Cross-referencing the ledgers…
Cross-referencing the ledgers…
Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
20,928
Total budget
₱602.8B
Average progress
95.1%
Completion rate
86.5%
Average risk score
36.7
Medium risk on average, out of 100
Flagged as unusual
640
3.1% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 7,413 | ₱208.2B | 36.2 | 81 | 95.0% |
| Buildings and Facilities | 6,918 | ₱78.1B | 28.2 | 73 | 96.6% |
| Flood Control and Drainage | 4,728 | ₱249.9B | 44.5 | 204 | 94.5% |
| Bridges | 884 | ₱28.7B | 35.9 | 29 | 96.4% |
| OTHER | 305 | ₱12.8B | 64.1 | 65 | 93.5% |
| Water Provision and Storage | 280 | ₱2.1B | 30.1 | 9 | 94.6% |
| GAA 2025 SSP | 264 | ₱10.9B | 91.5 | 153 | 74.5% |
| GAA 2025 OO-2 | 53 | ₱3.9B | 88.5 | 2 | 82.7% |
| GAA 2025 OO-1 | 49 | ₱3B | 90.2 | 22 | 76.7% |
| Bridges, Roads | 34 | ₱5B | 50.6 | 2 | 90.4% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bulacan 1st DEO | 2,840 | ₱88.4B | 42.8 | 133 | 90.4% |
| Bulacan 2nd DEO | 2,162 | ₱58.2B | 38.1 | 36 | 97.2% |
| Pampanga 1st DEO | 2,145 | ₱38.8B | 25.9 | 34 | 98.1% |
| Nueva Ecija 1st DEO | 2,051 | ₱33.7B | 28.8 | 27 | 98.9% |
| Tarlac DEO | 2,043 | ₱73.5B | 34.7 | 52 | 97.3% |
| Aurora DEO | 1,351 | ₱26.5B | 39.9 | 33 | 96.3% |
| Nueva Ecija 2nd DEO | 1,224 | ₱26.9B | 31.5 | 20 | 98.3% |
| Pampanga 2nd DEO | 1,071 | ₱20B | 31.1 | 9 | 99.0% |
| Region III | 982 | ₱79.9B | 54.6 | 103 | 85.1% |
| Zambales 1st DEO | 967 | ₱35.5B | 46.8 | 71 | 91.3% |
| Tarlac 2nd DEO | 926 | ₱33.2B | 34.8 | 14 | 97.9% |
| Pampanga 3rd DEO | 881 | ₱24.7B | 30.6 | 21 | 97.9% |
| Bataan 2nd DEO | 727 | ₱19B | 43.9 | 38 | 92.9% |
| Bataan 1st DEO | 714 | ₱13.5B | 35.0 | 6 | 95.6% |
| Zambales 2nd DEO | 647 | ₱18.4B | 36.2 | 16 | 96.0% |
| Bulacan 3rd DEO | 136 | ₱10.2B | 77.0 | 18 | 44.4% |
| Bataan 3rd DEO | 61 | ₱2.5B | 65.2 | 9 | 47.2% |
Exhibit C
Joint-venture projects count toward each partner.
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CN0159CONSTRUCTION OF BALER - SAN LUIS - DINGALAN ROAD, BALER, AURORA | Aurora DEO | R.N.G.M. CONSTRUCTION CORPORATION (FORMERLY: R.N.G.M. CONSTRUCTION) | On-Going | ₱95.7M | 54% | High risk96 | Flagged0.020 |
| 25CN0157CONSTRUCTION OF MULTI-PURPOSE BUILDING , BARANGAY ZABALI, BALER, AURORA | Aurora DEO | DALCON CONSTRUCTION | On-Going | ₱96M | 14% | High risk96 | Flagged0.032 |
| 25CN0161CONSTRUCTION OF DINGALAN-SAN LUIS-BALER ROAD, DINGALAN, AURORA | Aurora DEO | IRC CONSTRUCTION & SUPPLIES | On-Going | ₱141.8M | 27% | High risk96 | Flagged0.031 |
| 25CA0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BACONG SECTION, | Bataan 1st DEO | PASCAL CONSTRUCTION | On-Going | ₱94.5M | 92% | High risk96 | Flagged0.009 |
| 25CN0064CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NORTH POBLACION, DIPACULAO, AURORA | Aurora DEO | R.D. TALENS CONSTRUCTION AND TRADING | On-Going | ₱97.1M | 34% | High risk96 | Flagged0.024 |
| 25CB0093CONSTRUCTION OF DIKE (PHASE 4) ALONG NABASAG RIVER, BALANGA CITY, BATAAN | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 55% | High risk96 | Flagged0.021 |
| 25CB0095CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 6) | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0094CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 5) | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0098CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 2) | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 61% | High risk96 | Flagged0.020 |
| 25CB0099CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 3) | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 59% | High risk96 | Flagged0.020 |
| 25CE0252CONSTRUCTION OF BRIDGE, BARANGAY KALIWANAGAN TO BARANGAY TAYABO, SAN JOSE CITY, NUEVA ECIJA | Nueva Ecija 1st DEO | WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION)MGB CONSTRUCTION & TRADING | On-Going | ₱95.5M | 49% | High risk96 | Flagged0.021 |
| 25CP0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO DUPLAS,BRGY. KALAWAK | Bulacan 3rd DEO | TOPNOTCH CATALYST BUILDERS INC.BGC20 CONSTRUCTION CORP. | On-Going | ₱142.5M | 13% | High risk96 | Flagged0.036 |
| 25CP0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO TALAMSI I-SITIO KAMB | Bulacan 3rd DEO | EIRISH BUILDERS & SUPPLY INC. | On-Going | ₱142.5M | 50% | High risk96 | Flagged0.025 |
| 25CP0066CONVERGE. AND SPECIAL SUPPORT PROG. - SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGSS/ FACILITIES - CONST.OF ROAD, PHASE I, SITIO TALAMSI I - SITIO KAM | Bulacan 3rd DEO | EIRISH BUILDERS & SUPPLY INC. | On-Going | ₱142.5M | 50% | High risk96 | Flagged0.025 |
| 25CP0067CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, SITIO TUBIGAN - SITIO CALUMPIT, BRGY. | Bulacan 3rd DEO | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)MLR SOLID CONSTRUCTION AND DEVELOPMENT CORPORATION | On-Going | ₱142.5M | 20% | High risk96 | Flagged0.035 |
| 25CD0170CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER AND IT'S TRIBUTARIES, STA. 06+980 - STA. 07+160 (SALUYSOY SECTION), MEYCAUAYAN, BULACAN | Bulacan 2nd DEO | HALREY CONSTRUCTION INC. | On-Going | ₱96M | 97% | High risk96 | Flagged0.003 |
| 25CC0406REHABILITATION OF UGONG CREEK (LEFT SIDE) BALAGTAS, BULACAN (PACKAGE G) | Bulacan 1st DEO | A.L. SALAZAR CONSTRUCTION, INC. | On-Going | ₱95M | 0% | High risk96 | Flagged0.032 |
| 25CF0129SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG GAPAN - FORT MAGSAYSAY ROAD, PEÑARANDA SECTION, NUEVA ECIJA | Nueva Ecija 2nd DEO | ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES) | On-Going | ₱144M | 82% | High risk96 | Flagged0.015 |
| 25CJ0238CONSTRUCTION OF MONCADA - PANIQUI DIVERSION ROAD (SEGMENT 5), MONCADA, TARLAC | Tarlac DEO | HIGH STRENGTH DEV. CORPORATION | On-Going | ₱96.5M | 91% | High risk96 | Flagged0.011 |
| 25CI0033BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER (PHASE IV), MABALACAT CITY, PAMPANGA | Pampanga 3rd DEO | MCB ZAMORA CONSTRUCTION & SUPPLY | On-Going | ₱148.5M | 100% | High risk95 | Flagged0.014 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23CF0097CONCRETING OF BRGY. STO. CRISTO FMR, BRGY. STO. CRISTO, SAN ISIDRO, NUEVA ECIJA | Nueva Ecija 2nd DEO | TRIPLE S BUILDERS INC. | On-Going | ₱11.7M | 0% | High risk83 | Flagged0.069 |
| 23CF0094CONCRETING OF BRGY. BAGO FMR, BRGY. BAGO, GEN. TINIO, NUEVA ECIJA | Nueva Ecija 2nd DEO | F-DEY CONSTRUCTION AND TRADING | On-Going | ₱11.7M | 0% | High risk82 | Flagged0.069 |
| 25CA0074CONSTRUCTION OF SCHOOL BUILDING, MABUCO ELEMENTARY SCHOOL, MABUCO ELEMENTARY SCHOOL, BARANGAY MABUCO, HERMOSA, BATAAN | Bataan 1st DEO | BUILDERS EXPONENT EMPIRE CORP. (FORMERLY: BUILDERS EXPONENT ENTERPRISE) | On-Going | ₱19.5M | 0% | High risk84 | Flagged0.062 |
| 19C00077REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES-RECONSTRUCTION OF SLOPE PROTECTION AT BALAYBAY RESETTLEMENT ELEMENTARY SCHOOL, CASTILLEJOS, ZAMBALES | Region III | ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) | On-Going | ₱93.5M | 32% | High risk71 | Flagged0.060 |
| 24CL0208CONSTRUCTION OF REVETMENT ALONG GABOR RIVER, PHASE 1, SAN FELIPE, ZAMBALES | Zambales 1st DEO | CDC CONSTRUCTION & SUPPLIES | On-Going | ₱95.5M | 0% | High risk82 | Flagged0.060 |
| 24CJ0414CONSTRUCTION OF MULTI-PURPOSE BUILDING, TARLAC CITY GENERAL HOSPITAL, TARLAC CITY, TARLAC | Tarlac DEO | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱95.6M | 53% | High risk90 | Flagged0.060 |
| 25CD0223CONCRETING OF BRGY. STO. CRISTO FMR, BRGY. STO. CRISTO, SAN JOSE DEL MONTE, BULACAN | Bulacan 2nd DEO | TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) | On-Going | ₱28.9M | 0% | High risk79 | Flagged0.060 |
| 24CF0136SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE ALONG JAEN - SAN ANTONIO ROAD, JAEN, NUEVA EC | Nueva Ecija 2nd DEO | AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) | On-Going | ₱96M | 42% | High risk89 | Flagged0.059 |
| 25CH0062CONCRETING OF PUROK 6, BRGY. SAN ROQUE ARBOL FMR, BRGY. SAN ROQUE ARBOL, LUBAO, PAMPANGA | Pampanga 2nd DEO | 120 OVER CONSTRUCTION CO. | On-Going | ₱14.7M | 0% | High risk82 | Flagged0.059 |
| 23CL0174CONSTRUCTION OF BY-PASS AND DIVERSION ROADS IBA-BOTOLAN, ZAMBALES (PHASE 2) | Zambales 1st DEO | E.R. DELA CRUZ CONSTRUCTION & SUPPLY | On-Going | ₱95.2M | 0% | High risk78 | Flagged0.058 |
| 24CC0606CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL, PACKAGE B, BARANGAY SANTA ELENA - BARANGAY TIBAGUIN, HAGONOY, BULACAN | Bulacan 1st DEO | SYMS CONSTRUCTION TRADING | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.058 |
| 24CC0588CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KALERO RIVER, PACAKGE B, BARANGAY PANASAHAN, MALOLOS, BULACAN | Bulacan 1st DEO | SYMS CONSTRUCTION TRADING | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.058 |
| 24CC0604CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAYCAPIZ-TALIPTIP RIVER, PACKAGE B, BARANGAY PEREZ, BULAKAN, BULACAN | Bulacan 1st DEO | SYMS CONSTRUCTION TRADING | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CC0592CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, PACKAGE A, BARANGAY TAAL-BARANGAY SANTO CRISTO, PULILAN, BULACAN | Bulacan 1st DEO | SYMS CONSTRUCTION TRADING | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.057 |
| 23CL0173CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CAPAS-BOTOLAN ROAD TO IBA (PHASE 1), IBA, ZAMBALES | Zambales 1st DEO | T2B3 BUILDERS AND SUPPLIES CORP. | On-Going | ₱95.3M | 0% | High risk77 | Flagged0.057 |
| 23CL0176CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CAPAS-BOTOLAN ROAD TO IBA (PHASE 2), IBA, ZAMBALES | Zambales 1st DEO | T2B3 BUILDERS AND SUPPLIES CORP.LMAX CONSTRUCTION | On-Going | ₱95.5M | 0% | High risk77 | Flagged0.057 |
| 24CC0580CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE H, BARANGAY TANAWAN, BUSTOS, BULACAN | Bulacan 1st DEO | JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CC0579CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE G, BARANGAY TANAWAN, BUSTOS, BULACAN | Bulacan 1st DEO | A.R.L. CONSTRUCTION | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0582CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACAKGE J, BARANGAY TANAWAN, BUSTOS, BULACAN | Bulacan 1st DEO | RVR3 CONSTRUCTION SUPPLY AND SERVICES | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CC0581CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE I, BARANGAY TANAWAN, BUSTOS, BULACAN | Bulacan 1st DEO | JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 801 | 25CL0216CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORTS GYMNASIUM), BRGY. CARAEL, BOTOLAN, ZAMBALES | Zambales 1st DEO | E.R. DELA CRUZ CONSTRUCTION & SUPPLY | On-Going | ₱48.9M | 0% | High risk77 | —-0.002 |
| 802 | 24C00181FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DIPACULAO RIVER CONTROL STRUCTURE (PHASE 2), DIPACULAO, AURORA, PROVINCE OF AURORA | Region III | PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.4VC BUILDERS & DEVELOPMENT CORP. | Completed | ₱193M | 100% | High risk77 | —-0.027 |
| 803 | 24C00180FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF ABITONAN RIVER FLOOD CONTROL STRUCTURE, DIPACULAO, AURORA, PROVINCE OF AURORA | Region III | R.D. TALENS CONSTRUCTION AND TRADING | Completed | ₱169.8M | 100% | High risk77 | —-0.030 |
| 804 | 25CG0079BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI PURPOSE BUILDING (COVERED COURT), PPO COMPOUND, CITY OF SAN FERNANDO, PAMPANGA | Pampanga 1st DEO | CARL JOSH BUILDERS | On-Going | ₱1.9M | 100% | High risk77 | —-0.006 |
| 805 | 21CA0060CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) - CONSTRUCTION OF ABUCAY MUNICIPAL POLICE STATION BUILDI | Bataan 1st DEO | BIG BERTHA CONSTRUCTION & DEVELOPMENT | Completed | ₱56.2M | 100% | High risk77 | —-0.063 |
| 806 | 23CL0176CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CAPAS-BOTOLAN ROAD TO IBA (PHASE 2), IBA, ZAMBALES | Zambales 1st DEO | T2B3 BUILDERS AND SUPPLIES CORP.LMAX CONSTRUCTION | On-Going | ₱95.5M | 0% | High risk77 | Flagged0.057 |
| 807 | 25CP0064CONVERGE. AND SPECIAL SUPPORT PROG. - SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS/ FACILITIES - CONSTRUCTION OF ROAD, PHASE I, SITIO DUPLAS, BARANGA | Bulacan 3rd DEO | TOPNOTCH CATALYST BUILDERS INC.BGC20 CONSTRUCTION CORP. | On-Going | ₱142.5M | 35% | High risk77 | —-0.009 |
| 808 | 25CP0078CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS/ FACILITIES - CONST. OF ROAD, PHASE IV, SITIO BALIKIRAN, BARANGAY C | Bulacan 3rd DEO | L.R. TIQUI BUILDERS, INC. | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 809 | 24C00002FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF AGUANG FLOOD CONTROL STRUCTURE, BALER AURORA (PHASE II), PROVINCE OF AURORA | Region III | PERSAN CONSTRUCTION, INC. (FORMERLY: PERSAN CONST.4VC BUILDERS & DEVELOPMENT CORP. | Completed | ₱146.7M | 100% | High risk77 | —-0.036 |
| 810 | 25CP0061CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE I, BARANGAY PULONG SAMPALOC, D | Bulacan 3rd DEO | C & F CONSTRUCTION & DEVELOPMENT CORPORATION | On-Going | ₱142.5M | 21% | High risk77 | —-0.002 |
| 811 | 25CP0075CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE III,SITIO PELON,BRGY. CAMACHI | Bulacan 3rd DEO | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 812 | 25CP0079CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE IV, SITIO PELON, BRGY. CAMACHILE | Bulacan 3rd DEO | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | On-Going | ₱142.4M | 31% | High risk77 | —-0.007 |
| 813 | 25CP0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,BRGY. PULONG SAMPALOC,DONA | Bulacan 3rd DEO | C & F CONSTRUCTION & DEVELOPMENT CORPORATION | On-Going | ₱142.5M | 35% | High risk77 | —-0.009 |
| 814 | 25CP0063CONVERGE, AND SPECIAL SUPPORT PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE I, SITIO BALIKIRAN, BARANGAY CA | Bulacan 3rd DEO | L.R. TIQUI BUILDERS, INC. | On-Going | ₱142.6M | 41% | High risk77 | —-0.010 |
| 815 | 25CP0065CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST.OF ROAD, PHASE I, SITIO PELON, BARANGAY CAMACH | Bulacan 3rd DEO | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | On-Going | ₱142.6M | 39% | High risk77 | —-0.010 |
| 816 | 24C00158ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-TERTIARY ROADS-MEYCAUAYAN-CAMALIG-BAHAY PARI ROAD, PROVINCE OF BULACAN | Region III | ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958)JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) | On-Going | ₱174.2M | 67% | High risk77 | —-0.002 |
| 817 | 23CC0521CONSTRUCTION OF REVETMENT AND REHABILITATION OF WATERWAYS AT BRGY. SAN VICENTE, MALOLOS CITY, BULACAN | Bulacan 1st DEO | TOPNOTCH CATALYST BUILDERS INC. | On-Going | ₱69.5M | 84% | High risk77 | Flagged0.034 |
| 818 | 25CG0165BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTI-PURPOSE BUILDINGS, SAN MATEO, ARAYAT, PAMPANGA | Pampanga 1st DEO | R L MONTOYA BUILDERS & CONSTRUCTION INC. | On-Going | ₱2.8M | 100% | High risk77 | —-0.006 |
| 819 | 24CC0643CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT BARANGAY PRITIL (KABILANG BAKOOD TO PUROK 4) GUIGUINTO, BULACAN | Bulacan 1st DEO | TOPNOTCH CATALYST BUILDERS INC. | On-Going | ₱70.4M | 60% | High risk77 | Flagged0.035 |
| 820 | 24CD0281CONSTRUCTION OF NEW ROGACIANO M. MERCADO MEMORIAL HOSPITAL, MUNICIPALITY OF SANTA MARIA, BULACAN | Bulacan 2nd DEO | GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914) | Completed | ₱74.2M | 100% | High risk77 | —-0.067 |
| 821 | 24C00236CONVERGENCE AND SPL. SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FR. THE NAT'L. ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES, CONST. OF ROAD, BRGY. ALAS-ASIN IPAG (PHASE 2), MARIVE | Region III | ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762) | On-Going | ₱304.2M | 0% | High risk77 | Flagged0.020 |
| 822 | 25CP0071CONVERGE. AND SPECIAL SUPPORT PROG. -SUSTAINABLE INFRA. PROJ. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./ FACILITIES - CONST. OF ROAD, PHASE II, SITIO PELON, BARANGAY CAMAC | Bulacan 3rd DEO | FLORDES CONSTRUCTION & TRADING CORP. (FORMERLY FLO | On-Going | ₱142.6M | 26% | High risk77 | —-0.004 |
| 823 | 25CP0062CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, BRGY, TALBAK, DONA REMEDIOS TRINIDAD, | Bulacan 3rd DEO | GREAT PACIFIC BUILDERS AND GEN. CONTRACTOR INC. ([REVOKED] 45914) | On-Going | ₱142.5M | 30% | High risk77 | —-0.007 |
| 824 | 25CP0004ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SIBUL-BIAK-NA-BATO RD (SAN MIGUEL SECTION), SAN MIGUEL, BULACAN | Bulacan 3rd DEO | 1199S CONSTRUCTIONC.T. LEONCIO CONSTRUCTION & TRADING | On-Going | ₱143.3M | 51% | High risk77 | —-0.011 |
| 825 | 25CP0077CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE III, SITIO TUBIGAN-SITIO CALUMPIT, BRGY. | Bulacan 3rd DEO | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)MLR SOLID CONSTRUCTION AND DEVELOPMENT CORPORATION | On-Going | ₱142.5M | 31% | High risk77 | —-0.009 |