Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
237
Total budget
₱97.7B
Average progress
90.7%
Completion rate
62.4%
Below 70%
Average risk score
72.2
High risk on average, out of 100
Flagged as unusual
62
26.2% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 163 | ₱41.5B | 73.7 | 28 | 92.8% |
| Roads | 27 | ₱6.6B | 60.7 | 1 | 96.1% |
| OTHER | 21 | ₱27.4B | 79.1 | 17 | 84.3% |
| Buildings and Facilities | 11 | ₱12.1B | 66.8 | 5 | 87.7% |
| Bridges | 9 | ₱3B | 67.7 | 6 | 59.9% |
| Bridges, Roads | 6 | ₱7.2B | 78.0 | 5 | 85.2% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control Management Cluster | 171 | ₱43.7B | 73.7 | 32 | 93.0% |
| Roads Management Cluster I (Bilateral) | 25 | ₱15.1B | 62.8 | 3 | 96.1% |
| Roads Management Cluster II (Multilateral) | 16 | ₱20.8B | 77.7 | 14 | 80.8% |
| Bridges Management Cluster | 10 | ₱3.2B | 70.8 | 7 | 69.0% |
| Buildings and Special Projects Management Cluster | 8 | ₱13.7B | 69.6 | 6 | 76.7% |
| Bureau of Construction | 7 | ₱1.3B | 62.1 | 0 | 84.8% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| E. F. CHUA CONSTRUCTION, INC. | 28 | ₱5.3B | 74.3 | 0 | 100.0% |
| 11-16 CONSTRUCTION | 23 | ₱2.9B | 71.3 | 1 | 95.6% |
| MSB VITUG CONSTRUCTION | 14 | ₱5.8B | 75.2 | 6 | 95.5% |
| R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | 13 | ₱5.3B | 75.2 | 6 | 70.9% |
| TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC | 13 | ₱6.9B | 74.4 | 5 | 97.0% |
| L.R. TIQUI BUILDERS, INC. | 11 | ₱2.1B | 71.1 | 1 | 97.2% |
| AKN CONSTRUCTION CORPORATION | 10 | ₱1.4B | 74.6 | 1 | 98.0% |
| FERDSTAR BUILDERS INC. | 9 | ₱1.9B | 75.7 | 2 | 99.7% |
| J.D. LEGASPI CONSTRUCTION | 6 | ₱1.8B | 76.3 | 3 | 80.9% |
| PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP. | 6 | ₱1B | 75.3 | 3 | 60.5% |
| RAYMAN BUILDERS INC., | 6 | ₱4.8B | 74.8 | 2 | 85.8% |
| NORTHERN BUILDERS | 6 | ₱1.3B | 74.6 | 0 | 100.0% |
| EQUI-PARCO CONSTRUCTION COMPANY | 6 | ₱949.3M | 59.3 | 0 | 100.0% |
| M.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | 5 | ₱2.4B | 75.8 | 2 | 91.0% |
| PETER G. CHUA BUILDERS | 5 | ₱1.2B | 75.3 | 0 | 100.0% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22Z00032CONSTRUCTION OF THE NEW SENATE BUILDING (PHASE II), NAVY VILLAGE, FORT BONIFACIO, TAGUIG CITY | Buildings and Special Projects Management Cluster | HILMARC'S CONSTRUCTION CORPORATION | On-Going | ₱2.4B | 49% | High risk88 | Flagged0.079 |
| 21Z00020CONTRACT PACKAGE 5, SLOPE PROTECTION (MARAWI-BITO ROAD) UPPER AND LOWER SLOPES; TR-28: REHABILITATION OF ROAD ALONG MARAWI - BITO ROAD; AND TR-29: REHABILITATION OF LASURECO ROAD | Roads Management Cluster II (Multilateral) | M.M.A. ACHIEVER CONSTRUCTION & DEVELOPMENT CORP.KOUZBARY BUILDERS | On-Going | ₱200.6M | 46% | High risk83 | Flagged0.020 |
| 21Z00018CONTRACT PACKAGE 4A - CONSTRUCTION OF ROROGAGUS BRIDGE, RECONSTRUCTION AND DEVELOPMENT PLAN FOR A GREATER MARAWI - STAGE 2 UNDER ADB LOAN NO. 3769 - PHI: EMERGENCY ASSISTANCE FOR RECONSTRUCTION AND RECOVERY OF MARAWI (EARRM) | Roads Management Cluster II (Multilateral) | MUST ENTERPRISESBSP & COMPANY, INC.AL HUSSEIN CONSTRUCTION | On-Going | ₱215M | 60% | High risk83 | Flagged0.013 |
| 20Z00014CONTRACT PACKAGE 1A: REHABILITATION OF EXISTING TRANS-CENTRAL ROADS | Roads Management Cluster II (Multilateral) | FIAT CONSTRUCTION SERVICES | On-Going | ₱177.8M | 75% | High risk83 | Flagged0.020 |
| 20Z00015CONTRACT PACKAGE 1B - REHABILITATION OF EXISTING MINDANAO STATE UNIVERSITY (MSU) ROADS | Roads Management Cluster II (Multilateral) | KOUZBARY BUILDERS | On-Going | ₱161.1M | 71% | High risk83 | Flagged0.018 |
| 17Z00002CONSTRUCTION OF SAMAR PACIFIC COASTAL ROAD(SPCR) PROJECT, PROVINCE OF SAMAR, PHILIPPINES | Roads Management Cluster II (Multilateral) | ILSUNG CONSTRUCTION CO., LTD. (OECO_27310) | On-Going | ₱997.5M | 97% | High risk82 | Flagged0.038 |
| 19Z00011PR-01A, GUTALAC-BALIGUIAN ALTERNATIVE ROAD, ZAMBOANGA DEL NORTE, K2027+802.62-K2055+764.93 (WITH EXCEPTIONS) UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | CHINA WUYI CO., LTD (OECO_16634) | On-Going | ₱1.1B | 83% | High risk81 | Flagged0.031 |
| 21Z00008DAVAO CITY BYPASS CONSTRUCTION PROJECT (II), PACKAGE I-3 STA. 23+500 - STA. 29+700 | Roads Management Cluster I (Bilateral) | ULTICON BUILDERS, INC.SHIMIZU CORPORATION (OECO_16693)TAKENAKA CIVIL ENGINEERING & CONSTRUCTION CO., LTD. (OECO_29591) | On-Going | ₱9.7B | 3% | High risk81 | Flagged0.048 |
| 24N00196BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD (AGUSAN-MISAMIS OR ROAD)- K1253+544.32- K1256+165, K1256+322- K1259+812, K1263+828- K1264+956, AGUSAN DEL NORTE | Roads Management Cluster I (Bilateral) | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱285.7M | 100% | High risk80 | Flagged0.001 |
| 17Z00018PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 5 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 16+050 TO STA. 17+450, LEFT BANK, MARIKINA CITY | Flood Control Management Cluster | AKN CONSTRUCTION CORPORATION | On-Going | ₱294.1M | 87% | High risk80 | Flagged0.035 |
| 18Z00024PR-07, TAMPILISAN - SANDAYONG ROAD, ZAMBOANGA DEL NORTE, K1981+490.00 - K1999+065.86 | Roads Management Cluster II (Multilateral) | FIAT CONSTRUCTION SERVICESMAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION) | Completed | ₱658.2M | 100% | High risk80 | Flagged0.010 |
| 22O00063PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, CONTRACT PACKAGE NO. 4-B, RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 15+700 TO STA. 15+957 (PHASE 2), RIGHT BANK, MARIKINA CITY | Flood Control Management Cluster | FERDSTAR BUILDERS INC. | On-Going | ₱148.4M | 100% | High risk80 | Flagged0.003 |
| 18Z00023PR-06, ALICIA - MALANGAS ROAD, ZAMBOANGA SIBUGAY (K1769+648.00 - K1793+751.43) | Roads Management Cluster II (Multilateral) | CHINA GEO-ENGINEERING CORPORATION (OECO_3427)ESR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: ESR CONSTRUCTION & SUPPLIES) | Completed | ₱1.4B | 100% | High risk79 | Flagged0.011 |
| 18Z00026DESIGN-BUILD FOR THE CONSTRUCTION OF PANGUIL BAY BRIDGE PROJECT, PROVINCE OF MISAMIS OCCIDENTAL AND LANAO DEL NORTE, UNDER THE KOREA EXPORT-IMPORT BANK - ECONOMIC DEVELOPMENT COOPERATION FUND, LOAN AGREEMENT NO. PHL-18 | Roads Management Cluster II (Multilateral) | NAMKWANG ENGINEERING AND CONSTRUCTION CO., LTD.KUKDONG ENGINEERING AND CONSTRUCTION CO. LTD.GUMGWANG ENGINEERING AND CONSTRUCTION CO., LTD. | On-Going | ₱6.7B | 100% | High risk79 | Flagged0.037 |
| 18Z00034CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES IN METRO CEBU, BRGY. PASIL AND ERMITA, BRGY. TEJERO AND BRGY. TIPOLO, CEBU CITY | Flood Control Management Cluster | MSB VITUG CONSTRUCTIONKEILANA RESOURCE AND DEVELOPMENT CORPORATION | Completed | ₱266.6M | 100% | High risk79 | —-0.015 |
| 17Z00007BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES FOR (REGION IV-A), CONTRACT PACKAGE 4 | Bridges Management Cluster | ALGON ENGINEERING CONSTRUCTION CORPORATIONM.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | On-Going | ₱208.9M | 57% | High risk79 | Flagged0.013 |
| 19Z00013CURUAN-SIBUCO ROAD, ZAMBOANGA DEL NORTE, UNDER ADB LOAN NO. 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | SINO ROAD AND BRIDGE GROUP CO. LTD.M. ABUBAKAR CONST. AND ENGINEERING, INC. | On-Going | ₱2.1B | 95% | High risk79 | Flagged0.020 |
| 19Z00012PR-08, R.T. LIM - SIOCON ROAD, ZAMBOANGA SIBUGAY AND ZAMBOANGA DEL NORTE UNDER ADB LOAN NO. 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | CHINA WUYI CO., LTD | On-Going | ₱2.4B | 91% | High risk79 | Flagged0.017 |
| 19Z00015PR-09A, GUICAM BRIDGE, ZAMBOANGA SIBUGAY UNDER ADB LOAN NO. 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | TIANYUAN CONSTRUCTION GROUP CORPORATIONGRACE CONSTRUCTION CORPORATION | On-Going | ₱1.2B | 88% | High risk78 | Flagged0.022 |
| 19Z00014PR-13, SIAY-GAPOL ROAD, ZAMBOANGA SIBUGAY K1761+473.00-K1797+234.10 UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT | Roads Management Cluster II (Multilateral) | QINGDAO MUNICIPAL CONSTRUCTION GROUP CO., LTD.ESR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: ESR CONSTRUCTION & SUPPLIES) | On-Going | ₱1.3B | 80% | High risk78 | Flagged0.022 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22Z00032CONSTRUCTION OF THE NEW SENATE BUILDING (PHASE II), NAVY VILLAGE, FORT BONIFACIO, TAGUIG CITY | Buildings and Special Projects Management Cluster | HILMARC'S CONSTRUCTION CORPORATION | On-Going | ₱2.4B | 49% | High risk88 | Flagged0.079 |
| 18Z00041PROPOSED SEVEN (7) - STOREY GOVERNMENT PROCUREMENT POLICY BOARD (GPPB) BUILDING | Buildings and Special Projects Management Cluster | WISMON CONSTRUCTION & DEVELOPMENT CORP. (FORMERLYD.L CERVANTES CONSTRUCTION CORPORATION (FORMERLY: | On-Going | ₱317.1M | 0% | High risk63 | Flagged0.071 |
| 16Z00010CONTRACT PACKAGE 3, BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES IN LUZON | Bridges Management Cluster | GRACE CONSTRUCTION CORPORATION | On-Going | ₱538M | 16% | High risk73 | Flagged0.065 |
| 17Z00028PROPOSED DESIGN AND BUILD FOR THE REHABILITATION/RETROFITTING OF THE QUIRINO BRIDGE IN COTABATO CITY, REGION XII | Bridges Management Cluster | FREY-FIL CORPORATION (FORMERLY:FREYSSINET FILIPINA | On-Going | ₱164.9M | 4% | High risk68 | Flagged0.052 |
| 21Z00008DAVAO CITY BYPASS CONSTRUCTION PROJECT (II), PACKAGE I-3 STA. 23+500 - STA. 29+700 | Roads Management Cluster I (Bilateral) | ULTICON BUILDERS, INC.SHIMIZU CORPORATION (OECO_16693)TAKENAKA CIVIL ENGINEERING & CONSTRUCTION CO., LTD. (OECO_29591) | On-Going | ₱9.7B | 3% | High risk81 | Flagged0.048 |
| 18Z00036DESIGN AND BUILD OF THE NEW SENATE BUILDING | Buildings and Special Projects Management Cluster | HILMARC'S CONSTRUCTION CORPORATION | On-Going | ₱8.8B | 87% | High risk64 | Flagged0.047 |
| 16Z00020CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD | Flood Control Management Cluster | R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | On-Going | ₱942.7M | 12% | High risk77 | Flagged0.045 |
| 19C00023BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM II (BCRP II) - PAMPANGA DELTA BRIDGE AND APPROACHES, MASANTOL, PAMPANGA | Bridges Management Cluster | J.H. PAJARA CONSTRUCTION CORPORATIONEDDMARI CONSTRUCTION & TRADING | On-Going | ₱566.6M | 92% | High risk73 | Flagged0.039 |
| 19Z00032METRO CEBU FLOOD CONTROL PROJECT - FLOOD CONTROL AND DRAINAGE IMPROVEMENT PROJECT, KINALUMSAN RIVER, DULJO, LABANGON AND MAMBALING, CEBU CITY | Flood Control Management Cluster | RAYMAN BUILDERS INC.,SQUARE CUBE CONSTRUCTION(FORMERLY SQUARE CUBE TRAD | On-Going | ₱553.8M | 22% | High risk74 | Flagged0.039 |
| 17Z00002CONSTRUCTION OF SAMAR PACIFIC COASTAL ROAD(SPCR) PROJECT, PROVINCE OF SAMAR, PHILIPPINES | Roads Management Cluster II (Multilateral) | ILSUNG CONSTRUCTION CO., LTD. (OECO_27310) | On-Going | ₱997.5M | 97% | High risk82 | Flagged0.038 |
| 18Z00026DESIGN-BUILD FOR THE CONSTRUCTION OF PANGUIL BAY BRIDGE PROJECT, PROVINCE OF MISAMIS OCCIDENTAL AND LANAO DEL NORTE, UNDER THE KOREA EXPORT-IMPORT BANK - ECONOMIC DEVELOPMENT COOPERATION FUND, LOAN AGREEMENT NO. PHL-18 | Roads Management Cluster II (Multilateral) | NAMKWANG ENGINEERING AND CONSTRUCTION CO., LTD.KUKDONG ENGINEERING AND CONSTRUCTION CO. LTD.GUMGWANG ENGINEERING AND CONSTRUCTION CO., LTD. | On-Going | ₱6.7B | 100% | High risk79 | Flagged0.037 |
| 17Z00018PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 5 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 16+050 TO STA. 17+450, LEFT BANK, MARIKINA CITY | Flood Control Management Cluster | AKN CONSTRUCTION CORPORATION | On-Going | ₱294.1M | 87% | High risk80 | Flagged0.035 |
| 17Z00003AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE1)-CONSTRUCTION OF PROTECTION WORKS USING GABIONS AND MATTRESSES. BRGY. DORONGAN SAWAT, STA. 2+840 TO STA.3+140 AND STA. 3+140 T0 STA. 3+640, DORONGAN KETAKET, STA 1+592 TO STA. 2+840 MANGATAREM; (PHASE II-A)-R | Flood Control Management Cluster | MSB VITUG CONSTRUCTION | On-Going | ₱363.2M | 100% | High risk77 | Flagged0.033 |
| 19Z00020AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T | Flood Control Management Cluster | L.R. TIQUI BUILDERS, INC.MSB VITUG CONSTRUCTION | On-Going | ₱941.2M | 69% | High risk76 | Flagged0.033 |
| 19Z00011PR-01A, GUTALAC-BALIGUIAN ALTERNATIVE ROAD, ZAMBOANGA DEL NORTE, K2027+802.62-K2055+764.93 (WITH EXCEPTIONS) UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | CHINA WUYI CO., LTD (OECO_16634) | On-Going | ₱1.1B | 83% | High risk81 | Flagged0.031 |
| 17OF0198CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. 0+005.324 - STA. 0+484.093), Q.C. | Flood Control Management Cluster | R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | On-Going | ₱247.1M | 40% | High risk77 | Flagged0.031 |
| 19Z00021CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTE | Flood Control Management Cluster | MSB VITUG CONSTRUCTION | On-Going | ₱715.1M | 94% | High risk76 | Flagged0.030 |
| 18Z00027FLOOD RISK MANGEMENT PROJECT FOR CAGAYAN DE ORO RIVER (FRIMP-CDOR), JICA LOAN NO. PH-P259, CONTRACT PACKAGE 1 (BONBON-KAUSWAGAN) | Flood Control Management Cluster | A.M. ORETA & CO., INC.IPM CONSTRUCTION & DEVELOPMENT CORPORATION | On-Going | ₱371.1M | 86% | High risk71 | Flagged0.029 |
| 16C00084FLOOD/LAHAR CONTROL WORKS IN PASIG-POTRERO RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING DIVERSION OF FLOW OF WATER TO PASIG-POTRERO RIVER, BACOLOR, PAMPANGA | Flood Control Management Cluster | R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | On-Going | ₱376.8M | 72% | High risk77 | Flagged0.028 |
| 19Z00033DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMAR | Flood Control Management Cluster | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLYMSB VITUG CONSTRUCTION | On-Going | ₱744.4M | 87% | High risk74 | Flagged0.028 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 19C00057JICA-ASSISTED ROAD UPGRADING AND PRESERVATION PROJECT (RUPP) REHABILITATION/IMPROVEMENT ALONG DAANG MAHARLIKA, BULACAN, PROVINCE OF BULACAN | Roads Management Cluster I (Bilateral) | FIAT CONSTRUCTION SERVICESIM CONSTRUCTION CORPORATION | Completed | ₱295.3M | 100% | High risk70 | —-0.044 |
| 177 | 17F00085PREVENTIVE MAINTENANCE-ASPHALT OVERLAY OF LIBON-PANTAO-PIODURAN ROAD SECTION ALONG ALBAY WEST COAST ROAD, LIBON, ALBAY PROVINCE | Roads Management Cluster I (Bilateral) | WCS CONSTRUCTION, INC. | Completed | ₱189M | 100% | High risk70 | —-0.062 |
| 178 | 20O00064CLOSING OF GAPS ALONG MALABON-NAVOTAS RIVER, MALABON CITY | Flood Control Management Cluster | 11-16 CONSTRUCTION | Completed | ₱77.2M | 100% | High risk70 | —-0.052 |
| 179 | 21C00089REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS-MANILA NORTH ROAD, UNDER THE ANNUAL WORK PROGRAM 3, ASSET PRESERVATION CONTRACT (APC) COMPONENT, ROAD UPGRADING AND PRESERVATION PROJECT, PROVINCE OF BULACAN | Roads Management Cluster I (Bilateral) | IM CONSTRUCTION CORPORATION | Completed | ₱154.3M | 100% | High risk70 | —-0.066 |
| 180 | 20C00067REHABILITATION/IMPROVEMENT OF BALUYOT CHANNEL AND ITS SPILLWAY, BACOLOR, PAMPANGA | Flood Control Management Cluster | R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | On-Going | ₱47.2M | 0% | High risk69 | Flagged0.009 |
| 181 | 16O00049VALENZUELA-PUMPING STATIONS IN VALENZUELA WAWANG POLO AND COLOONG PUMPING STATIONS (COLOONG PUMPING STATION ACCESS ROAD), COLOONG VALENZUELA CITY | Flood Control Management Cluster | TRIPLE 8 CONSTRUCTION & SUPPLY, INC. (FORMERLY TRIPLE 8 CONST. & SUPPLY) | Completed | ₱91.8M | 100% | High risk69 | —-0.080 |
| 182 | 22Z00038CONSTRUCTION OF REVETMENT WALL /SHEET PILING OF BACLARAN CHANNEL (PHASE IV), PARANAQUE CITY (LIMITS: STA. 0+304.70 - STA. 0+388.30) | Flood Control Management Cluster | E. F. CHUA CONSTRUCTION, INC. | Completed | ₱47.2M | 100% | High risk69 | —-0.030 |
| 183 | 23Z00020CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT UPPER MARIKINA RIVER FROM BRGY. SAN JOSE GOING TO BRGY. BALITE (PHASE 2), RODRIQUEZ, RIZAL | Flood Control Management Cluster | 11-16 CONSTRUCTION | On-Going | ₱144.2M | 100% | High risk68 | —-0.055 |
| 184 | 23Z00026CONSTRUCTION OF SMALL RIVER IMPOUNDING PROJECT (SRIP) ANDDRAINAGE SYSTEMS ALONG THE FOLLOWING RIVERS;A.) CADCADIR RIVER, BRGY. BACSAY CATARAOAN SUR, CLAVERIA, CAGAYANB.) CADCADIR RIVER, BRGYS. UNION AND CADCADIR, CLAVERIA, CAGAYANC.) CABICUNGAN RI | Flood Control Management Cluster | TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC | On-Going | ₱1.4B | 100% | High risk68 | —-0.025 |
| 185 | 23Z00019CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG UPPER MARIKINA RIVER (FLOOD CONTROL WORKS) PHASE II, BRGY. STA. ANA, SAN MATEO, RIZAL | Flood Control Management Cluster | 11-16 CONSTRUCTION | On-Going | ₱144.7M | 100% | High risk68 | —-0.055 |
| 186 | 23Z00008IMPROVEMENT OF BULI CREEK PUMPING STATION ALONG MANGAHAN FLOODWAY, PASIG CITY | Flood Control Management Cluster | L.R. TIQUI BUILDERS, INC.NORTHERN BUILDERS | On-Going | ₱192.8M | 100% | High risk68 | —-0.045 |
| 187 | 23Z00017CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONGLAGUNA LAKESHORE AT BGRY. PAG-ASA, MABITAC, LAGUNA | Flood Control Management Cluster | 11-16 CONSTRUCTIONHAWK KEY CONSTRUCTION AND GENERAL MERCHANDISE CORPORATION | Completed | ₱144.3M | 100% | High risk68 | —-0.088 |
| 188 | 21C00108REPAIR/REHABILITATION OF PLARIDEL BYPASS UNDER THE ANNUAL WORK PROGRAM 3, ASSET PRESERVATION CONTRACT (APC) COMPONENT, ROAD UPGRADING AND PRESERVATION PROJECT, JICA LOAN AGREEMENT NO. PH-P247, PROVINCE OF BULACAN | Roads Management Cluster I (Bilateral) | L.R. TIQUI BUILDERS, INC.R.A. PAHATI CONST. & SUPPLY, INC. | Completed | ₱115.8M | 100% | High risk68 | —-0.077 |
| 189 | 17Z00028PROPOSED DESIGN AND BUILD FOR THE REHABILITATION/RETROFITTING OF THE QUIRINO BRIDGE IN COTABATO CITY, REGION XII | Bridges Management Cluster | FREY-FIL CORPORATION (FORMERLY:FREYSSINET FILIPINA | On-Going | ₱164.9M | 4% | High risk68 | Flagged0.052 |
| 190 | 17Z00027CONSTRUCTION OF THE SUPPLEMENTAL WORKS (E.G. CONSTRUCTION OF BRS LABORATORY BUILDING, CAR PORT, SITE DEVELOPMENT, VOICE AND DATA WORKS, MERALCO POWER PERMANENT CONNECTION AND MANILA WATER SUPPLY PERMANENT CONNECTION) FOR THE THREE (3) STOREY BUREAU OF RES | Bureau of Construction | HAIDEE CONSTRUCTION AND DEVELOPMENT CORP. | Completed | ₱15.1M | 100% | High risk67 | —-0.098 |
| 191 | 23Z00016CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAGUNA LAKESHORE AT BGRY. SAN, ANTONIO, MUNICIPALITY OF BAY, LAGUNA | Flood Control Management Cluster | 11-16 CONSTRUCTION | Completed | ₱192.8M | 100% | High risk67 | —-0.075 |
| 192 | 19O00064RAISING OF POLDER DIKE INCLUDING SLOPE PROTECTION WORKS AT BRGY. DAMPALIT (STA. 1+940 - STA. 2+030, L=90.00 LM) - PHASE 7, BRGY. DAMPALIT, MALABON CITY | Flood Control Management Cluster | G.G. UY CONSTRUCTION | Completed | ₱43.3M | 100% | High risk67 | —-0.080 |
| 193 | 23Z00033CONTRACT PACKAGE 1C - CONSTRUCTION OF NEW TRANS-CENTRAL ROADS AND DRAINAGE | Roads Management Cluster II (Multilateral) | SINO ROAD AND BRIDGE GROUP CO. LTD.KOUZBARY BUILDERSFIAT CONSTRUCTION SERVICES | On-Going | ₱1.1B | 7% | High risk67 | Flagged0.004 |
| 194 | 19C00042FLOOD CONTROL WORKS-IMPROVEMENT/REHABILITATION OF GROUNDSILLS ALONG SACOBIA-BAMBAN RIVER, MABALACAT, PAMPANGA | Flood Control Management Cluster | TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC | On-Going | ₱46.4M | 82% | High risk67 | —-0.008 |
| 195 | 22O00067CONSTRUCTION OF DIKE WITH SLOPE PROTECTION SACOBIA-BAMBAN RIVER, STA. 0+000 TO STA. 2+129.50, PAMPANGA | Flood Control Management Cluster | 11-16 CONSTRUCTION | Completed | ₱46.2M | 100% | High risk67 | —-0.077 |
| 196 | 23Z00014FLOOD CONTROL WORKS-PAMPANGA DELTA DEVELOPMENT PROJECT-PHASE II, CALUMPIT, BULACAN, PROVINCE OF BULACAN | Flood Control Management Cluster | RAYMAN BUILDERS INC., | On-Going | ₱472.7M | 93% | High risk67 | —-0.029 |
| 197 | 23Z00001CONSTRUCTION OF NAVOTAS COASTAL DIKE (COMPLETION), NAVOTAS CITY (RE-ADVERTISEMENT) | Flood Control Management Cluster | HALREY CONSTRUCTION INC. | On-Going | ₱37.8M | 72% | High risk66 | —-0.030 |
| 198 | 17B00060ASSET PRESERVATION CONTRACT-PREVENTIVE MAINTENANCE (APC) COMPONENT, JICA LOAN AGREEMENT NO. PH-247 PM 01: CABAGAN-SAN PABLO ROAD SECTION (DAANG MAHARLIKA), K0444+000.00 TO K0460+752.00 W/ EXCEPTIONS, CABAGAN-SAN PABLO, ISABELA | Roads Management Cluster I (Bilateral) | R.D. INTERIOR JUNIOR CONSTRUCTION | Completed | ₱206.6M | 100% | High risk66 | —-0.050 |
| 199 | 23B00080OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES, PROVINCES OF CAGAYAN AND ISABELA | Bridges Management Cluster | R.D. INTERIOR JUNIOR CONSTRUCTION | On-Going | ₱415.4M | 72% | High risk66 | —-0.005 |
| 200 | 23Z00015FLOOD CONTROL WORKS-DIKING SACOBIA-BAMBAN RIVER, BAMBAN, TARLAC, PROVINCE OF TARLAC | Flood Control Management Cluster | 11-16 CONSTRUCTION | On-Going | ₱144.7M | 100% | High risk66 | —-0.050 |