Cross-referencing the ledgers…
Cross-referencing the ledgers…
Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
7,430
Total budget
₱276B
Average progress
96.2%
Completion rate
87.5%
Average risk score
38.3
Medium risk on average, out of 100
Flagged as unusual
537
7.2% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 2,689 | ₱136.5B | 39.7 | 34 | 97.2% |
| Buildings and Facilities | 2,548 | ₱19.4B | 23.9 | 19 | 98.6% |
| Flood Control and Drainage | 799 | ₱51.3B | 42.9 | 17 | 97.5% |
| Bridges | 518 | ₱22.4B | 40.1 | 18 | 96.9% |
| OTHER | 256 | ₱17.2B | 77.0 | 141 | 88.1% |
| GAA 2025 SSP | 224 | ₱7.6B | 93.8 | 202 | 72.5% |
| Water Provision and Storage | 196 | ₱2.4B | 28.1 | 7 | 97.7% |
| GAA 2025 OO-1 | 89 | ₱6.5B | 90.6 | 72 | 70.8% |
| Bridges, Roads | 64 | ₱8B | 50.4 | 7 | 95.6% |
| GAA 2025 OO-2 | 47 | ₱4.7B | 89.9 | 20 | 82.6% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XIII | 1,198 | ₱141.4B | 52.2 | 166 | 91.4% |
| Surigao del Sur 1st DEO | 924 | ₱18.3B | 34.8 | 77 | 97.9% |
| Surigao del Norte 2nd DEO | 870 | ₱23.3B | 38.7 | 62 | 94.0% |
| Butuan City DEO | 812 | ₱14.7B | 35.1 | 47 | 95.3% |
| Surigao del Norte 1st DEO | 799 | ₱19.7B | 32.6 | 29 | 98.0% |
| Dinagat Islands DEO | 637 | ₱8.2B | 35.0 | 31 | 98.0% |
| Surigao del Sur 2nd DEO | 596 | ₱15.7B | 36.9 | 47 | 98.1% |
| Agusan del Sur 2nd DEO | 593 | ₱11.8B | 35.7 | 35 | 98.2% |
| Agusan del Norte DEO | 518 | ₱12.6B | 35.1 | 14 | 98.6% |
| Agusan del Sur 1st DEO | 483 | ₱10.3B | 37.1 | 29 | 98.0% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| EQUI-PARCO CONSTRUCTION COMPANY | 370 | ₱45.1B | 51.0 | 42 | 92.7% |
| TRIPARCO DEVELOPMENT CORPORATION | 269 | ₱27.3B | 51.0 | 37 | 90.6% |
| RADIAN CONSTRUCTION AND SUPPLY | 210 | ₱1.3B | 31.5 | 9 | 98.6% |
| ADFIL CORPORATION | 193 | ₱19.9B | 49.7 | 10 | 97.1% |
| LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) | 177 | ₱11.9B | 49.6 | 26 | 95.2% |
| J.M. LUCIANO CONSTRUCTION, INC. | 170 | ₱17B | 51.3 | 20 | 97.3% |
| BOOMETRIX DEVELOPMENT CORP. | 167 | ₱11B | 42.0 | 9 | 92.4% |
| A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D | 141 | ₱4.1B | 44.1 | 8 | 95.9% |
| RAMISES CONSTRUCTION | 134 | ₱7.5B | 41.0 | 5 | 96.6% |
| C.V. CONSTRUCTION & DEVELOPMENT | 130 | ₱2.4B | 38.0 | 12 | 95.1% |
| CARTESIAN BUILDERS CORPORATION (FORMERLY: CARTESIAN BUILDERS) | 129 | ₱2.6B | 31.4 | 2 | 99.1% |
| ROWIE'S CONSTRUCTION | 127 | ₱2B | 44.2 | 22 | 97.3% |
| MRS BUILDERS AND SUPPLY | 125 | ₱785.5M | 24.2 | 3 | 99.6% |
| JMT CONSTRUCTION | 124 | ₱4.6B | 39.9 | 4 | 96.5% |
| ARQ BUILDERS | 123 | ₱9B | 48.2 | 21 | 88.4% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25N00064CONSTRUCTION OF AGUSAN DEL NORTE/ AGUSAN DEL SUR NORTH-SOUTH LATERAL ROAD, (LAS NIEVES, AGUSAN DEL NORTE - KAPALONG, DAVAO DEL NORTE), PACKAGE 6, AGUSAN DEL SUR | Region XIII | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱286M | 52% | High risk96 | Flagged0.048 |
| 25N00063CONSTRUCTION OF AGUSAN DEL NORTE/ AGUSAN DEL SUR NORTH-SOUTH LATERAL ROAD, (LAS NIEVES, AGUSAN DEL NORTE - KAPALONG, DAVAO DEL NORTE), PACKAGE 5, AGUSAN DEL SUR | Region XIII | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱287.7M | 70% | High risk96 | Flagged0.045 |
| 25N00058CONSTRUCTION OF STA. IRENE - SAN MIGUEL ROAD, AGUSAN DEL SUR | Region XIII | J.M. LUCIANO CONSTRUCTION, INC. | On-Going | ₱187.3M | 98% | High risk96 | Flagged0.030 |
| 25N00059CONSTRUCTION OF BYPASS ROAD, MAGKIANGKANG, VILLA UNDAYON-NEW SALEM-MT CARMEL MT. ARARAT, PACKAGE 3, AGUSAN DEL SUR | Region XIII | ARQ BUILDERS | On-Going | ₱192M | 82% | High risk96 | Flagged0.033 |
| 25N00257(CLUSTER I) 1.) TUBAY-CABADBARAN COASTAL ROAD (CONSTRUCTION OF BRIDGE), AGUSAN DEL NORTE, 2.) CONSTRUCTION OF TUBAY-CABADBARAN BRIDGE, TUBAY, AGUSAN DEL NORTE | Region XIII | ARQ BUILDERSROMA CONSTRUCTION & DEVELOPMENT CORPORATION | On-Going | ₱335.3M | 55% | High risk96 | Flagged0.043 |
| 25NH0008CONST. OF BRIDGE, BARANGAY BOLHOON, SAN MIGUEL, SURIGAO DEL SUR | Surigao del Sur 1st DEO | LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) | On-Going | ₱95.5M | 90% | High risk96 | Flagged0.022 |
| 25NH0021CONSTRUCTION OF ROAD, PUROK 1, 4, AND 5, BARANGAY STA. CRUZ, CARMEN, SURIGAO DEL SUR | Surigao del Sur 1st DEO | ROWIE'S CONSTRUCTION | On-Going | ₱48.5M | 95% | High risk96 | Flagged0.014 |
| 25NH0057CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY BAYAN, MARIHATAG, SURIGAO DEL SUR | Surigao del Sur 1st DEO | CM TAN CONSTRUCTION | On-Going | ₱48.1M | 97% | High risk96 | Flagged0.019 |
| 25NC0036CONSTRUCTION OF NRJ SARMIENTO, TRENTO - BISLIG BYPASS ROAD, AGUSAN DEL SUR | Agusan del Sur 2nd DEO | J.M. LUCIANO CONSTRUCTION, INC. | On-Going | ₱47.6M | 92% | High risk96 | Flagged0.021 |
| 25NC0015CONSTRUCTION OF ROAD, NRJ OSMEÑA-COMOTA-LYDIA ROAD, LA PAZ, AGUSAN DEL SUR | Agusan del Sur 2nd DEO | J.M. LUCIANO CONSTRUCTION, INC. | On-Going | ₱47.5M | 80% | High risk96 | Flagged0.020 |
| 25NC0005CONSTRUCTION OF HINATUAN-BUNAWAN-ROSARIO BYPASS ROAD, AGUSAN DEL SUR | Agusan del Sur 2nd DEO | J.M. LUCIANO CONSTRUCTION, INC. | On-Going | ₱47.5M | 97% | High risk96 | Flagged0.016 |
| 25NI0019CONSTRUCTION OF BANK REVETMENT ALONG BAHI RIVER (BAHI BRIDGE SECTION), BAROBO, SURIGAO DEL SUR | Surigao del Sur 2nd DEO | LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) | On-Going | ₱143.2M | 89% | High risk96 | Flagged0.031 |
| 25N00230NRJ BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD TO NRJ BUTUAN CITY-MALAYBALAY RD VIA (BITAN-AGAN-NONG-NONG-BIT-OS DIVERSION ROAD), BUTUAN CITY | Region XIII | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱240M | 1% | High risk96 | Flagged0.057 |
| 25N00060AGUSAN DEL NORTE/ AGUSAN DEL SUR NORTH - SOUTH LATERAL ROAD, (LAS NIEVES, AGUSAN DEL NORTE-KAPALONG, DAVAO DEL NORTE), AGUSAN DEL SUR 1ST LD | Region XIII | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱48.1M | 90% | High risk96 | Flagged0.014 |
| 25NH0020CONSTRUCTION OF FLOOD CONTROL STRUCTURE, CARRASCAL, SURIGAO DEL SUR | Surigao del Sur 1st DEO | J.M. LUCIANO CONSTRUCTION, INC. | On-Going | ₱143.3M | 92% | High risk96 | Flagged0.025 |
| 25NH0058CONSTRUCTION OF NURCIA SEAWALL, LANUZA, SURIGAO DEL SUR | Surigao del Sur 1st DEO | LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) | On-Going | ₱48.5M | 92% | High risk96 | Flagged0.017 |
| 25NH0072CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT PUROK LANSONES I, BARANGAY SAN AGUSTIN, TANDAG CITY, SURIGAO DEL SUR | Surigao del Sur 1st DEO | J.M. LUCIANO CONSTRUCTION, INC. | On-Going | ₱48.5M | 100% | High risk96 | Flagged0.013 |
| 25NI0065CONSTRUCTION OF CAGUYAO BRIDGE, BISLIG CITY, SURIGAO DEL SUR | Surigao del Sur 2nd DEO | DAN-BEL CONSTRUCTION & SUPPLY | On-Going | ₱48.5M | 74% | High risk96 | Flagged0.029 |
| 25N00243CONSTRUCTION OF STA. IRENE-SAN MIGUEL ROAD, (PACKAGE 4), SURIGAO DEL SUR | Region XIII | J.M. LUCIANO CONSTRUCTION, INC. | On-Going | ₱140.4M | 62% | High risk96 | Flagged0.034 |
| 25NI0050CONSTRUCTION OF GAMUT - UNIDAD ROAD SECTION, BAROBO, SURIGAO DEL SUR | Surigao del Sur 2nd DEO | EMG CONSTRUCTION | On-Going | ₱48M | 89% | High risk96 | Flagged0.021 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24N00226DAANG MAHARLIKA (SURIGAO-AGUSAN SECT)- K1218+878.50-K1222+079.22 | Region XIII | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱193M | 53% | High risk90 | Flagged0.077 |
| 25NC0052CONCRETING OF FMR AT NRJ BRGY. PASTA TO BRGY. BUENASUERTE, SAN FRANCISCO, AGUSAN DEL SUR | Agusan del Sur 2nd DEO | ALCT CONSTRUCTION AND SUPPLY | On-Going | ₱9.6M | 0% | High risk86 | Flagged0.075 |
| 25NH0137CONSTRUCTION OF TWO (2) STOREY TEN (10) CLASSROOM SCHOOL BUILDING, CANTILAN NATIONAL HIGH SCHOOL, BRGY. MAGASANG, CANTILAN, SURIGAO DEL SUR | Surigao del Sur 1st DEO | RJ CONSTRUCTION & SUPPLY | On-Going | ₱24.4M | 15% | High risk87 | Flagged0.074 |
| 24N00214CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG LAKE MAINIT-TUBAY RIVER BASIN, TUBAY, AGUSAN DEL NORTE | Region XIII | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱193M | 76% | High risk90 | Flagged0.070 |
| 24ND0168CONSTRUCTION OF 3-STOREY 9-CLASSROOM SCHOOL BUILDING AT PEDRO D. DUNCANO NATIONAL HIGH SCHOOL, BUTUAN CITY, AGUSAN DEL NORTE | Butuan City DEO | REYROSE CONSTRUCTION & SUPPLY DEV'T CORP. (FOR: REY ROSE CONST. & SUPPLY) | On-Going | ₱47.3M | 1% | High risk88 | Flagged0.070 |
| 24N00224DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP) LGU HOSPITALS-AGUSAN DEL NORTE PROVINCIAL HOSPITAL, AGUSAN DEL NORTE | Region XIII | REYROSE CONSTRUCTION & SUPPLY DEV'T CORP. (FOR: REY ROSE CONST. & SUPPLY) | On-Going | ₱49.7M | 2% | High risk88 | Flagged0.070 |
| 25NG0111CONCRETING OF BRGY. MAPAWA TO BRGY. SILOP FMR, BRGY. MAPAWA AND BRGY. SILOP, SURIGAO CITY, SURIGAO DEL NORTE | Surigao del Norte 2nd DEO | A.T. DUMLAO CONSTRUCTION, INC. FORMERLYANDONI T. D | On-Going | ₱59.3M | 12% | High risk89 | Flagged0.069 |
| 24NI0099CONCRETING OF SAN ANTONIO - TABON (JUNCTION OF SAN ANTONIO ALTERNATE HIGHWAY OT ABIJOD TO TABON JUNCTION NATIONAL HIGHWAY), BISLIG CITY, SURIGAO DEL SUR | Surigao del Sur 2nd DEO | MN BAYALAS CONSTRUCTIONSVTS BUILDERS AND SUPPLY | On-Going | ₱48.3M | 65% | High risk86 | Flagged0.066 |
| 24N00210CONSTRUCTION OF DRAINAGE SYSTEM ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD, BUTUAN CITY AIRPORT TO LIBERTAD BRIDGE (BOTH SIDES), BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱96.3M | 61% | High risk89 | Flagged0.064 |
| 24N00128CONSTRUCTION OF REVETMENT ALONG SURIGAO RIVER, PHASE 2, LUNA SECTION, SURIGAO CITY, SURIGAO DEL NORTE | Region XIII | SANTECH BUILDERS CORPORATION | On-Going | ₱192.7M | 95% | High risk91 | Flagged0.063 |
| 24N00211CONSTRUCTION OF BUENAVISTA POBLACION SEAWALL PROTECTION, BUENAVISTA, AGUSAN DEL NORTE | Region XIII | JD-RG CONSTRUCTION AND SUPPLIES CORP. (FORMERLY: JD-RG CONSTRUCTION CORPORATION) | On-Going | ₱149.6M | 89% | High risk89 | Flagged0.062 |
| 25N00234CONSTRUCTION OF SAN LUIS-BINICALAN-ZAMBOANGUITA ROAD, BRGY. MAHAYAHAY, SAN LUIS, AGUSAN DEL SUR (PACKAGE 3) | Region XIII | ULTICON BUILDERS, INC. | On-Going | ₱342.3M | 8% | High risk95 | Flagged0.061 |
| 24NI0098CONSTRUCTION OF RIVER BANK PROTECTION ALONG HINATUAN RIVER (MALIXI SECTION), TAGBINA, SURIGAO DEL SUR | Surigao del Sur 2nd DEO | LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) | On-Going | ₱96.5M | 97% | High risk88 | Flagged0.061 |
| 25N00235CONSTRUCTION OF SAN LUIS-BINICALAN-ZAMBOANGUITA ROAD, BRGY. MAHAYAHAY, SAN LUIS, AGUSAN DEL SUR (PACKAGE 4) | Region XIII | ULTICON BUILDERS, INC. | On-Going | ₱293.4M | 8% | High risk95 | Flagged0.060 |
| 24NH0123CONST. OF SAN AGUSTIN SUR SEAWALL, TANDAG CITY, SURIGAO DEL SUR | Surigao del Sur 1st DEO | EVENPAR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: EVEN PAR CONST. CO. INC.)GICAR CONSTRUCTION, INC. | On-Going | ₱96.5M | 96% | High risk90 | Flagged0.060 |
| 25NB0058CONSTRUCTION OF SCHOOL BUILDING, PATIN-AY CENTRAL ELEMENTARY SCHOOL, BRGY. PATIN-AY, PROSPERIDAD, AGUSAN DEL SUR | Agusan del Sur 1st DEO | GIOVANNI CONSTRUCTION | On-Going | ₱9.8M | 53% | High risk86 | Flagged0.060 |
| 24N00198COMPLETION OF COLLEGE OF ENGINEERING AND INFORMATION SCIENCES INTEGRATED LABORATORY CENTER, PHASE 1- AGUSAN DEL SUR STATE COLLEGE OF AGRICULTURE AND TECHNOLOGY | Region XIII | THEARIS BUILDERS & SUPPLY | On-Going | ₱29.8M | 74% | High risk87 | Flagged0.059 |
| 25NI0039CONSTRUCTION OF SCHOOL BUILDING, GREENFIELD ELEMENTARY SCHOOL, STA. JUANA, TAGBINA, SURIGAO DEL SUR | Surigao del Sur 2nd DEO | ROCK DIWATA BUILDERS, INC. | On-Going | ₱9.9M | 63% | High risk86 | Flagged0.059 |
| 24N00209CONSTRUCTION OF MAIN DRAINAGE CANAL ALONG MONTILLA JCT MONTILLA BOULEVARD-SALVADOR CALO STREET TO COA MAIN DRAINAGE CANAL, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱96.5M | 80% | High risk90 | Flagged0.059 |
| 24NB0094INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (ROADWAY LIGHTING) ALONG NRJ AWA-LIANGA ROAD - K1291+(-852) - K1298+000, PROSPERIDAD, AGUSAN DEL SUR | Agusan del Sur 1st DEO | ZLREJ TRADING AND CONSTRUCTION CORPORATION | On-Going | ₱96.4M | 97% | High risk89 | Flagged0.058 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 701 | 24N00161RADIAL ROAD (NRJ BCIR - NRJ MAYOR DEMOCRITO D. PLAZA II AVENUE), (LIBERTAD-BONBON SECTION) BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱183.3M | 44% | Medium risk56 | —-0.023 |
| 702 | 23N00010NASIPIT-BUENAVISTA-MASAO PORT COASTAL ROAD LEADING TO MASAO PORT, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | ADFIL CORPORATION | Completed | ₱208.4M | 100% | Medium risk56 | —-0.037 |
| 703 | 16NE0083IMPROVEMENT OF CAYETANO WATERWAYS, DINAGAT, DINAGAT ISLANDS LONE DISTRICT, BRYG. CAYETANO, DINAGAT, DINAGAT ISLANDS | Dinagat Islands DEO | GICAR CONSTRUCTION, INC. | Completed | ₱9.8M | 100% | Medium risk56 | —-0.046 |
| 704 | 24N00082BUTUAN CITY-AGUSAN DEL NORTE LOGISTICAL HIGHWAY, PACKAGE 28, BUTUAN CITY | Region XIII | TRIPARCO DEVELOPMENT CORPORATION | Completed | ₱279.8M | 100% | Medium risk56 | —-0.054 |
| 705 | 22N00185CLUSTER 1C.1 BUTUAN CITY-AGUSAN DEL NORTE LOGISTICAL HIGHWAY, PACKAGE 23, BUTUAN CITY CLUSTER 1C.2 BUTUAN CITY-AGUSAN DEL NORTE LOGISTICAL HIGHWAY, PACKAGE 24, BUTUAN CITY CLUSTER 1C.3 BUTUAN CITY-AGUSAN DEL NORTE LOGISTICAL HIGHWAY, PACKAGE 25, BUTUAN CI | Region XIII | TRIPARCO DEVELOPMENT CORPORATION | Completed | ₱248M | 100% | Medium risk56 | —-0.054 |
| 706 | 24N00068NASIPIT-BUENAVISTA-MASAO PORT COASTAL ROAD LEADING TO MASAO PORT, BUTUAN CITY, AGUSAN DEL NORTE, PACKAGE A | Region XIII | ADFIL CORPORATION | On-Going | ₱158.3M | 85% | Medium risk56 | —-0.024 |
| 707 | 18N00102CONSTRUCTION OF ADGAWAN BRIDGE AND APPROACHES ALONG SAN LUIS-BINICALAN ROAD, SAN LUIS, AGUSAN DEL SUR | Region XIII | ARQ BUILDERS | Completed | ₱142.6M | 100% | Medium risk56 | Flagged0.023 |
| 708 | 24N00147CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT ABUTMENT A OF AGUSAN BRIDGE ALONG AGUSAN RIVER, PACKAGE 2, BUTUAN CITY, AGUSAN DEL NORTE | Region XIII | ADFIL CORPORATION | On-Going | ₱193M | 100% | Medium risk56 | —-0.006 |
| 709 | 17NF0179CONSTRUCTION OF BAD-AS FLOOD CONTROL / BRGY. BAD-AS, PLACER, SURIGAO DEL NORTE STA. 0+020 - 0+171 | Surigao del Norte 2nd DEO | ROWIE'S CONSTRUCTION | Completed | ₱9.8M | 100% | Medium risk56 | —-0.045 |
| 710 | 16NG0081CONSTRUCTION/EXTENSION OF SHORE PROTECTION/SEAWALL ALONG COASTAL OF BRGY. PAMOSAINGAN, SOCORRO, SURIGAO DEL NORTE | Surigao del Norte 1st DEO | R. SEMILLA CONSTRUCTION & MARKETING | Completed | ₱9.3M | 100% | Medium risk56 | —-0.041 |
| 711 | 25N00274CONSTRUCTION OF TAGYAGO-COMOTA-LYDIA ROAD CONNECTING RUBBER, CACAO, OIL PALM AND WOOD PLANTATION SITE AND NATIONAL ROAD JUNCTION IN SUPPORT TO RUBBER, CACAO, OIL PALM AND WOOD INDUSTRY, LAS PAZ, AGUSAN DEL SUR | Region XIII | ARQ BUILDERS | On-Going | ₱190.9M | 51% | Medium risk55 | —-0.022 |
| 712 | 25N00216BUTUAN CITY-AGUSAN DEL NORTE LOGISTICAL HIGHWAY, PACKAGE 30, AGUSAN DEL NORTE | Region XIII | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱235M | 40% | Medium risk55 | —-0.020 |
| 713 | 18N00075CONSTRUCTION OF ACCESS ROADS LEADING TO SEAPORTS, NASIPIT-BUENAVISTA0-MASAO PORT COASTAL ROAD, INCL. BRIDGE, AGUSAN DEL NORTE | Region XIII | EQUI-PARCO CONSTRUCTION COMPANYTRIPARCO DEVELOPMENT CORPORATION | Completed | ₱193M | 100% | Medium risk55 | —-0.040 |
| 714 | 25N00222SURIGAO-AGUSAN WEST COASTAL RD, PACKAGE 14, AGUSAN DEL NORTE | Region XIII | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱282.4M | 40% | Medium risk55 | —-0.017 |
| 715 | 16NF0159CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM MAYAG FLOOD CONTROL, MAINIT, SURIGAO DEL NORTE K 0+034 - K 0+180 | Surigao del Norte 2nd DEO | BISLIG VENTURE CONSTRUCTION & DEV'T. INC.ROMA CONSTRUCTION & DEVELOPMENT CORPORATION | Completed | ₱9.8M | 100% | Medium risk55 | —-0.046 |
| 716 | 24N00190DAANG MAHARLIKA (SURIGAO-AGUSAN SECT)- K1153+200- K1153+580, K1153+640- K1153+780, K1153+920- K1155+780, K1155+820- K1156+820 | Region XIII | SANTECH BUILDERS CORPORATION | On-Going | ₱183.3M | 40% | Medium risk55 | —-0.026 |
| 717 | 25NH0127PACKAGE 1 - CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RCWS) SURIGAO DEL SUR | Surigao del Sur 1st DEO | TRIDENT ENGINEERING SERVICES | Completed | ₱2.6M | 100% | Medium risk55 | —-0.022 |
| 718 | 17NG0005CONSTRUCTION/EXTENSION OF SHORE PROTECTION/SEAWALL ALONG THE COASTAL OF BARANGAY POBLACION 1 AND 2, UP TO BARANGAY BITAUG, BURGOS, SURIGAO DEL NORTE (STA. 0+246-0+465), BURGOS, SURIGAO DEL NORTE | Surigao del Norte 1st DEO | ROAD EDGE TRADING & DEVELOPMENT SERVICESR26 CONSTRUCTION, INC. | Completed | ₱13.9M | 100% | Medium risk55 | —-0.040 |
| 719 | 24N00156CONSTRUCTION OF BUGTA-BALATAKAN ROAD (PHASE II), BUENAVISTA, AGUSAN DEL NORTE | Region XIII | ADFIL CORPORATION | On-Going | ₱193M | 99% | Medium risk55 | —-0.033 |
| 720 | 23N00083BDRY. BUKIDNON/AGUSAN DEL NORTE, LAWAN-LAWAN SECTION, PACKAGE K, LAS NIEVES | Region XIII | ME 3 CONSTRUCTIONEQUI-PARCO CONSTRUCTION COMPANY | Completed | ₱208.4M | 100% | Medium risk55 | —-0.058 |
| 721 | 20N00021BDRY. BUKIDNON/ AGUSAN DEL NORTE, LAWAN- LAWAN SECTION, PACKAGE E, BUTUAN CITY | Region XIII | EQUI-PARCO CONSTRUCTION COMPANY | Completed | ₱193M | 100% | Medium risk55 | —-0.058 |
| 722 | 25NF0088CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG NRJ DON PAULINO-BINGAG-OSMENA PHASE 3, DAPA, SURIGAO DEL NORTE | Surigao del Norte 1st DEO | BOOMETRIX DEVELOPMENT CORP. | On-Going | ₱96.4M | 40% | Medium risk55 | —-0.004 |
| 723 | 18N00067CLUSTER 3: 3.1 CONSTRUCTION OF MISSING LINKS, COMPLETION OF THE EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE TO BUKIDNON, SAMPAGUITA-MAKILOS (AGUSAN DEL SUR/BUKIDNON BOUNDARY), PACKAGE 5, AGSUAN DEL SUR, 3.2 CONSTRUCTION OF MISSING LI | Region XIII | MAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION) | Completed | ₱386M | 100% | Medium risk55 | —-0.036 |
| 724 | 16NG0080CONSTRUCTION/EXTENSION OF SHORE PROTECTION/SEAWALL ALONG COASTAL OF POBLACION SOCORRO, SOCORRO, SURIGAO DEL NORTE | Surigao del Norte 1st DEO | MAMSAR CONSTRUCTION AND INDUSTRIAL CORPORATION | Completed | ₱14M | 100% | Medium risk55 | —-0.041 |
| 725 | 22N00038NRJ MAYOR DEMOCRITO D. PLAZA II AVE. ROAD-DELTA DISCOVERY PARK LEADING TO MT. MAYAPAY TO JCT. EAST-WEST LATERAL ROAD CONNECTING AGUSAN DEL SUR/AGUSAN DEL NORTE TO BUKIDNON DULAG-SIMBALAN (DELTA-NONG-NONG- EMELDA MAR SECTION), BUTUAN CITY | Region XIII | RAMISES CONSTRUCTIONEQUI-PARCO CONSTRUCTION COMPANY | Completed | ₱193M | 100% | Medium risk55 | —-0.056 |