Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
20,928
Total budget
₱602.8B
Average progress
95.1%
Completion rate
86.5%
Average risk score
36.7
Medium risk on average, out of 100
Flagged as unusual
640
3.1% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 7,413 | ₱208.2B | 36.2 | 81 | 95.0% |
| Buildings and Facilities | 6,918 | ₱78.1B | 28.2 | 73 | 96.6% |
| Flood Control and Drainage | 4,728 | ₱249.9B | 44.5 | 204 | 94.5% |
| Bridges | 884 | ₱28.7B | 35.9 | 29 | 96.4% |
| OTHER | 305 | ₱12.8B | 64.1 | 65 | 93.5% |
| Water Provision and Storage | 280 | ₱2.1B | 30.1 | 9 | 94.6% |
| GAA 2025 SSP | 264 | ₱10.9B | 91.5 | 153 | 74.5% |
| GAA 2025 OO-2 | 53 | ₱3.9B | 88.5 | 2 | 82.7% |
| GAA 2025 OO-1 | 49 | ₱3B | 90.2 | 22 | 76.7% |
| Bridges, Roads | 34 | ₱5B | 50.6 | 2 | 90.4% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bulacan 1st DEO | 2,840 | ₱88.4B | 42.8 | 133 | 90.4% |
| Bulacan 2nd DEO | 2,162 | ₱58.2B | 38.1 | 36 | 97.2% |
| Pampanga 1st DEO | 2,145 | ₱38.8B | 25.9 | 34 | 98.1% |
| Nueva Ecija 1st DEO | 2,051 | ₱33.7B | 28.8 | 27 | 98.9% |
| Tarlac DEO | 2,043 | ₱73.5B | 34.7 | 52 | 97.3% |
| Aurora DEO | 1,351 | ₱26.5B | 39.9 | 33 | 96.3% |
| Nueva Ecija 2nd DEO | 1,224 | ₱26.9B | 31.5 | 20 | 98.3% |
| Pampanga 2nd DEO | 1,071 | ₱20B | 31.1 | 9 | 99.0% |
| Region III | 982 | ₱79.9B | 54.6 | 103 | 85.1% |
| Zambales 1st DEO | 967 | ₱35.5B | 46.8 | 71 | 91.3% |
| Tarlac 2nd DEO | 926 | ₱33.2B | 34.8 | 14 | 97.9% |
| Pampanga 3rd DEO | 881 | ₱24.7B | 30.6 | 21 | 97.9% |
| Bataan 2nd DEO | 727 | ₱19B | 43.9 | 38 | 92.9% |
| Bataan 1st DEO | 714 | ₱13.5B | 35.0 | 6 | 95.6% |
| Zambales 2nd DEO | 647 | ₱18.4B | 36.2 | 16 | 96.0% |
| Bulacan 3rd DEO | 136 | ₱10.2B | 77.0 | 18 | 44.4% |
| Bataan 3rd DEO | 61 | ₱2.5B | 65.2 | 9 | 47.2% |
Exhibit C
Joint-venture projects count toward each partner.
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CN0159CONSTRUCTION OF BALER - SAN LUIS - DINGALAN ROAD, BALER, AURORA | Aurora DEO | R.N.G.M. CONSTRUCTION CORPORATION (FORMERLY: R.N.G.M. CONSTRUCTION) | On-Going | ₱95.7M | 54% | High risk96 | Flagged0.020 |
| 25CN0157CONSTRUCTION OF MULTI-PURPOSE BUILDING , BARANGAY ZABALI, BALER, AURORA | Aurora DEO | DALCON CONSTRUCTION | On-Going | ₱96M | 14% | High risk96 | Flagged0.032 |
| 25CN0161CONSTRUCTION OF DINGALAN-SAN LUIS-BALER ROAD, DINGALAN, AURORA | Aurora DEO | IRC CONSTRUCTION & SUPPLIES | On-Going | ₱141.8M | 27% | High risk96 | Flagged0.031 |
| 25CA0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BACONG SECTION, | Bataan 1st DEO | PASCAL CONSTRUCTION | On-Going | ₱94.5M | 92% | High risk96 | Flagged0.009 |
| 25CN0064CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NORTH POBLACION, DIPACULAO, AURORA | Aurora DEO | R.D. TALENS CONSTRUCTION AND TRADING | On-Going | ₱97.1M | 34% | High risk96 | Flagged0.024 |
| 25CB0093CONSTRUCTION OF DIKE (PHASE 4) ALONG NABASAG RIVER, BALANGA CITY, BATAAN | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 55% | High risk96 | Flagged0.021 |
| 25CB0095CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 6) | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0094CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 5) | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 54% | High risk96 | Flagged0.021 |
| 25CB0098CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 2) | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 61% | High risk96 | Flagged0.020 |
| 25CB0099CONSTRUCTION OF DIKE ALONG NABASAG RIVER, BALANGA CITY, BATAAN (PHASE 3) | Bataan 2nd DEO | TOPNOTCH CATALYST BUILDERS INC.ONE FRAME CONSTRUCTION INC. | On-Going | ₱96.9M | 59% | High risk96 | Flagged0.020 |
| 25CE0252CONSTRUCTION OF BRIDGE, BARANGAY KALIWANAGAN TO BARANGAY TAYABO, SAN JOSE CITY, NUEVA ECIJA | Nueva Ecija 1st DEO | WIZARD CONCRETE SOLUTIONS AND CONSTRUCTION CORPORATION (FORMERLY: WIZARD TRADING & CONSTRUCTION)MGB CONSTRUCTION & TRADING | On-Going | ₱95.5M | 49% | High risk96 | Flagged0.021 |
| 25CP0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO DUPLAS,BRGY. KALAWAK | Bulacan 3rd DEO | TOPNOTCH CATALYST BUILDERS INC.BGC20 CONSTRUCTION CORP. | On-Going | ₱142.5M | 13% | High risk96 | Flagged0.036 |
| 25CP0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS(SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF ROAD,PHASE II,SITIO TALAMSI I-SITIO KAMB | Bulacan 3rd DEO | EIRISH BUILDERS & SUPPLY INC. | On-Going | ₱142.5M | 50% | High risk96 | Flagged0.025 |
| 25CP0066CONVERGE. AND SPECIAL SUPPORT PROG. - SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGSS/ FACILITIES - CONST.OF ROAD, PHASE I, SITIO TALAMSI I - SITIO KAM | Bulacan 3rd DEO | EIRISH BUILDERS & SUPPLY INC. | On-Going | ₱142.5M | 50% | High risk96 | Flagged0.025 |
| 25CP0067CONVERG. AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-SIPAG-ACCESS ROADS AND/OR BRIDGES FROM THE NATL. ROADS LEADING TO MAJOR/ STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF ROAD, PHASE I, SITIO TUBIGAN - SITIO CALUMPIT, BRGY. | Bulacan 3rd DEO | LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION)MLR SOLID CONSTRUCTION AND DEVELOPMENT CORPORATION | On-Going | ₱142.5M | 20% | High risk96 | Flagged0.035 |
| 25CD0170CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER AND IT'S TRIBUTARIES, STA. 06+980 - STA. 07+160 (SALUYSOY SECTION), MEYCAUAYAN, BULACAN | Bulacan 2nd DEO | HALREY CONSTRUCTION INC. | On-Going | ₱96M | 97% | High risk96 | Flagged0.003 |
| 25CC0406REHABILITATION OF UGONG CREEK (LEFT SIDE) BALAGTAS, BULACAN (PACKAGE G) | Bulacan 1st DEO | A.L. SALAZAR CONSTRUCTION, INC. | On-Going | ₱95M | 0% | High risk96 | Flagged0.032 |
| 25CF0129SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF ROAD SAFETY DEVICES ALONG GAPAN - FORT MAGSAYSAY ROAD, PEÑARANDA SECTION, NUEVA ECIJA | Nueva Ecija 2nd DEO | ROCK-WBL CONSTRUCTION CORP. (FOR: ROCK-WBL CONSTRUCTION TRADING & SERVICES) | On-Going | ₱144M | 82% | High risk96 | Flagged0.015 |
| 25CJ0238CONSTRUCTION OF MONCADA - PANIQUI DIVERSION ROAD (SEGMENT 5), MONCADA, TARLAC | Tarlac DEO | HIGH STRENGTH DEV. CORPORATION | On-Going | ₱96.5M | 91% | High risk96 | Flagged0.011 |
| 25CI0033BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SACOBIA RIVER (PHASE IV), MABALACAT CITY, PAMPANGA | Pampanga 3rd DEO | MCB ZAMORA CONSTRUCTION & SUPPLY | On-Going | ₱148.5M | 100% | High risk95 | Flagged0.014 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23CF0097CONCRETING OF BRGY. STO. CRISTO FMR, BRGY. STO. CRISTO, SAN ISIDRO, NUEVA ECIJA | Nueva Ecija 2nd DEO | TRIPLE S BUILDERS INC. | On-Going | ₱11.7M | 0% | High risk83 | Flagged0.069 |
| 23CF0094CONCRETING OF BRGY. BAGO FMR, BRGY. BAGO, GEN. TINIO, NUEVA ECIJA | Nueva Ecija 2nd DEO | F-DEY CONSTRUCTION AND TRADING | On-Going | ₱11.7M | 0% | High risk82 | Flagged0.069 |
| 25CA0074CONSTRUCTION OF SCHOOL BUILDING, MABUCO ELEMENTARY SCHOOL, MABUCO ELEMENTARY SCHOOL, BARANGAY MABUCO, HERMOSA, BATAAN | Bataan 1st DEO | BUILDERS EXPONENT EMPIRE CORP. (FORMERLY: BUILDERS EXPONENT ENTERPRISE) | On-Going | ₱19.5M | 0% | High risk84 | Flagged0.062 |
| 19C00077REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES-RECONSTRUCTION OF SLOPE PROTECTION AT BALAYBAY RESETTLEMENT ELEMENTARY SCHOOL, CASTILLEJOS, ZAMBALES | Region III | ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) | On-Going | ₱93.5M | 32% | High risk71 | Flagged0.060 |
| 24CL0208CONSTRUCTION OF REVETMENT ALONG GABOR RIVER, PHASE 1, SAN FELIPE, ZAMBALES | Zambales 1st DEO | CDC CONSTRUCTION & SUPPLIES | On-Going | ₱95.5M | 0% | High risk82 | Flagged0.060 |
| 24CJ0414CONSTRUCTION OF MULTI-PURPOSE BUILDING, TARLAC CITY GENERAL HOSPITAL, TARLAC CITY, TARLAC | Tarlac DEO | EQUI-PARCO CONSTRUCTION COMPANY | On-Going | ₱95.6M | 53% | High risk90 | Flagged0.060 |
| 25CD0223CONCRETING OF BRGY. STO. CRISTO FMR, BRGY. STO. CRISTO, SAN JOSE DEL MONTE, BULACAN | Bulacan 2nd DEO | TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) | On-Going | ₱28.9M | 0% | High risk79 | Flagged0.060 |
| 24CF0136SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROAD WITH DRAINAGE ALONG JAEN - SAN ANTONIO ROAD, JAEN, NUEVA EC | Nueva Ecija 2nd DEO | AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) | On-Going | ₱96M | 42% | High risk89 | Flagged0.059 |
| 25CH0062CONCRETING OF PUROK 6, BRGY. SAN ROQUE ARBOL FMR, BRGY. SAN ROQUE ARBOL, LUBAO, PAMPANGA | Pampanga 2nd DEO | 120 OVER CONSTRUCTION CO. | On-Going | ₱14.7M | 0% | High risk82 | Flagged0.059 |
| 23CL0174CONSTRUCTION OF BY-PASS AND DIVERSION ROADS IBA-BOTOLAN, ZAMBALES (PHASE 2) | Zambales 1st DEO | E.R. DELA CRUZ CONSTRUCTION & SUPPLY | On-Going | ₱95.2M | 0% | High risk78 | Flagged0.058 |
| 24CC0606CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABANGAN CHANNEL, PACKAGE B, BARANGAY SANTA ELENA - BARANGAY TIBAGUIN, HAGONOY, BULACAN | Bulacan 1st DEO | SYMS CONSTRUCTION TRADING | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.058 |
| 24CC0588CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG KALERO RIVER, PACAKGE B, BARANGAY PANASAHAN, MALOLOS, BULACAN | Bulacan 1st DEO | SYMS CONSTRUCTION TRADING | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.058 |
| 24CC0604CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MAYCAPIZ-TALIPTIP RIVER, PACKAGE B, BARANGAY PEREZ, BULAKAN, BULACAN | Bulacan 1st DEO | SYMS CONSTRUCTION TRADING | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CC0592CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, PACKAGE A, BARANGAY TAAL-BARANGAY SANTO CRISTO, PULILAN, BULACAN | Bulacan 1st DEO | SYMS CONSTRUCTION TRADING | On-Going | ₱92.8M | 0% | High risk83 | Flagged0.057 |
| 23CL0173CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CAPAS-BOTOLAN ROAD TO IBA (PHASE 1), IBA, ZAMBALES | Zambales 1st DEO | T2B3 BUILDERS AND SUPPLIES CORP. | On-Going | ₱95.3M | 0% | High risk77 | Flagged0.057 |
| 23CL0176CONSTRUCTION OF BY-PASS AND DIVERSION ROADS CAPAS-BOTOLAN ROAD TO IBA (PHASE 2), IBA, ZAMBALES | Zambales 1st DEO | T2B3 BUILDERS AND SUPPLIES CORP.LMAX CONSTRUCTION | On-Going | ₱95.5M | 0% | High risk77 | Flagged0.057 |
| 24CC0580CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE H, BARANGAY TANAWAN, BUSTOS, BULACAN | Bulacan 1st DEO | JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CC0579CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE G, BARANGAY TANAWAN, BUSTOS, BULACAN | Bulacan 1st DEO | A.R.L. CONSTRUCTION | On-Going | ₱92.7M | 0% | High risk83 | Flagged0.057 |
| 24CC0582CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACAKGE J, BARANGAY TANAWAN, BUSTOS, BULACAN | Bulacan 1st DEO | RVR3 CONSTRUCTION SUPPLY AND SERVICES | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
| 24CC0581CONSTRUCTION OF RIVER WALL ALONG ANGAT RIVER, PACKAGE I, BARANGAY TANAWAN, BUSTOS, BULACAN | Bulacan 1st DEO | JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) | On-Going | ₱92.6M | 0% | High risk83 | Flagged0.057 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 25CO0008SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF FLOOD MITIGATION STRUCTURE, COLO RIS, DINALUPIHAN, BATAAN | Bataan 3rd DEO | BUILDERS EXPONENT EMPIRE CORP. (FORMERLY: BUILDERS EXPONENT ENTERPRISE) | On-Going | ₱47.3M | 62% | High risk94 | Flagged0.013 |
| 177 | 25CJ0276CONSTRUCTION OF ROAD AND DRAINANGE IN BARANGAY SAN ISIDRO, TARLAC CITY, TARLAC (PHASE I) | Tarlac DEO | NORTHERN BUILDERS | On-Going | ₱74.3M | 88% | High risk94 | Flagged0.005 |
| 178 | 25CE0199CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY MAYAMOT 1, TALUGTUG, NUEVA ECIJA | Nueva Ecija 1st DEO | IJK MAE CONSTRUCTION INC. | On-Going | ₱5.9M | 99% | High risk94 | —-0.004 |
| 179 | 25CE0205CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN ANTONIO, SCIENCE CITY OF MUÑOZ, NUEVA ECIJA | Nueva Ecija 1st DEO | NIÑAS CONSTRUCTION CORP. (FORMERLY: NINA'S CONSTRUCTION AND SUPPLIES) | On-Going | ₱5.9M | 99% | High risk94 | —-0.005 |
| 180 | 25CG0052BASIC INFRASTRUCTURE PROGRAM (BIP): MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), MESULO E/S, ARAYAT, PAMPANGA | Pampanga 1st DEO | BPDG CONSTRUCTION CORPORATION (FORMERLY: BPDG CONSTRUCTION & TRADING) | On-Going | ₱6.6M | 57% | High risk94 | Flagged0.011 |
| 181 | 25CE0335CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. MANAUL, ZARAGOZA, NUEVA ECIJA | Nueva Ecija 1st DEO | M.M. SERRANO CONSTRUCTION COMPANY | On-Going | ₱5.2M | 97% | High risk94 | —-0.005 |
| 182 | 25CN0151CONSTRUCTION OF MULTI - PURPOSE BUILDING, BARANGAY STO. TOMAS, MARIA AURORA, AURORA | Aurora DEO | JOHN DEE B. BUSTAMANTE CONSTRUCTION | On-Going | ₱4.8M | 100% | High risk94 | —-0.007 |
| 183 | 25CN0114CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY 1, MARIA AURORA, AURORA | Aurora DEO | ZF CONSTRUCTION | On-Going | ₱4.8M | 96% | High risk94 | —-0.006 |
| 184 | 25CE0327CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION WEST III, ALIAGA, NUEVA ECIJA | Nueva Ecija 1st DEO | M.M. SERRANO CONSTRUCTION COMPANY | On-Going | ₱5.8M | 100% | High risk94 | —-0.007 |
| 185 | 25CE0324CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. ST. JOHN, GUIMBA, NUEVA ECIJA | Nueva Ecija 1st DEO | M.M. SERRANO CONSTRUCTION COMPANY | On-Going | ₱4.9M | 100% | High risk94 | —-0.005 |
| 186 | 25CG0056BASIC INFRASTRUCTURE PROGRAM (BIP): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF ROADS AND DRAINAGE, CAMBA, ARAYAT, PAMPANGA | Pampanga 1st DEO | UNI-FIVE CONSTRUCTION AND TRADING | Completed | ₱7.5M | 100% | High risk94 | —-0.033 |
| 187 | 25CF0143BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES-SAGANA BR. (B01346LZ) ALONG JCT. TABLANG - GABALDON RD | Nueva Ecija 2nd DEO | REBCOR CONSTRUCTION AND TRADING CORPORATION | On-Going | ₱65.1M | 18% | High risk94 | Flagged0.014 |
| 188 | 25CF0126BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY MARAWA, JAEN, NUEVA ECIJA | Nueva Ecija 2nd DEO | TRIPLE S BUILDERS INC. | On-Going | ₱7.9M | 100% | High risk94 | —-0.006 |
| 189 | 25CN0139CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY DITEKI, SAN LUIS, AURORA | Aurora DEO | RVB CONSTRUCTION SUPPLIES TRADING | On-Going | ₱4.8M | 100% | High risk94 | —-0.007 |
| 190 | 25CE0287CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. BALBALINO, GUIMBA, NUEVA ECIJA | Nueva Ecija 1st DEO | M.M. SERRANO CONSTRUCTION COMPANY | On-Going | ₱5.1M | 100% | High risk94 | —-0.005 |
| 191 | 25CE0325CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. NORTH POBLACION, NAMPICUAN, NUEVA ECIJA | Nueva Ecija 1st DEO | M.M. SERRANO CONSTRUCTION COMPANY | On-Going | ₱4.9M | 100% | High risk94 | —-0.004 |
| 192 | 25CH0073CONSTRUCTION OF PEDESTRIAN OVERPASS, MANCATIAN, PORAC, PAMPANGA | Pampanga 2nd DEO | PASCAL CONSTRUCTIONV.M ESPIRITU CONSTRUCTION | On-Going | ₱19.6M | 9% | High risk93 | Flagged0.027 |
| 193 | 25CL0039CONSTRUCTION OF MULTI-PURPOSE BUILDING, PRESIDENT RAMON MAGSAYSAY STATE UNIVERSITY, IBA, ZAMBALES | Zambales 1st DEO | KAEE CONSTRUCTION SERVICES | On-Going | ₱48.9M | 97% | High risk93 | Flagged0.002 |
| 194 | 25CN0143CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY IPIL, DIPACULAO, AURORA | Aurora DEO | A.I.M. CONSTRUCTION | On-Going | ₱4.9M | 81% | High risk93 | Flagged0.000 |
| 195 | 25CI0083BASIC INFRASTRUCTURE PROGRAM BIP-BIP MULTI PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES; CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BRGY SAN JOSE, ANGELES CITY, PAMPANGA | Pampanga 3rd DEO | PRIME PAVE CONSTRUCTION AND ASPHALT CORPORATION | On-Going | ₱14.5M | 60% | High risk93 | Flagged0.013 |
| 196 | 25CJ0200CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TARLAC RIVER, LEFT DIKE, BRILLANTE - ADUAS SECTION (ANNEX 9), PANIQUI, TARLAC | Tarlac DEO | 11-16 CONSTRUCTION | On-Going | ₱96.5M | 89% | High risk93 | Flagged0.011 |
| 197 | 25CM0058CSSP, BIP, MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, REHABILITATION OF MULTI-PURPOSE BUILDING AT BRGY. ASINAN POBLACION, SUBIC, ZAMBALES | Zambales 2nd DEO | M.V.GUBALLA CONSTRUCTION CORPORATION (FORMERLY: M.V. GUBALLA CONSTRUCTION) | On-Going | ₱9.7M | 70% | High risk93 | Flagged0.007 |
| 198 | 25CF0142BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BARANGAY ATATE, PALAYAN CITY, NUEVA ECIJA | Nueva Ecija 2nd DEO | CCF EARTHMOVING CORP. | On-Going | ₱9.8M | 0% | High risk93 | Flagged0.022 |
| 199 | 25CD0014CONSTRUCTION OF ROAD, BARANGAY SULUCAN - TUBAO ENCANTO, ANGAT, BULACAN | Bulacan 2nd DEO | RRJ88 CONSTRUCTION DEVELOPMENT AND GENERAL MERCHANDISE INC. | On-Going | ₱28.5M | 100% | High risk93 | —-0.005 |
| 200 | 25CF0084SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY KAPT. PEPE, CABANATUAN CITY, NUEVA ECIJA | Nueva Ecija 2nd DEO | CELSO C. FERRER CONSTRUCTION CORP. | On-Going | ₱14.5M | 68% | High risk93 | Flagged0.005 |