1738 + 574, GLAN, SARANGANI PROVINCE | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱95.3M | 99% | High risk95 | Flagged0.016 |
| 25M00038ROAD WIDENING - MAHARLIKA HIGHWAY( DIGOS-MAKAR RD) - K1631 + 653 - K1634 + 200, GENERAL SANTOS CITY | Region XII | JDRC CONSTRUCTION & SUPPLIES, CORP. | On-Going | ₱72M | 79% | High risk95 | Flagged0.015 |
| 25MC0044CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER, PACKAGE 2, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Cotabato 2nd DEO | LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON | On-Going | ₱112.2M | 53% | High risk95 | Flagged0.038 |
| 25M00238PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1703 +824 - K1706 +581 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱85.6M | 34% | High risk95 | Flagged0.034 |
| 25M00237PREVENTIVE MAINTENANCE - SARANGANI - DAVAO DEL SUR COASTAL RD - K1691 + 570 - K1693 + 137 (WITH-IN STATION LIMITS), GLAN, SARANGANI PROVINCE | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱85.5M | 86% | High risk95 | Flagged0.019 |
| 25M00240PREVENTIVE MAINTENANCE - SARANGGANI - DAVAO DEL SUR COASTAL RD - K1706 + 581 - K1709 + 330 (WITH-IN STATION LIMITS), GLAN, SARANGANI | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱90.4M | 92% | High risk95 | Flagged0.019 |
| 25M00176PREVENTIVE MAINTENANCE - DEMOLOC-LITTLE BAGUIO-ALABEL RD - K1660+000 - K1661+073 (P00910283MN), ALABEL, SARANGANI | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱94.3M | 94% | High risk95 | Flagged0.017 |
| 25ME0016REPLACEMENT OF KALAONG BR. 3 (B01276MN) ALONG MAITUM - LAKE SEBU RD, MAITUM, SARANGANI PROVINCE | Sarangani DEO | CHARIFER BUILDERS, INC. | On-Going | ₱67.4M | 71% | High risk95 | Flagged0.018 |
| 25M00021CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS -MAHARLIKA HIGHWAY (MARBEL-MAKAR RD) - K1669 + 243 - K1670 + 000, POLOMOLOK, SOUTH COTABATO | Region XII | DRU CONSTRUCTIONSALMEGA BUILDERS | On-Going | ₱90.9M | 89% | High risk95 | Flagged0.014 |
| 25M00252PREVENTIVE MAINTENANCE - JCT DIGOS-BUAYAN AIRPORT RD (S00247MN) - K1652 + 473 - K1653 + 239, GENERAL SANTOS CITY | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱94.7M | 82% | High risk95 | Flagged0.021 |
| 25MI0029BUKIDNON-COTABATO RD - K1629 + 413 - K1629 + 530 | Cotabato 3rd DEO | P.L. SEBASTIAN CONSTRUCTION, INC. (FORMERLY: P.L. SEBASTIAN CONSTRUCTION) | On-Going | ₱74.3M | 100% | High risk95 | —-0.000 |
| 25MC0014CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - DOROLUMAN - PRESIDENT ROXAS - KADINGILAN ROAD, COTABATO | Cotabato 2nd DEO | JARGON CONSTRUCTION & SUPPLY | On-Going | ₱77M | 62% | High risk95 | Flagged0.020 |
| 25MB0082CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - ALBERT MORROW BLVD - K1650 + 521 - K1653 + 055 | South Cotabato 1st DEO | LHE CONSTRUCTION & INDUSTRIAL SERVICES, INC. (FORMERLY: LHE CONSTRUCTION & ENG'G. SERVICES)REYDAN BUILDERS | On-Going | ₱94.1M | 76% | High risk95 | Flagged0.022 |
| 25ME0021CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - SARANGANI - DAVAO DEL SUR COASTAL RD - K1657+000 - K1658+685, ALABEL, SARANGANI PROVINCE | Sarangani DEO | MCHAI CONSTRUCTION AND HARDWARE SUPPLYREYDAN BUILDERS | On-Going | ₱140.4M | 26% | High risk95 | Flagged0.042 |
| 25ME0115CONSTRUCTION OF MULTI-PURPOSE BUILDING, (MALAPATAN COLLEGE OF SCIENCE AND TECHNOLOGY), MALAPATAN, SARANGANI PROVINCE | Sarangani DEO | EDCL CONSTRUCTION AND SUPPLYRELY CONSTRUCTION & SUPPLY INC.(FORMERLY: RELY CONSTRUCTION AND SUPPLY) | On-Going | ₱49.5M | 49% | High risk95 | Flagged0.037 |
| 25MB0002CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - MAKAR-KIAMBA RD - K1660 + 662 - K1662 + 000 | South Cotabato 1st DEO | DELLOSA DESIGN BUILDERS CORP.(FORMERLY:DELLOSA DESIGN-BUILD SERVICES) | On-Going | ₱63.9M | 62% | High risk95 | Flagged0.023 |
| 25MI0030BUKIDNON-COTABATO RD - K1630 + 100 - K1630 + 300 | Cotabato 3rd DEO | P.L. SEBASTIAN CONSTRUCTION, INC. (FORMERLY: P.L. SEBASTIAN CONSTRUCTION) | On-Going | ₱79.3M | 36% | High risk95 | Flagged0.025 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24M00049COMPLETION OF THE UNIVERSITY GYMNASIUM (PHASE 2), MSU-GENERAL SANTOS-MINDANAO STATE UNIVERISTY, GENERAL SANTOS CITY | Region XII | FREDEN CONSTRUCTION | On-Going | ₱74.4M | 27% | High risk79 | Flagged0.076 |
| 24M00315CONSTRUCTION OF FLOOD CONTROL/REVETMENT ALONG RIO-GRANDE DE MINDANAO (UPSTREAM); LIBUNGAN-GAMBAR SECTION, STA. 0+000.00 - STA. 0+245.00, NORTHERN KABUNTALAN, MAGUINDANAO | Region XII | PATE-KHAY CONSTRUCTION | On-Going | ₱47.7M | 12% | High risk88 | Flagged0.074 |
| 24M00311PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY (DIGOS-MAKAR RD) - K1592+339 - K1593+000, K1594+000 - K1595+000, K1601+000 - K1601+394, K1604+000 - K1605+000, MALUNGON, SARANGANI | Region XII | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | On-Going | ₱241M | 100% | High risk86 | Flagged0.074 |
| 24M00287CONSTRUCTION OF THE TWO STOREY REGIONAL OFFICE BUILDING OF DOLE XII, KORONADAL CITY | Region XII | PLUS CONSTRUCTION INDUSTRIES CORP. | On-Going | ₱59.6M | 23% | High risk87 | Flagged0.074 |
| 25MG0118CONSTRUCTION OF THE PROVINCIAL SATTELITE AUDIT OFFICE (PSAO)-SOUTH COTABATO AT BARANGAY PARAISO, CITY OF KORONADAL, SOUTH COTABATO | South Cotabato 2nd DEO | REYDAN BUILDERS | On-Going | ₱25.8M | 4% | High risk87 | Flagged0.074 |
| 25MH0118CONCRETING OF HIGHWAY BRGY. JCT. POLOY-POLOY TO BRGY. RAGANDANG FMR, BRGY. POLOY-POLOY AND BRGY. RAGANDANG, LEBAK, SULTAN KUDARAT | Sultan Kudarat 2nd DEO | PSN CONSTRUCTION & SUPPLY | On-Going | ₱14.5M | 21% | High risk85 | Flagged0.066 |
| 24ME0126CONCRETING OF BRGY. BLAAN FMR, BRGY. BLAAN, MALUNGON, SARANGANI PROVINCE | Sarangani DEO | EC SOLICON BUILDERS & SUPPLY, INC. | On-Going | ₱49.7M | 38% | High risk88 | Flagged0.065 |
| 25MG0111CONSTRUCTION OF SCHOOL BUILDING, KORONADAL NATIONAL COMPREHENSIVE HIGH SCHOOL, KORONADAL CITY, SOUTH COTABATO | South Cotabato 2nd DEO | ALEXANDER BUILDERS | On-Going | ₱19.8M | 26% | High risk87 | Flagged0.065 |
| 24M00319CONSTRUCTION OF ROAD, STA 0+000 - STA 1+200, BARANGAY SOLON, SULTAN MASTURA, MAGUINDANAO DEL NORTE | Region XII | MUST ENTERPRISES | On-Going | ₱18.7M | 23% | High risk87 | Flagged0.065 |
| 25MB0098CONCRETING OF BRGY. UPPER LABAY FMR, BRGY. UPPER LABAY, GENERAL SANTOS CITY, SOUTH COTABATO | South Cotabato 1st DEO | JLH CONSTRUCTION INC. | On-Going | ₱14.9M | 34% | High risk87 | Flagged0.061 |
| 24MD0089CONCRETING OF JUNCTION PROVINCIAL ROAD AT BARANGAY SILIK TO PAIDU PULANGI, PIKIT, NORTH COTABATO | Cotabato 1st DEO | H-ROYAL CONSTRUCTION | On-Going | ₱91.4M | 95% | High risk89 | Flagged0.060 |
| 24M00284CONSTRUCTION OF SUPER HEALTH CENTERS - BANGA SUPER HEALTH CENTER, BANGA, SOUTH COTABATO | Region XII | DEDASE CONSTRUCTION SERVICES | On-Going | ₱9.9M | 30% | High risk87 | Flagged0.060 |
| 25MH0128CONSTRUCTION OF SCHOOL BUILDING, GUINTALES INTEGRATED SCHOOL, BRGY. POLOY-POLOY, LEBAK, SULTAN KUDARAT | Sultan Kudarat 2nd DEO | PSN CONSTRUCTION & SUPPLY | On-Going | ₱9.6M | 32% | High risk84 | Flagged0.059 |
| 24M00327ROAD CONCRETING FROM SITIO TATAS TO SITIO KAKAL, STA. 0+020 - STA. 0+680, STA. 0+860- STA. 1+400, BARANGAY LIMBALOD, DATU MONTAWAL, MAGUINDANAO DEL SUR | Region XII | ANGKAT CONSTRUCTION AND SUPPLIES | On-Going | ₱24.3M | 53% | High risk87 | Flagged0.058 |
| 25MC0102CONSTRUCTION OF SCHOOL BUILDING (ONE (1) STOREY THREE (3) CLASSROOM), AT ASUNCION ELEMENTARY SCHOOL, BARANGAY POBLACION, MAKILALA, COTABATO | Cotabato 2nd DEO | LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON | On-Going | ₱7.2M | 52% | High risk87 | Flagged0.058 |
| 24M00328ROAD CONCRETING IN SITIO BAYA TO SITIO DAGADANGEN, BARANGAY KILANGAN, PAGALUNGAN, MAGUINDANAO DEL SUR | Region XII | ANGKAT CONSTRUCTION AND SUPPLIES | On-Going | ₱39.3M | 1% | Medium risk45 | Flagged0.058 |
| 22M00060OFF-CARRIAGEWAY IMPROVEMENT - MARBEL-MAKAR RD - K1664+000 - K1665+487, K1667+038 K1667+670, K1667+780 - K1671+980, POLOMOLOK, SOUTH COTABATO | Region XII | HEXAMINDZ CORPORATION (FORMERLY:KILUSANG MAGKAIBIG | On-Going | ₱91.6M | 0% | High risk73 | Flagged0.058 |
| 25MC0104CONSTRUCTION OF SCHOOL BUILDING (ONE (1) STOREY TWO (2) CLASSROOM), AT NEW CEBU ELEMENTARY SCHOOL, BARANGAY NEW CEBU MAKILALA, COTABATO | Cotabato 2nd DEO | LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON | On-Going | ₱4.8M | 45% | High risk81 | Flagged0.057 |
| 25MH0129CONSTRUCTION OF SCHOOL BUILDING, KUDEN NATIONAL HIGH SCHOOL, BRGY. KUDEN, SEN. NINOY AQUINO, SULTAN KUDARAT | Sultan Kudarat 2nd DEO | FOUR S CONSTRUCTION SERVICES | On-Going | ₱9.9M | 37% | High risk87 | Flagged0.057 |
| 24M00281CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU - NORALA SUPER HEALTH CENTER, SOUTH COTABATO | Region XII | CMJ STAR CONSTRUCTION | On-Going | ₱9.6M | 51% | High risk87 | Flagged0.056 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 576 | 23M00161PREVENTIVE MAINTENANCE - MARBEL-MAKAR RD, K1690+449 - K1691+953.43, TUPI, SOUTH COTABATO | Region XII | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | On-Going | ₱144.7M | 100% | Medium risk54 | —-0.030 |
| 577 | 24M002271. ASPHALT OVERLAY - FROM JUNCTION OF MARBEL MAKAR ROAD STA K1708+270 (0+000-2+000) TO COLUMBIO BYPASS ROAD, KORONADAL CITY;2. ASPHALT OVERLAY - FROM JUNCTION OF MARBEL MAKAR ROAD STA K1708+270 (2+000-4+000) TO COLUMBIO BYPASS, KORONADAL CITY | Region XII | JLSABUDAN CONSTRUCTIONGEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | On-Going | ₱163.6M | 100% | Medium risk54 | —-0.036 |
| 578 | 21M00030CONSTRUCTION OF MISSING LINKS/ NEW ROADS - COLUMBIO - LUTAYAN - KORONADAL ROAD PACKAGE A, STA. 12+274 - STA. 14+894, COLOMBIO,SULTAN, KUDARAT. | Region XII | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | Completed | ₱144.7M | 100% | Medium risk54 | —-0.065 |
| 579 | 24M00145CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - GENERAL SANTOS CITY-T'BOLI-SURALLAH RD -(S01483MN), K1685+880 - K1685+950, K1685+910 - K1685+970, K1685+970 - K1686+040, GENERAL SANTOS CITY | Region XII | VICENTE T. LAO CONSTRUCTION | On-Going | ₱136.4M | 97% | Medium risk53 | —-0.036 |
| 580 | 19M00025CONSTRUCTION OF MISSING LINKS / NEW ROADS - KORONADAL - LUTAYAN - COLUMBIO - MATANAO ROAD, PACKAGE C, SULTAN KUDARAT | Region XII | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | Completed | ₱144.6M | 100% | Medium risk53 | —-0.063 |
| 581 | 23M00005CONSTRUCTION OF PULANGI RIVER FLOOD CONTROL PROJECT PHASE II (BARANGAY NABUNDAS SECTION), STA 0+800 - STA 1+068, PIKIT, NORTH COTABATO | Region XII | DQMB CONSTRUCTION & SUPPLY CORP.ABU CONSTRUCTION | On-Going | ₱104M | 98% | Medium risk53 | —-0.018 |
| 582 | 23M00080CONSTRUCTION OF MISSING LINKS/NEW ROADS - COLUMBIO - LUTAYAN - KORONADAL ROAD, PACKAGE D, STA.1682+470.00 - STA.1682+520.00 ; STA. 1683+080.00 - STA.1683+147.00, COLUMBIO, SULTAN KUDARAT | Region XII | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | On-Going | ₱135.1M | 100% | Medium risk53 | —-0.033 |
| 583 | 22M00076CONSTRUCTION OF MISSING LINKS/NEW ROADS COLUMBIO- LUTAYAN-KORONADAL ROAD, K1677+730.00-K1677+760.00,K1678+200.00-K1678+245.00,K1678+680.00-K1678+710.00, K1679+700.00-K1679+745.00, | Region XII | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | Completed | ₱135.1M | 100% | Medium risk53 | —-0.065 |
| 584 | 25ME0108CONSTRUCTION OF AMSIPIT WATER SYSTEM, AMSIPIT, MAASIM, SARANGANI PROVINCE | Sarangani DEO | SHEPPERD CONSTRUCTION AND SUPPLY | On-Going | ₱4.9M | 1% | Medium risk53 | Flagged0.034 |
| 585 | 24M00019CONSTRUCTION OF MISSING LINKS/ NEW ROADS - COLUMBIO - LUTAYAN - KORONADAL ROAD, PACKAGE E, K0000+000.00-K0000+085.50, COLUMBIO, SULTAN KUDARAT | Region XII | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | On-Going | ₱131.5M | 100% | Medium risk53 | —-0.036 |
| 586 | 22MD0083CONSTRUCTION OF FLOOD MITIGATION STRUCTURE -CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PULANGI RIVER, BRGY. NABUNDAS SECTION, PIKIT, NORTH COTABATO | Region XII | AGONG BUILDERS AND CONSTRUCTION SUPPLY, INC.ABU CONSTRUCTION | Completed | ₱109.7M | 100% | Medium risk53 | —-0.051 |
| 587 | 24M00106ROAD WIDENING - DIGOS-MAKAR RD - K1620 + 322 - K1623 + 337, K1623 + 417 - K1624 + 330, MALUNGON, SARANGANI | Region XII | TSQUARE CONSTRUCTION CORPORATION (FORMERLY:T-SQUARE BUILDERS) | On-Going | ₱144.7M | 100% | Medium risk53 | —-0.034 |
| 588 | 23M00023CONSTRUCTION OF MAGPET (PANGAO-AN - DON PANACA) TO DAVAO CITY VIA SALAYSAY (INDAWHONG-BALLAH-MASAWANG) TO LUMONDAO (JUNCTION BUKIDNON TO DAVAO) ROAD, COTABATO, STA. 1+874 - STA. 3+99 | Region XII | JARGON CONSTRUCTION & SUPPLY | Completed | ₱142.6M | 100% | Medium risk53 | —-0.067 |
| 589 | 24M00013PREVENTIVE MAINTENANCE - JCT DIGOS-BUAYAN AIRPORT RD - K1649+(-683) - K1650 + 086, GENERAL SANTOS CITY, SOUTH COTABATO | Region XII | GEMMA CONSTRUCTION SUPPLY, INC.(FORMERLY:GEMMA CON | Completed | ₱162.5M | 100% | Medium risk53 | —-0.061 |
| 590 | 24MI0097CONSTRUCTION OF MLANG RIVER FLOOD CONTROL PROJECT (DOWNSTREAM OF MLANG BRIDGE, LEFT SIDE), BARANGAY POBLACION A, MLANG, COTABATO | Cotabato 3rd DEO | JARGON CONSTRUCTION & SUPPLY | Completed | ₱127.1M | 100% | Medium risk53 | —-0.056 |
| 591 | 24M00164CONSTRUCTION OF CONCRETE REVETMENT, UPSTREAM OF SINAWAL BRIDGE, SINAWAL RIVER, STA 0+000 - STA 0+809, BARANGAY LABANGAL, GENERAL SANTOS CITY | Region XII | TSQUARE CONSTRUCTION CORPORATION (FORMERLY:T-SQUARE BUILDERS) | On-Going | ₱121M | 100% | Medium risk53 | —-0.020 |
| 592 | 25MH0078CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (GYMNASIUM), BARANGAY POBLACION III, LEBAK, SULTAN KUDARAT | Sultan Kudarat 2nd DEO | JV CONSTECH | Completed | ₱2.5M | 100% | Medium risk53 | —-0.020 |
| 593 | 21M00041CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - SURALLAH-T'BOLI-SAN JOSE ROAD (GEN. SANTOS CITY),PACKAGE D, STA. 29+500 - STA. 29+545; STA. 30+530 - STA. 30+610; STA. 33+300 - STA. | Region XII | VICENTE T. LAO CONSTRUCTION | Completed | ₱144.8M | 100% | Medium risk53 | —-0.057 |
| 594 | 23M00139CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - BANGA-TUPI-MALUNGON ROAD, (TUPI-MALUNGON SECTION) PACKAGE H, STA.54+770.000 - STA.57+340.000,TUPI, SOUTH COTABATO | Region XII | AMPLEX CONSTRUCTION AND SUPPLIES | On-Going | ₱144.7M | 100% | Medium risk53 | —-0.028 |
| 595 | 25MH0027CONSTRUCTION OF RIVERBANK PROTECTION/FLOOD CONTROL AT ALA RIVER, BARANGAY SALABACA, ESPERANZA, SULTAN KUDARAT | Sultan Kudarat 2nd DEO | ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196) | On-Going | ₱123.2M | 42% | Medium risk53 | —-0.007 |
| 596 | 25MH0009CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - AWANG-UPI-LEBAK-KALAMANSIG-PALIMBANG-SARANGANI RD - K2008+789 - K2008+839, K2008+930 - K2009+050, K2009+183 - K2009+298, K2009+584 - K2009+614, K2009+635 - K2009+790, K2010+141 - K2010+190, K2011+573 - K20 | Sultan Kudarat 2nd DEO | ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908) | On-Going | ₱144M | 90% | Medium risk52 | —-0.035 |
| 597 | 17MC0071CONSTRUCTION OF FLOOD CONTROL DIKE APPROACH OF KABACAN BRIDGE, (STA. 0+522-STA. 0+933.4), BRGY. POBLACION, PRESIDENT ROXAS SIDE, PRESIDENT ROXAS, NORTH COTABATO - CONSTRUCTION OF DIKE | Cotabato 2nd DEO | VICENTE T. LAO CONSTRUCTION | Completed | ₱49M | 100% | Medium risk52 | —-0.036 |
| 598 | 18MA0020ACCESS ROAD LEADING TO TAMONTAKA MOTHER TO ROSARY HEIGHTS 10, COTABATO CITY CIRCUMFERENTIAL ROAD TO PEOPLE'S PALACE SECTION, INCLUDING BRIDGE, COTABATO CITY | Cotabato City DEO | BRE CONSTRUCTION | Completed | ₱46.5M | 100% | Medium risk52 | —-0.048 |
| 599 | 24M00206PAVING OF UNPAVED ROADS - SNA-LEBAK-KALAMANSIG RD - K1886+687 - K1888+846, KALAMANSIG, SULTAN KUDARAT | Region XII | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) | On-Going | ₱138.5M | 98% | Medium risk52 | —-0.034 |
| 600 | 18M00041WIDENING OF PERMANENT BRIDGE UPPER MAKAR BR. (B01674MN) ALONG ALBERT MORROW BLVD., ALABEL, SARANGANI PROVINCE | Region XII | VICENTE T. LAO CONSTRUCTION | Completed | ₱192.4M | 100% | Medium risk52 | Flagged0.026 |