Precinct report
Everything on file for this region, broken down by province, category and contractor.
Total projects
237
Total budget
₱97.7B
Average progress
90.7%
Completion rate
62.4%
Below 70%
Average risk score
72.2
High risk on average, out of 100
Flagged as unusual
62
26.2% of the region's projects
Risk mix
Exhibit A
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 163 | ₱41.5B | 73.7 | 28 | 92.8% |
| Roads | 27 | ₱6.6B | 60.7 | 1 | 96.1% |
| OTHER | 21 | ₱27.4B | 79.1 | 17 | 84.3% |
| Buildings and Facilities | 11 | ₱12.1B | 66.8 | 5 | 87.7% |
| Bridges | 9 | ₱3B | 67.7 | 6 | 59.9% |
| Bridges, Roads | 6 | ₱7.2B | 78.0 | 5 | 85.2% |
Exhibit B
| Province / DEO | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control Management Cluster | 171 | ₱43.7B | 73.7 | 32 | 93.0% |
| Roads Management Cluster I (Bilateral) | 25 | ₱15.1B | 62.8 | 3 | 96.1% |
| Roads Management Cluster II (Multilateral) | 16 | ₱20.8B | 77.7 | 14 | 80.8% |
| Bridges Management Cluster | 10 | ₱3.2B | 70.8 | 7 | 69.0% |
| Buildings and Special Projects Management Cluster | 8 | ₱13.7B | 69.6 | 6 | 76.7% |
| Bureau of Construction | 7 | ₱1.3B | 62.1 | 0 | 84.8% |
Exhibit C
Joint-venture projects count toward each partner.
| Contractor | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| E. F. CHUA CONSTRUCTION, INC. | 28 | ₱5.3B | 74.3 | 0 | 100.0% |
| 11-16 CONSTRUCTION | 23 | ₱2.9B | 71.3 | 1 | 95.6% |
| MSB VITUG CONSTRUCTION | 14 | ₱5.8B | 75.2 | 6 | 95.5% |
| R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | 13 | ₱5.3B | 75.2 | 6 | 70.9% |
| TOKWING CONSTRUCTION, CORP.(FOR; TOKWING CONSTRUC | 13 | ₱6.9B | 74.4 | 5 | 97.0% |
| L.R. TIQUI BUILDERS, INC. | 11 | ₱2.1B | 71.1 | 1 | 97.2% |
| AKN CONSTRUCTION CORPORATION | 10 | ₱1.4B | 74.6 | 1 | 98.0% |
| FERDSTAR BUILDERS INC. | 9 | ₱1.9B | 75.7 | 2 | 99.7% |
| J.D. LEGASPI CONSTRUCTION | 6 | ₱1.8B | 76.3 | 3 | 80.9% |
| PRIME PACIFIC MARINE & INDUSTRIAL SERVICES CORP. | 6 | ₱1B | 75.3 | 3 | 60.5% |
| RAYMAN BUILDERS INC., | 6 | ₱4.8B | 74.8 | 2 | 85.8% |
| NORTHERN BUILDERS | 6 | ₱1.3B | 74.6 | 0 | 100.0% |
| EQUI-PARCO CONSTRUCTION COMPANY | 6 | ₱949.3M | 59.3 | 0 | 100.0% |
| M.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | 5 | ₱2.4B | 75.8 | 2 | 91.0% |
| PETER G. CHUA BUILDERS | 5 | ₱1.2B | 75.3 | 0 | 100.0% |
Exhibit D · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22Z00032CONSTRUCTION OF THE NEW SENATE BUILDING (PHASE II), NAVY VILLAGE, FORT BONIFACIO, TAGUIG CITY | Buildings and Special Projects Management Cluster | HILMARC'S CONSTRUCTION CORPORATION | On-Going | ₱2.4B | 49% | High risk88 | Flagged0.079 |
| 21Z00020CONTRACT PACKAGE 5, SLOPE PROTECTION (MARAWI-BITO ROAD) UPPER AND LOWER SLOPES; TR-28: REHABILITATION OF ROAD ALONG MARAWI - BITO ROAD; AND TR-29: REHABILITATION OF LASURECO ROAD | Roads Management Cluster II (Multilateral) | M.M.A. ACHIEVER CONSTRUCTION & DEVELOPMENT CORP.KOUZBARY BUILDERS | On-Going | ₱200.6M | 46% | High risk83 | Flagged0.020 |
| 21Z00018CONTRACT PACKAGE 4A - CONSTRUCTION OF ROROGAGUS BRIDGE, RECONSTRUCTION AND DEVELOPMENT PLAN FOR A GREATER MARAWI - STAGE 2 UNDER ADB LOAN NO. 3769 - PHI: EMERGENCY ASSISTANCE FOR RECONSTRUCTION AND RECOVERY OF MARAWI (EARRM) | Roads Management Cluster II (Multilateral) | MUST ENTERPRISESBSP & COMPANY, INC.AL HUSSEIN CONSTRUCTION | On-Going | ₱215M | 60% | High risk83 | Flagged0.013 |
| 20Z00014CONTRACT PACKAGE 1A: REHABILITATION OF EXISTING TRANS-CENTRAL ROADS | Roads Management Cluster II (Multilateral) | FIAT CONSTRUCTION SERVICES | On-Going | ₱177.8M | 75% | High risk83 | Flagged0.020 |
| 20Z00015CONTRACT PACKAGE 1B - REHABILITATION OF EXISTING MINDANAO STATE UNIVERSITY (MSU) ROADS | Roads Management Cluster II (Multilateral) | KOUZBARY BUILDERS | On-Going | ₱161.1M | 71% | High risk83 | Flagged0.018 |
| 17Z00002CONSTRUCTION OF SAMAR PACIFIC COASTAL ROAD(SPCR) PROJECT, PROVINCE OF SAMAR, PHILIPPINES | Roads Management Cluster II (Multilateral) | ILSUNG CONSTRUCTION CO., LTD. (OECO_27310) | On-Going | ₱997.5M | 97% | High risk82 | Flagged0.038 |
| 19Z00011PR-01A, GUTALAC-BALIGUIAN ALTERNATIVE ROAD, ZAMBOANGA DEL NORTE, K2027+802.62-K2055+764.93 (WITH EXCEPTIONS) UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | CHINA WUYI CO., LTD (OECO_16634) | On-Going | ₱1.1B | 83% | High risk81 | Flagged0.031 |
| 21Z00008DAVAO CITY BYPASS CONSTRUCTION PROJECT (II), PACKAGE I-3 STA. 23+500 - STA. 29+700 | Roads Management Cluster I (Bilateral) | ULTICON BUILDERS, INC.SHIMIZU CORPORATION (OECO_16693)TAKENAKA CIVIL ENGINEERING & CONSTRUCTION CO., LTD. (OECO_29591) | On-Going | ₱9.7B | 3% | High risk81 | Flagged0.048 |
| 24N00196BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY ROAD (AGUSAN-MISAMIS OR ROAD)- K1253+544.32- K1256+165, K1256+322- K1259+812, K1263+828- K1264+956, AGUSAN DEL NORTE | Roads Management Cluster I (Bilateral) | TRIPARCO DEVELOPMENT CORPORATION | On-Going | ₱285.7M | 100% | High risk80 | Flagged0.001 |
| 17Z00018PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 5 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 16+050 TO STA. 17+450, LEFT BANK, MARIKINA CITY | Flood Control Management Cluster | AKN CONSTRUCTION CORPORATION | On-Going | ₱294.1M | 87% | High risk80 | Flagged0.035 |
| 18Z00024PR-07, TAMPILISAN - SANDAYONG ROAD, ZAMBOANGA DEL NORTE, K1981+490.00 - K1999+065.86 | Roads Management Cluster II (Multilateral) | FIAT CONSTRUCTION SERVICESMAC BUILDERS CORP. (FORMERLY: MAC BUILDERS DEVELOPMENT CORPORATION) | Completed | ₱658.2M | 100% | High risk80 | Flagged0.010 |
| 22O00063PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, CONTRACT PACKAGE NO. 4-B, RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 15+700 TO STA. 15+957 (PHASE 2), RIGHT BANK, MARIKINA CITY | Flood Control Management Cluster | FERDSTAR BUILDERS INC. | On-Going | ₱148.4M | 100% | High risk80 | Flagged0.003 |
| 18Z00023PR-06, ALICIA - MALANGAS ROAD, ZAMBOANGA SIBUGAY (K1769+648.00 - K1793+751.43) | Roads Management Cluster II (Multilateral) | CHINA GEO-ENGINEERING CORPORATION (OECO_3427)ESR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: ESR CONSTRUCTION & SUPPLIES) | Completed | ₱1.4B | 100% | High risk79 | Flagged0.011 |
| 18Z00026DESIGN-BUILD FOR THE CONSTRUCTION OF PANGUIL BAY BRIDGE PROJECT, PROVINCE OF MISAMIS OCCIDENTAL AND LANAO DEL NORTE, UNDER THE KOREA EXPORT-IMPORT BANK - ECONOMIC DEVELOPMENT COOPERATION FUND, LOAN AGREEMENT NO. PHL-18 | Roads Management Cluster II (Multilateral) | NAMKWANG ENGINEERING AND CONSTRUCTION CO., LTD.KUKDONG ENGINEERING AND CONSTRUCTION CO. LTD.GUMGWANG ENGINEERING AND CONSTRUCTION CO., LTD. | On-Going | ₱6.7B | 100% | High risk79 | Flagged0.037 |
| 18Z00034CONSTRUCTION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES IN METRO CEBU, BRGY. PASIL AND ERMITA, BRGY. TEJERO AND BRGY. TIPOLO, CEBU CITY | Flood Control Management Cluster | MSB VITUG CONSTRUCTIONKEILANA RESOURCE AND DEVELOPMENT CORPORATION | Completed | ₱266.6M | 100% | High risk79 | —-0.015 |
| 17Z00007BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES FOR (REGION IV-A), CONTRACT PACKAGE 4 | Bridges Management Cluster | ALGON ENGINEERING CONSTRUCTION CORPORATIONM.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | On-Going | ₱208.9M | 57% | High risk79 | Flagged0.013 |
| 19Z00013CURUAN-SIBUCO ROAD, ZAMBOANGA DEL NORTE, UNDER ADB LOAN NO. 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | SINO ROAD AND BRIDGE GROUP CO. LTD.M. ABUBAKAR CONST. AND ENGINEERING, INC. | On-Going | ₱2.1B | 95% | High risk79 | Flagged0.020 |
| 19Z00012PR-08, R.T. LIM - SIOCON ROAD, ZAMBOANGA SIBUGAY AND ZAMBOANGA DEL NORTE UNDER ADB LOAN NO. 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | CHINA WUYI CO., LTD | On-Going | ₱2.4B | 91% | High risk79 | Flagged0.017 |
| 19Z00015PR-09A, GUICAM BRIDGE, ZAMBOANGA SIBUGAY UNDER ADB LOAN NO. 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | TIANYUAN CONSTRUCTION GROUP CORPORATIONGRACE CONSTRUCTION CORPORATION | On-Going | ₱1.2B | 88% | High risk78 | Flagged0.022 |
| 19Z00014PR-13, SIAY-GAPOL ROAD, ZAMBOANGA SIBUGAY K1761+473.00-K1797+234.10 UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT | Roads Management Cluster II (Multilateral) | QINGDAO MUNICIPAL CONSTRUCTION GROUP CO., LTD.ESR CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: ESR CONSTRUCTION & SUPPLIES) | On-Going | ₱1.3B | 80% | High risk78 | Flagged0.022 |
Exhibit E · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22Z00032CONSTRUCTION OF THE NEW SENATE BUILDING (PHASE II), NAVY VILLAGE, FORT BONIFACIO, TAGUIG CITY | Buildings and Special Projects Management Cluster | HILMARC'S CONSTRUCTION CORPORATION | On-Going | ₱2.4B | 49% | High risk88 | Flagged0.079 |
| 18Z00041PROPOSED SEVEN (7) - STOREY GOVERNMENT PROCUREMENT POLICY BOARD (GPPB) BUILDING | Buildings and Special Projects Management Cluster | WISMON CONSTRUCTION & DEVELOPMENT CORP. (FORMERLYD.L CERVANTES CONSTRUCTION CORPORATION (FORMERLY: | On-Going | ₱317.1M | 0% | High risk63 | Flagged0.071 |
| 16Z00010CONTRACT PACKAGE 3, BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES IN LUZON | Bridges Management Cluster | GRACE CONSTRUCTION CORPORATION | On-Going | ₱538M | 16% | High risk73 | Flagged0.065 |
| 17Z00028PROPOSED DESIGN AND BUILD FOR THE REHABILITATION/RETROFITTING OF THE QUIRINO BRIDGE IN COTABATO CITY, REGION XII | Bridges Management Cluster | FREY-FIL CORPORATION (FORMERLY:FREYSSINET FILIPINA | On-Going | ₱164.9M | 4% | High risk68 | Flagged0.052 |
| 21Z00008DAVAO CITY BYPASS CONSTRUCTION PROJECT (II), PACKAGE I-3 STA. 23+500 - STA. 29+700 | Roads Management Cluster I (Bilateral) | ULTICON BUILDERS, INC.SHIMIZU CORPORATION (OECO_16693)TAKENAKA CIVIL ENGINEERING & CONSTRUCTION CO., LTD. (OECO_29591) | On-Going | ₱9.7B | 3% | High risk81 | Flagged0.048 |
| 18Z00036DESIGN AND BUILD OF THE NEW SENATE BUILDING | Buildings and Special Projects Management Cluster | HILMARC'S CONSTRUCTION CORPORATION | On-Going | ₱8.8B | 87% | High risk64 | Flagged0.047 |
| 16Z00020CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD | Flood Control Management Cluster | R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | On-Going | ₱942.7M | 12% | High risk77 | Flagged0.045 |
| 19C00023BRIDGE CONSTRUCTION AND REPLACEMENT PROGRAM II (BCRP II) - PAMPANGA DELTA BRIDGE AND APPROACHES, MASANTOL, PAMPANGA | Bridges Management Cluster | J.H. PAJARA CONSTRUCTION CORPORATIONEDDMARI CONSTRUCTION & TRADING | On-Going | ₱566.6M | 92% | High risk73 | Flagged0.039 |
| 19Z00032METRO CEBU FLOOD CONTROL PROJECT - FLOOD CONTROL AND DRAINAGE IMPROVEMENT PROJECT, KINALUMSAN RIVER, DULJO, LABANGON AND MAMBALING, CEBU CITY | Flood Control Management Cluster | RAYMAN BUILDERS INC.,SQUARE CUBE CONSTRUCTION(FORMERLY SQUARE CUBE TRAD | On-Going | ₱553.8M | 22% | High risk74 | Flagged0.039 |
| 17Z00002CONSTRUCTION OF SAMAR PACIFIC COASTAL ROAD(SPCR) PROJECT, PROVINCE OF SAMAR, PHILIPPINES | Roads Management Cluster II (Multilateral) | ILSUNG CONSTRUCTION CO., LTD. (OECO_27310) | On-Going | ₱997.5M | 97% | High risk82 | Flagged0.038 |
| 18Z00026DESIGN-BUILD FOR THE CONSTRUCTION OF PANGUIL BAY BRIDGE PROJECT, PROVINCE OF MISAMIS OCCIDENTAL AND LANAO DEL NORTE, UNDER THE KOREA EXPORT-IMPORT BANK - ECONOMIC DEVELOPMENT COOPERATION FUND, LOAN AGREEMENT NO. PHL-18 | Roads Management Cluster II (Multilateral) | NAMKWANG ENGINEERING AND CONSTRUCTION CO., LTD.KUKDONG ENGINEERING AND CONSTRUCTION CO. LTD.GUMGWANG ENGINEERING AND CONSTRUCTION CO., LTD. | On-Going | ₱6.7B | 100% | High risk79 | Flagged0.037 |
| 17Z00018PASIG MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT, PHASE V, CONTRACT PACKAGE 5 - RIVER IMPROVEMENT WORKS ALONG UPPER MARIKINA RIVER (UPSTREAM OF MARIKINA BRIDGE) STA. 16+050 TO STA. 17+450, LEFT BANK, MARIKINA CITY | Flood Control Management Cluster | AKN CONSTRUCTION CORPORATION | On-Going | ₱294.1M | 87% | High risk80 | Flagged0.035 |
| 17Z00003AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE1)-CONSTRUCTION OF PROTECTION WORKS USING GABIONS AND MATTRESSES. BRGY. DORONGAN SAWAT, STA. 2+840 TO STA.3+140 AND STA. 3+140 T0 STA. 3+640, DORONGAN KETAKET, STA 1+592 TO STA. 2+840 MANGATAREM; (PHASE II-A)-R | Flood Control Management Cluster | MSB VITUG CONSTRUCTION | On-Going | ₱363.2M | 100% | High risk77 | Flagged0.033 |
| 19Z00020AGNO RIVER BASIN FLOOD CONTROL PROJECT (PHASE III)-CONSTRUCTION OF DIKE WITH PROTECTION WORKS USING GABIONS AND MATTRESSES ALONG: A. STA MARIA-ASINGAN, STA. 24+600 TO STA. 28+600, PANGASINAN; B. ASINGAN-TAYUG, STA. 29+776 TO STA., 30+900 AND STA. 33+840 T | Flood Control Management Cluster | L.R. TIQUI BUILDERS, INC.MSB VITUG CONSTRUCTION | On-Going | ₱941.2M | 69% | High risk76 | Flagged0.033 |
| 19Z00011PR-01A, GUTALAC-BALIGUIAN ALTERNATIVE ROAD, ZAMBOANGA DEL NORTE, K2027+802.62-K2055+764.93 (WITH EXCEPTIONS) UNDER ADB LOAN 3631-PHI: IMPROVING GROWTH CORRIDORS IN MINDANAO ROAD SECTOR PROJECT (IGCMRSP) | Roads Management Cluster II (Multilateral) | CHINA WUYI CO., LTD (OECO_16634) | On-Going | ₱1.1B | 83% | High risk81 | Flagged0.031 |
| 17OF0198CONSTRUCTION OF RETARDING POND, KAINGIN BUKID, BRGY. APOLONIO SAMSON, QUEZON CITY 6TH LD (PROPOSED INTERCEPTOR ALONG TOCTOCAN ROAD, STA. 0+005.324 - STA. 0+484.093), Q.C. | Flood Control Management Cluster | R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | On-Going | ₱247.1M | 40% | High risk77 | Flagged0.031 |
| 19Z00021CONSTRUCTION/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG UGUIS RIVER, BRGY. UGUIS AND ALONG TIBANGRAN RIVER, BRGY. BARANGOBONG, MUNICIPALITY OF NUEVA ERA, ILOCOS NORTE | Flood Control Management Cluster | MSB VITUG CONSTRUCTION | On-Going | ₱715.1M | 94% | High risk76 | Flagged0.030 |
| 18Z00027FLOOD RISK MANGEMENT PROJECT FOR CAGAYAN DE ORO RIVER (FRIMP-CDOR), JICA LOAN NO. PH-P259, CONTRACT PACKAGE 1 (BONBON-KAUSWAGAN) | Flood Control Management Cluster | A.M. ORETA & CO., INC.IPM CONSTRUCTION & DEVELOPMENT CORPORATION | On-Going | ₱371.1M | 86% | High risk71 | Flagged0.029 |
| 16C00084FLOOD/LAHAR CONTROL WORKS IN PASIG-POTRERO RIVER AND PASAC DELTA AREA, PAMPANGA INCLUDING DIVERSION OF FLOW OF WATER TO PASIG-POTRERO RIVER, BACOLOR, PAMPANGA | Flood Control Management Cluster | R.U. AQUINO CONSTRUCTION AND DEVELOPMENT CORP. (FO | On-Going | ₱376.8M | 72% | High risk77 | Flagged0.028 |
| 19Z00033DESIGN AND BUILD OF COASTAL DIKE AND DRAINAGE IMPROVEMENT, CATBALOGAN CITY, SAMAR | Flood Control Management Cluster | HI-TONE CONSTRUCTION & DEVELOPMENT CORP. (FORMERLYMSB VITUG CONSTRUCTION | On-Going | ₱744.4M | 87% | High risk74 | Flagged0.028 |
Exhibit F · Evidence locker
Sorted by risk score.
| # | Contract | Province / DEO | Contractor | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 17CH0078FLOOD CONTROL PROJECTS IN CENTRAL LUZON-FLOOD CONTROL WORKS IN PORAC-GUMAIN RIVER, LUBAO, SASMUAN AN | Flood Control Management Cluster | 11-16 CONSTRUCTIONFERDSTAR BUILDERS INC. | Completed | ₱60.3M | 100% | High risk72 | —-0.072 |
| 152 | 20O00090CLOSING OF GAPS ALONG MALABON-TULLAHAN RIVER: ACACIA PS TO PNR, PNR TO MCARTHUR BRIDGE, MCARTHUR BRIDGE TO BAILEY BRIDGE, BAILEY BRIDGE TO MALABON BOUNDARY, MALABON CITY | Flood Control Management Cluster | AKN CONSTRUCTION CORPORATION | On-Going | ₱74.8M | 100% | High risk72 | —-0.021 |
| 153 | 17Z00023METRO CEBU FLOOD CONTROL PROJECT AND DRAINAGE IMPROVEMENT PROJECT - SUBANG DAKU, LAHUG, GUADALUPE AND BULACAO RIVER BASINS, CEBU CITY | Flood Control Management Cluster | MSB VITUG CONSTRUCTIONM.E. SICAT CONSTRUCTION, INC. (FORMERLY M.E. SICAT | Completed | ₱142.1M | 100% | High risk72 | —-0.048 |
| 154 | 21O00126CONSTRUCTION OF DAMPALIT PUMPING STATION (PHASE 1), MALABON CITY | Flood Control Management Cluster | E. F. CHUA CONSTRUCTION, INC. | Completed | ₱91.3M | 100% | High risk72 | —-0.070 |
| 155 | 20O00091CLOSING OF GAPS ALONG MALABON-TULLAHAN RIVER, C4 ROAD, LONGOS PS TO MALABON BRIDGE, TONSUYA-MALABON BRIDGE, NIUGAN, LAMBINGAN BRIDGE, REMIGIO (MAYSILO), MUZON, IBABA, SAN AGUSTIN, TANONG, MALABON CITY | Flood Control Management Cluster | AKN CONSTRUCTION CORPORATION | On-Going | ₱77.2M | 93% | High risk72 | —-0.017 |
| 156 | 17O00022VALENZUELA-OBANDO MEYCAUAYAN FLOOD CONTROL PROJECT NAVOTAS-PROVISION OF TWO (2) PUMPING STATIONS ALONG NAVOTAS COASTAL DIKE (CONSTRUCTION OF PUMPING STATION WITH BOX CULVERT ALONG COASTAL DIKE), NAVOTAS CITY | Flood Control Management Cluster | PETER G. CHUA BUILDERS | Completed | ₱89.8M | 100% | High risk72 | —-0.051 |
| 157 | 20O00072CONSTRUCTION OF REVETMENT ALONG KAYBUBOY CREEK TRIBUTARY, STA. 1+120.4 TO STA.1+276(RS), LAS PIÑAS CITY | Flood Control Management Cluster | E. F. CHUA CONSTRUCTION, INC. | Completed | ₱74M | 100% | High risk72 | —-0.076 |
| 158 | 21O00108CONSTRUCTION OF RIVERWALLS (INTERMITTENT SECTIONS) ALONG MALABON-NAVOTAS RIVER, (BARANGAY TAÑONG UP TO BARANGAY HULONG DUHAT), MALABON CITY | Flood Control Management Cluster | AKN CONSTRUCTION CORPORATION | Completed | ₱77.8M | 100% | High risk72 | —-0.062 |
| 159 | 17CA0069CONSTRUCTION OF LAYAC DIVERSION CHANNEL,DINALUPIHAN, BATAAN | Flood Control Management Cluster | ORANI CONSTRUCTION AND SUPPLY CORPORATION (FORMERLY:ORANI BUILDERS & SUPPLY) | Completed | ₱62.4M | 100% | High risk72 | —-0.055 |
| 160 | 20O00066REHABILITATION OF SEAWALL ALONG MANILA BAY (PARANAQUE SECTION) PHASE II PARANAQUE | Flood Control Management Cluster | AKN CONSTRUCTION CORPORATION | Completed | ₱89.2M | 100% | High risk72 | —-0.070 |
| 161 | 20O00068REVETMENT WORKS ALONG LAGUNA LAKE SHORE, BRGY. SUCAT TO BRGY. BULI, MUNTINLUPA CITY STA. 0+000 TO STA. 0+220.00 | Flood Control Management Cluster | L.R. TIQUI BUILDERS, INC. | Completed | ₱90M | 100% | High risk72 | —-0.071 |
| 162 | 23Z00002CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LAGUNA DE BAY, BARANGAY PUTATAN, MUNTINLUPA CITY | Flood Control Management Cluster | E. F. CHUA CONSTRUCTION, INC. | Completed | ₱82M | 100% | High risk72 | —-0.076 |
| 163 | 17OB0417REVETMENT AND DREDGING WORKS ALONG SALAPAN CREEK (RIGHT BANK, STA. 0+020.000 TO STA. 0+500.000) | Flood Control Management Cluster | L.R. TIQUI BUILDERS, INC. | Completed | ₱91.7M | 100% | High risk72 | —-0.066 |
| 164 | 22O00085REHABILITATION OF FLOOD CONTROL STRUCTURES, BRGY. BAGUMBAYAN, QUEZON CITY | Flood Control Management Cluster | 11-16 CONSTRUCTION | Completed | ₱90.3M | 100% | High risk72 | —-0.060 |
| 165 | 21O00085CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG EAST BANK ROAD, BARANGAY STA. LUCIA, PASIG CITY | Flood Control Management Cluster | L.R. TIQUI BUILDERS, INC. | Completed | ₱81.8M | 100% | High risk71 | —-0.072 |
| 166 | 17OB0476PASIG-MARIKINA RIVER CHANNEL IMPROVEMENT PROJECT PHASE IV (CONTRACT PACKAGE NO. 2) MIDDLE MARIKINA RIVER IMPROVEMENT WORKS, LEFT BANK, STA. 7+235 TO STA. 7+335 | Flood Control Management Cluster | MSB VITUG CONSTRUCTION | Terminated | ₱67.1M | 100% | High risk71 | —-0.022 |
| 167 | 18Z00027FLOOD RISK MANGEMENT PROJECT FOR CAGAYAN DE ORO RIVER (FRIMP-CDOR), JICA LOAN NO. PH-P259, CONTRACT PACKAGE 1 (BONBON-KAUSWAGAN) | Flood Control Management Cluster | A.M. ORETA & CO., INC.IPM CONSTRUCTION & DEVELOPMENT CORPORATION | On-Going | ₱371.1M | 86% | High risk71 | Flagged0.029 |
| 168 | 21O00103UPGRADING OF CATMON PUMPING STATION, MALABON CITY (PROVISION OF BACK-UP GENERATOR AND IMPROVEMENT OF RETARDING BASIN) | Flood Control Management Cluster | MSB VITUG CONSTRUCTION | Completed | ₱50.1M | 100% | High risk71 | —-0.080 |
| 169 | 17OB0418DREDGING AND REVETMENT WORKS ALONG SAN JUAN RIVER (LEFT BANK, STA. 3+638.903 TO STA. 4+700.000) | Flood Control Management Cluster | L.R. TIQUI BUILDERS, INC. | Completed | ₱91.7M | 100% | High risk71 | —-0.046 |
| 170 | 21O00133UPGRADING OF BALETE PUMPING STATION, MANILA | Flood Control Management Cluster | E. F. CHUA CONSTRUCTION, INC. | Completed | ₱51.5M | 100% | High risk71 | —-0.079 |
| 171 | 22O00081CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ILANG-ILANG CREEK LEADING TO TULLAHAN RIVER AT BRGY. COMMONWEALTH, QUEZON CITY | Flood Control Management Cluster | ALPHA & OMEGA GEN. CONTRACTOR & DEVELOPMENT CORP. ([REVOKED] 38958) | Completed | ₱53.5M | 100% | High risk71 | —-0.078 |
| 172 | 22O00082CONSTRUCTION OF FLOOD CONTROL STRUCTURE AND TRIBUTARIES, BRGY. COMMONWEALTH, QUEZON CITY | Flood Control Management Cluster | SMPE CONSTRUCTION TRADING CORPORATION (FORMERLY: SMPE CONSTRUCTION SUPPLIES TRADING) | Completed | ₱53.5M | 100% | High risk71 | —-0.078 |
| 173 | 22Z00013UPGRADING OF BANGKULASI PUMPING STATION, NAVOTAS | Flood Control Management Cluster | MARKBILT CONSTRUCTION TRADING & DEVELOPMENT CORP. (FORMERLY:MARKBILT CONSTRUCTION)PRAETORIA BUILDERS INCORPORATED | Completed | ₱48.2M | 100% | High risk70 | —-0.078 |
| 174 | 21O00134CONSTRUCTION OF SOUTH PINAGKABALIAN PUMPING STATION, MALABON CITY | Flood Control Management Cluster | E. F. CHUA CONSTRUCTION, INC. | Completed | ₱48.2M | 100% | High risk70 | —-0.079 |
| 175 | 16Z00009BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES IN LUZON CONTRACT PACKAGE 1B | Bridges Management Cluster | R.D. INTERIOR JUNIOR CONSTRUCTION | Completed | ₱690.4M | 100% | High risk70 | Flagged0.021 |