Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
14,386
Total budget
₱406.4B
Average progress
92.7%
Completion rate
83.9%
Average risk score
45.9
Medium risk on average, out of 100
Flagged as unusual
336
2.3% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 5,821 | ₱138.9B | 43.4 | 98 | 92.1% |
| Roads | 4,028 | ₱82.7B | 43.8 | 9 | 93.7% |
| Flood Control and Drainage | 3,372 | ₱147.7B | 49.1 | 24 | 94.1% |
| Bridges | 446 | ₱12.6B | 45.0 | 7 | 91.4% |
| OTHER | 360 | ₱13.5B | 53.7 | 57 | 94.0% |
| GAA 2025 SSP | 184 | ₱5.7B | 90.2 | 125 | 66.6% |
| Water Provision and Storage | 104 | ₱402.4M | 26.7 | 1 | 98.1% |
| GAA 2025 OO-2 | 36 | ₱2.5B | 83.2 | 3 | 74.7% |
| GAA 2025 OO-1 | 31 | ₱1.9B | 89.5 | 11 | 68.2% |
| Bridges, Roads | 4 | ₱445.3M | 60.5 | 1 | 75.0% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Metro Manila 1st DEO | 3,141 | ₱81B | 45.1 | 27 | 94.3% |
| Metro Manila 3rd DEO | 2,325 | ₱55.1B | 46.3 | 65 | 90.4% |
| Quezon City 1st DEO | 1,867 | ₱46.1B | 46.3 | 40 | 91.2% |
| North Manila DEO | 1,584 | ₱55B | 46.7 | 30 | 95.3% |
| Las Piñas-Muntinlupa DEO | 1,065 | ₱22.2B | 44.3 | 12 | 93.6% |
| Quezon City 2nd DEO | 1,053 | ₱27.3B | 44.6 | 24 | 93.7% |
| South Manila DEO | 1,053 | ₱26.5B | 43.8 | 21 | 94.6% |
| Metro Manila 2nd DEO | 1,048 | ₱24B | 46.5 | 17 | 92.4% |
| Malabon-Navotas DEO | 880 | ₱22.5B | 45.1 | 24 | 95.1% |
| National Capital Region | 370 | ₱46.7B | 56.8 | 76 | 71.9% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| AARCON BUILDERS | 277 | ₱6B | 44.5 | 1 | 92.7% |
| TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) | 265 | ₱2.8B | 42.1 | 10 | 89.6% |
| IM CONSTRUCTION CORPORATION | 234 | ₱6.8B | 48.6 | 7 | 94.0% |
| ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) | 228 | ₱11B | 49.4 | 3 | 96.0% |
| ST. TIMOTHY CONSTRUCTION CORPORATION ([REVOKED] 39196) | 218 | ₱10.4B | 48.8 | 1 | 95.9% |
| JAGONBUILD CONSTRUCTION CORP. (FOR. JAGON BUILDERS | 210 | ₱4.4B | 46.0 | 9 | 92.4% |
| LE BRON CONSTRUCTION | 195 | ₱12.2B | 52.9 | 17 | 76.5% |
| B. VALENCERINA TRADING & CONSTRUCTION | 187 | ₱1.3B | 35.8 | 1 | 97.7% |
| FRAMECON BUILDERS | 184 | ₱2.9B | 45.2 | 5 | 86.2% |
| MRB11 CONSTRUCTION CORPORATION (FORMERLY:MRB CONS | 171 | ₱8.6B | 51.3 | 2 | 94.3% |
| PHILIPPINE CHEMSTEEL INDUSTRIES, INC. | 169 | ₱4.8B | 46.5 | 1 | 99.5% |
| C.L. MORALES CONSTRUCTION AND TRADING | 155 | ₱1.7B | 41.3 | 0 | 90.3% |
| ST. MATTHEW GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 40908) | 153 | ₱3B | 38.9 | 0 | 99.1% |
| E.L. TORRES CONSTRUCTION AND TRADING INC. (FORMERLY : E. L. TORRES CONSTRUCTION & TRADING | 142 | ₱3.6B | 47.0 | 1 | 93.9% |
| J. SIMEON CONSTRUCTION | 139 | ₱7.4B | 49.1 | 0 | 93.6% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OE0077INSTALLATION OF SOLAR LED STREETLIGHTS AT A. RIVERA ST. - C000.00 TO C945.45, TAYUMAN ST. - K0007 + (-562.60) TO K0007 + 282 AND HERMOSA ST. - C000.00 TO C622.83, MANILA CITY | North Manila DEO | JIIK CONSTRUCTION SERVICES | On-Going | ₱94.6M | 52% | High risk95 | Flagged0.023 |
| 25OE0068REHABILITATION OF DELPAN (MUELLE) PUMPING STATION, MANILA CITY | North Manila DEO | JIIK CONSTRUCTION SERVICES | On-Going | ₱94.6M | 100% | High risk95 | Flagged0.007 |
| 25OG0097REHABILITATION OF ROAD, BARANGAY SAN ROQUE, QUEZON CITY | Quezon City 2nd DEO | TOPNOTCH CATALYST BUILDERS INC. | On-Going | ₱94.5M | 67% | High risk95 | Flagged0.018 |
| 25OE0076INSTALLATION OF SOLAR LED STREETLIGHTS AT QUIRICADA ST. - CHAINAGE 0 TO CHAINAGE 731.80, TAYUMAN ST. - K0007 + 299.0 TO K0008 + 000.00 AND MUELLE DELA INDUSTRIA ST. - K0003 + (-375) TO K0004 + 472, MANILA CITY | North Manila DEO | AL-AMEN BUILDERS | On-Going | ₱94.9M | 63% | High risk95 | Flagged0.021 |
| 25OH0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREET LIGHT ALONG NEW PANADEROS ST. FROM MANDALUYONG/MANILA BOUNDARY TO F. CALDERON ST., MANILA CITY | South Manila DEO | AL-AMEN BUILDERS | On-Going | ₱95.3M | 27% | High risk95 | Flagged0.028 |
| 25OH0100INSTALLATION OF SOLAR LED STREETLIGHTS WITHIN BARANGAYS 649 TO 828, PRES. QUIRINO AVE (FROM TAFT AVE. TO SOUTH SUPERHIGHWAY), SOUTH SUPERHIGHWAY (FROM ZOBEL ROXAS ST. TO P. QUIRINO AVE), P. FAURA ST. (SAN MARCELINO ST. TO ROXAS BLVD.), ESCODA ST. (FROM TA | South Manila DEO | AL-AMEN BUILDERS | On-Going | ₱145.2M | 40% | High risk95 | Flagged0.031 |
| 25OF0163REHABILITATION OF ROAD ALONG BARANGAY LAGRO, PACKAGE 1A, QUEZON CITY | Quezon City 1st DEO | LE BRON CONSTRUCTION | On-Going | ₱94.5M | 47% | High risk95 | Flagged0.026 |
| 25OB0353CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING AT BARANGAY WACKWACK PACKAGE 7, MANDALUYONG CITY | Metro Manila 1st DEO | VIRAC NRC CONSTRUCTION | On-Going | ₱97M | 55% | High risk95 | Flagged0.022 |
| 25OF0165REHABILITATION OF ROAD ALONG BARANGAY STA. MONICA, PACKAGE 1A, QUEZON CITY | Quezon City 1st DEO | LE BRON CONSTRUCTION | On-Going | ₱94.4M | 43% | High risk95 | Flagged0.026 |
| 25OF0157IMPROVEMENT OF DRAINAGE SYSTEMS AT BRGY. HOLY SPIRIT, QUEZON CITY | Quezon City 1st DEO | MRB11 CONSTRUCTION CORPORATION (FORMERLY:MRB CONS | On-Going | ₱94.6M | 61% | High risk95 | Flagged0.022 |
| 25OE0083INSTALLATION OF SOLAR LED STREETLIGHTS ALONG NAGTAHAN FLYOVER (B03338LZ) AND MABINI BRIDGE (B01733LZ) INCLUDING APPROACHES, MANILA CITY | North Manila DEO | JIIK CONSTRUCTION SERVICES | On-Going | ₱105.9M | 15% | High risk95 | Flagged0.037 |
| 25OH0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREETLIGHT WITHIN BRGY. 649 TO 828, RAILROAD ST (CHAINAGE 0 - 855), MURALLA ST (CHAINAGE 0 - 1355), GEN LUNA S | South Manila DEO | JIIK CONSTRUCTION SERVICES | On-Going | ₱143.1M | 49% | High risk95 | Flagged0.030 |
| 25OC0079CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER) AT BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA | Metro Manila 2nd DEO | AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129) | On-Going | ₱94.6M | 15% | High risk95 | Flagged0.037 |
| 25OC0129CONSTRUCTION OF REVETMENT ALONG PARAÑAQUE RIVER MOUTH (NORTH SIDE), PHASE 2,PARAÑAQUE CITY, METRO MANILA | Metro Manila 2nd DEO | K84 CONSTRUCTION AND DEVELOPMENT CORPORATIONEGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | On-Going | ₱94.6M | 18% | High risk95 | Flagged0.036 |
| 25OD0179REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BARANGAY 28 (PHASE 1), CALOOCAN CITY | Metro Manila 3rd DEO | AYLAN CONSTRUCTION & TRADING | On-Going | ₱48M | 51% | High risk95 | Flagged0.016 |
| 25OD0180REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG BARANGAY 28 (PHASE 2), CALOOCAN CITY | Metro Manila 3rd DEO | AYLAN CONSTRUCTION & TRADING | On-Going | ₱48M | 58% | High risk95 | Flagged0.015 |
| 25OA0070CONSTRUCTION OF C-4 FLOOD GATE (PHASE 1), NAVOTAS CITY | Malabon-Navotas DEO | IM CONSTRUCTION CORPORATION | On-Going | ₱47.5M | 47% | High risk95 | Flagged0.016 |
| 25OF0162REHABILITATION OF ROAD ALONG BARANGAY BAGBAG, PACKAGE 1A, QUEZON CITY | Quezon City 1st DEO | LE BRON CONSTRUCTION | On-Going | ₱94.6M | 46% | High risk95 | Flagged0.026 |
| 25OF0136IMPROVEMENT OF ROADS AT BARANGAY LAGRO, QUEZON CITY | Quezon City 1st DEO | LE BRON CONSTRUCTION | On-Going | ₱97M | 51% | High risk95 | Flagged0.025 |
| 25OC0054CONSTRUCTION OF DRAINAGE MAIN ALONG ESTRELLA STREET FROM EDSA TOWARDS PASIG RIVER, BARANGAY GUADALUPE VIEJO,MAKATI CITY, METRO MANILA | Metro Manila 2nd DEO | TWO DIMENSION CONSTRUCTION | On-Going | ₱48.5M | 0% | High risk95 | Flagged0.028 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23O00090PROPOSED DESIGN AND BUILD FOR THE CONSTRUCTION OF NEW FOOD AND DRUG ADMINISTRATION OFFICE | National Capital Region | KAEL CONSTRUCTION AND SUPPLY | On-Going | ₱1.8B | 37% | High risk79 | Flagged0.087 |
| 20OG0117FUNDING REQUIREMENT FOR THE RESILIENCE INSTITUTE, U.P. DILIMAN, QUEZON CITY | Quezon City 2nd DEO | MRB11 CONSTRUCTION CORPORATION (FORMERLY:MRB CONS | On-Going | ₱48.8M | 0% | High risk82 | Flagged0.082 |
| 19Z00038PROPOSED MANILA BAY REHABILITATION PROGRAM (DREDGING AND DISPOSAL OF SOLID WASTE OR SLUDGE WASTE USING OCEAN-BASED METHODOLOGY INCLUDING CONSTRUCTION/EXTENSION OF THREE (3) DRAINAGE OUTFALLS) | National Capital Region | MSB VITUG CONSTRUCTIONMAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION) | On-Going | ₱502.3M | 95% | High risk78 | Flagged0.078 |
| 23O00068CONSTRUCTION OF THE NBI MAIN BUILDING (PHASE I) | National Capital Region | ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762)TOPNOTCH CATALYST BUILDERS INC. | On-Going | ₱447.7M | 0% | Medium risk58 | Flagged0.071 |
| 18OG0133CONSTRUCTION OF FACULTY AND STAFF HOUSING, UP DILIMAN, QUEZON CITY | Quezon City 2nd DEO | FLORIDABLANCA CONSTRUCTION AND DEVELOPMENT CORPORATIONM.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | On-Going | ₱193.3M | 0% | High risk65 | Flagged0.067 |
| 20O00077CONSTRUCTION OF BRIDGE ACROSS PARANAQUE RIVER ADJACENT TO THE PARANAQUE INTEGRATED TERMINAL EXCHANGE (PITX), DON GALO, PARANAQUE CITY | National Capital Region | J.H. PAJARA CONSTRUCTION CORPORATION | On-Going | ₱18.9M | 0% | Medium risk49 | Flagged0.066 |
| 23O00099CONSTRUCTION OF MULTI-PURPOSE BUILDING FOR JOINT-STAFF BILLETING | National Capital Region | SPIDERONE CONSTRUCTION COMPANY LTD. | On-Going | ₱609.5M | 0% | Medium risk57 | Flagged0.065 |
| 22O00090MANILA BAY REHABILITATION PROGRAM: CONSTRUCTION OF A SOLAR-POWERED SEWAGE TREATMENT PLANT ALONG THE LAS PIÑAS RIVER | National Capital Region | DRAGONHART CONSTRUCTION ENTERPRISE, INC.KAEL CONSTRUCTION AND SUPPLY | On-Going | ₱199M | 76% | High risk77 | Flagged0.062 |
| 22O00113RENOVATION OF EXISTING FOOD AND DRUG ADMINISTRATION EXPERIMENTAL ANIMAL HOUSE (EAH) BUILDING TO BECOME VACCINE AND BIOLOGICAL TESTING LABORATORY | National Capital Region | MILES TRADING AND CONSTRUCTION | On-Going | ₱126.1M | 0% | Medium risk54 | Flagged0.062 |
| 18OG0140FUNDING FOR THE RESILIENCE INSTITUTE FOR DRRM, UP DILIMAN, QUEZON CITY | Quezon City 2nd DEO | FLORIDABLANCA CONSTRUCTION AND DEVELOPMENT CORPORATIONM.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | On-Going | ₱388.1M | 39% | High risk65 | Flagged0.061 |
| 18OG0134REHABILITATION, RENOVATION, AND MODERNIZATION OF THE GONZALES HALL, UNIVERSITY LIBRARY, UP DILIMAN, QUEZON CITY | Quezon City 2nd DEO | FLORIDABLANCA CONSTRUCTION AND DEVELOPMENT CORPORATIONM.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | On-Going | ₱401.9M | 48% | High risk64 | Flagged0.061 |
| 22O00092MANILA BAY REHABILITATION PROGRAM : CONSTRUCTION OF A SOLAR-POWERED STP - VITAS RIVER | National Capital Region | DRAGONHART CONSTRUCTION ENTERPRISE, INC.KAEL CONSTRUCTION AND SUPPLY | On-Going | ₱222.9M | 88% | High risk77 | Flagged0.061 |
| 22O00091MANILA BAY REHABILITATION PROGRAM : CONSTRUCTION OF A SOLAR-POWERED STP - SAN JUAN RIVER | National Capital Region | DRAGONHART CONSTRUCTION ENTERPRISE, INC.KAEL CONSTRUCTION AND SUPPLY | On-Going | ₱222.9M | 88% | High risk78 | Flagged0.061 |
| 20O00105CONSTRUCTION OF DRAINAGE SYSTEM/OUTFALL EXTENSION AT MANILA BAY | National Capital Region | PREMIUM MEGASTRUCTURES INC.DRAGONHART CONSTRUCTION ENTERPRISE, INC. | On-Going | ₱258.6M | 77% | High risk74 | Flagged0.057 |
| 24O00209CONSTRUCTION/COMPLETION OF NANGKA SUPER HEALTH CENTER | National Capital Region | JORDAN RIVER CONSTRUCTION AND DEVELOPMENT CORPORATION | On-Going | ₱5.8M | 0% | High risk80 | Flagged0.056 |
| 24O00207REPAIR/REHABILITATION OF CONCEPCION UNO SUPER HEALTH CENTER | National Capital Region | JORDAN RIVER CONSTRUCTION AND DEVELOPMENT CORPORATION | On-Going | ₱5.8M | 0% | High risk78 | Flagged0.056 |
| 24OA0086CONSTRUCTION OF FOUR (4) STOREY, EIGHT (8) CLASSROOM SCHOOL BUILDING, NINOY AQUINO ELEMENTARY SCHOOL, MALABON CITY | Malabon-Navotas DEO | C.B. TAMPENGCO CONSTRUCTION & SUPPLY | On-Going | ₱42.9M | 51% | High risk74 | Flagged0.054 |
| 18O00026CONST. OF ONE UNIT TWELVE STOREY PNU CONVENTION AND TRAINING CENTER (PNUCTC) BUILDINGS (PHASE I) PNU COMPOUND, TAFT AVENUE, MANILA (PARTIAL CONSTRUCTION ONLY) | National Capital Region | FLORIDABLANCA CONSTRUCTION AND DEVELOPMENT CORPORATION | On-Going | ₱226.1M | 70% | High risk64 | Flagged0.053 |
| 18OE0269CONSTRUCTION OF FOUR (4) STOREY TWENTY EIGHT (28) CLASSROOM SCHOOL BUILDING AT MABINI ELEMENTARY SCHOOL QUIAPO, MANILA CITY (BASED ON 2017 PLAN, REVISED 3-24-17) | North Manila DEO | SUPREME ABF CONST. & CONST. SUPPLY COMPANY INC.G.F. FABIAN CONSTRUCTION | Completed | ₱221M | 100% | High risk71 | Flagged0.052 |
| 18OG0126CONSTRUCTION OF FACULTY CENTER (CAL), UP DILIMAN, QUEZON CITY | Quezon City 2nd DEO | FLORIDABLANCA CONSTRUCTION AND DEVELOPMENT CORPORATIONM.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | On-Going | ₱576.9M | 88% | High risk65 | Flagged0.052 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 351 | 25OF0131CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARIKINA RIVER, BARANGAY BATASAN HILLS, QUEZON CITY | Quezon City 1st DEO | A.L. SALAZAR CONSTRUCTION, INC. | On-Going | ₱189.1M | 40% | High risk67 | —-0.015 |
| 352 | 24OF0178CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MARIKINA RIVER, BARANGAY BATASAN HILLS, QUEZON CITY | Quezon City 1st DEO | A.L. SALAZAR CONSTRUCTION, INC. | On-Going | ₱190.4M | 97% | High risk67 | —-0.025 |
| 353 | 25OE0043REHABILITATION OF DRAINAGE SYSTEM ALONG DAGUPAN ST., MANILA CITY, PHASE 1 | North Manila DEO | ROAD EDGE TRADING & DEVELOPMENT SERVICES | On-Going | ₱140.3M | 5% | High risk67 | —-0.011 |
| 354 | 24O00024CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF ABUCAY PUMPING STATION (PHASE 2), MANILA | National Capital Region | E. F. CHUA CONSTRUCTION, INC. | On-Going | ₱143.6M | 93% | High risk67 | —-0.031 |
| 355 | 25OH0043ORGANIZATIONAL OUTCOME 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. AND INSTALLATION OF PUMP AND ITS FACILITIES & APPURTENANCES AT BAC III DRIVE, PASAY | South Manila DEO | E. F. CHUA CONSTRUCTION, INC. | On-Going | ₱143.1M | 87% | High risk67 | —-0.035 |
| 356 | 24OE0179REHABILITATION OF BINONDO PUMPING STATION, MANILA | North Manila DEO | EIGHT J'S CONSTRUCTION SERVICESMNJAP CONSTRUCTION SERVICES | Completed | ₱143.2M | 100% | High risk67 | —-0.066 |
| 357 | 24OE0178REHABILITATION OF ESCOLTA PUMPING STATION, MANILA | North Manila DEO | EIGHT J'S CONSTRUCTION SERVICESJMRP CONSTRUCTION SERVICES | Completed | ₱144.5M | 100% | High risk67 | —-0.066 |
| 358 | 22O00044CONSTRUCTION OF DRAINAGE ALONG SUMULONG HIGHWAY INCLUDING LATERALS, MARIKINA CITY (PHASE II) | National Capital Region | ANORE CONSTRUCTION | On-Going | ₱164M | 83% | High risk67 | —-0.012 |
| 359 | 22O00043CONSTRUCTION OF DRAINAGE ALONG SUMULONG HIGHWAY INCLUDING LATERALS, MARIKINA CITY (PHASE I) | National Capital Region | ANORE CONSTRUCTION | Completed | ₱183.3M | 100% | High risk67 | —-0.048 |
| 360 | 18O00019CONSTRUCTION OF FLOOD CONTROL PROTECTION DIKE ALONG MUZON RIVER, MALABON, NAVOTAS-OBANDO SECTION, MALABON CITY | National Capital Region | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLONEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) | Completed | ₱481.7M | 100% | High risk67 | —-0.024 |
| 361 | 18OD0181CONSTRUCTION OF REVETMENT WALL ALONG POLO RIVER, VALENZUELA CITY | Metro Manila 3rd DEO | JASA GD 2000 CONSTRUCTION CORPORATION (FORMERLY:JASA BUILDER'S)E.M. CUERPO, INC. | Completed | ₱210.6M | 100% | High risk67 | —-0.051 |
| 362 | 25OE0026REHABILITATION OF ESTEROS WITHIN ZONE 25 - 40, MANILA CITY | North Manila DEO | JJPR CONSTRUCTION SERVICES | On-Going | ₱142.4M | 78% | High risk67 | —-0.034 |
| 363 | 24OE0236REHABILITATION OF ROAD WITH DRAINAGE IMPROVEMENT WITHIN ZONE 1 TO 67, MANILA, METROPOLITAN MANILA | North Manila DEO | ALRIE CONSTRUCTION SERVICES | Completed | ₱96.5M | 100% | High risk67 | Flagged0.027 |
| 364 | 25OD0218INSTALLATION OF NEW UNIT PUMPS WITH FLOOD GATE AT COLOONG PUMPING STATION WITH CONSTRUCTION OF PUMP HOUSE AT BARANGAY COLOONG, VALENZUELA CITY | Metro Manila 3rd DEO | MRB11 CONSTRUCTION CORPORATION (FORMERLY:MRB CONS | On-Going | ₱190.5M | 29% | High risk67 | —-0.012 |
| 365 | 25OD0139CONSTRUCTION OF FLOOD CONTROL WALL ALONG LINGUNAN CREEK STA 0+300 TO STA. 0+600, BRGY. LINGUNAN, VALENZUELA CITY | Metro Manila 3rd DEO | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | On-Going | ₱145.8M | 29% | High risk67 | —-0.019 |
| 366 | 25OE0060CONSTRUCTION OF RETARDING BASIN AT ESTERO DE KABULUSAN, PHASE II, TONDO, MANILA CITY | North Manila DEO | DAHL CONSTRUCTION CORP. (FORMERLY: DAHL CONSTRUCTION) | On-Going | ₱142.1M | 40% | High risk67 | —-0.024 |
| 367 | 25OE0048REHABILITATION OF DRAINAGE WITHIN ZONE 1 TO 67, PHASE 3, MANILA CITY | North Manila DEO | EIGHT J'S CONSTRUCTION SERVICESJROSWELL CONSTRUCTION SERVICES | On-Going | ₱142M | 87% | High risk67 | —-0.034 |
| 368 | 25OH0031ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE AT BASECO COMPOUND, PORT AREA, MANILA, PHASE 7 | South Manila DEO | JELSIE CONSTRUCTION & SUPPLY | On-Going | ₱142.9M | 88% | High risk67 | —-0.034 |
| 369 | 25OH0029ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE, PHASE 5, BASECO COMPOUND, PORT AREA, MANILA | South Manila DEO | JELSIE CONSTRUCTION & SUPPLY | On-Going | ₱143M | 81% | High risk67 | —-0.034 |
| 370 | 25OH0030ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURE AT BASECO COMPOUND, PORT AREA, MANILA, PHASE 6 | South Manila DEO | JELSIE CONSTRUCTION & SUPPLY | On-Going | ₱143.1M | 93% | High risk67 | —-0.035 |
| 371 | 22O00110ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS - MAINTENANCE AND UPGRADING OF ACTIVE TRANSPORT INFRASTRUCTURE PHASE II | National Capital Region | S-ANG CONSTRUCTION & GENERAL TRADING, INC.KAEL CONSTRUCTION AND SUPPLY | On-Going | ₱146M | 78% | High risk67 | Flagged0.024 |
| 372 | 25OF0133CONSTRUCTION OF FLOOD MITIGATING STRUCTURE AT AFP ROAD RD. BRGY. HOLY SPIRIT, QUEZON CITY | Quezon City 1st DEO | K84 CONSTRUCTION AND DEVELOPMENT CORPORATIONEGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | On-Going | ₱97M | 5% | High risk67 | —-0.020 |
| 373 | 24OE0044INSTALLATION OF BOOSTER PUMP AT ESTERO DE BINONDO (PACKAGE 1C), MANILA CITY | North Manila DEO | JJPR CONSTRUCTION SERVICES | Completed | ₱144.6M | 100% | High risk67 | —-0.063 |
| 374 | 24OE0041INSTALLATION OF BOOSTER PUMP AT ESTERO DELA REINA (PACKAGE 1B), BINONDO, MANILA CITY | North Manila DEO | JJPR CONSTRUCTION SERVICES | Completed | ₱144.1M | 100% | High risk67 | —-0.066 |
| 375 | 24OE0017CONSTRUCTION OF RETARDING BASIN AT ESTERO DE BINONDO, MANILA CITY | North Manila DEO | JJPR CONSTRUCTION SERVICES | On-Going | ₱140.2M | 97% | High risk67 | —-0.028 |