Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
20,928
Total budget
₱602.8B
Average progress
95.1%
Completion rate
86.5%
Average risk score
36.7
Medium risk on average, out of 100
Flagged as unusual
640
3.1% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 7,413 | ₱208.2B | 36.2 | 81 | 95.0% |
| Buildings and Facilities | 6,918 | ₱78.1B | 28.2 | 73 | 96.6% |
| Flood Control and Drainage | 4,728 | ₱249.9B | 44.5 | 204 | 94.5% |
| Bridges | 884 | ₱28.7B | 35.9 | 29 | 96.4% |
| OTHER | 305 | ₱12.8B | 64.1 | 65 | 93.5% |
| Water Provision and Storage | 280 | ₱2.1B | 30.1 | 9 | 94.6% |
| GAA 2025 SSP | 264 | ₱10.9B | 91.5 | 153 | 74.5% |
| GAA 2025 OO-2 | 53 | ₱3.9B | 88.5 | 2 | 82.7% |
| GAA 2025 OO-1 | 49 | ₱3B | 90.2 | 22 | 76.7% |
| Bridges, Roads | 34 | ₱5B | 50.6 | 2 | 90.4% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bulacan 1st DEO | 2,840 | ₱88.4B | 42.8 | 133 | 90.4% |
| Bulacan 2nd DEO | 2,162 | ₱58.2B | 38.1 | 36 | 97.2% |
| Pampanga 1st DEO | 2,145 | ₱38.8B | 25.9 | 34 | 98.1% |
| Nueva Ecija 1st DEO | 2,051 | ₱33.7B | 28.8 | 27 | 98.9% |
| Tarlac DEO | 2,043 | ₱73.5B | 34.7 | 52 | 97.3% |
| Aurora DEO | 1,351 | ₱26.5B | 39.9 | 33 | 96.3% |
| Nueva Ecija 2nd DEO | 1,224 | ₱26.9B | 31.5 | 20 | 98.3% |
| Pampanga 2nd DEO | 1,071 | ₱20B | 31.1 | 9 | 99.0% |
| Region III | 982 | ₱79.9B | 54.6 | 103 | 85.1% |
| Zambales 1st DEO | 967 | ₱35.5B | 46.8 | 71 | 91.3% |
| Tarlac 2nd DEO | 926 | ₱33.2B | 34.8 | 14 | 97.9% |
| Pampanga 3rd DEO | 881 | ₱24.7B | 30.6 | 21 | 97.9% |
| Bataan 2nd DEO | 727 | ₱19B | 43.9 | 38 | 92.9% |
| Bataan 1st DEO | 714 | ₱13.5B | 35.0 | 6 | 95.6% |
| Zambales 2nd DEO | 647 | ₱18.4B | 36.2 | 16 | 96.0% |
| Bulacan 3rd DEO | 136 | ₱10.2B | 77.0 | 18 | 44.4% |
| Bataan 3rd DEO | 61 | ₱2.5B | 65.2 | 9 | 47.2% |
Exhibit C
Joint-venture projects count toward each partner.
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CN0159CONSTRUCTION OF BALER - SAN LUIS - DINGALAN ROAD, BALER, AURORA | Aurora DEO | R.N.G.M. CONSTRUCTION CORPORATION (FORMERLY: R.N.G.M. CONSTRUCTION) | On-Going | ₱95.7M | 54% | High risk96 | Flagged0.020 |
| 25CN0157CONSTRUCTION OF MULTI-PURPOSE BUILDING , BARANGAY ZABALI, BALER, AURORA | Aurora DEO | DALCON CONSTRUCTION | On-Going | ₱96M | 14% | High risk96 | Flagged0.032 |
| 25CN0161CONSTRUCTION OF DINGALAN-SAN LUIS-BALER ROAD, DINGALAN, AURORA | Aurora DEO | IRC CONSTRUCTION & SUPPLIES | On-Going | ₱141.8M | 27% | High risk96 | Flagged0.031 |
| 25CA0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BACONG SECTION, | Bataan 1st DEO | PASCAL CONSTRUCTION | On-Going | ₱94.5M | 92% | High risk96 | Flagged0.009 |
| 25CN0064CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NORTH POBLACION, DIPACULAO, AURORA | Aurora DEO | R.D. TALENS CONSTRUCTION AND TRADING | On-Going | ₱97.1M | 34% | High risk96 | Flagged0.024 |
| 25CB0093CONSTRUCTION OF DIKE (PHASE 4) ALONG NABASAG RIVER, BALANGA CITY, BATAAN | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 55% | High risk96 | Flagged0.021 |
| 25CB0095CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 6) | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0094CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 5) | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0098CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 2) | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 61% | High risk96 | Flagged0.020 |
| 25CB0099CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 3) | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 59% | High risk96 | Flagged0.020 |
| 25CE0252CONSTRUCTION OF BRIDGE, BARANGAY KALIWANAGAN TO BARANGAY TAYABO, SAN JOSE CITY, NUEVA ECIJA | Nueva Ecija 1st DEO | WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION)MGB CONSTRUCTION & TRADING | On-Going | ₱95.5M | 49% | High risk96 | Flagged0.021 |
| 25CP0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO DUPLAS,BRGY. KALAWAK | Bulacan 3rd DEO | TOPNOTCH CATALYST BUILDERS INC.BGC20 CONSTRUCTION CORP. | On-Going | ₱142.5M | 13% | High risk96 | Flagged0.036 |
| 25CP0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO TALAMSI I-SITIO KAMB | Bulacan 3rd DEO | EIRISH BUILDERS & SUPPLY INC. | On-Going | ₱142.5M | 50% | High risk96 | Flagged0.025 |
| 25CP0066CONVERGE. AND SPECIAL SUPPORT PROG. - SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGSS/ FACILITIES - CONST.OF ROAD, PHASE I, SITIO TALAMSI I - SITIO KAM | Bulacan 3rd DEO | EIRISH BUILDERS & SUPPLY INC. | On-Going | ₱142.5M | 50% | High risk96 | Flagged0.025 |
| 25CP0067CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, SITIO TUBIGAN - SITIO CALUMPIT, BRGY. | Bulacan 3rd DEO | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)MLR SOLID CONSTRUCTION AND DEVELOPMENT CORPORATION | On-Going | ₱142.5M | 20% | High risk96 | Flagged0.035 |
| 25CD0170CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER AND IT'S TRIBUTARIES, STA. 06+980 - STA. 07+160 (SALUYSOY SECTION), MEYCAUAYAN, BULACAN | Bulacan 2nd DEO | HALREY CONSTRUCTION INC. | On-Going | ₱96M | 97% | High risk96 | Flagged0.003 |
| 25CC0406REHABILITATION OF UGONG CREEK (LEFT SIDE) BALAGTAS, BULACAN (PACKAGE G) | Bulacan 1st DEO | A.L. SALAZAR CONSTRUCTION, INC. | On-Going | ₱95M | 0% | High risk96 | Flagged0.032 |
| 25CF0129SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG GAPAN - FORT MAGSAYSAY ROAD, PEÑARANDA SECTION, NUEVA ECIJA | Nueva Ecija 2nd DEO | ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES) | On-Going | ₱144M | 82% | High risk96 | Flagged0.015 |
| 25CJ0238CONSTRUCTION OF MONCADA - PANIQUI DIVERSION ROAD (SEGMENT 5), MONCADA, TARLAC | Tarlac DEO | HIGH STRENGTH DEV. CORPORATION | On-Going | ₱96.5M | 91% | High risk96 | Flagged0.011 |
| 25CI0033BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER (PHASE IV), MABALACAT CITY, PAMPANGA | Pampanga 3rd DEO | MCB ZAMORA CONSTRUCTION & SUPPLY | On-Going | ₱148.5M | 100% | High risk95 | Flagged0.014 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23CF0097CONCRETING OF BRGY. STO. CRISTO FMR, BRGY. STO. CRISTO, SAN ISIDRO, NUEVA ECIJA | Nueva Ecija 2nd DEO | TRIPLE S BUILDERS INC. | On-Going | ₱11.7M | 0% | High risk83 | Flagged0.069 |
| 23CF0094CONCRETING OF BRGY. BAGO FMR, BRGY. BAGO, GEN. TINIO, NUEVA ECIJA | Nueva Ecija 2nd DEO | F-DEY CONSTRUCTION AND TRADING | On-Going | ₱11.7M | 0% | High risk82 | Flagged0.069 |
| 25CA0074CONSTRUCTION OF SCHOOL BUILDING, MABUCO ELEMENTARY SCHOOL, MABUCO ELEMENTARY SCHOOL, BARANGAY MABUCO, HERMOSA, BATAAN | Bataan 1st DEO | BUILDERS EXPONENT EMPIRE CORP. (FORMERLY: BUILDERS EXPONENT ENTERPRISE) | On-Going | ₱19.5M | 0% | High risk84 | Flagged0.062 |
| 19C00077REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES-RECONSTRUCTION OF SLOPE PROTECTION AT BALAYBAY RESETTLEMENT ELEMENTARY SCHOOL, CASTILLEJOS, ZAMBALES | Region III | ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) | On-Going | ₱93.5M | 32% | High risk71 | Flagged0.060 |
| 24CL0208CONSTRUCTION OF REVETMENT ALONG GABOR RIVER, PHASE 1, SAN FELIPE, ZAMBALES | Zambales 1st DEO | CDC CONSTRUCTION & SUPPLIES | On-Going | ₱95.5M | 0% | High risk82 | Flagged0.060 |
| 24CJ0414CONSTRUCTION OF MULTI-PURPOSE BUILDING, TARLAC CITY GENERAL HOSPITAL, TARLAC CITY, TARLAC | Tarlac DEO | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱95.6M | 53% | High risk90 | Flagged0.060 |
| 25CD0223CONCRETING OF BRGY. STO. CRISTO FMR, BRGY. STO. CRISTO, SAN JOSE DEL MONTE, BULACAN | Bulacan 2nd DEO | TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) | On-Going | ₱28.9M | 0% | High risk79 | Flagged0.060 |
| 24CF0136SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE ALONG JAEN - SAN ANTONIO ROAD, JAEN, NUEVA EC | Nueva Ecija 2nd DEO | AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) | On-Going | ₱96M | 42% | High risk89 | Flagged0.059 |
| 25CH0062CONCRETING OF PUROK 6, BRGY. SAN ROQUE ARBOL FMR, BRGY. SAN ROQUE ARBOL, LUBAO, PAMPANGA | Pampanga 2nd DEO | 120 OVER CONSTRUCTION CO. | On-Going | ₱14.7M | 0% | High risk82 | Flagged0.059 |
| 23CL0174CONSTRUCTION OF BY-PASS AND DIVERSION ROADS IBA-BOTOLAN, ZAMBALES (PHASE 2) | Zambales 1st DEO | E.R. DELA CRUZ CONSTRUCTION & SUPPLY | On-Going | ₱95.2M | 0% | High risk78 | Flagged0.058 |
| 24CC0606CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL, PACKAGE B, BARANGAY SANTA ELENA - BARANGAY TIBAGUIN, HAGONOY, BULACAN | Bulacan 1st DEO | SYMS CONSTRUCTION TRADING | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.058 |
| 24CC0588CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KALERO RIVER, PACAKGE B, BARANGAY PANASAHAN, MALOLOS, BULACAN | Bulacan 1st DEO | SYMS CONSTRUCTION TRADING | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.058 |
| 24CC0604CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAYCAPIZ-TALIPTIP RIVER, PACKAGE B, BARANGAY PEREZ, BULAKAN, BULACAN | Bulacan 1st DEO | SYMS CONSTRUCTION TRADING | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CC0592CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, PACKAGE A, BARANGAY TAAL-BARANGAY SANTO CRISTO, PULILAN, BULACAN | Bulacan 1st DEO | SYMS CONSTRUCTION TRADING | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.057 |
| 23CL0173CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CAPAS-BOTOLAN ROAD TO IBA (PHASE 1), IBA, ZAMBALES | Zambales 1st DEO | T2B3 BUILDERS AND SUPPLIES CORP. | On-Going | ₱95.3M | 0% | High risk77 | Flagged0.057 |
| 23CL0176CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CAPAS-BOTOLAN ROAD TO IBA (PHASE 2), IBA, ZAMBALES | Zambales 1st DEO | T2B3 BUILDERS AND SUPPLIES CORP.LMAX CONSTRUCTION | On-Going | ₱95.5M | 0% | High risk77 | Flagged0.057 |
| 24CC0580CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE H, BARANGAY TANAWAN, BUSTOS, BULACAN | Bulacan 1st DEO | JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CC0579CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE G, BARANGAY TANAWAN, BUSTOS, BULACAN | Bulacan 1st DEO | A.R.L. CONSTRUCTION | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0582CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACAKGE J, BARANGAY TANAWAN, BUSTOS, BULACAN | Bulacan 1st DEO | RVR3 CONSTRUCTION SUPPLY AND SERVICES | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CC0581CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE I, BARANGAY TANAWAN, BUSTOS, BULACAN | Bulacan 1st DEO | JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 25C00293ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - JOSE ABAD SANTOS AVE (JASA) - DINALUPIHAN, BATAAN | Bataan 3rd DEO | S-ANG CONSTRUCTION & GENERAL TRADING, INC. | On-Going | ₱113.5M | 71% | High risk92 | Flagged0.009 |
| 252 | 25CG0069FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - FLOOD MITIGATION STRUCTURE - CONSTRUCTION/ REHABILITATION OF SLOPE PROTECTION WORKS AT BRGY. MALIWALU, BACOLOR, PAMPANGA | Pampanga 1st DEO | THREE-IN-ONE CONSTRUCTION & TRADING | On-Going | ₱91.7M | 0% | High risk92 | Flagged0.009 |
| 253 | 25CI0038FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER (DOWNSTREAM OF CENTENNIAL BRIDGE), BARANGAY TABUN, MABALACAT CITY, PAMPANGA | Pampanga 3rd DEO | TRICHES CONSTRUCTION & TRADING | On-Going | ₱96.5M | 100% | High risk92 | —-0.016 |
| 254 | 25CG0178SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): FLOOD MITIGATION STRUCTURES PROTECTION PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION/REHABILITATION OF DRAINAGE SYSTEM, BARANGAY ARENAS, ARAYAT, PAMPANGA | Pampanga 1st DEO | BEFORE THIRTY THREE CONSTRUCTION AND TRADING | Completed | ₱9.3M | 100% | High risk92 | —-0.032 |
| 255 | 25CJ0068CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALOY RIVER (PACKAGE 12), GERONA, TARLAC | Tarlac DEO | T2B3 BUILDERS AND SUPPLIES CORP. | On-Going | ₱96.5M | 95% | High risk92 | —-0.013 |
| 256 | 25CG0066FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONCRETING OF SLOPE PROTECTION AT INUMAN BAKA STA. ANA-ARAYAT PORTION, PAMPANGA PHASE II | Pampanga 1st DEO | CHOLO CONSTRUCTION AND TRADING | On-Going | ₱91.5M | 61% | High risk92 | —-0.007 |
| 257 | 25CK0095REHABILITATION OF EARTH SLOPE DIKE, UPSTREAM OF BANGOT BRIDGE - BANGUT RIVER LEFT SIDE (SEGMENT C), CAPAS, TARLAC | Tarlac 2nd DEO | 11-16 CONSTRUCTION | On-Going | ₱96.5M | 70% | High risk92 | —-0.007 |
| 258 | 25CF0078ASSET PRESERVATION PROGRAM - CONSTRUCTION / UPGRADING / REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - CABANATUAN CITY - PAPAYA RD - K0117+732 - K0118+000, K0118+000-K0118+397 | Nueva Ecija 2nd DEO | FRAMECON BUILDERS | On-Going | ₱24.1M | 82% | High risk92 | —-0.008 |
| 259 | 25CB0037PREVENTIVE MAINTENANCE - SECONDARY ROADS-ROMAN EXPRESSWAY - K0128 + 292 - K0129 + 883, BATAAN 2ND DISTRICT | Bataan 2nd DEO | S-ANG CONSTRUCTION & GENERAL TRADING, INC. | On-Going | ₱133.6M | 22% | High risk91 | Flagged0.025 |
| 260 | 25CI0050NETWORK DEVELOPMENT PROGRAM; OFF-CARRIAGEWAY IMPROVEMENT-SCONDARY ROADS; WEST CIRCUMFERENTIAL ROAD, ANELES CITY K0082+(-640)-K0085+048 | Pampanga 3rd DEO | JGPD CONSTRUCTION SERVICES | On-Going | ₱22.4M | 62% | High risk91 | Flagged0.003 |
| 261 | 25CD0036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER, LIPUTAN - NAGBALON SECTION, STA. 05+375 - STA. 05+475, MEYCAUAYAN, BULACAN | Bulacan 2nd DEO | JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) | On-Going | ₱96.5M | 100% | High risk91 | —-0.018 |
| 262 | 25CD0082CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER AND ITS TRIBUTARIES, CAINGIN - MEYLAND SECTION, STA. 9+613 - STA. 9+850, MEYCAUAYAN CITY, BULACAN | Bulacan 2nd DEO | ROYAL CROWN MONARCH CONSTRUCTION & SUPPLIES CORP. | On-Going | ₱96.5M | 100% | High risk91 | —-0.018 |
| 263 | 25CJ0217CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN ISIDRO CREEK (ANNEX 13), CITY OF TARLAC, TARLAC | Tarlac DEO | 11-16 CONSTRUCTION | Completed | ₱96.5M | 100% | High risk91 | —-0.019 |
| 264 | 25CE0148CONSTRUCTION OF DE LEON DAM, BARANGAY BULAC, TALAVERA, NUEVA ECIJA | Nueva Ecija 1st DEO | SPECO BUILDERS INC. (FORMERLY VRF CONSTRUCTION) | On-Going | ₱116.4M | 97% | High risk91 | —-0.012 |
| 265 | 25CI0049NETWORK DEVELOPMENT PROGRAM; OFF-CARRIAGEWAY IMPROVEMENT-SECONDARY ROADS: OLD MANILA NORTH RD, ANGELES CITY K0082+(-640)-K0085+048 | Pampanga 3rd DEO | MC SAMPANG CONSTRUCTION | On-Going | ₱14.7M | 88% | High risk91 | —-0.009 |
| 266 | 25CE0108CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, BARANGAY POBLACION NORTE, MUNICIPALITY OF RIZAL, NUEVA ECIJA | Nueva Ecija 1st DEO | R.A. PAHATI CONST. & SUPPLY, INC. | On-Going | ₱144.7M | 95% | High risk91 | —-0.006 |
| 267 | 25CF0071ASSET PRESERVATION PROGRAM - REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - CABANATUAN CITY - CARMEN RD - K0123+(-909)-K0123+(-835), K0123+(-681)-K0123+000, K0123+340-K0123+602, K0123+660-K0123+688, K0123+790-K0123+8 | Nueva Ecija 2nd DEO | CELSO C. FERRER CONSTRUCTION CORP. | On-Going | ₱25.1M | 95% | High risk91 | —-0.013 |
| 268 | 25CB0120CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TALISAY RIVER STA 4 + 339 - STA. 4 + 099, BALANGA CITY, BATAAN | Bataan 2nd DEO | SUPREME BUILDERS CONSTRUCTION AND TRADING | On-Going | ₱56.7M | 5% | High risk91 | Flagged0.004 |
| 269 | 25CO0071BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY MALIGAYA, MARIVELES, BATAAN | Bataan 3rd DEO | NICAP CONSTRUCTION | On-Going | ₱4.8M | 0% | High risk91 | Flagged0.025 |
| 270 | 25CG0065FLOOD MANAGEMENT PROGRAM: CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONCRETING OF SLOPE PROTECTION AT INUMAN BAKA STA. ANA-ARAYAT PORTION, PAMPANGA PHASE I | Pampanga 1st DEO | CHOLO CONSTRUCTION AND TRADING | On-Going | ₱64.2M | 75% | High risk91 | —-0.016 |
| 271 | 25CJ0098CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG SAN ISIDRO CREEK (PHASE 5), TARLAC CITY, TARLAC | Tarlac DEO | BIG BERTHA CONSTRUCTION & DEVELOPMENT | On-Going | ₱74.3M | 84% | High risk91 | —-0.018 |
| 272 | 25C00482BRIDGE PROGRAM-1.)RETROFITTING/STRENGHTENING OF PERMANENT BRIDGES-AGUANG BRIDGE (BO3015LZ) ALONG BALER-CASIGURAN ROAD (BALER-DINADIAWAN, AND 2.) REHAB./MAJOR REPAIR OF PERMANENT BRIDGES-MALUPA BRIDGE (BO3007LZ) ALONG CASTANEDA-MA. AURORA-SAN LUIS ROAD | Region III | ALPHATEC CHEMICAL CORPORATION | On-Going | ₱40.6M | 100% | High risk91 | —-0.013 |
| 273 | 25CD0035CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER, LIPUTAN - NAGBALON SECTION, STA. 05+475 - STA. 05+575, MEYCAUAYAN, BULACAN | Bulacan 2nd DEO | JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) | On-Going | ₱96.5M | 100% | High risk91 | —-0.018 |
| 274 | 25CN0020REPLACEMENT OF PERMANENT WEAK BRIDGES LIPIT BR. (B03016LZ) ALONG BALER-CASIGURAN RD (BALER-DINADIAWAN) | Aurora DEO | R.N.G.M. CONSTRUCTION CORPORATION (FORMERLY: R.N.G.M. CONSTRUCTION) | On-Going | ₱45.5M | 100% | High risk91 | —-0.012 |
| 275 | 25CG0182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF GATIAWIN-LACMIT ROAD, ARAYAT, PAMPANGA | Pampanga 1st DEO | NES-SAN BUILDERS | Completed | ₱13.9M | 100% | High risk91 | —-0.035 |