Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
237
Total budget
₱97.7B
Average progress
90.7%
Completion rate
62.4%
Below 70%
Average risk score
72.2
High risk on average, out of 100
Flagged as unusual
62
26.2% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 163 | ₱41.5B | 73.7 | 28 | 92.8% |
| Roads | 27 | ₱6.6B | 60.7 | 1 | 96.1% |
| OTHER | 21 | ₱27.4B | 79.1 | 17 | 84.3% |
| Buildings and Facilities | 11 | ₱12.1B | 66.8 | 5 | 87.7% |
| Bridges | 9 | ₱3B | 67.7 | 6 | 59.9% |
| Bridges, Roads | 6 | ₱7.2B | 78.0 | 5 | 85.2% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control Management Cluster | 171 | ₱43.7B | 73.7 | 32 | 93.0% |
| Roads Management Cluster I (Bilateral) | 25 | ₱15.1B | 62.8 | 3 | 96.1% |
| Roads Management Cluster II (Multilateral) | 16 | ₱20.8B | 77.7 | 14 | 80.8% |
| Bridges Management Cluster | 10 | ₱3.2B | 70.8 | 7 | 69.0% |
| Buildings and Special Projects Management Cluster | 8 | ₱13.7B | 69.6 | 6 | 76.7% |
| Bureau of Construction | 7 | ₱1.3B | 62.1 | 0 | 84.8% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| E. F. CHUA CONSTRUCTION, INC. | 28 | ₱5.3B | 74.3 | 0 | 100.0% |
| 11-16 CONSTRUCTION | 23 | ₱2.9B | 71.3 | 1 | 95.6% |
| MSB VITUG CONSTRUCTION | 14 | ₱5.8B | 75.2 | 6 | 95.5% |
| R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | 13 | ₱5.3B | 75.2 | 6 | 70.9% |
| TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC | 13 | ₱6.9B | 74.4 | 5 | 97.0% |
| L.R. TIQUI BUILDERS, INC. | 11 | ₱2.1B | 71.1 | 1 | 97.2% |
| AKN CONSTRUCTION CORPORATION | 10 | ₱1.4B | 74.6 | 1 | 98.0% |
| FERDSTAR BUILDERS INC. | 9 | ₱1.9B | 75.7 | 2 | 99.7% |
| J.D. LEGASPI CONSTRUCTION | 6 | ₱1.8B | 76.3 | 3 | 80.9% |
| PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP. | 6 | ₱1B | 75.3 | 3 | 60.5% |
| RAYMAN BUILDERS INC., | 6 | ₱4.8B | 74.8 | 2 | 85.8% |
| NORTHERN BUILDERS | 6 | ₱1.3B | 74.6 | 0 | 100.0% |
| EQUI-PARCO CONSTRUCTION COMPANY | 6 | ₱949.3M | 59.3 | 0 | 100.0% |
| M.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | 5 | ₱2.4B | 75.8 | 2 | 91.0% |
| PETER G. CHUA BUILDERS | 5 | ₱1.2B | 75.3 | 0 | 100.0% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22Z00032CONSTRUCTION OF THE NEW SENATE BUILDING (PHASE II), NAVY VILLAGE, FORT BONIFACIO, TAGUIG CITY | Buildings and Special Projects Management Cluster | HILMARC'S CONSTRUCTION CORPORATION | On-Going | ₱2.4B | 49% | High risk88 | Flagged0.079 |
| 21Z00020CONTRACT PACKAGE 5, SLOPE PROTECTION (MARAWI-BITO ROAD) UPPER AND LOWER SLOPES; TR-28: REHABILITATION OF ROAD ALONG MARAWI - BITO ROAD; AND TR-29: REHABILITATION OF LASURECO ROAD | Roads Management Cluster II (Multilateral) | M.M.A. ACHIEVER CONSTRUCTION & DEVELOPMENT CORP.KOUZBARY BUILDERS | On-Going | ₱200.6M | 46% | High risk83 | Flagged0.020 |
| 21Z00018CONTRACT PACKAGE 4A - CONSTRUCTION OF ROROGAGUS BRIDGE, RECONSTRUCTION AND DEVELOPMENT PLAN FOR A GREATER MARAWI - STAGE 2 UNDER ADB LOAN NO. 3769 - PHI: EMERGENCY ASSISTANCE FOR RECONSTRUCTION AND RECOVERY OF MARAWI (EARRM) | Roads Management Cluster II (Multilateral) | MUST ENTERPRISESBSP & COMPANY, INC.AL HUSSEIN CONSTRUCTION | On-Going | ₱215M | 60% | High risk83 | Flagged0.013 |
| 20Z00014CONTRACT PACKAGE 1A: REHABILITATION OF EXISTING TRANS-CENTRAL ROADS | Roads Management Cluster II (Multilateral) | FIAT CONSTRUCTION SERVICES | On-Going | ₱177.8M | 75% | High risk83 | Flagged0.020 |
| 20Z00015CONTRACT PACKAGE 1B - REHABILITATION OF EXISTING MINDANAO STATE UNIVERSITY (MSU) ROADS | Roads Management Cluster II (Multilateral) | KOUZBARY BUILDERS | On-Going | ₱161.1M | 71% | High risk83 | Flagged0.018 |
| 17Z00002CONSTRUCTION OF SAMAR PACIFIC COASTAL ROAD(SPCR) PROJECT, PROVINCE OF SAMAR, PHILIPPINES | Roads Management Cluster II (Multilateral) | ILSUNG CONSTRUCTION CO., LTD. (OECO_27310) | On-Going | ₱997.5M | 97% | High risk82 | Flagged0.038 |
| 19Z00011PR-01A, GUTALAC-BALIGUIAN ALTERNATIVE ROAD, ZAMBOANGA DEL NORTE, K2027+802.62-K2055+764.93 (WITH EXCEPTIONS) UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | CHINA WUYI CO., LTD (OECO_16634) | On-Going | ₱1.1B | 83% | High risk81 | Flagged0.031 |
| 21Z00008DAVAO CITY BYPASS CONSTRUCTION PROJECT (II), PACKAGE I-3 STA. 23+500 - STA. 29+700 | Roads Management Cluster I (Bilateral) | ULTICON BUILDERS, INC.SHIMIZU CORPORATION (OECO_16693)TAKENAKA CIVIL ENGINEERING & CONSTRUCTION CO., LTD. (OECO_29591) | On-Going | ₱9.7B | 3% | High risk81 | Flagged0.048 |
| 24N00196BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD (AGUSAN-MISAMIS OR ROAD)- K1253+544.32- K1256+165, K1256+322- K1259+812, K1263+828- K1264+956, AGUSAN DEL NORTE | Roads Management Cluster I (Bilateral) | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱285.7M | 100% | High risk80 | Flagged0.001 |
| 17Z00018PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 5 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 16+050 TO STA. 17+450, LEFT BANK, MARIKINA CITY | Flood Control Management Cluster | AKN CONSTRUCTION CORPORATION | On-Going | ₱294.1M | 87% | High risk80 | Flagged0.035 |
| 18Z00024PR-07, TAMPILISAN - SANDAYONG ROAD, ZAMBOANGA DEL NORTE, K1981+490.00 - K1999+065.86 | Roads Management Cluster II (Multilateral) | FIAT CONSTRUCTION SERVICESMAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION) | Completed | ₱658.2M | 100% | High risk80 | Flagged0.010 |
| 22O00063PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, CONTRACT PACKAGE NO. 4-B, RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 15+700 TO STA. 15+957 (PHASE 2), RIGHT BANK, MARIKINA CITY | Flood Control Management Cluster | FERDSTAR BUILDERS INC. | On-Going | ₱148.4M | 100% | High risk80 | Flagged0.003 |
| 18Z00023PR-06, ALICIA - MALANGAS ROAD, ZAMBOANGA SIBUGAY (K1769+648.00 - K1793+751.43) | Roads Management Cluster II (Multilateral) | CHINA GEO-ENGINEERING CORPORATION (OECO_3427)ESR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: ESR CONSTRUCTION & SUPPLIES) | Completed | ₱1.4B | 100% | High risk79 | Flagged0.011 |
| 18Z00026DESIGN-BUILD FOR THE CONSTRUCTION OF PANGUIL BAY BRIDGE PROJECT, PROVINCE OF MISAMIS OCCIDENTAL AND LANAO DEL NORTE, UNDER THE KOREA EXPORT-IMPORT BANK - ECONOMIC DEVELOPMENT COOPERATION FUND, LOAN AGREEMENT NO. PHL-18 | Roads Management Cluster II (Multilateral) | NAMKWANG ENGINEERING AND CONSTRUCTION CO., LTD.KUKDONG ENGINEERING AND CONSTRUCTION CO. LTD.GUMGWANG ENGINEERING AND CONSTRUCTION CO., LTD. | On-Going | ₱6.7B | 100% | High risk79 | Flagged0.037 |
| 18Z00034CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES IN METRO CEBU, BRGY. PASIL AND ERMITA, BRGY. TEJERO AND BRGY. TIPOLO, CEBU CITY | Flood Control Management Cluster | MSB VITUG CONSTRUCTIONKEILANA RESOURCE AND DEVELOPMENT CORPORATION | Completed | ₱266.6M | 100% | High risk79 | —-0.015 |
| 17Z00007BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES FOR (REGION IV-A), CONTRACT PACKAGE 4 | Bridges Management Cluster | ALGON ENGINEERING CONSTRUCTION CORPORATIONM.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | On-Going | ₱208.9M | 57% | High risk79 | Flagged0.013 |
| 19Z00013CURUAN-SIBUCO ROAD, ZAMBOANGA DEL NORTE, UNDER ADB LOAN NO. 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | SINO ROAD AND BRIDGE GROUP CO. LTD.M. ABUBAKAR CONST. AND ENGINEERING, INC. | On-Going | ₱2.1B | 95% | High risk79 | Flagged0.020 |
| 19Z00012PR-08, R.T. LIM - SIOCON ROAD, ZAMBOANGA SIBUGAY AND ZAMBOANGA DEL NORTE UNDER ADB LOAN NO. 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | CHINA WUYI CO., LTD | On-Going | ₱2.4B | 91% | High risk79 | Flagged0.017 |
| 19Z00015PR-09A, GUICAM BRIDGE, ZAMBOANGA SIBUGAY UNDER ADB LOAN NO. 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | TIANYUAN CONSTRUCTION GROUP CORPORATIONGRACE CONSTRUCTION CORPORATION | On-Going | ₱1.2B | 88% | High risk78 | Flagged0.022 |
| 19Z00014PR-13, SIAY-GAPOL ROAD, ZAMBOANGA SIBUGAY K1761+473.00-K1797+234.10 UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT | Roads Management Cluster II (Multilateral) | QINGDAO MUNICIPAL CONSTRUCTION GROUP CO., LTD.ESR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: ESR CONSTRUCTION & SUPPLIES) | On-Going | ₱1.3B | 80% | High risk78 | Flagged0.022 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22Z00032CONSTRUCTION OF THE NEW SENATE BUILDING (PHASE II), NAVY VILLAGE, FORT BONIFACIO, TAGUIG CITY | Buildings and Special Projects Management Cluster | HILMARC'S CONSTRUCTION CORPORATION | On-Going | ₱2.4B | 49% | High risk88 | Flagged0.079 |
| 18Z00041PROPOSED SEVEN (7) - STOREY GOVERNMENT PROCUREMENT POLICY BOARD (GPPB) BUILDING | Buildings and Special Projects Management Cluster | WISMON CONSTRUCTION & DEVELOPMENT CORP. (FORMERLYD.L CERVANTES CONSTRUCTION CORPORATION (FORMERLY: | On-Going | ₱317.1M | 0% | High risk63 | Flagged0.071 |
| 16Z00010CONTRACT PACKAGE 3, BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES IN LUZON | Bridges Management Cluster | GRACE CONSTRUCTION CORPORATION | On-Going | ₱538M | 16% | High risk73 | Flagged0.065 |
| 17Z00028PROPOSED DESIGN AND BUILD FOR THE REHABILITATION/RETROFITTING OF THE QUIRINO BRIDGE IN COTABATO CITY, REGION XII | Bridges Management Cluster | FREY-FIL CORPORATION (FORMERLY:FREYSSINET FILIPINA | On-Going | ₱164.9M | 4% | High risk68 | Flagged0.052 |
| 21Z00008DAVAO CITY BYPASS CONSTRUCTION PROJECT (II), PACKAGE I-3 STA. 23+500 - STA. 29+700 | Roads Management Cluster I (Bilateral) | ULTICON BUILDERS, INC.SHIMIZU CORPORATION (OECO_16693)TAKENAKA CIVIL ENGINEERING & CONSTRUCTION CO., LTD. (OECO_29591) | On-Going | ₱9.7B | 3% | High risk81 | Flagged0.048 |
| 18Z00036DESIGN AND BUILD OF THE NEW SENATE BUILDING | Buildings and Special Projects Management Cluster | HILMARC'S CONSTRUCTION CORPORATION | On-Going | ₱8.8B | 87% | High risk64 | Flagged0.047 |
| 16Z00020CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD | Flood Control Management Cluster | R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | On-Going | ₱942.7M | 12% | High risk77 | Flagged0.045 |
| 19C00023BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM II (BCRP II) - PAMPANGA DELTA BRIDGE AND APPROACHES, MASANTOL, PAMPANGA | Bridges Management Cluster | J.H. PAJARA CONSTRUCTION CORPORATIONEDDMARI CONSTRUCTION & TRADING | On-Going | ₱566.6M | 92% | High risk73 | Flagged0.039 |
| 19Z00032METRO CEBU FLOOD CONTROL PROJECT - FLOOD CONTROL AND DRAINAGE IMPROVEMENT PROJECT, KINALUMSAN RIVER, DULJO, LABANGON AND MAMBALING, CEBU CITY | Flood Control Management Cluster | RAYMAN BUILDERS INC.,SQUARE CUBE CONSTRUCTION(FORMERLY SQUARE CUBE TRAD | On-Going | ₱553.8M | 22% | High risk74 | Flagged0.039 |
| 17Z00002CONSTRUCTION OF SAMAR PACIFIC COASTAL ROAD(SPCR) PROJECT, PROVINCE OF SAMAR, PHILIPPINES | Roads Management Cluster II (Multilateral) | ILSUNG CONSTRUCTION CO., LTD. (OECO_27310) | On-Going | ₱997.5M | 97% | High risk82 | Flagged0.038 |
| 18Z00026DESIGN-BUILD FOR THE CONSTRUCTION OF PANGUIL BAY BRIDGE PROJECT, PROVINCE OF MISAMIS OCCIDENTAL AND LANAO DEL NORTE, UNDER THE KOREA EXPORT-IMPORT BANK - ECONOMIC DEVELOPMENT COOPERATION FUND, LOAN AGREEMENT NO. PHL-18 | Roads Management Cluster II (Multilateral) | NAMKWANG ENGINEERING AND CONSTRUCTION CO., LTD.KUKDONG ENGINEERING AND CONSTRUCTION CO. LTD.GUMGWANG ENGINEERING AND CONSTRUCTION CO., LTD. | On-Going | ₱6.7B | 100% | High risk79 | Flagged0.037 |
| 17Z00018PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 5 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 16+050 TO STA. 17+450, LEFT BANK, MARIKINA CITY | Flood Control Management Cluster | AKN CONSTRUCTION CORPORATION | On-Going | ₱294.1M | 87% | High risk80 | Flagged0.035 |
| 17Z00003AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE1)-CONSTRUCTION OF PROTECTION WORKS USING GABIONS AND MATTRESSES. BRGY. DORONGAN SAWAT, STA. 2+840 TO STA.3+140 AND STA. 3+140 T0 STA. 3+640, DORONGAN KETAKET, STA 1+592 TO STA. 2+840 MANGATAREM; (PHASE II-A)-R | Flood Control Management Cluster | MSB VITUG CONSTRUCTION | On-Going | ₱363.2M | 100% | High risk77 | Flagged0.033 |
| 19Z00020AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T | Flood Control Management Cluster | L.R. TIQUI BUILDERS, INC.MSB VITUG CONSTRUCTION | On-Going | ₱941.2M | 69% | High risk76 | Flagged0.033 |
| 19Z00011PR-01A, GUTALAC-BALIGUIAN ALTERNATIVE ROAD, ZAMBOANGA DEL NORTE, K2027+802.62-K2055+764.93 (WITH EXCEPTIONS) UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | CHINA WUYI CO., LTD (OECO_16634) | On-Going | ₱1.1B | 83% | High risk81 | Flagged0.031 |
| 17OF0198CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. 0+005.324 - STA. 0+484.093), Q.C. | Flood Control Management Cluster | R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | On-Going | ₱247.1M | 40% | High risk77 | Flagged0.031 |
| 19Z00021CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTE | Flood Control Management Cluster | MSB VITUG CONSTRUCTION | On-Going | ₱715.1M | 94% | High risk76 | Flagged0.030 |
| 18Z00027FLOOD RISK MANGEMENT PROJECT FOR CAGAYAN DE ORO RIVER (FRIMP-CDOR), JICA LOAN NO. PH-P259, CONTRACT PACKAGE 1 (BONBON-KAUSWAGAN) | Flood Control Management Cluster | A.M. ORETA & CO., INC.IPM CONSTRUCTION & DEVELOPMENT CORPORATION | On-Going | ₱371.1M | 86% | High risk71 | Flagged0.029 |
| 16C00084FLOOD/LAHAR CONTROL WORKS IN PASIG-POTRERO RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING DIVERSION OF FLOW OF WATER TO PASIG-POTRERO RIVER, BACOLOR, PAMPANGA | Flood Control Management Cluster | R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | On-Going | ₱376.8M | 72% | High risk77 | Flagged0.028 |
| 19Z00033DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMAR | Flood Control Management Cluster | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLYMSB VITUG CONSTRUCTION | On-Going | ₱744.4M | 87% | High risk74 | Flagged0.028 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 18Z00008CONSTRUCTION OF PUBLIC ATTORNEY'S OFFICE (PAO) BUILDING, PHASE I | Buildings and Special Projects Management Cluster | FLORIDABLANCA CONSTRUCTION AND DEVELOPMENT CORPORATIONM.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | On-Going | ₱927.1M | 98% | High risk76 | —-0.002 |
| 77 | 22O00086UPGRADING OF SANTIBAÑEZ PUMPING STATION, PACO, MANILA | Flood Control Management Cluster | J.D. LEGASPI CONSTRUCTION11-16 CONSTRUCTION | Completed | ₱192M | 100% | High risk76 | —-0.040 |
| 78 | 18A00116CONSTRUCTION/REHABILITATION OF BOLO RIVER DAM, BRGY. SAN ISIDRO, DUMALNEG, ILOCOS NORTE | Flood Control Management Cluster | TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC | On-Going | ₱366.6M | 100% | High risk76 | Flagged0.024 |
| 79 | 21O00038CONSTRUCTION OF REVETMENT WALL OF BACLARAN CHANNEL (PHASE 5) PARAÑAQUE CITY | Flood Control Management Cluster | E. F. CHUA CONSTRUCTION, INC. | Completed | ₱188.3M | 100% | High risk76 | —-0.048 |
| 80 | 21O00116REVETMENT WORKS ALONG MARULAS TUNGTONG CREEK DIVERSION CHANNEL, LAS PIÑAS CITY | Flood Control Management Cluster | E. F. CHUA CONSTRUCTION, INC. | Completed | ₱351.8M | 100% | High risk76 | —-0.040 |
| 81 | 19Z00036CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) AT PAPA RIVER, BRGY. STO. NIÑO, NUEVA ERA, ILOCOS NORTE | Flood Control Management Cluster | TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC | On-Going | ₱533.8M | 94% | High risk76 | Flagged0.027 |
| 82 | 16C00085FLOOD CONTROL PROJECT-WESTERN RIVER, STO. TOMAS/BUCAO RIVER, ZAMBALES | Flood Control Management Cluster | HORAMABI BUILDERSR.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | Completed | ₱420.4M | 100% | High risk76 | —-0.010 |
| 83 | 18Z00030METRO MANILA FLOOD MANAGEMENT PROJECT, PHASE I, REHABILITATION WORKS FOR BALUT PUMPING STATION | Flood Control Management Cluster | TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUCFERDSTAR BUILDERS INC. | Completed | ₱390.9M | 100% | High risk76 | —-0.026 |
| 84 | 19Z00019CONSTRUCTION / ADDITIONAL FLOOD CONTROL STRUCTURE ALONG ABRA RIVER, MUNICIPALITIES OF BUCAY, LANGIDEN, TAYUM, SALLAPADAN, LAGANGILANG, MANABO, AND LA PAZ ABRA | Flood Control Management Cluster | RAYMAN BUILDERS INC.,KATHA BUILDERS & SUPPLIES INC. | Completed | ₱853.1M | 100% | High risk76 | —-0.003 |
| 85 | 17Z00005REHABILITATION OF DIKE SYSTEM ALONG CURA-LABUGAON RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK) LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUCFR ESPIRITU BUILDERS AND DEVELOPMENT CORP. (FORMERLY: FR ESPIRITU JR BUILDERS) | Completed | ₱862M | 100% | High risk76 | —-0.004 |
| 86 | 18C00054CONSTRUCTION OF GROUNDSILLS ACROSS PASIG-POTRERO RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE, ANGELES-PORAC RIVER AT DOWNSTREAM OF MANCATIAN BRIDGE (GROUNDSILL NO. 1), ANGELES-PORAC, PAMPANGA | Flood Control Management Cluster | NORTHERN BUILDERS | Completed | ₱309.6M | 100% | High risk76 | —-0.009 |
| 87 | 22O00069UPGRADING OF TAGUIG PUMPING STATION, TAGUIG CITY | Flood Control Management Cluster | NORTHERN BUILDERSEQUI-PARCO CONSTRUCTION COMPANY | Completed | ₱144.7M | 100% | High risk76 | —-0.057 |
| 88 | 18Z00037CONSTRUCTION OF THE PROFESSIONAL REGULATION COMMISSION (PRC) BUILDING, PHASE I | Buildings and Special Projects Management Cluster | CAVDEAL-CAVITE IDEAL INT'L. CONST. & DEV'T. CORP. | On-Going | ₱872.9M | 96% | High risk76 | Flagged0.001 |
| 89 | 17C00065REHABILITATION OF PAMPANGA RIVER BASIN, BARANGAY SAN NICOLAS, SAN SIMON, PAMPANGA | Flood Control Management Cluster | D.L CERVANTES CONSTRUCTION CORPORATION (FORMERLY:FERDSTAR BUILDERS INC. | Completed | ₱144.3M | 100% | High risk76 | —-0.056 |
| 90 | 17C00054CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, REHABILITATION OF PAMPANGA RIVER BASIN, BARANGAY STA. CRUZ, SAN SIMON, PAMPANGA | Flood Control Management Cluster | TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC | Completed | ₱144.6M | 100% | High risk76 | —-0.057 |
| 91 | 19C00032CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-FLOOD CONTROL WORKS-DIKING/SLOPE PROTECTION/STRENGTHENING OF GUMAIN-PORAC RIVER AT LUBAO AND FLORIDABLANCA, PAMPANGA, PROVINCE OF PAMPANGA | Flood Control Management Cluster | GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO | Completed | ₱142.7M | 100% | High risk75 | —-0.054 |
| 92 | 17Z00006REHABILITATION OF DIKE SYSTEM ALONG SOLSONA RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT | Flood Control Management Cluster | E.M. CUERPO, INC. | Completed | ₱669.3M | 100% | High risk75 | —-0.002 |
| 93 | 21O00095CONSTRUCTION OF RIVERWALLS (INTERMITTENT SECTIONS) ALONG MALABON-TULLAHAN RIVER (UPSTREAM SIDE), BRGY. POTRERO, MALABON CITY | Flood Control Management Cluster | AARCON BUILDERS | Completed | ₱92.4M | 100% | High risk75 | —-0.069 |
| 94 | 18C00051CONSTRUCTION OF FLOOD CONTROL WORKS ALONG SAPANG BAYU AND SAPANG MARAGUL, LUBAO AND STA. RITA, PAMPANGA | Flood Control Management Cluster | TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC | Completed | ₱94M | 100% | High risk75 | —-0.052 |
| 95 | 19C00039FLOOD/LAHAR CONTROL WORKS IN PASIG-POTRERO RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING DIVERSION OF FLOW OF WATER TO PASIG-POTRERO RIVER, BACOLOR AND PORAC, PAMPANGA | Flood Control Management Cluster | R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | Completed | ₱94.9M | 100% | High risk75 | —-0.056 |
| 96 | 19C00041FLOOD CONTROL WORKS-IMPROVEMENT/REHABILITATION OF WEST LATERAL DIKE OF MEGADIKE ALONG PASIG-POTRERO, STA. RITA AND PORAC, PAMPANGA | Flood Control Management Cluster | R.D. POLICARPIO & COMPANY INC. | Completed | ₱95M | 100% | High risk75 | —-0.064 |
| 97 | 19O00054CONSTRUCTION OF NAVOTAS COASTAL DIKE, NAVOTAS CITY (STA. 0+508.50 - STA. 520.70 - STA. 1+453.60 - STA. 1+523, STA. 1+535.00 - STA. 1+540.00, STA. 1+595.70 - STA. 1+622.50, STA 3+021.40 - STA. 3+295.00) | Flood Control Management Cluster | PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP. | On-Going | ₱137.5M | 91% | High risk75 | —-0.000 |
| 98 | 17CG0082REHABILITATION/RESTORATION OF DETERIOTED DIKES/ERODED PAMPANGA RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL: SLOPE PROTECTION STA. 0+450.08--STA. 0+406 LEFT & RIGHT DIKE AND SAN SIMON (BRGY. SAN PEDRO), STA. 0+070-STA.0+151.20 RIGHT | Flood Control Management Cluster | ST. GERRARD CONSTRUCTION GEN. CONTRACTOR & DEVELOPMENT CORP. (FORMERLY:ST. GERRARD CONSTRUCTION) ([REVOKED] 31762) | Completed | ₱92M | 100% | High risk75 | —-0.059 |
| 99 | 18C00048REHABILITATION OF CABIAO-SAN ISIDRO RING LEVEE, CABIAO AND SAN ISIDRO, NUEVA ECIJA | Flood Control Management Cluster | R.A. PAHATI CONST. & SUPPLY, INC.GVDPM CONSTRUCTION CORP. (FORMERLY: ZM CONSTRUCTIO | Completed | ₱143.4M | 100% | High risk75 | —-0.056 |
| 100 | 19C00073CONSTRUCTION OF DIKE ALONG GROUNDSILLS ACROSS PASIG-POTRERO RIVER AT THE DOWNSTREAM OF MANCATIAN BRIDGE, PORAC, PAMPANGA | Flood Control Management Cluster | L.R. TIQUI BUILDERS, INC. | Completed | ₱94.8M | 100% | High risk75 | —-0.055 |