Cross-referencing the ledgers…
Cross-referencing the ledgers…
Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
8,265
Total budget
₱236B
Average progress
96.0%
Completion rate
80.7%
Average risk score
46.1
Medium risk on average, out of 100
Flagged as unusual
599
7.2% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 4,190 | ₱142.4B | 45.2 | 75 | 97.1% |
| Buildings and Facilities | 1,676 | ₱14.7B | 37.0 | 56 | 96.1% |
| Flood Control and Drainage | 1,106 | ₱45.2B | 48.3 | 80 | 97.2% |
| Bridges | 398 | ₱11B | 44.0 | 20 | 96.8% |
| Water Provision and Storage | 300 | ₱2.4B | 31.3 | 2 | 99.2% |
| OTHER | 283 | ₱11.4B | 77.2 | 157 | 90.3% |
| GAA 2025 SSP | 155 | ₱1.9B | 90.8 | 128 | 76.1% |
| GAA 2025 OO-1 | 98 | ₱3.2B | 89.6 | 51 | 81.4% |
| GAA 2025 OO-2 | 50 | ₱3.2B | 90.1 | 29 | 75.0% |
| Bridges, Roads | 9 | ₱705.4M | 58.4 | 1 | 89.8% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Abra DEO | 1,508 | ₱66.8B | 51.2 | 130 | 94.2% |
| Lower Kalinga DEO | 841 | ₱16.5B | 45.1 | 82 | 94.6% |
| Benguet 1st DEO | 792 | ₱15.2B | 39.5 | 24 | 97.9% |
| Mountain Province 1st DEO | 725 | ₱8.3B | 43.1 | 38 | 97.2% |
| Benguet 2nd DEO | 713 | ₱12.3B | 41.8 | 26 | 98.6% |
| Baguio City DEO | 707 | ₱9.3B | 36.0 | 31 | 98.2% |
| Upper Kalinga DEO | 562 | ₱11.5B | 48.4 | 62 | 95.6% |
| Apayao 2nd DEO | 554 | ₱15.3B | 51.2 | 32 | 98.2% |
| Cordillera Administrative Region | 480 | ₱56.6B | 59.2 | 66 | 93.4% |
| Ifugao 1st DEO | 380 | ₱5B | 42.1 | 27 | 88.5% |
| Ifugao 2nd DEO | 375 | ₱6.1B | 46.0 | 21 | 97.4% |
| Apayao 1st DEO | 314 | ₱6.5B | 51.4 | 36 | 97.3% |
| Mountain Province 2nd DEO | 314 | ₱6.7B | 47.7 | 24 | 97.2% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| 739 BUILDERS | 397 | ₱10.2B | 50.2 | 27 | 88.3% |
| MG SAMIDAN CONSTRUCTION | 359 | ₱35.4B | 60.2 | 59 | 88.5% |
| PHESCO, INCORPORATED | 235 | ₱19.9B | 55.1 | 3 | 99.8% |
| A.D. MARRERO GENERAL CONSTRUCTION | 203 | ₱4.1B | 44.4 | 1 | 99.1% |
| BHM CONSTRUCTION | 176 | ₱6.2B | 53.0 | 22 | 94.6% |
| R.A. FANGLAYAN (RAF) GENERAL CONSTRUCTION INC. (FORMERLY:RAF GENERAL CONSTRUCTION) | 157 | ₱2.3B | 40.1 | 0 | 100.0% |
| GOLDRICH CONSTRUCTION & TRADING | 118 | ₱7B | 51.7 | 7 | 97.8% |
| DJY CONSTRUCTION | 111 | ₱7.7B | 53.7 | 8 | 93.1% |
| ISNAG BUILDERS & DEV'T. CORPORATION | 108 | ₱4.3B | 55.9 | 12 | 96.4% |
| JTM CONSTRUCTION | 102 | ₱3.6B | 53.4 | 11 | 91.1% |
| BALINTUGAN CONSTRUCTION | 98 | ₱6.5B | 54.2 | 6 | 96.0% |
| RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE | 90 | ₱7.9B | 58.7 | 7 | 96.7% |
| TAGEL CORPORATION | 86 | ₱4.4B | 53.8 | 2 | 99.2% |
| ASC CONSTRUCTION & CONCRETE PRODUCTS | 82 | ₱3.4B | 54.5 | 2 | 98.7% |
| F.B. BANTALES ENGINEERING CONSTRUCTION | 71 | ₱3.2B | 49.3 | 3 | 100.0% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PK0035BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF BALBALAN (BAIS) MULTI-PURPOSE FACILITIES, BRGY. BALANTOY, BALBALAN, KALINGA | Upper Kalinga DEO | EEJ CONSTRUCTION | On-Going | ₱28.8M | 31% | High risk96 | Flagged0.025 |
| 25PK0012CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC BUILDINGS/FACILITIES - CONSTRUCTION OF BALBALAN-PINUKPUK ROAD JCT.-BALANT | Upper Kalinga DEO | BHM CONSTRUCTION | On-Going | ₱19.5M | 72% | High risk96 | Flagged0.018 |
| 25PL0085CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF ROAD, MANUEL S. AGYAO BOULEVARD | Lower Kalinga DEO | DCEBUILDERS CORPORATION (FORMERLY: DCESTRANERO CORPORATION) | On-Going | ₱28.5M | 78% | High risk96 | Flagged0.017 |
| 25PK0040BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF BALANTOY ELEMENTARY SCHOOL MULTI-PURPOSE BUILDING, BRGY. BALANTOY, BALBALAN, KALINGA | Upper Kalinga DEO | RAD CONSTRUCTION | On-Going | ₱4.8M | 66% | High risk96 | Flagged0.017 |
| 25PK0057BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF SCHOOL BUILDING, DAO-ANGAN INTEGRATED SCHOOL, BRGY. DAO-ANGAN, BALBALAN, KALINGA | Upper Kalinga DEO | RANCHER BUILDERS SERVICES | On-Going | ₱14.4M | 27% | High risk96 | Flagged0.025 |
| 25PB0048BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (MUNICIPAL POLICE STATION), POBLACION, KABUGAO, APAYAO | Apayao 1st DEO | MAK-CT CONSTRUCTION OPC | On-Going | ₱4.9M | 25% | High risk96 | Flagged0.028 |
| 25PL0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF LIWAN WEST-ANONANG ROAD, RIZAL, KALINGA | Lower Kalinga DEO | BULLAYAO CONSTRUCTION SERVICES | On-Going | ₱9.9M | 55% | High risk96 | Flagged0.021 |
| 25PB0019CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI - PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (YOUTH CENTER) BRGY. POBLACION, KABUGAO APAYAO | Apayao 1st DEO | MAK-CT CONSTRUCTION OPC | On-Going | ₱4.8M | 74% | High risk96 | Flagged0.016 |
| 25PL0024CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF BRIDGE (SAN JULIAN), SAN JULIAN | Lower Kalinga DEO | BOBSAN BUILDERS AND SUPPLY | On-Going | ₱9.8M | 88% | High risk96 | Flagged0.013 |
| 25PB0049CONVERGENCE AND SPECIAL PROGRAM, BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (BIRTHING HOME), BRGY. BULUAN, CONNER, APAYAO | Apayao 1st DEO | ENRIQUE T. CHUA CONSTRUCTION DEVELOPMENT CORPORATION | On-Going | ₱4.8M | 59% | High risk96 | Flagged0.018 |
| 25PK0036CONVERGENCE AND SPECIAL SUPPORT PROGRAM SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ACCESS ROAD LEADING TO DPW | Upper Kalinga DEO | ABMJ CONSTRUCTION AND AGGREGATESSHAMA CONSTRUCTION | On-Going | ₱28.5M | 52% | High risk96 | Flagged0.021 |
| 25PK0061BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF MULTI-PURPOSE GYM, BARANGAY BALINCIAGAO NORTE, CAGALUAN, BALATOC, PASIL, KALINGA | Upper Kalinga DEO | RAD CONSTRUCTION | On-Going | ₱4.9M | 46% | High risk96 | Flagged0.019 |
| 25PL0082CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI- PURPOSE BUILDING, BARANGAY CASIGAYAN, DAGUPAN CENTRO, MAGSAYSAY, TABUK CITY, KALINGA | Lower Kalinga DEO | JEP CONSTRUCTION | On-Going | ₱7.9M | 79% | High risk96 | Flagged0.015 |
| 25PB0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING CAGLAYAN ELEMENTARY SCHOOL, BARANGAY CAGLAYAN, CONNER, APAYAO | Apayao 1st DEO | PRIME MASTER CONST. AND DEV'T. CORP. | On-Going | ₱9.8M | 91% | High risk96 | Flagged0.012 |
| 25PB0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MALAMA, CONNER, APAYAO | Apayao 1st DEO | GKA ENGINEERING AND CONSTRUCTION | On-Going | ₱9.7M | 96% | High risk96 | Flagged0.011 |
| 25PK0060BASIC INFRASTRUCTURE PROGRAM (BIP) MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES CONSTRUCTION OF (COMPLETION) OF BALBALASANG MULTI-PURPOSE BUILDING, BRGY. BALBALASANG, BALBALAN, KALINGA | Upper Kalinga DEO | BHM CONSTRUCTION | On-Going | ₱14.7M | 27% | High risk96 | Flagged0.026 |
| 25PL0108CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BLISS, NAMBARAN, NEW TANGLAG, BANTAY-BIDES, PURO | Lower Kalinga DEO | 2RAW CALSIYAO CONSTRUCTION SERVICES | On-Going | ₱6.4M | 71% | High risk96 | Flagged0.016 |
| 25PL0048CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - CONSTRUCTION OF ROAD, TULIAO, LAYA WEST, BULO-BASSIT ACCESS ROAD, BARANGA | Lower Kalinga DEO | J.A.O.S CONSTRUCTION | On-Going | ₱5.9M | 99% | High risk96 | Flagged0.010 |
| 25PL0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI- PURPOSE BUILDING, BARANGAY SAN FRANCISCO, SAN PASCUAL, LACNOG WEST, NAMBARAN, RIZAL, TAB | Lower Kalinga DEO | J.A.O.S CONSTRUCTION | On-Going | ₱8.9M | 77% | High risk96 | Flagged0.016 |
| 25PB0042BASIC INFRASTRUTURE PROGRAM (BIP) - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTNRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BRGY. KUMAO, KABUGAO, APAYAO | Apayao 1st DEO | GKA ENGINEERING AND CONSTRUCTION | On-Going | ₱7.7M | 37% | High risk96 | Flagged0.024 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18P00052DISASTER-RELATED AND EMERGENCY REHABILITATION - FLOOD CONTROL SYSTEMS 1.) RECOVERY/RECONSTRUCTION OF FLOOD CONTROL PROJECTS IN DOLORES, ABRA 2.) REPAIR/REHABILITATION OF FLOOD CONTROL PROJECTS IN DOLORES, ABRA | Cordillera Administrative Region | S.D. PLATON CONSTRUCTION, INC. | On-Going | ₱112.3M | 26% | High risk73 | Flagged0.084 |
| 18P00055CLUSTER I :A) REPAIR/REHABILITATION/IMPROVEMENT OF LUZONG-TUQUIPA ROAD, BRGYS. LUZONG AND TUQUIPA, LUBA, ABRAB) REPAIR/ REHABILITATION/ IMPROVEMENT OF SITIO CABA-GAYAMAN ROAD, BRGY GAYAMAN, LUBA, ABRAC) REPAIR/REHABILITATION/ IMPROVEMENT OF SABNANGA | Cordillera Administrative Region | PRECIOUS CONSTRUCTION | On-Going | ₱100M | 21% | High risk69 | Flagged0.082 |
| 24P00083COMPLETION OF FOUR-STOREY LIBRARY BUILDING, BULANAO CAMPUS - PHASE 2 - KALINGA STATE UNIVERSITY, BULANAO, TABUK CITY, KALINGA | Cordillera Administrative Region | YUNAKIM CONSTRUCTIONEGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) | On-Going | ₱124.3M | 38% | High risk90 | Flagged0.081 |
| 25PE0064CONSTRUCTION OF SCHOOL BUILDING, TUBA CENTRAL NATIONAL HIGH SCHOOL, BARANGAY POBLACION, TUBA, BENGUET | Benguet 1st DEO | SEJ CONSTRUCTION & AGGREGATES | On-Going | ₱19.9M | 2% | High risk88 | Flagged0.072 |
| 25PE0063CONSTRUCTION OF SCHOOL BUILDING, VIRAC INTEGRADTED SCHOOL, BARANGAY VIRAC, ITOGON, BENGUET | Benguet 1st DEO | ALBER AND SEVEN CONSTRUCTION | On-Going | ₱19.9M | 13% | High risk88 | Flagged0.071 |
| 24PA0197CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CARDONA, DOLORES, ABRA | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱138.9M | 96% | High risk90 | Flagged0.071 |
| 24PA0185CONSTRUCTION OF NAGUILLAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRA | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱139M | 95% | High risk90 | Flagged0.071 |
| 24PA0196CONSTRUCTION OF BULBULALA FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY BULBULALA, LA PAZ, ABRA | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱138.2M | 95% | High risk90 | Flagged0.071 |
| 24PA0199CONSTRUCTION OF KAWITAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, DANGLAS, ABRA | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱138.9M | 95% | High risk90 | Flagged0.071 |
| 24PA0200CONSTRUCTION OF SOOT FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, LA PAZ, ABRA | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱137.8M | 95% | High risk90 | Flagged0.071 |
| 24P00076CONSTRUCTION OF NEW SUPER HEALTH CENTERS / RHU - LA TRINIDAD SUPER HEALTH CENTER, BENGUETLA TRINIDAD, BENGUET | Cordillera Administrative Region | OLIVER L. DOLLIGAS CONSTRUCTION | On-Going | ₱18.7M | 17% | High risk87 | Flagged0.070 |
| 24PA0220CONSTRUCTION OF BLISS FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BANGUED, ABRA | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱137.6M | 95% | High risk90 | Flagged0.070 |
| 24PE0089CONSTRUCTION OF ROAD, AMBACUAG-ORING-LA TRINIDAD ROAD, SABLAN, BENGUET, PHASE 2 | Benguet 1st DEO | MG SAMIDAN CONSTRUCTIONANAS CONSTRUCTION | On-Going | ₱96.5M | 60% | High risk90 | Flagged0.066 |
| 24PA0194CONSTRUCTION OF POBLACION FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY POBLACION, LAGAYAN, ABRA | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱137.6M | 0% | High risk74 | Flagged0.066 |
| 25PB0047BASIC EDUCATIONAL FACILITIES FUND (BEFF) : CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS : CONSTRUCTION OF SCHOOL BUILDING, KALIAT INTEGRATED SCHOOL, KABUGAO, APAYAO | Apayao 1st DEO | JTC CONSTRUCTION SUPPLY AND SERVICES | On-Going | ₱6.4M | 28% | High risk86 | Flagged0.064 |
| 24PE0087CONCRETING OF ROAD ANOVANG DOMOLPOS ITOGON - KAYAPA NUEVA VIZCAYA, BARANGAY TINONGDAN, ITOGON, BENGUET | Benguet 1st DEO | TSAI SHEN CONSTRUCTION | On-Going | ₱19.3M | 27% | High risk87 | Flagged0.064 |
| 24PA0187CONSTRUCTION OF CATACDEGAN VIEJO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY CATACDEGAN VIEJO, MANABO, ABRA | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱138.8M | 21% | High risk74 | Flagged0.063 |
| 24PF0076CONSTRUCTION OF 2-STOREY 4 CLASSROOM SCHOOL BUILDING IN TACADANG NATIONAL HIGHSCHOOL, BARANGAY TACADANG, KIBUNGAN, BENGUET | Benguet 2nd DEO | PATARAS CONSTRUCTION SERVICES | On-Going | ₱25.4M | 39% | High risk87 | Flagged0.063 |
| 24P00058UPGRADING OF COLLEGE LIBRARY, LAGANGILANG CAMPUS - ABRA STATE INSTITUTE OF SCIENCES AND TECHNOLOGY, LAGANGILANG, ABRA | Cordillera Administrative Region | TRAMS CONSTRUCTION | On-Going | ₱29.8M | 57% | High risk87 | Flagged0.063 |
| 24PE0093CONSTRUCTION OF FLOOD CONTROL ALONG TOBOY RIVER, SITIO LUPITAK NORTE AND SITIO LUPITAK SUR, BARANGAY ANSAGAN, TUBA, BENGUET | Benguet 1st DEO | AKSUM CONTRACTING CORPORATION | On-Going | ₱94.6M | 75% | High risk90 | Flagged0.062 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 576 | 24PL0078CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF ROMUALDEZ MULTI-PURPOSE BUILDING, RIZAL, KALINGA | Lower Kalinga DEO | DELTA JO CONSTRUCTION (DELCONS) | On-Going | ₱2M | 90% | High risk71 | Flagged0.006 |
| 577 | 17PI0088FLOOD CONTROL MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; REHABILITATION/RESTORATION OF UPPER CHICO RIVER FLOOD -EROSION CONTROL PROJECTS - TIPUNAN MONAMON NORTE - SUYO MONAMON SUR, BAUKO MT. PROVINC | Mountain Province 1st DEO | L.S.D. CONSTRUCTION & SUPPLIES | Completed | ₱89.9M | 100% | High risk71 | —-0.029 |
| 578 | 17PI0091FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS; REHABILITATION/RESTORATION OF UPPER CHICO RIVER FLOOD-EROSION CONTROL PROJECTS - MAGATILEY MONAMON SUR, BAUKO MT. PROVINCE | Mountain Province 1st DEO | L.S.D. CONSTRUCTION & SUPPLIES | Completed | ₱88.3M | 100% | High risk71 | —-0.029 |
| 579 | 22PD0023CY 2022 CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONST/IMPVT OF VARIOUS INFRA IN SUPPORT OF NATIONAL SECURITY (TIKAS-PROGRAM) CONST. OF MUSEUM, PMA, FORT DEL PILAR, BAGUIO CITY, BENGUET | Baguio City DEO | L.S.D. CONSTRUCTION & SUPPLIES | Completed | ₱48.6M | 100% | High risk70 | —-0.052 |
| 580 | 25PG0070CONSTRUCTION OF GUMHANG MULTI-PURPOSE BUILDING, BARANGAY GUMHANG, TINOC, IFUGAO | Ifugao 1st DEO | LOKNOY CONSTRUCTION | On-Going | ₱4.9M | 0% | High risk70 | Flagged0.001 |
| 581 | 25PK0044CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTOR SYSTEMS - CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAINWATER COLLECTOR SYSTEM | Upper Kalinga DEO | MPD3 CONSTRUCTION | On-Going | ₱2.6M | 100% | High risk70 | —-0.002 |
| 582 | 25PA0017CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY LINGEY, BUCLOC, ABRA | Abra DEO | 739 BUILDERS | Completed | ₱4.7M | 100% | High risk70 | —-0.016 |
| 583 | 25PG0060CONSTRUCTION OF CUDOG HIGH SCHOOL MUTI-PURPOSE BUILDING, BARANGAY CUDOG, LAGAWE, IFUGAO | Ifugao 1st DEO | BANGHALLAN CONSTRUCTION | On-Going | ₱4.9M | 51% | High risk70 | —-0.016 |
| 584 | 25PD0058BASIC INFRASTRUCTURE PROGRAM (BIP)-CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (ANNEX NEW BUILDING), BARANGAY LOWER MAGSAYSAY, BAGUIO CITY | Baguio City DEO | HAIGHT'S CONSTRUCTION | Completed | ₱2M | 100% | High risk69 | —-0.017 |
| 585 | 25PD0087SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) REHABILITATION OF ROAD BARANGAY DONTOGAN, BAGUIO CITY | Baguio City DEO | W.S. FAGCANGAN CONSTRUCTION MANAGEMENT SERVICES | Completed | ₱4.6M | 100% | High risk69 | —-0.021 |
| 586 | 18P00055CLUSTER I :A) REPAIR/REHABILITATION/IMPROVEMENT OF LUZONG-TUQUIPA ROAD, BRGYS. LUZONG AND TUQUIPA, LUBA, ABRAB) REPAIR/ REHABILITATION/ IMPROVEMENT OF SITIO CABA-GAYAMAN ROAD, BRGY GAYAMAN, LUBA, ABRAC) REPAIR/REHABILITATION/ IMPROVEMENT OF SABNANGA | Cordillera Administrative Region | PRECIOUS CONSTRUCTION | On-Going | ₱100M | 21% | High risk69 | Flagged0.082 |
| 587 | 24PA0029OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF QUILIAT FLOOD CONTROL ALONG ABRA RIVER, QUILIAT, LANGIDEN, ABRA | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱138.3M | 100% | High risk69 | —-0.003 |
| 588 | 24PA0180SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF CALABA VIADUCT PHASE 2, CALABA, BANGUED, ABRA | Abra DEO | E.T. LATAWAN CONSTRUCTION | On-Going | ₱139.8M | 41% | High risk69 | Flagged0.015 |
| 589 | 23PA0109OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN (PHASE II), BARANGAY BA | Abra DEO | 739 BUILDERS | On-Going | ₱138.1M | 95% | High risk69 | Flagged0.005 |
| 590 | 24PA0181SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF SINALANG-PALAO BRIDGE APPROACHES, PALAO, BANGUED, ABRA | Abra DEO | E.T. LATAWAN CONSTRUCTION | On-Going | ₱137.5M | 18% | High risk69 | Flagged0.024 |
| 591 | 24PA0046OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BANGBANGCAG FLOOD CONTROL ALONG ABRA RIVER, BANGBANGCAG, BUCAY, ABRA | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱137.5M | 100% | High risk69 | —-0.008 |
| 592 | 24PA0032OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF NAGTUPACAN FLOOD CONTROL ALONG ABRA RIVER, NAGTUPACAN, LAGANGILANG, ABRA | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱137.5M | 90% | High risk69 | —-0.001 |
| 593 | 24PA0173SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF CALABA VIADUCT PHASE I, CALABA, BANGUED, ABRA | Abra DEO | E.T. LATAWAN CONSTRUCTION | On-Going | ₱139.9M | 45% | High risk69 | Flagged0.013 |
| 594 | 23PA0250OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, BARANGAY PALAQUIO, BUC | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱142.8M | 96% | High risk68 | —-0.002 |
| 595 | 22PL0064CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) -CONSTRUCTION OF RIZAL MUNICIPAL POLICE STATION BUILDIN | Lower Kalinga DEO | FC ARCHTS CONSTRUCTION | Completed | ₱7.1M | 100% | High risk68 | —-0.052 |
| 596 | 24PA0054CONSTRUCTION OF DALAGUISEN FLOOD CONTROL STRUCTURE, LAGANGILANG, ABRA | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱148.5M | 92% | High risk68 | —-0.001 |
| 597 | 24PA0172SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF SINALANG-PALAO BRIDGE, BANGUED, ABRA | Abra DEO | E.T. LATAWAN CONSTRUCTION | On-Going | ₱137.4M | 22% | High risk68 | Flagged0.021 |
| 598 | 23PA0033OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, BARANGAY QUILLAT, LANGIDEN, | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱144.7M | 93% | High risk68 | Flagged0.009 |
| 599 | 24PA0112OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF CARDONA FLOOD CONTROL STRUCTURE, CARDONA, DOLORES, ABRA | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱140.3M | 86% | High risk68 | —-0.002 |
| 600 | 23PA0137OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, NORO-DEMET, POBLACION, | Abra DEO | MG SAMIDAN CONSTRUCTION | On-Going | ₱139M | 90% | High risk68 | Flagged0.009 |